Sei sulla pagina 1di 245

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 SUNDAY
2 7:47 12:05 12:43 5:00
3 7:39 12:18 12:30 5:06 MONITOR INFRASTRUCTURE PROJECTS AT
PALIMBANG, ESPERANZA, BAGUMBAYAN,
4 7:48 12:26 12:31 5:23
SENATOR NINOY AQUINO, KALAMANSIG AND
5 7:39 12:02 12:28 5:04 LEBAK, SULTAN KUDARAT.
6 7:40 12:02 12:23 5:05
7 SATURDAY
8 SUNDAY
9 7:34 12:02 12:17 5:01
10 7:56 12:04 12:23 5:00 MONITOR INFRASTRUCTURE PROJECTS AT
PALIMBANG, ESPERANZA, BAGUMBAYAN,
11 7:40 12:00 12:22 5:00
SENATOR NINOY AQUINO, KALAMANSIG AND
12 7:57 12:01 12:31 5:00 LEBAK, SULTAN KUDARAT.
13 7:37 12:01 12:38 5:00
14 SATURDAY
15 SUNDAY
16 7:34 12:04 12:39 5:03 MONITOR INFRASTRUCTURE PROJECTS
17 7:50 12:03 12:58 5:00 AT PALIMBANG, ESPERANZA,
18 7:57 12:32 12:37 5:04 BAGUMBAYAN, SENATOR NINOY AQUINO,
19 7:59 12:01 12:34 5:01 KALAMANSIG AND LEBAK, SULTAN
20 7:55 12:20 12:50 5:08 KUDARAT.
21 SATURDAY
22 SUNDAY
23 7:41 12:03 12:31 5:01
MONITOR INFRASTRUCTURE PROJECTS AT
24 7:49 12:02 12:17 5:01
PALIMBANG, ESPERANZA, BAGUMBAYAN,
25 7:34 12:01 12:50 5:00
SENATOR NINOY AQUINO, KALAMANSIG AND
26 7:59 12:01 12:21 5:02 LEBAK, SULTAN KUDARAT.
27 7:45 12:14 12:57 5:02
28 SATURDAY
29 SUNDAY MONITOR INFRASTRUCTURE PROJECTS AT
30 7:59 12:01 12:21 5:02 PALIMBANG, ESPERANZA, BAGUMBAYAN,
31 7:50 12:39 12:52 5:03 SENATOR NINOY AQUINO, KALAMANSIG AND
I hereby certify on my honor that the above is a true and Verified as toLEBAK, SULTANoffice
the prescribed KUDARAT.
hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

NORMAN M. APADAN REYNALDO C. GUARDIANO, JR.


Administrative Aide I Acting Chief, Contruction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 7:56 12:02 12:45 5:10 MONITOR INFRASTRUCTURE PROJECTS AT
PALIMBANG, ESPERANZA, BAGUMBAYAN, SENATOR
2 7:46 12:13 12:44 5:06
NINOY AQUINO, KALAMANSIG AND LEBAK, SULTAN
3 7:37 12:01 12:19 5:00 KUDARAT.
4 SATURDAY
5 SUNDAY
6 7:54 12:32 12:36 5:06
MONITOR INFRASTRUCTURE PROJECTS AT
7 7:50 12:03 2:18 5:03
PALIMBANG, ESPERANZA, BAGUMBAYAN,
8 8:00 12:05 12:48 5:00 SENATOR NINOY AQUINO, KALAMANSIG AND
9 8:00 12:19 12:29 5:03 LEBAK, SULTAN KUDARAT.
10 8:00 12:00 12:23 5:00
11 SATURDAY
12 SUNDAY
13 7:44 12:02 12:20 5:09
14 7:56 12:00 12:23 5:37 MONITOR INFRASTRUCTURE PROJECTS AT
PALIMBANG, ESPERANZA, BAGUMBAYAN, SENATOR
15 7:59 12:14 12:29 5:37 NINOY AQUINO, KALAMANSIG AND LEBAK, SULTAN
16 7:50 12:03 2:18 5:03 KUDARAT.
17 8:00 12:05 12:48 5:00
18 SATURDAY
19 SUNDAY
20 7:54 12:32 12:36 5:03
MONITOR INFRASTRUCTURE PROJECTS AT
21 HOLIDAY
PALIMBANG, ESPERANZA, BAGUMBAYAN,
22 7:59 12:05 12:45 5:10
SENATOR NINOY AQUINO, KALAMANSIG AND
23 7:56 12:19 12:44 5:06 LEBAK, SULTAN KUDARAT.
24 7:59 12:00 12:19 5:00
25 SATURDAY
26 SUNDAY
27 HOLIDAY
28 7:41 12:03 12:31 5:01 MONITOR INFRASTRUCTURE PROJECTS AT
29 7:49 12:02 12:17 5:01 PALIMBANG, ESPERANZA, BAGUMBAYAN,
30 7:34 12:01 12:50 5:00 SENATOR NINOY AQUINO, KALAMANSIG AND
31 7:59 12:01 12:21 5:02 LEBAK, SULTAN KUDARAT.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

NORMAN M. APADAN REYNALDO C. GUARDIANO, JR.


Administrative Aide I Acting Chief, Contruction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 SUNDAY
2
3
4
5
6
7 SATURDAY
8 SUNDAY
9
10
11
12
13
14 SATURDAY
15 SUNDAY
16 7:45 12:04 12:21 5:01 do office works
17 7:50 12:03 12:20 5:00 do office works
18 7:40 12:06 12:15 5:07 do office works
19 7:59 12:08 12:36 5:03 do office works
20 7:55 12:20 12:50 5:08 do office works
21 SATURDAY
22 SUNDAY
23 7:41 12:08 12:39 5:02 do office works
24 7:49 12:02 12:34 5:03 do office works
25 7:57 12:08 12:50 5:08 do office works
26 7:50 12:00 12:15 5:06 do office works
27 7:45 12:05 12:20 5:02 do office works
28 SATURDAY
29 SUNDAY
30 7:20 12:05 12:45 5:01 do office works
31 7:50 12:00 12:15 5:00 do office works
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

CARL ANTONNIE C. BETITO REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 SUNDAY
2 7:47 12:05 12:43 5:00
3 7:39 12:18 12:30 5:06
Conduct official travel of the Chief, Construction
4 7:48 12:26 12:31 5:23
Section and DPWH personnel.
5 7:39 12:02 12:28 5:04
6 7:40 12:02 12:23 5:05
7 SATURDAY
8 SUNDAY
9 7:34 12:02 12:17 5:01
10 7:56 12:04 12:23 5:00
Conduct official travel of the Chief, Construction
11 7:40 12:00 12:22 5:00
Section and DPWH personnel.
12 7:57 12:01 12:31 5:00
13 7:37 12:01 12:38 5:00
14 SATURDAY
15 SUNDAY
16 7:34 12:04 12:39 5:03
17 7:50 12:03 12:58 5:00
Conduct official travel of the Chief,
18 7:57 12:32 12:37 5:04
Construction Section and DPWH personnel.
19 7:59 12:01 12:34 5:01
20 7:55 12:20 12:50 5:08
21 SATURDAY
22 SUNDAY
23 7:41 12:03 12:31 5:01
24 7:49 12:02 12:17 5:01
Conduct official travel of the Chief, Construction
25 7:34 12:01 12:50 5:00
Section and DPWH personnel.
26 7:59 12:01 12:21 5:02
27 7:45 12:14 12:57 5:02
28 SATURDAY
29 SUNDAY
30 7:59 12:01 12:21 5:02 Conduct official travel of the Chief, Construction
31 7:50 12:39 12:52 5:03 Section and DPWH personnel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHANDEE R. BELTRAN REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Contruction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 7:56 12:02 12:45 5:10
Conduct official travel of the Chief, Construction
2 7:46 12:13 12:44 5:06
Section and DPWH personnel.
3 7:37 12:01 12:19 5:00
4 SATURDAY
5 SUNDAY
6 7:54 12:32 12:36 5:06
7 7:50 12:03 2:18 5:03
Conduct official travel of the Chief, Construction
8 8:00 12:05 12:48 5:00
Section and DPWH personnel.
9 8:00 12:19 12:29 5:03
10 8:00 12:00 12:23 5:00
11 SATURDAY
12 SUNDAY
13 7:44 12:02 12:20 5:09
Conduct official travel of the Chief, Construction
14 7:56 12:00 12:23 5:37
Section and DPWH personnel.
15 7:59 12:14 12:29 5:37
16 7:50 12:03 2:18 5:03
17 8:00 12:05 12:48 5:00
18 SATURDAY
19 SUNDAY
20 7:54 12:32 12:36 5:03
21 HOLIDAY
Conduct official travel of the Chief, Construction
22 7:59 12:05 12:45 5:10 Section and DPWH personnel.
23 7:56 12:19 12:44 5:06
24 7:59 12:00 12:19 5:00
25 SATURDAY
26 SUNDAY
27 HOLIDAY
28 7:41 12:03 12:31 5:01
29 7:49 12:02 12:17 5:01 Conduct official travel of the Chief, Construction
30 7:34 12:01 12:50 5:00 Section and DPWH personnel.
31 7:59 12:01 12:21 5:02
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHANDEE R. BELTRAN REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Contruction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:58 12:04 12:25 5:07
MONITOR THE IMPLEMENTATION OF THE
17 7:50 12:04 12:40 7:18 PROJECTS IMPLEMENTED UNDER SK2 - DEO
18 7:59 12:05 12:43 5:05
19 SATURDAY
20 SUNDAY
21 7:36 12:12 12:32 5:07
22 8:00 12:03 12:27 5:09
MONITOR THE IMPLEMENTATION OF THE
23 7:11 12:03 12:40 5:00
PROJECTS IMPLEMENTED UNDER SK2 - DEO
24 7:39 12:00 12:15 5:05
25 7:50 12:03 12:50 5:02
26 SATURDAY
27 SUNDAY
28 7:50 12:00 12:15 5:09
29 7:59 12:06 12:20 5:01 MONITOR THE IMPLEMENTATION OF THE
30 7:47 12:03 12:40 5:06 PROJECTS IMPLEMENTED UNDER SK2 - DEO
31 7:45 12:00 12:15 5:01
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

DARYLL P. AGBON REYNALDO C. GUARDIANO, JR.


Administrative Aide I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC - Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1
2 SATURDAY
3 SUNDAY
4
5
6
7
8
9 SATURDAY
10 SUNDAY
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:50 12:03 12:27 5:00
19 7:54 12:00 12:30 5:00
MONITOR THE IMPLEMENTATION OF THE
20 7:45 12:03 12:15 5:03
PROJECTS IMPLEMENTED UNDER SK2 - DEO
21 7:30 12:00 12:45 5:02
22 7:56 12:20 12:50 5:04
23 SATURDAY
24 SUNDAY
25 7:45 12:08 12:38 5:02
26 7:45 12:00 12:26 5:05
MONITOR THE IMPLEMENTATION OF THE
27 7:50 12:00 12:30 5:00
PROJECTS IMPLEMENTED UNDER SK2 - DEO
28 7:55 12:04 12:41 5:01
29 7:48 12:00 12:24 5:00
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

DARYLL P. AGBON REYNALDO C. GUARDIANO, JR.


Administrative Aide I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC - Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
MONITOR THE IMPLEMENTATION OF THE
1 7:50 12:03 12:27 5:00
PROJECTS IMPLEMENTED UNDER SK2 - DEO
2 SATURDAY
3 SUNDAY
4 7:45 12:03 12:15 5:03
5 7:30 12:00 12:45 5:02
MONITOR THE IMPLEMENTATION OF THE
6 7:56 12:20 12:50 5:04
PROJECTS IMPLEMENTED UNDER SK2 - DEO
7 7:50 12:03 12:27 5:00
8 7:54 12:00 12:30 5:00
9 SATURDAY
10 SUNDAY
11 7:55 12:04 12:41 5:01
12 HOLIDAY
MONITOR THE IMPLEMENTATION OF THE
13 7:45 12:08 12:38 5:02
PROJECTS IMPLEMENTED UNDER SK2 - DEO
14 7:45 12:00 12:26 5:05
15 HOLIDAY
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23 SATURDAY
24 SUNDAY
25
26
27
28
29
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

DARYLL P. AGBON REYNALDO C. GUARDIANO, JR.


