Sei sulla pagina 1di 1

150

A SIRI
- UTTA
COL RF RANA
NDA B
MAWA
- THA
(MAX)
300
PAVEMENT
(MAX)
600

PAVEMENT

PAVEMENT
40000

300 300 FRL - 0.250 m


PAVEMENT
300

300
MSL -5.400 m MH
RAMP

SECTION
MH
MH
FRL - 0.550 m PAVEMENT

2965
MSL -5.100 m

2902
1 MH

MH

-
MH MH MH

Scale: 1:30 132/11KV TR 1 PLINTH - +0.05


132/11KV TR 2
PLINTH - +0.05 PLINTH - +0.05
FRL - 0.550 m
F.W.1 F.W.2
132/11KV TR 3
FUTURE MSL -5.100 m
DETAIL-X DETAIL-X
1162 1162 MH

AUX TR2
250 132KV GIS ROOM

SECTION SECTION

900
-0.100m

SFL -0.05m GFL ± 0.00 m MSL +5.650 m +0.000m


GENERATOR ROOM

R6 - 125 c/c

1008
A B 2T12

250
-
Scale: 1:20 -
Scale: 1:20 1
- 2T12 - KEY PLAN
-
Scale: 1:300
3T10

T12-150T1 T12-150T2
T12-150T1 COLUMN RF DETAIL
T12-150T2 -
Scale: 1:20

03
CHECK ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION. DO NOT SCALE 02
FROM 01
00
DRAWING. REPORT ANY DISCREPANCIES. IF IN DOUBT ASK. COPYRIGHT AND
INDEX SHEET REVISION DATE DRAWN CHECKED APPROVED
AUTHORITY
T12-150B1 T12-150B2
T12-150B1 FOR ANY REPRODUCTION OF DESIGN SHOWN HERE IS RETAINED. DO NOT
T12-150B2
KEEP SUPERSEDED
DRAWINGS ON SITE.

A RF SECTION B RF SECTION 1. FOR GENERAL NOTES REFER DRG. NO CEB-PKG1-M-71-ST02.


PROJECT ARCHITECT :
DAMITH PERERA
CHARTERED ARCHITECT
- -
Scale: 1:20 Scale: 1:20 2. FOR TYPICAL DETAILS REFER DRG. NOS. CEB-PKG1-M-71-ST03 ,
CEB-PKG1-M-71-ST04, CEB-PKG1-M-71-ST05. CEYLON ELECTRICITY BOARD
50x50x3 L-ANGLE
2mm TK MS PLATE 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT SRI LANKA
ARCHITECTS AND ENGINEERS DRAWINGS AND SPECIFICATIONS.
PROJECT : GREATER COLOMBO TRANSMISSION & DISTRIBUTION
T10-450 4. ALL DIMENSIONS ARE GIVEN IN MILLIMETERS.
LOSS REDUCTION PROJECT (GCT&DLRP)
5. NO CONCRETE TO BE POURED UNTIL THE REINFORCEMENT HAS BEEN
INSPECTED CONTRACT No. : GEB/GCTDLRP/PACKAGE-1(Lot-1)/02
AND APPROVED BY THE ENGINEER. ENGINEER : JV OF   LOAN No. :
TOKYO ELECTRIC POWER SERVICES CO., LTD.
CONCRETE GRADE: SL - P 107 JICA of JAPAN
COLUMN - C30 ELECTRIC POWER DEVELOPMENT CO., LTD.
BASE - C30 NIPPON KOEI CO., LTD.
CONTRACTOR : 

COVER TO: HYOSUNG CORPORATION


300 300
FOUNDATION
BOTTOM - 50mm

- GUIDE RAIL FIXING DETAIL


R.C. GATE BASE
50mm THICK
SIDES
TOP
-
-
50mm
40mm
SUB CONTRACTOR :

DP/CEBK/SP/126 (SIERRA CONSTRUCTION (PVT) LIMITED,NO.23 HAVELOCK ROAD,COLOMBO 05,


LEAN CONCRETE (GRADE 15) COLUMN
SRI LANKA)
SUBSTATION :
SIDE/TOP - 40mm
132/11kV COLOMBO M GRID SUBSTATION
50

DRAWING TITLE :
6. NO CONCRETE IS TO BE POURED UNTIL THE REINFORCEMENT HAS BEEN
INSPECTED DETAILS OF GATE BASE
COMPACTED TO 7% CBR (MINIMUM) DATE : 31 - 01 - 2019
DETAIL - X AND APPROVED BY THE ENGINEER.
SUPPLIER / SUB CONTRACTOR :  DRAWING No : 
Scale : As Given
(SCALE- 1:20) HYOSUNG CEB-PKG1-M-74-DR01 Sheet 01
A3
of 01