INDEX OF DRAWING GENERAL NOTES:

1. STATIONING

(a) THE ROAD STATION AND ELEMENTS ARE RELATIVE TO


CENTERLINE OF ROAD, UNLESS OTHERWISE INDICATED IN
THE DRAWINGS.
(b) LOCATION OF STATIONS
@ EVERY 20.00 M STATIONS
@ EVERY CULVERTS
@ EVERY POINT OF GEOMETRY

2.ELEVATION AND GRADES

(a) FINISHED GRADE ELEVATIONS INDICATED ON PROFILE


REFERS TO THE FINISHED ROAD(SECTION SUBJECTED TO
GRADE CORRECTION OTHERS TO FOLLOW EXISTING
GRADE)AS SHOWN IN THE TYPICAL ROADWAY SECTION.

(b) ELEVATION SHOWN ON "ORIGINAL GROUND " OF PROFILE


SHEETS ARE THE ELEVATION OF EXISTING GROUND ALONG
THE CENTERLINE OF THE ROAD PROJECT.

(c) ALL ELEVATION ARE IN METERS UNLESS OTHERWISE


INDICATED.

3. SPECIFICATIONS:

THE SPECIFICATIONS OF ITEMS WORK FOR THIS PROJECT


SHALL BE THE DPWH STANDARD SPECIFICATIONS FOR
PUBLIC WORKS & HIGHWAYS,2013 EDITION,VOLUME IV
-HIGHWAYS,BRIDGES & AIRPORTS OR SPECIAL PROVISION
AS PRESENTED IN THE TENDER DOCUMENTS OF THE
PROJECT.

4. DESIGN TECHNICAL STANDARD AND REFERENCE:

DESIGN GUIDELINES,CRITERIA,& STANDARD FOR PUBLIC


WORKS & HIGHWAYS VOLUME IV- HIGHWAY DESIGN AND
HIGHWAY SAFETY DESIGN STANDARDS, PART 1&2 ISSUED
ON MAY 2012.

5. DEFLECTION ANGLE ARE MEASURED RIGHT OR LEFT TO


SUCCEEDING DIRECTION OF EACH POINT OF
INTERSECTION.NORTH-MERIDIAN AS INDICATED PLAN.

THE VERTICAL CONTROL WAS RECKONED FROM BM-01 X


MARK ON TOP OF PCCP STA. 30+721.31, ELEV. =75.35 M
SUCCEEDING BENCHMARK WAS LIKEWISE MARKED
THEREAFTER AT X-DRAFT MARK ON TOP C/L OF EXTNG.
PCCP AND OTHER STRUCTURES ALONG THE CITED ROUTE.

6. BEFORE THE START OF ACTUAL CONSTRUCTION, THE


"AS-STAKED PLAN" SHOULD BE SUBMITTED TO THE
REGIONAL OFFICE IN ORDER THAT IMMEDIATE STEPS MAY
BE UNDERTAKEN TO CORRECT OR ADJUST APPRECIABLE
DEVIATION THERE MAY BE FROM THE ORIGINAL PLAN.

7. PRIOR TO CONSTRUCTION THE ADEQUACY/ APPROPRIATES


OF THE THICKNESS OF PAVEMENT STRUCTURE SHALL BE
VALIDATED BY UNDERTAKEN PAVEMENT DESIGN ANALYSIS
TAKING INTO CONSIDERATION THE ACTUAL CBR AND
TRAFFIC (ESAL) ALONG THE ROAD SECTION.

8. THESE PLAN ARE INTENDED FOR BIDDING AND


CONTRACTING PURPOSES AND THE REQUIRED SURVEY
DATA AND TECHNICAL INFORMATION IN ACCORDANCE WITH
DPWH GUIDELINES WILL BE DETERMINED/ VERIFIED DURING
PRE-CONSTRUCTION SURVEY. THE BASIS OF
IMPLEMENTATION SHALL BE THE "AS-STAKED PLAN".

9. THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS


OF AND PROVIDE ACCESSIBILITY FACILITIES FOR PERSONS
WITH DISABILITY IN ACCORDANCE WITH D.O. 37, SERIES OF
2009.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES C.Y. 2019 PROJECT


ORGANIZATIONAL OUTCOME 1
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM G 1
REGIONAL OFFICE No. V NETWORK DEVELOPMENT PROGRAM
BIBZ

REGIONAL GOVERNMENT CENTER, RAWIS, LEGAZPI CITY CONSTRUCTION OF MISSING LINKS/NEW ROADS AS SHOWN JULIUS CAESAR A. ALAURIN CONSTANTINO A. ANTIMANO MARILOU N. LACUNA ESMERALDO S. SARMIENTO VIRGILIO C. EDUARTE, CESO IV
ASID-TIGBAO-BARA-MALBUG ROAD 1 11 71
SURVEYMAN ENGINEER III CHIEF, PLANNING & DESIGN DIVISION OIC-ASST. REGIONAL DIRECTOR REGIONAL DIRECTOR, REGION V
MASBATE PROVINCE DATE: DATE: DATE: DATE:
STA. 30+721.31 - STA. 33+879.90