Administrative Aide I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC - Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:30 12:01 12:22 5:01 PREPARES LOGBOOK FOR PROJECTS/DO
2 8:00 12:00 12:25 5:01 OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 8:00 12:00 12:15 5:00 PREPARES LOGBOOK FOR PROJECTS/DO
6 7:56 12:00 12:15 5:00 OFFICE WORKS
7 LEAVE STATION TO BAGUMBAYAN, S. K.
8 STILL OUT AT BAGUMBAYAN, S. K. ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
TURN OVER CONGRESSIONAL COMPLETED SULTAN KUDARAT
9
PROJECTS AT BAGUMBAYAN, S.K.
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:50 12:07 12:36 5:04 PREPARES LOGBOOK FOR PROJECTS/DO
13 7:20 12:10 12:50 5;04 OFFICE WORKS
14 LEAVE STATION TO BAGUMBAYAN, S. K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
15 STILL OUT AT BAGUMBAYAN, S. K. SULTAN KUDARAT
16 RETURN STATION TO LEBAK, S.K.
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:23 12:04 12:29 5:02 PREPARES LOGBOOK FOR PROJECTS/DO
20 7:40 12:03 12:19 5:01 OFFICE WORKS
21 LEAVE STATION TO BAGUMBAYAN, S. K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
22 STILL OUT AT BAGUMBAYAN, S. K.
SULTAN KUDARAT
23 RETURN STATION TO LEBAK, S.K.
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 8:00 12:01 12:24 5:00
PREPARES LOGBOOK FOR PROJECTS/DO
27 7:56 12:01 12:16 5:00 OFFICE WORKS
28 8:00 12:00 HOLIDAY
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 8:00 12:04 12:19 5:07 DO OFFICE WORKS
3 8:00 12:00 12:16 5:00 DO OFFICE WORKS
4 LEAVE STATION TO SENATOR NINOY AQUINO, S. K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT
5 STILL AT SENATOR NINOY AQUINO, S.K.
SNA, SULTAN KUDARAT
6 RETURN STATION TO LEBAK, S.K.
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:50 12:01 12:29 5:00
ASSIST PE, PI IN SUPERVISING PROJECTS AT
11 8:00 12:02 LEAVE STATION TO SNA, S.K.
SNA, SULTAN KUDARAT
12 STILL AT SENATOR NINOY AQUINO, S.K.
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:50 12:07 12:38 5:04
17 8:00 12:00 12:13 5:02 ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
18 8:00 12:09 LEAVE STATION TO SNA, S.K. SULTAN KUDARAT
19 STILL AT SENATOR NINOY AQUINO, S.K.
TRAINING/SEMINAR ON PROJECT PROPER
BRILLE'S CHICKEN PALACE, ISULAN, SULTAN
20 IMPLEMENTATION AND MATERIALS QUALITY
KUDARAT CONTROL
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 LEAVE STATION TO SENATOR NINOY AQUINO, S. K.
24 STILL AT SENATOR NINOY AQUINO, S.K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT
25 STILL AT SENATOR NINOY AQUINO, S.K. SNA, SULTAN KUDARAT
26 STILL AT SENATOR NINOY AQUINO, S.K.
27 RETURN STATION TO LEBAK, S.K.
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
STILL AT SENATOR NINOY ASSIST PE, PI IN SUPERVISING PROJECTS AT
30 7:48
AQUINO, S.K. SNA, SULTAN KUDARAT
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
LEAVE STATION TO SENATOR NINOY AQUINO, S.
2 K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
3 STILL AT SENATOR NINOY AQUINO, S.K. SNA, SULTAN KUDARAT
4 RETURN STATION TO LEBAK, S.K.
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:20 12:04 12:27 5:03 DO OFFICE WORKS
LEAVE STATION TO SENATOR NINOY AQUINO, S.
8 K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
9 STILL AT SENATOR NINOY AQUINO, S.K. SNA, SULTAN KUDARAT
10 STILL AT SENATOR NINOY AQUINO, S.K.
11 RETURN STATION TO LEBAK, S.K.
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
LEAVE STATION TO SENATOR NINOY ASSIST PE, PI IN SUPERVISING PROJECTS AT
15
AQUINO, S. K. SNA, SULTAN KUDARAT
16
17
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section
Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:58 12:04 12:25 5:07 DO OFFICE WORKS
17 7:50 12:04 12:40 7:18 DO OFFICE WORKS
18 7:59 12:05 12:43 5:05 DO OFFICE WORKS
19 SATURDAY
20 SUNDAY
21 7:36 12:12 12:32 5:07 DO OFFICE WORKS
22 8:00 12:03 12:27 5:09 DO OFFICE WORKS
23 7:11 12:03 12:40 5:00 DO OFFICE WORKS
LEAVE STATION TO PALIMBANG, SULTAN
24 ASSIST PI, PE IN SUPERVISING ON GOING
KUDARAT
PROJECTS AT PALIMBANG, S. K.
25 RETURN STATION TO LEBAK, S.K.
26 SATURDAY
27 SUNDAY
LEAVE STATION TO PALIMBANG, SULTAN
28
KUDARAT
ASSIST PI, PE IN SUPERVISING ON GOING
29 STILL AT PALIMBANG, SULTAN KUDARAT
PROJECTS AT PALIMBANG, S. K.
30 STILL AT PALIMBANG, SULTAN KUDARAT
31 STILL AT PALIMBANG, SULTAN KUDARAT
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
NIKKO A. IBAY REYNALDO C. GUARDIANO, JR
Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:30 12:01 12:22 5:01 PREPARES LOGBOOK FOR PROJECTS/DO
2 8:00 12:00 12:25 5:01 OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 8:00 12:00 12:15 5:00 PREPARES LOGBOOK FOR PROJECTS/DO
6 7:56 12:00 12:15 5:00 OFFICE WORKS
7 LEAVE STATION TO BAGUMBAYAN, S. K.
8 STILL OUT AT BAGUMBAYAN, S. K. ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
TURN OVER CONGRESSIONAL COMPLETED SULTAN KUDARAT
9
PROJECTS AT BAGUMBAYAN, S.K.
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:50 12:07 12:36 5:04 PREPARES LOGBOOK FOR PROJECTS/DO
13 7:20 12:10 12:50 5;04 OFFICE WORKS
14 LEAVE STATION TO BAGUMBAYAN, S. K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
15 STILL OUT AT BAGUMBAYAN, S. K. SULTAN KUDARAT
16 RETURN STATION TO LEBAK, S.K.
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:23 12:04 12:29 5:02 PREPARES LOGBOOK FOR PROJECTS/DO
20 7:40 12:03 12:19 5:01 OFFICE WORKS
21 LEAVE STATION TO BAGUMBAYAN, S. K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
22 STILL OUT AT BAGUMBAYAN, S. K.
SULTAN KUDARAT
23 RETURN STATION TO LEBAK, S.K.
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 8:00 12:01 12:24 5:00
PREPARES LOGBOOK FOR PROJECTS/DO
27 7:56 12:01 12:16 5:00 OFFICE WORKS
28 8:00 12:00 HOLIDAY
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 8:00 12:04 12:19 5:07 DO OFFICE WORKS
3 8:00 12:00 12:16 5:00 DO OFFICE WORKS
4 LEAVE STATION TO SENATOR NINOY AQUINO, S. K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT
5 STILL AT SENATOR NINOY AQUINO, S.K.
SNA, SULTAN KUDARAT
6 RETURN STATION TO LEBAK, S.K.
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:50 12:01 12:29 5:00
ASSIST PE, PI IN SUPERVISING PROJECTS AT
11 8:00 12:02 LEAVE STATION TO SNA, S.K.
SNA, SULTAN KUDARAT
12 STILL AT SENATOR NINOY AQUINO, S.K.
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:50 12:07 12:38 5:04
17 8:00 12:00 12:13 5:02 ASSIST PE, PI IN SUPERVISING PROJECTS AT SNA,
18 8:00 12:09 LEAVE STATION TO SNA, S.K. SULTAN KUDARAT
19 STILL AT SENATOR NINOY AQUINO, S.K.
TRAINING/SEMINAR ON PROJECT PROPER
BRILLE'S CHICKEN PALACE, ISULAN, SULTAN
20 IMPLEMENTATION AND MATERIALS QUALITY
KUDARAT CONTROL
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 LEAVE STATION TO SENATOR NINOY AQUINO, S. K.
24 STILL AT SENATOR NINOY AQUINO, S.K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT
25 STILL AT SENATOR NINOY AQUINO, S.K. SNA, SULTAN KUDARAT
26 STILL AT SENATOR NINOY AQUINO, S.K.
27 RETURN STATION TO LEBAK, S.K.
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
STILL AT SENATOR NINOY ASSIST PE, PI IN SUPERVISING PROJECTS AT
30 7:48
AQUINO, S.K. SNA, SULTAN KUDARAT
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
LEAVE STATION TO SENATOR NINOY AQUINO, S.
2 K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
3 STILL AT SENATOR NINOY AQUINO, S.K. SNA, SULTAN KUDARAT
4 RETURN STATION TO LEBAK, S.K.
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:20 12:04 12:27 5:03 DO OFFICE WORKS
LEAVE STATION TO SENATOR NINOY AQUINO, S.
8 K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
9 STILL AT SENATOR NINOY AQUINO, S.K. SNA, SULTAN KUDARAT
10 STILL AT SENATOR NINOY AQUINO, S.K.
11 RETURN STATION TO LEBAK, S.K.
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
LEAVE STATION TO SENATOR NINOY ASSIST PE, PI IN SUPERVISING PROJECTS AT
15
AQUINO, S. K. SNA, SULTAN KUDARAT
16
17
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section
Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:58 12:04 12:25 5:07 DO OFFICE WORKS
17 7:50 12:04 12:40 7:18 DO OFFICE WORKS
18 7:59 12:05 12:43 5:05 DO OFFICE WORKS
19 SATURDAY
20 SUNDAY
21 7:36 12:02 12:15 5:08 DO OFFICE WORKS
22 8:00 12:09 12:22 5:00 DO OFFICE WORKS
23 7:11 12:03 12:40 5:00 DO OFFICE WORKS
LEAVE STATION TO PALIMBANG, SULTAN
24 ASSIST PI, PE IN SUPERVISING ON GOING
KUDARAT
PROJECTS AT PALIMBANG, S. K.
25 RETURN STATION TO LEBAK, S.K.
26 SATURDAY
27 SUNDAY
LEAVE STATION TO PALIMBANG, SULTAN
28
KUDARAT
ASSIST PI, PE IN SUPERVISING ON GOING
29 STILL AT PALIMBANG, SULTAN KUDARAT
PROJECTS AT PALIMBANG, S. K.
30 STILL AT PALIMBANG, SULTAN KUDARAT
31 STILL AT PALIMBANG, SULTAN KUDARAT
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
JOMAR S. SANGKAY REYNALDO C. GUARDIANO, JR
Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 HOLIDAY HOLIDAY
2
3
4
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7
8
9
10
11
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15
16 7:54 12:01 12:40 5:12
17 7:50 12:09 12:37 5:08 Cleaning and doing errands
18 7:35 12:05 12:50 5:20
19 SATURDAY
20 SUNDAY
21 7:52 12:28 12:34 5:04
22 7:56 12:00 12:18 5:00
23 7:45 12:05 12:15 5:10 Cleaning and doing errands
24 7:50 12:00 12:20 5:06
25 7:45 12:05 12:50 5:04
26 SATURDAY
27 SUNDAY
28 7:50 12:00 12:15 5:05
29 7:29 12:07 12:42 5:04
Cleaning and doing errands
30 7:19 12:03 12:38 5:05
31 7:26 12:00 12:15 5:09
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ABDULLAH A. PULUA REYNALDO C. GUARDIANO, JR.


Utility Worker I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC- Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 HOLIDAY HOLIDAY
2
3
4
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7
8
9
10
11
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15
16 7:54 12:01 12:40 5:12
17 7:50 12:09 12:37 5:08 DO OFFICE WORKS
18 7:35 12:05 12:50 5:20
19 SATURDAY
20 SUNDAY
21 7:52 12:28 12:34 5:04
22 7:56 12:00 12:18 5:00
23 7:45 12:05 12:15 5:10 DO OFFICE WORKS
24 7:50 12:00 12:20 5:06
25 7:45 12:05 12:50 5:04
26 SATURDAY
27 SUNDAY
28 7:50 12:00 12:15 5:05
29 7:29 12:07 12:42 5:04
DO OFFICE WORKS
30 7:19 12:03 12:38 5:05
31 7:26 12:00 12:15 5:09
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

JORHAMIN A. NASA REYNALDO C. GUARDIANO, JR.


Administrative Aide I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC- Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: September 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 SATURDAY
2 SUNDAY
3 8:00 12:06 12:17 5:02
DO OFFICE WORKS
4 8:00 12:01 12:50 5:02
5 ABSENT ABSENT
6 ABSENT ABSENT
7 ABSENT ABSENT
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
10 ABSENT ABSENT
11 HOLIDAY HOLIDAY
12 ABSENT ABSENT
13 ABSENT ABSENT
14 ABSENT ABSENT
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

JORHAMIN A. NASA REYNALDO C. GUARDIANO, JR.


Administrative Aide I Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC- Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3 HOLIDAY HOLIDAY
4 8:00 12:01 12:15 5:07 DOING OFFICE WORKS
5 8:00 12:14 12:15 5:14 DOING OFFICE WORKS
6 7:50 12:11 12:35 5:03 DOING OFFICE WORKS
7 8:00 12:01 12:59 5:00 DOING OFFICE WORKS
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10 8:00 12:06 12:28 5:02 DOING OFFICE WORKS
11 7:53 12:00 12:18 5:00 DOING OFFICE WORKS
12 8:00 12:04 12:34 5:03 DOING OFFICE WORKS
13 8:00 12:00 12:19 5:00 DOING OFFICE WORKS
14 7:49 12:00 12:23 5:06 DOING OFFICE WORKS
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17
18
19
20
21
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24
25
26
27
28
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3
4
5
6
7
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10
11
12
13
14
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17 8:00 12:06 12:19 5:06 DOING OFFICE WORKS
18 7:21 12:05 12:22 5:06 DOING OFFICE WORKS
19 7:17 12:01 12:24 5:36 DOING OFFICE WORKS
20 7:35 12:02 12:19 5:02 DOING OFFICE WORKS
21 7:30 12:00 12:30 5:30 FAMILY DAY
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24 8:00 12:01 12:26 5:15 DOING OFFICE WORKS
25 7:21 12:05 12:25 5:24 DOING OFFICE WORKS
26 8:00 12:09 12:15 5:09 DOING OFFICE WORKS
27 7:22 12:00 12:20 5:00 DOING OFFICE WORKS
28 Leave station to Isulan and Marbel Carry communication for FPJ,GEMMA,CS Construction
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: November 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 8:00 12:05 12:20 5:00 DOING OFFICE WORKS
3 LEAVE STATION TO KORONADAL CITY TO TAKE THE COMPUTER LITERACY EXAM
4 TO TAKE THE COMPUTER LITERACY EXAM AT DPWH REGIONAL OFFICE XII
5 SATURDAY NO SERVICE RENDERED
6 SUNDAY NO SERVICE RENDERED
7 7:00 12:02 1:00 5:18 ATTENDED FLAG CEREMONY AT PROVINCIAL CAPITOL

8 7:53 12:02 12:15 5:02 DOING OFFICE WORKS


9 8:00 12:02 12:15 5:09 DOING OFFICE WORKS
10 7:26 12:00 12:36 5:00 DOING OFFICE WORKS
HANDCARRY DOCUMENTS TO MINROCK
11 LEAVE STATION TO COTABATO CITY CONSTRUCTION
12 SATURDAY NO SERVICE RENDERED
13 SUNDAY NO SERVICE RENDERED
14 7:51 12:10 1:00 5:09 DOING OFFICE WORKS
15 7:34 12:00 12:15 5:00 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:15 1:00 5:00 DOING OFFICE WORKS
2 8:00 12:05 12:33 5:00 DOING OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 HOLIDAY HOLIDAY
6 8:00 12:07 1:00 5:13 DOING OFFICE WORKS
7 8:00 12:11 12:15 5:04 DOING OFFICE WORKS
8 8:00 12:07 12:38 5:00 DOING OFFICE WORKS
9 8:00 12:00 12:39 5:00 DOING OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 8:00 12:03 12:21 5:00 DOING OFFICE WORKS
14 8:00 12:02 12:19 5:15 DOING OFFICE WORKS
15 7:52 12:01 12:17 5:04 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA
Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:56 12:00 12:35 5:02 DOING OFFICE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 HOLIDAY HOLIDAY
20 8:00 12:06 12:15 5:17 DOING OFFICE WORKS
21 SK 2ND DEO CHRISTMAS PARTY SK 2ND DEO CHRISTMAS PARTY
22 8:00 12:00 12:56 5:04 DOING OFFICE WORKS
23 8:00 12:05 1:00 5:03 DOING OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 8:00 12:05 12:50 5:01 DOING OFFICE WORKS
28 7:13 12:00 12:16 5:06 DOING OFFICE WORKS
29 8:00 12:04 12:25 5:20 DOING OFFICE WORKS
30 HOLIDAY HOLIDAY
31 SATURDAY SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: January 9-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2
3
4
5
6
7 SATURDAY
8 SUNDAY
9 7:35 12:00 12:35 5:01 DO OFFICE WORKS
10 7:40 12:03 12:40 5:05 DO OFFICE WORKS
11 7:50 12:05 12:15 5:03 DO OFFICE WORKS
12 7:20 12:00 12:20 5:00 DO OFFICE WORKS
13 7:55 12:04 12:47 5:09 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:05 12:09 12:40 5:49 DO OFFICE WORKS
17 7:45 12:00 12:50 5:00 DO OFFICE WORKS
18 7:30 12:05 12:45 5:08 DO OFFICE WORKS
19 7:58 12:07 12:15 5:06 DO OFFICE WORKS
20 7:45 12:00 12:15 5:00 DO OFFICE WORKS
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:02 12:23 5:00 DO OFFICE WORKS
24 8:00 12:03 1:00 5:09 DO OFFICE WORKS
25 8:00 12:02 12:18 5:06 DO OFFICE WORKS
26 8:00 12:08 12:20 5:09 DO OFFICE WORKS
27 7:45 12:00 12:15 5:01 DO OFFICE WORKS
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:50 12:05 1:00 5:16 DO OFFICE WORKS
31 8:00 12:00 12:33 5:12 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:04 12:40 5:03 Conducted the Assistant Chief of Construction
2 8:00 12:06 12:30 5:09 Section and DPWH Personnel
3 8:00 12:01 12:18 5:00 to their Official Travel.
4 SATURDAY SATURDAY
5 SUNDAY SUNDAY
6 7:30 12:05 12:39 5:04 Conducted the Assistant Chief of Construction
7 8:00 12:03 12:38 5:06 Section and DPWH Personnel
8 8:00 12:03 12:38 5:06 to their Official Travel.
9 7:15 12:03 12:36 6:20 Conducted the Assistant Chief of Construction
10 8:00 12:06 12:33 5:06 Section and DPWH Personnel to their Official Travel
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 7:26 12:08 12:29 5:10 Conducted the Assistant Chief of Construction
14 7:30 12:01 12:40 5:05 Section and DPWH Personnel
15 8:00 12:10 12:22 5:15 to their Official Travel.
16
17
18 SATURDAY SATURDAY

19 SUNDAY SUNDAY

20
21
22
23
24
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL LOIDA L. LEAL, MPA


Utility 2 / Driver 1 Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: February 16 - 28, 2017

Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM
UNDERT OVER
DAYS REMARKS
IME TIME
IN OUT IN OUT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:32 12:00 12:35 5:23 DO OFFICE WORKS
17 absent ABSENT
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 7:53 12:02 12:15 5:04 DO OFFICE WORKS
21 7:52 12:03 12:19 5:10 DO OFFICE WORKS
22 7:30 12:20 12:23 5:04 DO OFFICE WORKS
23 7:57 12:01 12:45 5:02 DO OFFICE WORKS
Leave station to follow up t-shirt and to buy Leave station to follow up t-shirt and to buy
24 decoration for convocation. decoration for convocation.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:05 12:09 12:41 5:04 DO OFFICE WORKS
28 7:59 12:01 12:15 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 Leave station to Cotabato City and Tacurong City To follow up excise taxes of Kanalan PS,
2 At DepEd Tacurong City Bululawan ES, and Plamango PS, and to
3 Return station to DPWH Lebak, Sultan Kudarat follow up the post completion report of
4 SATURDAY Kalibuhan ES at DepEd Tacurong City.
5 SUNDAY
Attended flag ceremony at Capitol, Attended flag ceremony at Capitol, Isulan,
6 Isulan Sultan Kkudarat
5:03
Sultan Kudarat
7 7:21 12:02 12:22 5:08 Do office work
8 7:44 12:06 12:36 5:02 Do office work
9 8:00 12:05 12:46 3:30 Do office work
10 ABSENT ABSENT
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 8:00 12:06 12:46 5:01 Do office work
14 7:48 12:26 12:41 5:04 Do office work
15 8:00 Leave Station to DPWH RO XII To follow up documents and to submit documents
16
17
18 SATURDAY
19 SUNDAY
20
21
22
23
24
25
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 At Regional Office XII, Koronadal city To follow up documents and to submit documents
17 Return station to DPWH Lebak, Sultan Kudarat Return Station to DPWH Lebak, Sultan Kudarat
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:07 12:23 5:16 Do office work
21 7:58 12:03 12:16 5:01 Do office work
22 7:40 12:06 12:19 5:02 Do office work
23 7:41 12:02 12:27 5:07 Do office work
24 7:47 Leave station to DepEd Tacurong City To follow up documents.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:23 12:10 12:48 5:02 Do office work
28 7:18 12:04 12:45 5:02 Do office work
29 7:52 12:03 12:28 5:02 Do office work
30 Leave station to DAR Office, Isulan, Sultan Kudarat Hand carry documents of 16MH0050 Bugso
31 At DAR Office, Isulan, Sultan Kudarat FMR at DAR, Isulan, Sultan Kudarat.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 At Provincial Capitol, Isulan, Sultan Kudarat 5:23 Attended Flag Ceremony at Provincial Capitol, Isulan Sultan Kudarat
4 8:00 12:11 12:29 5:03 Do Office works
5 7:44 12:04 12:15 5:13 Do Office works
6 7:33 12:00 Leave station to Isulan Submitted documents of list of Infrastructure Projects CY 2010 to CY
2016 under Congressman Arnulfo F. Go at the Provincial Governors
7 Still out at Provincial Capitol, Isulan, Sultan Kudarat Office.

8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
10 ABSENT ABSENT
11 ABSENT ABSENT
12 ABSENT ABSENT
13 HOLIDAY HOLIDAY
14 HOLIDAY HOLIDAY
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SUNDAY SUNDAY
17 8:00 12:04 12:19 5:01 Do office works
18 7:35 12:25 12:55 5:00 Do office works
19 7:23 12:03 12:20 5:00 Do office works
20 Absent Absent
21 Absent Absent
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 HOLIDAY HOLIDAY
Leave station to Esperanza,Bagumbayan,Senator
25 Ninoy Aquino,Palimbang Sultan Kudarat Assisted QAU personnels and Project Engineers
26 Still Out and Project Inspector at Esperanza-
27 Still Out bagumbayan-Senator Ninoy Aquino and
Leave station to Esperanza,Bagumbayan,Senator Palimbang and Prepared QAU documents
28 Ninoy Aquino,Palimbang Sultan Kudarat
29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY Holiday
Attended Flag Attended flag ceremony at Provincial Capitol, Isulan,
2 Ceremony 12:16 12:44 5:04
Sultan Kudarat/Do office works
3 7:34 12:04 12:16 5:05 Do office works
4 7:47 12:04 12:31 5:05 Do office works
5 7:45 12:00 12:19 5:00 Do office works
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 ABSENT ABSENT
9 8:00 12:00 1:00 5:04 Do office works
10 7:56 12:01 12:24 5:04 Do office works
11 7:39 12:03 12:23 5:02 Do office works
12 7:29 12:00 12:17 5:00 Do office works
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:26 12:06 12:26 5:00 Do office works
16
17
18
19
20 SATURDAY
21 SUNDAY
22
23
24
25
26
27 SATURDAY
28 SUNDAY
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM
AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3

5
6 SATURDAY

7 SUNDAY

8
9

10

11
12
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15
16 7:59 12:02 12:40 5:04 Do office works
17 8:00 12:03 12:20 5:05 Do office works
18 7:35 12:01 12:19 5:04 Do office works
19 7:50 12:04 12:17 5:00 Do office works
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:25 12:07 12:21 5:05 Do office works
23 7:36 12:02 12:23 5:04 Do office works
24 7:42 LEAVE STATION TO DepEd To submit letter request for final inspection of 14MH00104
Construction of Two Units One Storey Two Classroom School
25 AT DepEd DIVISON OF SULTAN KUDARAT Building, Kalibuhan, Palimbang, Sultan Kudarat at DepEd
26 Return station at DPWH LEBAK Division of Sultan Kudarat.
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:53 12:07 12:24 5:03 Do office works
30 8:00 12:03 12:23 5:00 Do office works
31 7:37 12:00 12:15 5:02 Do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat
DAILY TIME RECORD

For the month of: June 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME FOLLOW UP LIST OF CY2017 MULTI STOREY
1 Leave station to DepEd Division of Sultan Kudarat SCHOOL BUILDING PROJECTS FOR FUNDING TO
2 Still out at DepEd Division of Sultan Kudarat COVER THE SOIL INVESTIGATION UNDER DepEd'S
2017 BASIC EDUCATION FUND.
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
Attended flag ceremony at Provincial Attended flag ceremony at Provincial Capitol, Isulan,
5 5:02
Capitol Sultan Kudarat/Do Office works
6 7:40 12:07 12:17 5:04 DO OFFICE WORKS
7 7:53 12:03 12:15 Leave5:09
station at DO OFFICE WORKS
DepEd Division DO OFFICE WORKS/LEAVE STATION TO
8 7:48 12:02 12:21 of Sultan DEPARTMENT OF EDUCATION DIVISION OFFICE OF
9 Still out at DepEd Division of Sultan Kudarat
Kudarat
SULTAN KUDARAT
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 7:40 12:04 12:36 5:00 DO OFFICE WORKS
14 7:10 12:04 12:20 5:02 DO OFFICE WORKS
15 7:38 12:15 12:34 5:01 DO OFFICE WORKS
16

17 SATURDAY

18 SUNDAY

19

20
21
22
23
24 SATURDAY
25 SUNDAY
26
27
28
29
30

I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8

9
10
11
12
13
14
15
16 7:41 12:02 12:18 5:00 DO OFFICCE WORKS
17 SATURDAY SATURDAY
18 SUNDAY REHERSAL FOR
SUNDAY
19 7:24 12:06 12:23 DPWH
REHERSAL FOR
DO OFFICE WORKS
CELEBRATION
20 7:46 12:00 12:18 DPWH
REHERSAL FOR
DO OFFICE WORKS
CELEBRATION
21 7:58 12:00 12:16 DPWH
REHERSAL FOR
DO OFFICE WORKS
CELEBRATION
22 7:22 2:02 12:42 DPWH DO OFFICE WORKS
CELEBRATION
23 7:09 12:00 12:15 5:00 DPWH ANNIVERSARY CELEBRATION
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY

26 HOLIDAY HOLIDAY

27 7:00 12:05 12:22 5:00 DO OFFICE WORKS


28 7:13 12:02 12:43 5:00 DO OFFICE WORKS

29 7:50 12:02 12:18 5:01 DO OFFICE WORKS

30 7:34 12:00 12:29 5:00 DO OFFICE WORKS


I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 3-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 7:34 12:00 12:29 5:00
4 7:50 12:01 12:22 5:36
5 7:59 12:23 12:40 5:06 Do office works at Construction Section
6 7:36 12:04 12:24 5:00
7 8:00 12:02 12:20 5:00
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
At Department Of Education, Division of Sultan Follow up Post Completion of Kanalan Primary School,
10 Esperanza, Sultan Kudarat for approval of Rafael C.
Still at Department ofKudarat
11 Education Division Office
12:47 5:01 Fontanilla, Ph.D., CESO V/Do Office Works
12 7:31 12:05 12:31 5:09
13 7:41 12:04 12:19 5:03 Do office works at Construction Section
14 7:40 12:00 12:49 5:00
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17 8:00 12:08 12:31 5:06
18 7:20 12:07 12:26 5:00
19 7:16 12:02 12:31 5:05 Do office works at Construction Section
20 7:28 12:24 12:34 5:08
21 7:01 12:00 12:30 5:00
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 7:45 12:06 12:15 5:06
25 7:51 12:04 12:30 5:-01
Do office works at Construction Section
26 7:33 12:04 12:34 5:04
27 7:37 12:02 12:25 5:06 Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
28 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V
29 SATURDAY SATURDAY
30 SUNDAY SUNDAYReport of Limulan
Follow up Post Completion
At Department Of Education, Division of Sultan
31 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval
I hereby certify on my honor that the above is a true and Verified as toofthe
Rafael C. Fontanilla,
prescribed Ph. D., CESO V
office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 16 - 31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:22 12:05 12:15 5:14
17 8:00 12:21 12:31 5:06 DO OFFICE WORKS
18 8:00 12:00 12:45 5:00
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 HOLIDAY HOLIDAY
22 8:00 12:06 12:17 5:02
23 7:54 12:14 12:33 5:01
DO OFFICE WORKS
24 7:59 12:21 12:42 5:00
25 7:42 12:00 12:15 5:00
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 HOLIDAY HOLIDAY
29 7:16 12:18 12:29 5:04
30 7:57 12:01 12:18 5:00 DO OFFICE WORKS
31 7:48 12:04 12:21 5:00
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1-15,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY
2 SATURDAY
3 SUNDAY
ATTENDED FLAG CEREMONY AT CAPITOL/DO
4 8:00 12:00 12:59 5:05
OFFICE WORK
5 7:39 12:00 12:28 5:01 DO OFFICE WORKS
6 7:34 12:07 12:24 5:08 DO OFFICE WORKS
7 7:39 12:15 12:29 5:03 DO OFFICE WORKS
8 7:34 12:05 12:15 5:00 DO OFFICE WORKS
9 SATURDAY SATURDAY
10 SUNDAY SUNDAY
11 6:56 12:09 12:25 5:04 DO OFFICE WORKS
12 7:34 12:12 12:26 5:04 DO OFFICE WORKS
13 7:16 12:05 12:23 5:00 DO OFFICE WORKS
14 7:35 12:02 12:22 5:00 DO OFFICE WORKS
15 7:44 12:01 12:17 5:06 DO OFFICE WORKS
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 16-30,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:35 12:08 12:26 5:03 DOING OFFICE WORKS
19 7:21 12:20 12:32 5:03 DOING OFFICE WORKS
20 7:41 12:01 12:20 5:04 DOING OFFICE WORKS
21 HOLIDAY HOLIDAY
22 7:30 12:00 12:15 5:00 DOING OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 7:08 12:09 12:20 5:01 DOING OFFICE WORKS
26 7:33 12:04 12:28 5:03 DOING OFFICE WORKS
27 7:47 12:03 12:33 5:00 DOING OFFICE WORKS
28 8:00 12:45 12:46 5:00 DOING OFFICE WORKS
29 7:48 12:05 12:27 5:00 DOING OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: OCTOBER 1 - 30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 7:43 12:05 12:27 5:01 DO OFFICE WORKS
3 7:41 12:03 12:33 5:03 DO OFFICE WORKS
4 7:25 12:08 12:34 5:00 DO OFFICE WORKS
5 7:36 12:10 12:22 5:02 DO OFFICE WORKS
6 7:24 12:05 12:20 5:00 DO OFFICE WORKS
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 7:47 12:06 12:27 5:03 DO OFFICE WORKS
10 7:39 12:08 12:28 5:00 DO OFFICE WORKS
11 7:19 12:21 12:30 5:01 DO OFFICE WORKS
12 7:31 12:06 12:15 5:02 DO OFFICE WORKS
13 7:42 12:00 12:20 5:00 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 HOLIDAY HOLIDAY
17 HOLIDAY HOLIDAY
18 7:55 12:07 12:40 5:05 DO OFFICE WORK
19 7:30 12:18 12:31 5:03 DO OFFICE WORK
20 7:38 12:00 12:19 5:00 DO OFFICE WORK
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:13 12:33 5:00 DO OFFICE WORK
24 7:27 12:12 12:22 5:02 DO OFFICE WORK
25 7:58 12:04 12:32 5:14 DO OFFICE WORK
26 7:18 12:00 12:23 5:00 DO OFFICE WORK
27 7:49 12:00 12:30 5:02 DO OFFICE WORK
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:20 12;15 12:40 5:00 DO OFFICE WORK
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: NOVEMBER 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:50 12:06 12:25 5:03 DO OFFICE WORKS
17 7:26 12:02 12:16 5:00 DO OFFICE WORKS
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:05 12:13 5:01 DO OFFICE WORKS
21 7:53 12:23 12:25 5:00 DO OFFICE WORKS
22 HOLIDAY HOLIDAY
23 7:50 12:01 12:29 5:06 DO OFFICE WORKS
24 7:31 12:00 12:15 5:00 DO OFFICE WORKS
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 LEAVE STATION TO ISULAN FOLLOW UP POST COMPLETION REPORT
28 STILL OUT AT DEPERTMENT OF EDUCATION REGION
29 RETURN STATION TO LEBAK XII, DIVISION OF SULTAN KUDARAT
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
REYNALDO C. GUARDIANO, JR.
Assistant Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: DECEMBER 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY SATURDAY
17 SUNDAY SUNDAY
18 7:37 12:07 12:26 5:05 DO OFFICE WORKS
19 HOLIDAY HOLIDAY
20 7:46 12:12 12:25 5:01 DO OFFICE WORKS
21 7:48 12:00 12:05 5:03 DO OFFICE WORKS
22 7:20 12:01 12:20 5:00 DO OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 HOLIDAY HOLIDAY
26 HOLIDAY HOLIDAY
27 7:50 12:00 12:20 5:05 DO OFFICE WORKS
28 7:35 12:10 12:30 5:05 DO OFFICE WORKS
29 7:30 12:17 12:30 5:02 DO OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:30 12:01 12:22 5:01 PREPARES LOGBOOK FOR PROJECTS/DO
2 8:00 12:00 12:25 5:01 OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 8:00 12:00 12:15 5:00 PREPARES LOGBOOK FOR PROJECTS/DO
6 7:56 12:00 12:15 5:00 OFFICE WORKS
7 LEAVE STATION TO BAGUMBAYAN, S. K.
8 STILL OUT AT BAGUMBAYAN, S. K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
BAGUMBAYAN & SENATOR NINOY AQUINO, SULTAN
TURN OVER CONGRESSIONAL COMPLETED KUDARAT
9
PROJECTS AT BAGUMBAYAN, S.K.
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:50 12:07 12:36 5:04 PREPARES LOGBOOK FOR PROJECTS/DO
13 7:20 12:10 12:50 5;04 OFFICE WORKS
14 LEAVE STATION TO BAGUMBAYAN, S. K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
15 STILL OUT AT BAGUMBAYAN, S. K. BAGUMBAYAN & SENATOR NINOY AQUINO, SULTAN
KUDARAT
16 RETURN STATION TO LEBAK, S.K.
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:23 12:04 12:29 5:02 PREPARES LOGBOOK FOR PROJECTS/DO
20 7:40 12:03 12:19 5:01 OFFICE WORKS
21 LEAVE STATION TO BAGUMBAYAN, S. K.
ASSIST PE, PI IN SUPERVISING PROJECTS AT
22 STILL OUT AT BAGUMBAYAN, S. K. BAGUMBAYAN & SENATOR NINOY AQUINO, SULTAN
KUDARAT
23 RETURN STATION TO LEBAK, S.K.
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 8:00 12:01 12:24 5:00
PREPARES LOGBOOK FOR PROJECTS/DO
27 7:56 12:01 12:16 5:00 OFFICE WORKS
28 8:00 12:00 HOLIDAY
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 8:00 12:04 12:19 5:07 DO OFFICE WORKS
3 8:00 12:00 12:16 5:00 DO OFFICE WORKS
4 LEAVE STATION TO SENATOR NINOY AQUINO, S. K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
5 STILL AT SENATOR NINOY AQUINO, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
6 RETURN STATION TO LEBAK, S.K. SULTAN KUDARAT
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:50 12:01 12:29 5:00 ASSIST PE, PI IN SUPERVISING PROJECTS AT
11 8:00 12:02 LEAVE STATION TO SNA, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
12 STILL AT SENATOR NINOY AQUINO, S.K. SULTAN KUDARAT
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:50 12:07 12:38 5:04
17 8:00 12:00 12:13 5:02 ASSIST PE, PI IN SUPERVISING PROJECTS AT
BAGUMBAYAN & SENATOR NINOY AQUINO, SULTAN
18 8:00 12:09 LEAVE STATION TO SNA, S.K.
KUDARAT
19 STILL AT SENATOR NINOY AQUINO, S.K.
TRAINING/SEMINAR ON PROJECT PROPER
BRILLE'S CHICKEN PALACE, ISULAN, SULTAN
20 IMPLEMENTATION AND MATERIALS QUALITY
KUDARAT CONTROL
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 LEAVE STATION TO SENATOR NINOY AQUINO, S. K.
24 STILL AT SENATOR NINOY AQUINO, S.K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
25 STILL AT SENATOR NINOY AQUINO, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
26 STILL AT SENATOR NINOY AQUINO, S.K. SULTAN KUDARAT
27 RETURN STATION TO LEBAK, S.K.
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
ASSIST PE, PI IN SUPERVISING PROJECTS AT
STILL AT SENATOR NINOY
30 7:48 BAGUMBAYAN & SENATOR NINOY AQUINO,
AQUINO, S.K. SULTAN KUDARAT
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
LEAVE STATION TO SENATOR NINOY AQUINO, S.
2 K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
3 STILL AT SENATOR NINOY AQUINO, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
RETURN STATION TO LEBAK, S.K. SULTAN KUDARAT
4
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:20 12:04 12:27 5:03 DO OFFICE WORKS
LEAVE STATION TO SENATOR NINOY AQUINO, S.
8 ASSIST PE, PI IN SUPERVISING PROJECTS AT
K.
9 STILL AT SENATOR NINOY AQUINO, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
10 STILL AT SENATOR NINOY AQUINO, S.K. SULTAN KUDARAT
11 RETURN STATION TO LEBAK, S.K.
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
ASSIST PE, PI IN SUPERVISING PROJECTS AT
LEAVE STATION TO SENATOR NINOY
15 BAGUMBAYAN & SENATOR NINOY AQUINO,
AQUINO, S. K.
SULTAN KUDARAT
16
17
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section
Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ASSIST PE, PI IN SUPERVISING PROJECTS AT
LEAVE STATION TO SENATOR NINOY
16 BAGUMBAYAN & SENATOR NINOY AQUINO, SULTAN
AQUINO, S. K. KUDARAT
17 7:50 12:05 12:20 8:00 DO OFFICE WORKS
18 7:20 12:04 12:21 5:05 DO OFFICE WORKS
19 SATURDAY
20 SUNDAY
21 7:36 12:02 12:15 5:08 DO OFFICE WORKS
22 8:00 12:00 12:22 5:00 DO OFFICE WORKS
23 7:50 12:03 12:40 5:00 DO OFFICE WORKS
LEAVE STATION TO SENATOR NINOY ASSIST PE, PI IN SUPERVISING PROJECTS AT
24
AQUINO, S. K. BAGUMBAYAN & SENATOR NINOY AQUINO,
25 RETURN STATION TO LEBAK, S.K. SULTAN KUDARAT
26 SATURDAY
27 SUNDAY
LEAVE STATION TO SENATOR NINOY
28
AQUINO, S. K. ASSIST PE, PI IN SUPERVISING PROJECTS AT
29 STILL AT SENATOR NINOY AQUINO, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
30 STILL AT SENATOR NINOY AQUINO, S.K. SULTAN KUDARAT
31 STILL AT SENATOR NINOY AQUINO, S.K.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR
Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1 - 15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
ASSIST PE, PI IN SUPERVISING PROJECTS AT
1 RETURN STATION TO LEBAK, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
SULTAN KUDARAT
2 SATURDAY
3 SUNDAY
4 7:55 12:02 12:17 5:00 DO OFFICE WORKS
5 7:50 12:00 12:15 5:00 DO OFFICE WORKS
6 7:30 12:02 12:19 5:30 DO OFFICE WORKS
ASSIST PE, PI IN SUPERVISING PROJECTS AT
LEAVE STATION TO SENATOR NINOY
7 BAGUMBAYAN & SENATOR NINOY AQUINO,
AQUINO, S. K.
ASSIST PE, PISULTAN
IN SUPERVISING
KUDARAT PROJECTS AT
8 RETURN STATION TO LEBAK, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
SULTAN KUDARAT
9 SATURDAY
10 SUNDAY
ASSIST PE, PI IN SUPERVISING PROJECTS AT
LEAVE STATION TO SENATOR NINOY
11 BAGUMBAYAN & SENATOR NINOY AQUINO,
AQUINO, S. K.
SULTAN KUDARAT
12 HOLIDAY
ASSIST PE, PI IN SUPERVISING PROJECTS AT
13 STILL AT SENATOR NINOY AQUINO, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
ASSIST PE, PISULTAN KUDARAT PROJECTS AT
IN SUPERVISING
14 RETURN STATION TO LEBAK, S.K. BAGUMBAYAN & SENATOR NINOY AQUINO,
SULTAN KUDARAT
15 HOLIDAY
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23 SATURDAY
24 SUNDAY
25
26
27
28
29
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 7:59 12:01 12:33 5:18
ASSIST PE, PI IN SUPERVISING PROJECTS AT
2 8:00 12:02 12:18 5:10
BAGUMBAYAN & SENATOR NINOY AQUINO,
Leave Station to Bagumbayan & Senator Ninoy SULTAN KUDARAT
3
Aquino.
4 SATURDAY
5 SUNDAY
Leave Station to Bagumbayan & Senator Ninoy
6 Aquino.
7 Still Out ASSIST PE, PI IN SUPERVISING PROJECTS AT
BAGUMBAYAN & SENATOR NINOY AQUINO,
8 Still Out
SULTAN KUDARAT
9 Still Out
10 Return Station to Lebak, Sultan Kudarat
11 SATURDAY
12 SUNDAY
Leave Station to Bagumbayan & Senator
13 ASSIST PE, PI IN SUPERVISING PROJECTS AT
Ninoy Aquino.
BAGUMBAYAN & SENATOR NINOY AQUINO,
14 Still Out SULTAN KUDARAT
15 Still Out
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
ASSIST PE, PI IN SUPERVISING PROJECTS
15
AT BAGUMBAYAN & SENATOR NINOY
16 Still out
AQUINO, SULTAN KUDARAT
17 Return Station to Lebak, Sultan Kudarat
18 SATURDAY
19 SUNDAY
Leave Station to Bagumbayan & Senator Ninoy
20
Aquino.
ASSIST PE, PI IN SUPERVISING PROJECTS AT
21 HOLIDAY BAGUMBAYAN & SENATOR NINOY AQUINO,
22 8:09 12:04 12:30 5:03 SULTAN KUDARAT/do office works
23 7:59 12:01 12:28 5:00
24 7:43 12:03 12:20 5:00
25 SATURDAY
26 SUNDAY
27 HOLIDAY
Leave Station to Bagumbayan & Senator Ninoy
28
Aquino. ASSIST PE, PI IN SUPERVISING PROJECTS AT
29 Still out BAGUMBAYAN & SENATOR NINOY AQUINO,
30 Still out SULTAN KUDARAT
31 Return Station to Lebak, Sultan Kudarat
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: September 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTIM OVER
DAYS E REMARKS
IN OUT IN OUT TIME
1 SATURDAY
2 SUNDAY
3 RETURN STATION TO LEBAK
4 7:53 12:01 12:42 5:00 ASSIST PE, PI IN SUPERVISING PROJECTS AT
5 7:55 12:04 12:40 5:00 BAGUMBAYAN & SENATOR NINOY AQUINO, SULTAN
6 LEAVE STATION KUDARAT
7 BAGUMBAYAN & SENATOR NINOY AQUINO
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
ASSIST PE, PI IN SUPERVISING PROJECTS AT BAGUMBAYAN &
10 BAGUMBAYAN & SENATOR NINOY AQUINO SENATOR NINOY AQUINO, SULTAN KUDARAT

