Ace Assessments Pvt. Ltd.

Assessment of Suryamitra Candidates


Date of Exam- _________
SGJ/Q0101- Solar PV Installer (Suryamitra)
Note:
• Total- 50 questions. Answer all
• Time- 50 Mins.
• No negative marking

SGJ/N0101 (Site Survey for installation of solar PV systems) (4X4=16 Marks)

1. Which of the following is a main disadvantage of a solar PV system?


A. Capital cost B. Operation Cost C. Maintenance cost D. Life cycle cost

2. In India PV panel should be ________.


A. North Facing B. North and east facing C. East facing D. South facing

3. As per thumb rule, tilt at ______ gives best annual performance.


A. Azimuth B. Latitude C. Altitude D. None of the these

4. Which is not a part of Site feasibility study ?


A. Soil quality B. Population of nearest city C. Wind speed D. Location

ELE/N5903 (Assess the customer's solar PV requirement) (8X5=40 Marks)

5. In a residential roof-top PV system, which is not taken in to the consideration?


A. Nearest transmission grid B. Load & load flow analysis C. Roof area D. Back up Hours

6. In Solar PV system, what does PR stands for ______ .


A. Project Report B. Project Review C. Performance Ratio D. Performance Review

7. Which is important to deal with customer?


A. Tech. Knowledge B. Confidence C. Positive approach D. All of the these

8. In a high-rise building, LA is installed against _____.


A. Lightening B. Bird C. Animals D. Both A and B

9. Battery bank shouldn't be installed in a location.


A. Near PV array B. Well ventilated room C. Near control room D. At high temperature area

10. If the orientation of PV module changes from horizontal to vertical, Tilt angle will _______.
A. Change B. Remain same C. Depends D. Can't say

11. Bypass diode has overcome the effect of


A. Short circuit B. Shading C. Temperature rise D. Over voltage

12. Which is important in commercial & financial calculation of a Solar PV project?


A. Payback period B. Net metering C. Open access D. Operating Procedure
SGJ/N0102 (Procure solar PV system components) (5X5=25 Marks)

13. What does BOM Stand for?


A. Block of the Month B. Board of Managers C. Bill Of Materials D. Business Object Model

14. MPPT stands for ____.


A. Maximum Power point Temperature B. Maximum Power Produce Temperature
C. Maximum Power Point Tracker D. Minimum Power Produce Temperature

15. Pyranometer meter is used to measure


A. Radiation B. Voltage requirements C. Air mass D. Ambient Temperature

16. Anemometer is used to measure ______.


A. Wind speed B. Wind direction C. Sun rays direction D. Both A and B

17. Temperature sensor to measure _______.


A. Ambient temperature B. Cell temperature C. Both A & B D. Temperature coefficient

SGJ/N0103 (Install civil and mechanical parts of solar PV system) (5X5=25 Marks)

18. Which has no effect on PV plant construction?


A. Red soil B. Wind speed C. No rail communication D. None of Them

19. Which is not taken in to the consideration at the time of mounting structure design?
A. String size B. Roof C. Tracking system D. All of the these

20. Distance between two earth-pit should be _____.


A. 1 meter B. 2 Meter C. 3 Meter D. 5 Meter

21. "What is the typical area required for a 1 MW Solar system


A. 1 - 2 Acre B. 0.5 - 1 Acre C. 4 - 8 Acre D. 10 - 20 Acre

22. Which PV module has better efficiency?


A. Mono crystalline Module B. Poly crystalline module C. Thin film Module D. All have same efficiency

SGJ/N0104 (Install electrical components of solar PV system) (8X5 =40 Marks)


23. In a string Modules are connected in
A. Parallel B. As per customer requirement C. Series D. Series and Parallel

24. Importance of blocking diode is


A. It blocks the reverse current B. It blocks the flow of extra current
C. Both A & B D. It protects the equipment against surge

25. Which is a part of Solar PV system


A. AC combiner box B. Pyranometer C. MC4 connector D. All of the these

26. Which of these is the best material for earthing?


A. Silver B. Copper C. GI D. Iron

27. In Solar PV system, what is used to generate electricity


A. Heat B. Light C. Both A & B D. Can't say

28. If temperature rises, then Voltage of PV Module


A. Increases B. Decreases C. Remains same D. It will remain same for certain temperature, then it 'll decrease

29. "It can be protected by Charge Controller.


A. Light B. Module C. Battery D. All the thsese

30. One unit electricity means


A. 1 KWh B. 1 KW C. 1 watt D. 1 Wh

SGJ/N0105 (Test and commission solar PV system) (4X6 =24 Marks)

31. Minimum distance between two fixed modules should be ___.


A. 250mm B. 20mm C. 5mm D. 2mm

32. IEC 61215 is the standard for_____.


A. Thinfilm module B. Poly crystaline module C. Mono crystaline Module D. Both B and C

33. PV Module generates electricity in ________.


A. AC B. DC C. As per requirement D. None of them

34. SPD is used for ______.


A. Over Current Protection B. Over Voltage Protection C. Surge Protection D. Single Pole protection

ELE/N6001 (Maintain solar photovoltaic system) (5X8 =40 Marks)

35. Which is a cause of degradation of module?


A. Aging B. Cleanness C. Earthing D. All of these

36.Transformer is used to __________.


A. Step up the Voltage B. Step down the voltage C. Both A & B D. To store Electricity

37. Which is a circuit breaker?


A. MCB B. MCCB C. ACB D. All of them

38. "The life of a lead acid battery is expected to be


A. "2 - 5 Year B. 1 - 2 year C. 5 - 10 Year D. 20 - 25 Year

39. Anti Islanding is used _______.


A. In Module for protection B. In Combiner box for protection C. In MPPT for protection D. In Inverter for
protection.

SGJ/N0106 (Maintain work safety of solar PV system) (6X5 =30 Marks)

40. Which is a part of PPE.


A. Safety shoes B. Hand gloves C. Helmet D. All of these

41. Which is not a part of 5S?


A. Sort B. Shine C. Standardize D. Shape

42. SOP stands for _____.


A. Set Of Precaution B. Standard Of Protection C. Standard Operating Procedure D. Set Of Procedure

43. Grounding is required for ______.


A. Equipments safety B. Operators safety C. System safety D. All of these
44. In battery bank room construction, which is taken in to the priority?
A. Dust free area B. Ventilation C. Cleanness D. All of these

45. Which PPE is needed, when working at the height?


A. Safety shoes B. Safety belt C. Helmet D. All of these

SGJ/N0107 (Customer orientation for solar PV system) (5X2 =10 Marks)

46. Site hand over should be done with _______.


A. In the presence of Electrical inspector B. Proper Documentation & check lists
C. Both A & B D. None of these

47. Customer should be aware of


A. Abnormal condition B. Operating Procedure C. Data logging D. All of these

48. In Net-metering, bidirectional meter is used to measure ______.


A. Excess power export B. Powe import C. Both A & B D. None of the these

49. Battery sizing doesn't depend on ________.


A. Ambient temperature B. Back up Hours C. Battery Nominal Voltage D. Load

50. Which is the key of efficiency in PV plant?


A. Well design B. Proper Cleaning & maintenance C. Procurement D. All of these

Name: ____________________________________ Aadhar No.: ______________________________

Sign: ____________________________________