PROPOSED PROJECT WORK SCHEDULE FOR ANWA

Date : 05/02/2019 Schedule

10-Feb-19

11-Feb-19

12-Feb-19

13-Feb-19
14-Feb-19

15-Feb-19

16-Feb-19
17-Feb-19

18-Feb-19

19-Feb-19
20-Feb-19
21-Feb-19
22-Feb-19

23-Feb-19

24-Feb-19

25-Feb-19
26-Feb-19
27-Feb-19

28-Feb-19

1-Mar-19

2-Mar-19
5-Feb-19
6-Feb-19

7-Feb-19

8-Feb-19

9-Feb-19
S.No Description

1 Level 25
a)Required Manpower 18 18 18 18 15 15
b)Double board installation
c)Concrete Filing
d) Jointing and Tapping
e) Final Touch up IR Handover
2 Level 24
a)Required Manpower 6 4 18 18 18 18 18 18 18 18 18 18 15
b) Cutting Frame work
c)Double board installation
d)Concrete Filing
e) Jointing and Tapping
f) Final Touch up IR Handover
3 Level 26
a)Required Manpower 0 6 10 10 18 18 18 18 18 18 18 18 18 15
b) Cutting Frame work
c)Double board installation
d)Concrete Filing
e) Jointing and Tapping
f) Final Touch up IR Handover
4 Level 22
a)Required Manpower 6 6 6 6 6 18 18 18 18 18 18 18 18 18 18 18 15
b) Cutting Frame work
c)Double board installation
d)Concrete Filing
e) Jointing and Tapping
f) Final Touch up IR
Total Manpower Required Per Day 24 22 0 24 36 36 49 49 42 42 42 36 54 54 51 36 36 33 18 18 18 18 18 15
Manpower Allocation Details Note :
1 Concrete Filling Team 10 Labours 1.Labours working time should be 7am to 6pm
2 Board Installation 5 Labours 2.Sub contractor has to shift materials up
3 Maintance Team 3 Labours 3.Over time may needed according to the productivity of the day