11 HOLIDAY HOLIDAY
12 BAGUMBAYAN & SENATOR NINOY AQUINO ASSIST PE, PI IN SUPERVISING PROJECTS AT
13 BAGUMBAYAN & SENATOR NINOY AQUINO BAGUMBAYAN & SENATOR NINOY AQUINO,
14 RETURN STATION TO LEBAK SULTAN KUDARAT
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

MARK ANTHONY T. DIMEN REYNALDO C. GUARDIANO, JR


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5
6
7
8
9
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12
13
14
15
16
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19
20
21
22
23
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26
27
28 HOLIDAY
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

REYNALDO C GUARDIANO, JR
Laborer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 16-28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

SUBMIT/PROCESS CONTRACT OF SERVICE FOR JOB


RETURN STATION TO LEBAK, SULTAN
16 ORDER (HIRE) PERSONNEL OF CONSTRUCTION
KUDART SECTION AT DPWH RO. XII, KORONADAL CITY

17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:40 12:03 12:29 5:49 DO OFFICE WORKS
20 7:50 12:14 12:42 5:31 DO OFFICE WORKS
21 7:40 12:06 12:35 8:00 DO OFFICE WORKS
22 7:55 12:00 12:31 5:00 DO OFFICE WORKS
23 7:50 12:04 12:46 5:00 DO OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:38 12:09 12:26 5:03 DO OFFICE WORKS
27 7:46 12:00 12:15 5:05 DO OFFICE WORKS
28 7;34 12:02 DO OFFICE WORKS
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

REYNALDO C GUARDIANO, JR
Laborer I Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MAY 16 - 31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 8:00 12:17 12:59 5:10 DO OFFICE WORKS
17 8:00 12:11 12:43 5:00 DO OFFICE WORKS
ASSIST PE & PI IN SUPERVIVING ON GOING
18 OUT TO KALAMANSIG, S. K. PROJECTS
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 8:13 12:00 12:54 5:00 DO OFFICE WORKS
ASSIST PE & PI IN SUPERVIVING ON GOING
22 OUT TO KALAMANSIG, S. K. PROJECTS
23 8:08 12:04 12:46 5:00 DO OFFICE WORKS
ASSIST PE & PI IN SUPERVIVING ON GOING
24 OUT TO KALAMANSIG, S. K. PROJECTS
ASSIST PE & PI IN SUPERVIVING ON GOING
25 OUT TO KALAMANSIG, S. K. PROJECTS
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 7:34 12:02 12:50 3:48 DO OFFICE WORKS
ASSIST PE & PI IN SUPERVIVING ON GOING
29 OUT TO KALAMANSIG, S. K. PROJECTS
30 8:00 12:00 12:15 5:05 DO OFFICE WORKS
ASSIST PE & PI IN SUPERVIVING ON GOING
31 OUT TO KALAMANSIG, S. K. PROJECTS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
JOCARNINE S. ANSAO REYNALDO C. GUARDIANO, JR.
Engineering Aide Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC - Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 30, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 LEAVE STATION TO DPWH RO XII,KORONADAL CITY
SCHEDULE EXAMINATION FOR CLE AT DPWH
4 AT REGIONAL OFFICE XII, KORONADAL CITY REGIONAL OFFICE XII, KORONADAL CITY
5 RETURN STATION TO LEBAK, SULTAN KUDARAT
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 ABSENT ABSENT
9 ABSENT ABSENT
10 ABSENT ABSENT
11 ABSENT ABSENT
12 ABSENT ABSENT
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:58 12:04 12:43 5:04 DO OFFICE WORKS
16 8:00 12:02 12:23 5:04 DO OFFICE WORKS
17 8:05 12:12 12:18 5:02 DO OFFICE WORKS
DO OFFICE WORKS/CONSTRUCTION COORDINATION
18 7:53 12:00 12:30 5:01 MEETING
19 8:00 12:00 12:48 5:00 DO OFFICE WORKS
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 ABSENT ABSENT
23 ABSENT ABSENT
24 ABSENT ABSENT
25 8:03 12:16 12:18 5:02 DO OFFICE WORKS
26 7:58 12:03 12:15 5:00 DO OFFICE WORKS
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 DO OFFICE WORKS
30 7:23 12:10 12:22 5:08 DO OFFICE WORKS
31 8:00 12:08 12:29 5:05 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:54 12:08 12:49 5:06 DO OFFICE WORKS
2 8:00 12:01 12:26 5:00 DO OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00 DO OFFICE WORKS
6 8:00 12:15 12:41 5:00 DO OFFICE WORKS
7 7:51 12:04 12:33 5:01 DO OFFICE WORKS
8 7:53 12:10 12:19 5:04 DO OFFICE WORKS
9 7:56 12:00 12:45 5:00 DO OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:30 5:10 DO OFFICE WORKS
13 7:50 12:08 12:15 5:05 DO OFFICE WORKS
14 7:49 12:04 12:23 5:00 DO OFFICE WORKS
15 7:56 12:02 12:31 5:01 DO OFFICE WORKS
16 HOLIDAY HOLIDAY
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:42 12:04 12:15 5:06 DO OFFICE WORKS
20 7:51 12:08 12:24 5:06 DO OFFICE WORKS
21 8:00 12:07 12:17 5:04 DO OFFICE WORKS
22 7:52 12:07 12:47 5:06 DO OFFICE WORKS
23 7:47 12:09 12:22 5:04 DO OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:50 12:18 12:31 5:04 DO OFFICE WORKS
27 7:59 12:11 12:31 5:00 DO OFFICE WORKS
28 7:58 12:00 12:15 5:00 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:36 12:05 12:21 5:02 DO OFFICE WORKS
2 7:58 12:04 12:14 5:04 DO OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:43 12:00 12:15 5:00 DO OFFICE WORKS
6 7:56 12:11 12:29 5:07 DO OFFICE WORKS
7 7:55 12:00 12:17 5:04 DO OFFICE WORKS
8 7:24 12:08 12:18 5:03 DO OFFICE WORKS
9 7:58 12:01 12:20 5:00 DO OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:52 12:04 12:15 5:22 DO OFFICE WORKS
13 7:56 12:02 12:13 5:00 DO OFFICE WORKS
LEAVE STATION TO
14 7:43 12:01 DPWH RO XII SUBMIT/PROCESS CONTRACT OF SERVICE FOR JOB
ORDER (HIRE) PERSONNEL OF CONSTRUCTION
15 AT DPWH RO XII, KORONADAL CITY SECTION AT DPWH RO. XII, KORONADAL CITY

16
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19
20
21
22
23
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:56 12:03 12:26 5:12 DO OFFICE WORKS
2 LEAVE STATION TO MASIAG, BAGUMBAYAN PROJECT SUPERVISION
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 8:00 12:08 12:40 5:00 DO OFFICE WORKS
6 8:03 12:11 12:27 5:06 DO OFFICE WORKS
7 7:59 12:13 12:33 5:00 DO OFFICE WORKS
8 8:00 12:05 12:20 5:03 DO OFFICE WORKS
9 LEAVE STATION TO BAGUMBAYAN TURN OVER CEREMONY OF PROJECTS
10 SATURDAY NO SERVICE RENDERED
11 SUNDAY NO SERVICE RENDERED
12 7:47 12:02 12:17 5:15 DO OFFICE WORKS
13 7:48 12:05 12:24 5:03 DO OFFICE WORKS
14 8:06 12:09 12:34 5:01 DO OFFICE WORKS
15 8:03 12:03 12:29 5:04 DO OFFICE WORKS
16 7:59 12:13 12:31 5:02 DO OFFICE WORKS
17 SATURDAY
18 SUNDAY
19 8:00 12:07 12:27 5:02 DO OFFICE WORKS
20 7:33 12:06 12:28 5:13 DO OFFICE WORKS
21 8:09 12:06 12:31 5:01 DO OFFICE WORKS
22 LEAVE STATION TO MASIAG, BAGUMBAYAN PROJECT SUPERVISION
23 STILL AT MASIAG, BAGUMBAYAN PROJECT SUPERVISION
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
LEAVE STATION TO MASIAG, BAGUMBAYAN &
26 LANGGAL, SNA.
PROJECT SUPERVISION

27 STILL AT MASIAG, BAGUMBAYAN & LANNGAL SNA PROJECT SUPERVISION


RETURN STATION AT
28 LEBAK, SK.
PROJECT SUPERVISION
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

CLIFFORD D. BERCASIO REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 31, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 7:50 12:01 12:23 5:06 Clen/Check service vehicle daily before travel
4 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
5 7:15 12:05 12:45 5:02 personnel on their Official Travel.
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 7:25 12:01 12:36 5:10
9 7:26 12:00 12:45 5:02 Clen/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
10 7:49 12:15 12:30 5:09 personnel on their Official Travel.
11 7:50 12:13 12:36 5:05
12 7:30 12:00 12:45 5:09
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:40 12:06 12:30 5:06
16 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
17 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
18 8:00 12:16 12:18 5:02 personnel on their Official Travel.
19 7:58 12:03 12:15 5:00
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:40 12:06 12:30 5:06
23 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
24 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
25 8:00 12:16 12:18 5:02 personnel on their Official Travel.
26 7:58 12:03 12:15 5:00
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 Clen/Check service vehicle daily before travel
30 7:23 12:10 12:22 5:08 by Construction Section and Conduct the DPWH
31 8:00 12:08 12:29 5:05 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Maintenance Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:54 12:08 12:49 5:06 Clean/Check service vehicle daily before travel by Construction Section
and Conduct the DPWH personnel on their Official Travel.
2 8:00 12:01 12:26 5:00
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00
6 8:00 12:15 12:41 5:00 Clean/Check service vehicle daily before travel
7 7:51 12:04 12:33 5:01 by Construction Section and Conduct the DPWH
8 7:53 12:10 12:19 5:04 personnel on their Official Travel.
9 7:56 12:00 12:45 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:15 5:00
13 7:50 12:01 12:23 5:06 Clean/Check service vehicle daily before travel
14 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
15 7:15 12:05 12:45 5:02 personnel on their Official Travel.
16 7:15 12:05 12:45 5:02
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:40 12:06 12:30 5:06
20 7:20 12:00 12:50 5:00 Clean/Check service vehicle daily before travel
21 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
22 8:00 12:16 12:18 5:02 personnel on their Official Travel.
23 7:58 12:03 12:15 5:00
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:40 12:06 12:30 5:06 Clean/Check service vehicle daily before travel
27 7:20 12:00 12:50 5:00 by Construction Section and Conduct the DPWH
28 8:00 12:00 12:30 5:07 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Maintenance Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1 - 31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:37 12:08 12:49 5:07
DO MANUAL WORKS
2 8:00 12:01 12:26 5:00
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00
6 8:00 12:01 12:32 5:05
7 7:51 12:07 12:15 5:00 DO MANUAL WORKS
8 7:53 12:10 12:19 5:04
9 7:56 12:00 12:45 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:15 5:00
13 7:57 12:02 12:15 5:07
14 7:58 12:44 12:46 5:07 DO MANUAL WORKS
15 7:15 12:05 12:45 5:02
16
17 SATURDAY
18 SUNDAY
19 7:50 12:02 12:42 5:00
20 8:00 12:01 12:32 5:05
21 7:51 12:07 12:15 5:00 DO MANUAL WORKS
22 7:53 12:10 12:19 5:04
23 7:56 12:00 12:45 5:00
24 SATURDAY
25 SUNDAY
26 7:57 12:02 12:15 5:07
27 7:58 12:44 12:46 5:07 DO MANUAL WORKS
28 7:15 12:05 12:45 5:02
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ALLAN T. OTAYDE REYNALDO G. CASTOR


