Basis Type
Allocation Charge Methods
Sub-element
Material Material Resources OSP Overhead
Overhead
Activity X
Item X X X X X
Lot X X X X X
Resource Unit X X
Resource Value X X
Total Value X
Activity:
Use the Activity basis type to assign an activity cost to an item. An activity is an action
or task that you perform in a business that uses a resource or incurs cost.
For Material Overhead sub-elements, the cost per item is calculated within each cost type
as follows:
Item:
Use Item basis type to assign a fixed cost per item. For Material and Material Overhead
sub-elements, you define a fixed amount per item. For Resource, OPS, and Overhead
sub-elements, you define a fixed amount per item moved through an operation.
Lot:
Use the Lot basis type to assign a lot charge pre item or operation. For Material and
Material Overhead sub-elements, the cost per item is calculated within each cost type as
follows:
For Resource, OPS, and Overhead sub-elements, the cost per item is calculated within
each cost type as follows:
Cost per item = Routing usage x Rate or amount x 1/ Item’s costing lot size.
Resource Units:
Use the Resource Units basis type to allocate overhead to an item based on the number
of resource units. For Material Overhead and Overhead ( e.g. number of direct labor
hours) sub-elements, the cost per item is calculated within each cost type as follows:
Cost per item = Overhead rate x No. of resources units earned in routing operation.
1
Resource Value:
Use the Resource Value basis type to allocate Overhead to an item based on a
“percentage” of the resource value. For Material Overhead and Overhead (e.g. Direct
Labor Dollars) sub-elements, the cost per item is calculated within each cost type as
follows:
Cost per item = Overhead rate x Resource value earned in routing operation.
Total Value:
Use the Total Value basis type to allocate Overhead to an item based on a “percentage”
of the total value. For Material Overhead sub-elements, the cost per item is calculated
within each cost type as follows:
Cost per item = Total Cost – (Material Overhead earned at this level x MOH rate )
Material Overhead based on total value can be earned when you receive PO or when you
perform WIP completion transactions.
Cost Sub-elements
Material Sub-element:
You use material sub-elements when you define the material cost element of your
items.
You generally use one material sub-element for each item.
The system defaults the basis type when you define item costs to speed date entry.
You assign a default basis type of Item or Lot.
Resources:
You can enter a fixed resource cost in two ways.
2
Enter a fixed charge on the “routing operation”.
Use this method when the resource cost varies by item.
Overhead: