COSTOS REVISTA Coeficiente de Reajuste

DESCRIPCIÓN Und
Feb-18 Jul-18 Oct-18 Feb-18 Oct-18 Coef K
MANO DE OBRA
Jefe de Cuadrilla HH 20.96 21.86
Ayudante HH 15.29 15.78
Vigías HH 15.29 15.78
EQUIPO
Volquete 15 m3 HM 263.03 283.88
Volquete 20 m3 HM 293.03 293.03
Cargador Frontal 286 HP 5.5 Yd3 HM 352.61 374.52
Excavadora 280 HP HM 371.69 387.75 294.48 307.20 1.04
Martillo Hidraulico 3 TN HM 215.93 225.26 294.48 307.20 1.04
Excavadora 170 - 250 HP HM 322.83 342.18
Retroexcavadora 90 HP HM 132.79 138.53 294.48 307.20 1.04
Tractor 310 HP HM 455.55 482.25
Cama Baja 40 Tn HM 248.47 269.12
Motosierra 7.5 HP HM 118.00 118.00
Cisterna 5000 Glns HM 204.40 213.23 294.48 307.20 1.04
Motoniveladora 195 HP HM 244.04
Rodillo 10 Tn HM 170.99
Motobomba 4" HM 24.44 25.33
Torre de Iluminación 8 Kw HM 28.28 28.47
Camión Baranda HM 920.00 920.00
Maquina para pintar marcas en el. HM 56.52 58.96 294.48 307.20 1.04
Mini Cargador 73 HP HM 87.26 91.03 294.48 307.20 1.04
MATERIALES
Arena Fina M3 76.34 77.18 545.16 551.14 1.01
Arena Gruesa M3 76.34 75.24 450.89 444.38 0.99
Piedra Chancada M3 70.59 69.57 450.89 444.38 0.99
Pintura amarilla, Blanca Gal 54.02 54.33 406.60 408.90 1.01
Tuberia PVC 6" Und 179.00 184.63 424.19 437.54 1.03
Cemento Bls 29.79 29.79 476.04 476.04 1.00
COSTOS REVISTA Coeficiente de Reajuste
DESCRIPCIÓN Und
Feb-18 Jul-18 Oct-18 Feb-18 Oct-18 Coef K
Postes delineadores Und 192.11 193.07 465.05 467.38 1.01
Emulsión Asfaltica gln 6.60 7.73 1,461.65 1,711.24 1.17
Asfalto en Caliente m3 595.31 696.96 1,461.65 1,711.24 1.17
Acero Corrugado Kg 2.41 2.55 502.32 531.71 1.06
Alambre # 16 Kg 2.93 3.08 528.59 555.22 1.05
Alambre # 8 Kg 3.12 3.28 528.59 555.22 1.05
Pegamento Und 5.00 5.00
Camara de Agua Und 150.00 150.00
Material de Lastre M3 17.11 17.11