Employee Assistant Chief, Maintenance Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: September 16-30, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3 SATURDAY NO SERVICE RENDERED
4 SUNDAY NO SERVICE RENDERED
5
6
7
8
9
10 SATURDAY NO SERVICE RENDERED
11 SUNDAY NO SERVICE RENDERED
12
13
14
15
16 8:00 12:00 1:00 5:00 DOING OFFICE WORKS
17 SATURDAY NO SERVICE RENDERED
18 SUNDAY NO SERVICE RENDERED
19 8:00 12:00 12:18 5:03 DOING OFFICE WORKS
20 7:19 12:07 12:43 5:01 DOING OFFICE WORKS
21 7:15 12:10 12:17 5:07 DOING OFFICE WORKS
22 7:39 12:12 12:17 5:11 DOING OFFICE WORKS
23 7:30 12:00 12:18 5:00 DOING OFFICE WORKS
24 SATURDAY NO SERVICE RENDERED
25 SUNDAY NO SERVICE RENDERED
26 8:00 12:31 12:32 5:00 DOING OFFICE WORKS
27 7:42 12:05 12:21 5:09 DOING OFFICE WORKS
28 8:00 12:11 12:26 5:07 DOING OFFICE WORKS
29 7:19 12:00 12:15 5:00 DOING OFFICE WORKS
30 8:00 12:09 12:15 5:00 DOING OFFICE WORKS
31 SATURDAY NO SERVICE RENDERED
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3 HOLIDAY HOLIDAY
4 8:00 12:01 12:15 5:07 DOING OFFICE WORKS
5 8:00 12:14 12:15 5:14 DOING OFFICE WORKS
6 7:50 12:11 12:35 5:03 DOING OFFICE WORKS
7 8:00 12:01 12:59 5:00 DOING OFFICE WORKS
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10 8:00 12:06 12:28 5:02 DOING OFFICE WORKS
11 7:53 12:00 12:18 5:00 DOING OFFICE WORKS
12 8:00 12:04 12:34 5:03 DOING OFFICE WORKS
13 8:00 12:00 12:19 5:00 DOING OFFICE WORKS
14 7:49 12:00 12:23 5:06 DOING OFFICE WORKS
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17
18
19
20
21
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24
25
26
27
28
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3
4
5
6
7
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10
11
12
13
14
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17 8:00 12:06 12:19 5:06 DOING OFFICE WORKS
18 7:21 12:05 12:22 5:06 DOING OFFICE WORKS
19 7:17 12:01 12:24 5:36 DOING OFFICE WORKS
20 7:35 12:02 12:19 5:02 DOING OFFICE WORKS
21 7:30 12:00 12:30 5:30 FAMILY DAY
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24 8:00 12:01 12:26 5:15 DOING OFFICE WORKS
25 7:21 12:05 12:25 5:24 DOING OFFICE WORKS
26 8:00 12:09 12:15 5:09 DOING OFFICE WORKS
27 7:22 12:00 12:20 5:00 DOING OFFICE WORKS
28 Leave station to Isulan and Marbel Carry communication for FPJ,GEMMA,CS Construction
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: November 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 8:00 12:05 12:20 5:00 DOING OFFICE WORKS
3 LEAVE STATION TO KORONADAL CITY TO TAKE THE COMPUTER LITERACY EXAM
4 TO TAKE THE COMPUTER LITERACY EXAM AT DPWH REGIONAL OFFICE XII
5 SATURDAY NO SERVICE RENDERED
6 SUNDAY NO SERVICE RENDERED
7 7:00 12:02 1:00 5:18 ATTENDED FLAG CEREMONY AT PROVINCIAL CAPITOL

8 7:53 12:02 12:15 5:02 DOING OFFICE WORKS


9 8:00 12:02 12:15 5:09 DOING OFFICE WORKS
10 7:26 12:00 12:36 5:00 DOING OFFICE WORKS
HANDCARRY DOCUMENTS TO MINROCK
11 LEAVE STATION TO COTABATO CITY CONSTRUCTION
12 SATURDAY NO SERVICE RENDERED
13 SUNDAY NO SERVICE RENDERED
14 7:51 12:10 1:00 5:09 DOING OFFICE WORKS
15 7:34 12:00 12:15 5:00 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA
Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:15 1:00 5:00 DOING OFFICE WORKS
2 8:00 12:05 12:33 5:00 DOING OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 HOLIDAY HOLIDAY
6 8:00 12:07 1:00 5:13 DOING OFFICE WORKS
7 8:00 12:11 12:15 5:04 DOING OFFICE WORKS
8 8:00 12:07 12:38 5:00 DOING OFFICE WORKS
9 8:00 12:00 12:39 5:00 DOING OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 8:00 12:03 12:21 5:00 DOING OFFICE WORKS
14 8:00 12:02 12:19 5:15 DOING OFFICE WORKS
15 7:52 12:01 12:17 5:04 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:56 12:00 12:35 5:02 DOING OFFICE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 HOLIDAY HOLIDAY
20 8:00 12:06 12:15 5:17 DOING OFFICE WORKS
21 SK 2ND DEO CHRISTMAS PARTY SK 2ND DEO CHRISTMAS PARTY
22 8:00 12:00 12:56 5:04 DOING OFFICE WORKS
23 8:00 12:05 1:00 5:03 DOING OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 8:00 12:05 12:50 5:01 DOING OFFICE WORKS
28 7:13 12:00 12:16 5:06 DOING OFFICE WORKS
29 8:00 12:04 12:25 5:20 DOING OFFICE WORKS
30 HOLIDAY HOLIDAY
31 SATURDAY SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: January 9-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2
3
4
5
6
7 SATURDAY
8 SUNDAY
9 7:35 12:00 12:35 5:01 DO OFFICE WORKS
10 7:40 12:03 12:40 5:05 DO OFFICE WORKS
11 7:50 12:05 12:15 5:03 DO OFFICE WORKS
12 7:20 12:00 12:20 5:00 DO OFFICE WORKS
13 7:55 12:04 12:47 5:09 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:05 12:09 12:40 5:49 DO OFFICE WORKS
17 7:45 12:00 12:50 5:00 DO OFFICE WORKS
18 7:30 12:05 12:45 5:08 DO OFFICE WORKS
19 7:58 12:07 12:15 5:06 DO OFFICE WORKS
20 7:45 12:00 12:15 5:00 DO OFFICE WORKS
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:02 12:23 5:00 DO OFFICE WORKS
24 8:00 12:03 1:00 5:09 DO OFFICE WORKS
25 8:00 12:02 12:18 5:06 DO OFFICE WORKS
26 8:00 12:08 12:20 5:09 DO OFFICE WORKS
27 7:45 12:00 12:15 5:01 DO OFFICE WORKS
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:50 12:05 1:00 5:16 DO OFFICE WORKS
31 8:00 12:00 12:33 5:12 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:04 12:40 5:03 Conducted the Assistant Chief of Construction
2 8:00 12:06 12:30 5:09 Section and DPWH Personnel
3 8:00 12:01 12:18 5:00 to their Official Travel.
4 SATURDAY SATURDAY
5 SUNDAY SUNDAY
6 7:30 12:05 12:39 5:04 Conducted the Assistant Chief of Construction
7 8:00 12:03 12:38 5:06 Section and DPWH Personnel
8 8:00 12:03 12:38 5:06 to their Official Travel.
9 7:15 12:03 12:36 6:20 Conducted the Assistant Chief of Construction
10 8:00 12:06 12:33 5:06 Section and DPWH Personnel to their Official Travel
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 7:26 12:08 12:29 5:10 Conducted the Assistant Chief of Construction
14 7:30 12:01 12:40 5:05 Section and DPWH Personnel
15 8:00 12:10 12:22 5:15 to their Official Travel.
16
17
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20
21
22
23
24
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL LOIDA L. LEAL, MPA


Utility 2 / Driver 1 Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: February 16 - 28, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

16 7:32 12:00 12:35 5:23 DO OFFICE WORKS

17 absent ABSENT
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 7:53 12:02 12:15 5:04 DO OFFICE WORKS
21 7:52 12:03 12:19 5:10 DO OFFICE WORKS
22 7:30 12:20 12:23 5:04 DO OFFICE WORKS
23 7:57 12:01 12:45 5:02 DO OFFICE WORKS
Leave station to follow up t-shirt and to buy Leave station to follow up t-shirt and to buy
24 decoration for convocation. decoration for convocation.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:05 12:09 12:41 5:04 DO OFFICE WORKS
28 7:59 12:01 12:15 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 Leave station to Cotabato City and Tacurong City To follow up excise taxes of Kanalan PS,
2 At DepEd Tacurong City Bululawan ES, and Plamango PS, and to
3 Return station to DPWH Lebak, Sultan Kudarat follow up the post completion report of
4 SATURDAY Kalibuhan ES at DepEd Tacurong City.
5 SUNDAY
Attended flag ceremony at Capitol, Attended flag ceremony at Capitol, Isulan,
6 Isulan Sultan Kkudarat
5:03
Sultan Kudarat
7 7:21 12:02 12:22 5:08 Do office work
8 7:44 12:06 12:36 5:02 Do office work
9 8:00 12:05 12:46 3:30 Do office work
10 ABSENT ABSENT
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 8:00 12:06 12:46 5:01 Do office work
14 7:48 12:26 12:41 5:04 Do office work
15 8:00 Leave Station to DPWH RO XII To follow up documents and to submit documents
16
17
18 SATURDAY
19 SUNDAY
20
21
22
23
24
25
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 At Regional Office XII, Koronadal city To follow up documents and to submit documents
17 Return station to DPWH Lebak, Sultan Kudarat Return Station to DPWH Lebak, Sultan Kudarat
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:07 12:23 5:16 Do office work
21 7:58 12:03 12:16 5:01 Do office work
22 7:40 12:06 12:19 5:02 Do office work
23 7:41 12:02 12:27 5:07 Do office work
24 7:47 Leave station to DepEd Tacurong City To follow up documents.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:23 12:10 12:48 5:02 Do office work
28 7:18 12:04 12:45 5:02 Do office work
29 7:52 12:03 12:28 5:02 Do office work
30 Leave station to DAR Office, Isulan, Sultan Kudarat Hand carry documents of 16MH0050 Bugso
31 At DAR Office, Isulan, Sultan Kudarat FMR at DAR, Isulan, Sultan Kudarat.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 At Provincial Capitol, Isulan, Sultan Kudarat 5:23 Attended Flag Ceremony at Provincial Capitol, Isulan Sultan Kudarat
4 8:00 12:11 12:29 5:03 Do Office works
5 7:44 12:04 12:15 5:13 Do Office works
6 7:33 12:00 Leave station to Isulan Submitted documents of list of Infrastructure Projects CY 2010 to CY
2016 under Congressman Arnulfo F. Go at the Provincial Governors
7 Still out at Provincial Capitol, Isulan, Sultan Kudarat Office.

