Sei sulla pagina 1di 5

EXTERNAL PEER TEAM REPORT

OF
JAYAMUKHI INSTITUTE OF TECHNOLOGICAL SCIENCES

(Permanently Affiliated to JNTUH, UGC-Autonomous)

Narsampet, Warangal- 506 332(T.S)

Section I GENERAL INFORMATION

GENERAL INFORMATION
1.1 Name & Address of the Institution: Jayamukhi Institute Of Technological
Sciences

1.2 Year of Establishment: 2001


1.3 Current Academic Activities at the UG: 05 PG : 03
Institution (Numbers):
 Departments/ Centres: Engineering :05 Management :01
 Programmes/ Courses offered: UG:05 PG: 03
 Permanent Faculty Members:
1.4 Dates of visit of the Peer Team
1.5 Composition of the Peer Team which
undertook the on- site visit:
Chairperson
Member Co-ordinator
Member

Section II: CRITERION WISE ANALYSIS

Key-Aspects Observations(Strengths and/or


Weaknesses) on Key-Aspects(Please limit
to three major ones for each and use
telegraphic language) (It is not necessary
to indicate all the three bullets each time;
write only the relevant ones)
2.1 Curricular Aspects:
2.1.1.Curricular Design and Development  Curriculum are prescribed with the
objectives of the university and
through respective BOS
 Curriculum updated regularly
 Skill based course offered
 Part time programs not offered

2.1.2 Academic Flexibility:  CBCS implemented in UG/PG


courses
 Flexible modular course structure is
offered
 Many electives of inter disciplinary
course is offered in structure
2.1.3 Feedback System:  Feedback from students collected
 Feedback system from all
stakeholders needs to be
institutionalized
2.2 Teaching-Learning & Evaluation:
2.2.1 Student Enrolment and Profile:  Well-structured admission process
 Admission on merit and entrance
examination conducted by the
university
 Reservation policy followed as per
norms
 Seats are allotted as per the preferred
choice of the student
2.2.2 Catering to Student Diversity:  Provision of good quality education
to rural , semi- urban students
 Orientation program conducted for
new students
 Bridge course offered
 Infrastructure for differently abled
students’ needs to be improved
2.2.3 Teaching-Learning Process:  In addition to academic activities ,
additional soft skill courses are
thought for students to his/ her
interest
 Results are declared within one
month of examination
 Sports, yoga and meditation are
included for personal development of
students
2.2.4 Student Performance and Learning  With regular mid/ end semester
Outcomes: examinations, performance is
assessed through assignments and
group discussions
 Good pass percentage in both UG and
PG programs
 Use of ICT techniques should be
implemented.

2.3 Research, Consultancy & Extension:


2.3.1 Promotion of Research:  Workshops/ seminars and training
programs are encouraged
 Research board has to be setup to
monitor research activities
 Research MoUs has to be
implemented
2.3.2 Collaborations  MoUs with corporate for skill
development is available
 Collaborations with academic
institutions of International and
national level have to be initiated
2.4 Infrastructure and Learning Resources:
2.4.1 Physical Facilities:  Well designed administrative and
academic buildings with adequate
facilities
 Well equipped laboratories
 Indoor and outdoor sports facilities
need improvements
2.4.2 Library as a Learning Resource:  Spacious library , e-resources and
digital library available
 All departments have departmental
libraries
 Back volume journal facility to be
initiated
2.5 Student Support and Progression:
2.5.1 Student Mentoring and Support:  Government scholarship available
 Mentor mentee system is systematic
 Career counselling , ethical
orientation is regularly conducted
 Training to students in thrust areas to
be implemented

2.5.2 Student Participation and Activities  Active IEEE students chapter and
ISTE chapter
 Institute encourages students to
participate in co-curricular and extra
curricular activities
 Many awards won by students in non
local participations

2.6 Governance, Leadership and Management:


2.6.1 Institutional Vision and Leadership:  Vision and Mission are in place
 Meetings of statutory bodies are held
regularly
 Integration efforts need attention
2.6.2 Strategy Development and  Some engineering courses need to be
Deployment: NBA accredited
 NAAC accreditation to be initiated
 Labs to be setup with industrial
collaborations

2.6.5 Internal Quality Assurance System:  IQAC constituted recently and


AQAR submitted
Section III: Recommendations for Quality Enhancement of the Institution

 Increase funding of research projects


 Establishment of research centres
 Training and placement activities to be strengthened
 Sports infrastructure needs improvement
 Increase international and national exposure in students
 Long term perspective plan to be prepared
 Initiate new quality activities through IQAC

I agree with the Observations of the Peer Team as mentioned in this report

.Signature of the Head of the Institution Seal of the Institution

Signatures of the Peer Team Members:

Name Designation Signature with date


Chairperson
Member Co-ordinator
Member

Place:
Date:
DECLARATION

This is to certify that the college has followed the following conditions given in the UGC
Autonomous guidelines for the year 2017-2018.

1) IQAC cell is established in the college for regular monitoring of the college under
intimation to UGC. The cell is having an external Peer Team comprising of
academicians of repute and report of the peer team is enclosed. The report is also put
on public domain on the website of the college. The external peer review is conducted
on 28.11.2018.
2) The college has uploaded in its website information regarding the courses offered, the
fees for the course, the details of the faculty along with qualification and unique ID,
the admission procedure, the details of relevant infrastructure, research activities of
the college.
3) The college has also put on its website the creation of various committees/ cells as
mandated in the various UGC regulations notified from time to time. The college has
conducted the meetings of the statutory bodies regularly and uploaded the minutes of
the meeting in the college website.
4) All the regulations notifies by UGC is followed in letter and spirit by the college and
undertaking to this is uploaded in college website
5) The college doesn’t have any contractual faculty.

Dated: Signature of the Principal

With college seal

Potrebbero piacerti anche