8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
10 ABSENT ABSENT
11 ABSENT ABSENT
12 ABSENT ABSENT
13 HOLIDAY HOLIDAY
14 HOLIDAY HOLIDAY
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM
AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SUNDAY SUNDAY
17 8:00 12:04 12:19 5:01 Do office works
18 7:35 12:25 12:55 5:00 Do office works
19 7:23 12:03 12:20 5:00 Do office works
20 Absent Absent
21 Absent Absent
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 HOLIDAY HOLIDAY
Leave station to Esperanza,Bagumbayan,Senator
25 Ninoy Aquino,Palimbang Sultan Kudarat Assisted QAU personnels and Project Engineers
26 Still Out and Project Inspector at Esperanza-
27 Still Out bagumbayan-Senator Ninoy Aquino and
Leave station to Esperanza,Bagumbayan,Senator Palimbang and Prepared QAU documents
28 Ninoy Aquino,Palimbang Sultan Kudarat
29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY Holiday
Attended Flag Attended flag ceremony at Provincial Capitol, Isulan,
2 Ceremony 12:16 12:44 5:04
Sultan Kudarat/Do office works
3 7:34 12:04 12:16 5:05 Do office works
4 7:47 12:04 12:31 5:05 Do office works
5 7:45 12:00 12:19 5:00 Do office works
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 ABSENT ABSENT
9 8:00 12:00 1:00 5:04 Do office works
10 7:56 12:01 12:24 5:04 Do office works
11 7:39 12:03 12:23 5:02 Do office works
12 7:29 12:00 12:17 5:00 Do office works
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:26 12:06 12:26 5:00 Do office works
16
17
18
19
20 SATURDAY
21 SUNDAY
22
23
24
25
26
27 SATURDAY
28 SUNDAY
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat
DAILY TIME RECORD

For the month of: May 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6 SATURDAY
7 SUNDAY
8
9
10
11
12
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15
16 7:59 12:02 12:40 5:04 Do office works
17 8:00 12:03 12:20 5:05 Do office works
18 7:35 12:01 12:19 5:04 Do office works
19 7:50 12:04 12:17 5:00 Do office works
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:25 12:07 12:21 5:05 Do office works
23 7:36 12:02 12:23 5:04 Do office works
24 7:42 LEAVE STATION TO DepEd To submit letter request for final inspection of 14MH00104
Construction of Two Units One Storey Two Classroom School
25 AT DepEd DIVISON OF SULTAN KUDARAT Building, Kalibuhan, Palimbang, Sultan Kudarat at DepEd
26 Return station at DPWH LEBAK Division of Sultan Kudarat.

27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:53 12:07 12:24 5:03 Do office works
30 8:00 12:03 12:23 5:00 Do office works
31 7:37 12:00 12:15 5:02 Do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME

1 Leave station to DepEd Division of Sultan Kudarat FOLLOW UP LIST OF CY2017 MULTI STOREY
SCHOOL BUILDING PROJECTS FOR FUNDING TO
COVER THE SOIL INVESTIGATION UNDER DepEd'S
2 Still out at DepEd Division of Sultan Kudarat 2017 BASIC EDUCATION FUND.

3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
Attended flag ceremony at Provincial Attended flag ceremony at Provincial Capitol, Isulan,
5 Capitol
5:02 Sultan Kudarat/Do Office works
6 7:40 12:07 12:17 5:04 DO OFFICE WORKS
7 7:53 12:03 12:15 5:09 DO OFFICE WORKS
Leave station at
DepEd Division DO OFFICE WORKS/LEAVE STATION TO
8 7:48 12:02 12:21 of Sultan DEPARTMENT OF EDUCATION DIVISION OFFICE OF
Kudarat
SULTAN KUDARAT
9 Still out at DepEd Division of Sultan Kudarat
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 7:40 12:04 12:36 5:00 DO OFFICE WORKS
14 7:10 12:04 12:20 5:02 DO OFFICE WORKS
15 7:38 12:15 12:34 5:01 DO OFFICE WORKS
16
17 SATURDAY
18 SUNDAY
19
20
21
22
23
24 SATURDAY
25 SUNDAY
26
27
28
29
30

I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:41 12:02 12:18 5:00 DO OFFICCE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
REHERSAL FOR
19 7:24 12:06 12:23 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
20 7:46 12:00 12:18 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
21 7:58 12:00 12:16 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
22 7:22 2:02 12:42 DPWH DO OFFICE WORKS
CELEBRATION
23 7:09 12:00 12:15 5:00 DPWH ANNIVERSARY CELEBRATION
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 7:00 12:05 12:22 5:00 DO OFFICE WORKS
28 7:13 12:02 12:43 5:00 DO OFFICE WORKS
29 7:50 12:02 12:18 5:01 DO OFFICE WORKS
30 7:34 12:00 12:29 5:00 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 3-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 7:34 12:00 12:29 5:00
4 7:50 12:01 12:22 5:36
5 7:59 12:23 12:40 5:06 Do office works at Construction Section
6 7:36 12:04 12:24 5:00
7 8:00 12:02 12:20 5:00
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
At Department Of Education, Division of Sultan
10 Kudarat Follow up Post Completion of Kanalan Primary School,
Still at Department of Esperanza, Sultan Kudarat for approval of Rafael C.
11 Education Division Office
12:47 5:01
Fontanilla, Ph.D., CESO V/Do Office Works
12 7:31 12:05 12:31 5:09
13 7:41 12:04 12:19 5:03 Do office works at Construction Section
14 7:40 12:00 12:49 5:00
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17 8:00 12:08 12:31 5:06
18 7:20 12:07 12:26 5:00
19 7:16 12:02 12:31 5:05 Do office works at Construction Section
20 7:28 12:24 12:34 5:08
21 7:01 12:00 12:30 5:00
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 7:45 12:06 12:15 5:06
25 7:51 12:04 12:30 5:-01
Do office works at Construction Section
26 7:33 12:04 12:34 5:04
27 7:37 12:02 12:25 5:06
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
28 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V

29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
31 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 16 - 31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:22 12:05 12:15 5:14
17 8:00 12:21 12:31 5:06 DO OFFICE WORKS
18 8:00 12:00 12:45 5:00
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 HOLIDAY HOLIDAY
22 8:00 12:06 12:17 5:02
23 7:54 12:14 12:33 5:01
DO OFFICE WORKS
24 7:59 12:21 12:42 5:00
25 7:42 12:00 12:15 5:00
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 HOLIDAY HOLIDAY
29 7:16 12:18 12:29 5:04
30 7:57 12:01 12:18 5:00 DO OFFICE WORKS
31 7:48 12:04 12:21 5:00
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1-15,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY
2 SATURDAY
3 SUNDAY
ATTENDED FLAG CEREMONY AT CAPITOL/DO
4 8:00 12:00 12:59 5:05
OFFICE WORK
5 7:39 12:00 12:28 5:01 DO OFFICE WORKS
6 7:34 12:07 12:24 5:08 DO OFFICE WORKS
7 7:39 12:15 12:29 5:03 DO OFFICE WORKS
8 7:34 12:05 12:15 5:00 DO OFFICE WORKS
9 SATURDAY SATURDAY
10 SUNDAY SUNDAY
11 6:56 12:09 12:25 5:04 DO OFFICE WORKS
12 7:34 12:12 12:26 5:04 DO OFFICE WORKS
13 7:16 12:05 12:23 5:00 DO OFFICE WORKS
14 7:35 12:02 12:22 5:00 DO OFFICE WORKS
15 7:44 12:01 12:17 5:06 DO OFFICE WORKS
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 16-30,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:35 12:08 12:26 5:03 DOING OFFICE WORKS
19 7:21 12:20 12:32 5:03 DOING OFFICE WORKS
20 7:41 12:01 12:20 5:04 DOING OFFICE WORKS
21 HOLIDAY HOLIDAY
22 7:30 12:00 12:15 5:00 DOING OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 7:08 12:09 12:20 5:01 DOING OFFICE WORKS
26 7:33 12:04 12:28 5:03 DOING OFFICE WORKS
27 7:47 12:03 12:33 5:00 DOING OFFICE WORKS
28 8:00 12:45 12:46 5:00 DOING OFFICE WORKS
29 7:48 12:05 12:27 5:00 DOING OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: OCTOBER 1 - 30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 7:43 12:05 12:27 5:01 DO OFFICE WORKS
3 7:41 12:03 12:33 5:03 DO OFFICE WORKS
4 7:25 12:08 12:34 5:00 DO OFFICE WORKS
5 7:36 12:10 12:22 5:02 DO OFFICE WORKS
6 7:24 12:05 12:20 5:00 DO OFFICE WORKS
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 7:47 12:06 12:27 5:03 DO OFFICE WORKS
10 7:39 12:08 12:28 5:00 DO OFFICE WORKS
11 7:19 12:21 12:30 5:01 DO OFFICE WORKS
12 7:31 12:06 12:15 5:02 DO OFFICE WORKS
13 7:42 12:00 12:20 5:00 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 HOLIDAY HOLIDAY
17 HOLIDAY HOLIDAY
18 7:55 12:07 12:40 5:05 DO OFFICE WORK
19 7:30 12:18 12:31 5:03 DO OFFICE WORK
20 7:38 12:00 12:19 5:00 DO OFFICE WORK
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:13 12:33 5:00 DO OFFICE WORK
24 7:27 12:12 12:22 5:02 DO OFFICE WORK
25 7:58 12:04 12:32 5:14 DO OFFICE WORK
26 7:18 12:00 12:23 5:00 DO OFFICE WORK
27 7:49 12:00 12:30 5:02 DO OFFICE WORK
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:20 12;15 12:40 5:00 DO OFFICE WORK
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: NOVEMBER 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:50 12:06 12:25 5:03 DO OFFICE WORKS
17 7:26 12:02 12:16 5:00 DO OFFICE WORKS
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:05 12:13 5:01 DO OFFICE WORKS
21 7:53 12:23 12:25 5:00 DO OFFICE WORKS
22 HOLIDAY HOLIDAY
23 7:50 12:01 12:29 5:06 DO OFFICE WORKS
24 7:31 12:00 12:15 5:00 DO OFFICE WORKS
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 LEAVE STATION TO ISULAN FOLLOW UP POST COMPLETION REPORT
28 STILL OUT AT DEPERTMENT OF EDUCATION REGION
29 RETURN STATION TO LEBAK XII, DIVISION OF SULTAN KUDARAT
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
REYNALDO C. GUARDIANO, JR.
Assistant Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: DECEMBER 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY SATURDAY
17 SUNDAY SUNDAY
18 7:37 12:07 12:26 5:05 DO OFFICE WORKS
19 HOLIDAY HOLIDAY
20 7:46 12:12 12:25 5:01 DO OFFICE WORKS
21 7:48 12:00 12:05 5:03 DO OFFICE WORKS
22 7:20 12:01 12:20 5:00 DO OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 HOLIDAY HOLIDAY
26 HOLIDAY HOLIDAY
27 7:50 12:00 12:20 5:05 DO OFFICE WORKS
28 7:35 12:10 12:30 5:05 DO OFFICE WORKS
29 7:30 12:17 12:30 5:02 DO OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 31, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 7:50 12:01 12:23 5:06 Clen/Check service vehicle daily before travel
4 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
5 7:15 12:05 12:45 5:02 personnel on their Official Travel.
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 7:25 12:01 12:36 5:10
9 7:26 12:00 12:45 5:02 Clen/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
10 7:49 12:15 12:30 5:09 personnel on their Official Travel.
11 7:50 12:13 12:36 5:05
12 7:30 12:00 12:45 5:09
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:40 12:06 12:30 5:06
16 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
17 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
18 8:00 12:16 12:18 5:02 personnel on their Official Travel.
19 7:58 12:03 12:15 5:00
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:40 12:06 12:30 5:06
23 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
24 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
25 8:00 12:16 12:18 5:02 personnel on their Official Travel.
26 7:58 12:03 12:15 5:00
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 Clen/Check service vehicle daily before travel
30 7:23 12:10 12:22 5:08 by Construction Section and Conduct the DPWH
31 8:00 12:08 12:29 5:05 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:04 12:05 12:21 5:05
Cleaning and doing errands
2 8:00 12:01 12:26 5:00
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 ABSENT
6 ABSENT
7 ABSENT Cleaning and doing errands
8 ABSENT
9 ABSENT
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:01 12:18 5:00
13 7:19 12:05 12:27 5:05
14 7:48 12:00 12:24 5:06 Cleaning and doing errands
15 7:15 12:00 12:15 5:02
16 HOLIDAY
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:40 12:06 12:30 5:06
20 7:20 12:00 12:50 5:00
21 8:00 12:00 12:30 5:07 Cleaning and doing errands
22 8:00 12:16 12:18 5:02
23 7:58 12:03 12:15 5:00
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:40 12:06 12:30 5:06
27 7:20 12:00 12:50 5:00 Cleaning and doing errands
28 8:00 12:00 12:30 5:07
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

KING PHILIP II C. TORQUIDO REYNALDO C. GUARDIANO, JR.


Utility Worker II Acting Chief, Construction Section
e
Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:57 12:22 12:39 5:45
2 7:58 12:00 12:27 5:02
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:43 12:13 12:48 5:00
6 7:27 12:14 12:30 5:04
7 7:55 12:03 12:18 5:00
8 7:24 12:08 12:18 5:03
9 7:58 12:01 12:20 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:52 12:04 12:15 5:12
13 7:33 12:06 12:34 5:07
14 7:41 12:12 12:35 5:00
15 8:00 12:12 12:31 5:00
16
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19
20
21
22
23
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

KING PHILIP II C. TORQUIDO REYNALDO C. GUARDIANO, JR.


Utility Worker II Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY HOLIDAY
2
3
4
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7
8
9
10
11
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15
16 7:54 12:01 12:40 5:12 DO OFFICE WORKS
17 7:50 12:09 12:37 5:08 DO OFFICE WORKS
18 7:35 12:05 12:50 5:20 DO OFFICE WORKS
19 SATURDAY
20 SUNDAY
21 7:52 12:28 12:34 5:04 DO OFFICE WORKS
22 7:56 12:00 12:18 5:00 DO OFFICE WORKS
23 7:45 12:05 12:15 5:10 DO OFFICE WORKS
24 7:50 12:00 12:20 5:06 DO OFFICE WORKS
25 7:45 12:05 12:50 5:04 DO OFFICE WORKS
26 SATURDAY
27 SUNDAY
28 7:50 12:00 12:15 5:05 DO OFFICE WORKS
29 7:29 12:07 12:42 5:04 DO OFFICE WORKS
30 7:19 12:03 12:38 5:05 DO OFFICE WORKS
31 7:26 12:00 12:15 5:09 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

KING PHILIP II C. TORQUIDO REYNALDO C. GUARDIANO, JR.


Administrative Aide IV Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3 HOLIDAY HOLIDAY
4 8:00 12:01 12:15 5:07 DOING OFFICE WORKS
5 8:00 12:14 12:15 5:14 DOING OFFICE WORKS
6 7:50 12:11 12:35 5:03 DOING OFFICE WORKS
7 8:00 12:01 12:59 5:00 DOING OFFICE WORKS
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10 8:00 12:06 12:28 5:02 DOING OFFICE WORKS
11 7:53 12:00 12:18 5:00 DOING OFFICE WORKS
12 8:00 12:04 12:34 5:03 DOING OFFICE WORKS
13 8:00 12:00 12:19 5:00 DOING OFFICE WORKS
14 7:49 12:00 12:23 5:06 DOING OFFICE WORKS
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17
18
19
20
21
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24
25
26
27
28
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3
4
5
6
7
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10
11
12
13
14
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17 8:00 12:06 12:19 5:06 DOING OFFICE WORKS
18 7:21 12:05 12:22 5:06 DOING OFFICE WORKS
19 7:17 12:01 12:24 5:36 DOING OFFICE WORKS
20 7:35 12:02 12:19 5:02 DOING OFFICE WORKS
21 7:30 12:00 12:30 5:30 FAMILY DAY
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24 8:00 12:01 12:26 5:15 DOING OFFICE WORKS
25 7:21 12:05 12:25 5:24 DOING OFFICE WORKS
26 8:00 12:09 12:15 5:09 DOING OFFICE WORKS
27 7:22 12:00 12:20 5:00 DOING OFFICE WORKS
28 Leave station to Isulan and Marbel Carry communication for FPJ,GEMMA,CS Construction
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: November 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 8:00 12:05 12:20 5:00 DOING OFFICE WORKS
3 LEAVE STATION TO KORONADAL CITY TO TAKE THE COMPUTER LITERACY EXAM
4 TO TAKE THE COMPUTER LITERACY EXAM AT DPWH REGIONAL OFFICE XII
5 SATURDAY NO SERVICE RENDERED
6 SUNDAY NO SERVICE RENDERED
7 7:00 12:02 1:00 5:18 ATTENDED FLAG CEREMONY AT PROVINCIAL CAPITOL

8 7:53 12:02 12:15 5:02 DOING OFFICE WORKS


9 8:00 12:02 12:15 5:09 DOING OFFICE WORKS
10 7:26 12:00 12:36 5:00 DOING OFFICE WORKS
HANDCARRY DOCUMENTS TO MINROCK
11 LEAVE STATION TO COTABATO CITY CONSTRUCTION
12 SATURDAY NO SERVICE RENDERED
13 SUNDAY NO SERVICE RENDERED
14 7:51 12:10 1:00 5:09 DOING OFFICE WORKS
15 7:34 12:00 12:15 5:00 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA
Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:15 1:00 5:00 DOING OFFICE WORKS
2 8:00 12:05 12:33 5:00 DOING OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 HOLIDAY HOLIDAY
6 8:00 12:07 1:00 5:13 DOING OFFICE WORKS
7 8:00 12:11 12:15 5:04 DOING OFFICE WORKS
8 8:00 12:07 12:38 5:00 DOING OFFICE WORKS
9 8:00 12:00 12:39 5:00 DOING OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 8:00 12:03 12:21 5:00 DOING OFFICE WORKS
14 8:00 12:02 12:19 5:15 DOING OFFICE WORKS
15 7:52 12:01 12:17 5:04 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:56 12:00 12:35 5:02 DOING OFFICE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 HOLIDAY HOLIDAY
20 8:00 12:06 12:15 5:17 DOING OFFICE WORKS
21 SK 2ND DEO CHRISTMAS PARTY SK 2ND DEO CHRISTMAS PARTY
22 8:00 12:00 12:56 5:04 DOING OFFICE WORKS
23 8:00 12:05 1:00 5:03 DOING OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 8:00 12:05 12:50 5:01 DOING OFFICE WORKS
28 7:13 12:00 12:16 5:06 DOING OFFICE WORKS
29 8:00 12:04 12:25 5:20 DOING OFFICE WORKS
30 HOLIDAY HOLIDAY
31 SATURDAY SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: January 9-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2
3
4
5
6
7 SATURDAY
8 SUNDAY
9 7:35 12:00 12:35 5:01 DO OFFICE WORKS
10 7:40 12:03 12:40 5:05 DO OFFICE WORKS
11 7:50 12:05 12:15 5:03 DO OFFICE WORKS
12 7:20 12:00 12:20 5:00 DO OFFICE WORKS
13 7:55 12:04 12:47 5:09 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:05 12:09 12:40 5:49 DO OFFICE WORKS
17 7:45 12:00 12:50 5:00 DO OFFICE WORKS
18 7:30 12:05 12:45 5:08 DO OFFICE WORKS
19 7:58 12:07 12:15 5:06 DO OFFICE WORKS
20 7:45 12:00 12:15 5:00 DO OFFICE WORKS
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:02 12:23 5:00 DO OFFICE WORKS
24 8:00 12:03 1:00 5:09 DO OFFICE WORKS
25 8:00 12:02 12:18 5:06 DO OFFICE WORKS
26 8:00 12:08 12:20 5:09 DO OFFICE WORKS
27 7:45 12:00 12:15 5:01 DO OFFICE WORKS
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:50 12:05 1:00 5:16 DO OFFICE WORKS
31 8:00 12:00 12:33 5:12 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:04 12:40 5:03 Conducted the Assistant Chief of Construction
2 8:00 12:06 12:30 5:09 Section and DPWH Personnel
3 8:00 12:01 12:18 5:00 to their Official Travel.
4 SATURDAY SATURDAY
5 SUNDAY SUNDAY
6 7:30 12:05 12:39 5:04 Conducted the Assistant Chief of Construction
7 8:00 12:03 12:38 5:06 Section and DPWH Personnel
8 8:00 12:03 12:38 5:06 to their Official Travel.
9 7:15 12:03 12:36 6:20 Conducted the Assistant Chief of Construction
10 8:00 12:06 12:33 5:06 Section and DPWH Personnel to their Official Travel
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 7:26 12:08 12:29 5:10 Conducted the Assistant Chief of Construction
14 7:30 12:01 12:40 5:05 Section and DPWH Personnel
15 8:00 12:10 12:22 5:15 to their Official Travel.
16
17
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20
21
22
23
24
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL LOIDA L. LEAL, MPA


Utility 2 / Driver 1 Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: February 16 - 28, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

16 7:32 12:00 12:35 5:23 DO OFFICE WORKS

17 absent ABSENT
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 7:53 12:02 12:15 5:04 DO OFFICE WORKS
21 7:52 12:03 12:19 5:10 DO OFFICE WORKS
22 7:30 12:20 12:23 5:04 DO OFFICE WORKS
23 7:57 12:01 12:45 5:02 DO OFFICE WORKS
Leave station to follow up t-shirt and to buy Leave station to follow up t-shirt and to buy
24 decoration for convocation. decoration for convocation.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:05 12:09 12:41 5:04 DO OFFICE WORKS
28 7:59 12:01 12:15 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 Leave station to Cotabato City and Tacurong City To follow up excise taxes of Kanalan PS,
2 At DepEd Tacurong City Bululawan ES, and Plamango PS, and to
3 Return station to DPWH Lebak, Sultan Kudarat follow up the post completion report of
4 SATURDAY Kalibuhan ES at DepEd Tacurong City.
5 SUNDAY
Attended flag ceremony at Capitol, Attended flag ceremony at Capitol, Isulan,
6 Isulan Sultan Kkudarat
5:03
Sultan Kudarat
7 7:21 12:02 12:22 5:08 Do office work
8 7:44 12:06 12:36 5:02 Do office work
9 8:00 12:05 12:46 3:30 Do office work
10 ABSENT ABSENT
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 8:00 12:06 12:46 5:01 Do office work
14 7:48 12:26 12:41 5:04 Do office work
15 8:00 Leave Station to DPWH RO XII To follow up documents and to submit documents
16
17
18 SATURDAY
19 SUNDAY
20
21
22
23
24
25
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 At Regional Office XII, Koronadal city To follow up documents and to submit documents
17 Return station to DPWH Lebak, Sultan Kudarat Return Station to DPWH Lebak, Sultan Kudarat
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:07 12:23 5:16 Do office work
21 7:58 12:03 12:16 5:01 Do office work
22 7:40 12:06 12:19 5:02 Do office work
23 7:41 12:02 12:27 5:07 Do office work
24 7:47 Leave station to DepEd Tacurong City To follow up documents.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:23 12:10 12:48 5:02 Do office work
28 7:18 12:04 12:45 5:02 Do office work
29 7:52 12:03 12:28 5:02 Do office work
30 Leave station to DAR Office, Isulan, Sultan Kudarat Hand carry documents of 16MH0050 Bugso
31 At DAR Office, Isulan, Sultan Kudarat FMR at DAR, Isulan, Sultan Kudarat.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 At Provincial Capitol, Isulan, Sultan Kudarat 5:23 Attended Flag Ceremony at Provincial Capitol, Isulan Sultan Kudarat
4 8:00 12:11 12:29 5:03 Do Office works
5 7:44 12:04 12:15 5:13 Do Office works
6 7:33 12:00 Leave station to Isulan Submitted documents of list of Infrastructure Projects CY 2010 to CY
2016 under Congressman Arnulfo F. Go at the Provincial Governors
7 Still out at Provincial Capitol, Isulan, Sultan Kudarat Office.

8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
10 ABSENT ABSENT
11 ABSENT ABSENT
12 ABSENT ABSENT
13 HOLIDAY HOLIDAY
14 HOLIDAY HOLIDAY
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM
AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SUNDAY SUNDAY
17 8:00 12:04 12:19 5:01 Do office works
18 7:35 12:25 12:55 5:00 Do office works
19 7:23 12:03 12:20 5:00 Do office works
20 Absent Absent
21 Absent Absent
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 HOLIDAY HOLIDAY
Leave station to Esperanza,Bagumbayan,Senator
25 Ninoy Aquino,Palimbang Sultan Kudarat Assisted QAU personnels and Project Engineers
26 Still Out and Project Inspector at Esperanza-
27 Still Out bagumbayan-Senator Ninoy Aquino and
Leave station to Esperanza,Bagumbayan,Senator Palimbang and Prepared QAU documents
28 Ninoy Aquino,Palimbang Sultan Kudarat
29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY Holiday
Attended Flag Attended flag ceremony at Provincial Capitol, Isulan,
2 Ceremony 12:16 12:44 5:04
Sultan Kudarat/Do office works
3 7:34 12:04 12:16 5:05 Do office works
4 7:47 12:04 12:31 5:05 Do office works
5 7:45 12:00 12:19 5:00 Do office works
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 ABSENT ABSENT
9 8:00 12:00 1:00 5:04 Do office works
10 7:56 12:01 12:24 5:04 Do office works
11 7:39 12:03 12:23 5:02 Do office works
12 7:29 12:00 12:17 5:00 Do office works
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:26 12:06 12:26 5:00 Do office works
16
17
18
19
20 SATURDAY
21 SUNDAY
22
23
24
25
26
27 SATURDAY
28 SUNDAY
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat
DAILY TIME RECORD

For the month of: May 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6 SATURDAY
7 SUNDAY
8
9
10
11
12
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15
16 7:59 12:02 12:40 5:04 Do office works
17 8:00 12:03 12:20 5:05 Do office works
18 7:35 12:01 12:19 5:04 Do office works
19 7:50 12:04 12:17 5:00 Do office works
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:25 12:07 12:21 5:05 Do office works
23 7:36 12:02 12:23 5:04 Do office works
24 7:42 LEAVE STATION TO DepEd To submit letter request for final inspection of 14MH00104
Construction of Two Units One Storey Two Classroom School
25 AT DepEd DIVISON OF SULTAN KUDARAT Building, Kalibuhan, Palimbang, Sultan Kudarat at DepEd
26 Return station at DPWH LEBAK Division of Sultan Kudarat.

27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:53 12:07 12:24 5:03 Do office works
30 8:00 12:03 12:23 5:00 Do office works
31 7:37 12:00 12:15 5:02 Do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME

1 Leave station to DepEd Division of Sultan Kudarat FOLLOW UP LIST OF CY2017 MULTI STOREY
SCHOOL BUILDING PROJECTS FOR FUNDING TO
COVER THE SOIL INVESTIGATION UNDER DepEd'S
2 Still out at DepEd Division of Sultan Kudarat 2017 BASIC EDUCATION FUND.

3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
Attended flag ceremony at Provincial Attended flag ceremony at Provincial Capitol, Isulan,
5 Capitol
5:02 Sultan Kudarat/Do Office works
6 7:40 12:07 12:17 5:04 DO OFFICE WORKS
7 7:53 12:03 12:15 5:09 DO OFFICE WORKS
Leave station at
DepEd Division DO OFFICE WORKS/LEAVE STATION TO
8 7:48 12:02 12:21 of Sultan DEPARTMENT OF EDUCATION DIVISION OFFICE OF
Kudarat
SULTAN KUDARAT
9 Still out at DepEd Division of Sultan Kudarat
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 7:40 12:04 12:36 5:00 DO OFFICE WORKS
14 7:10 12:04 12:20 5:02 DO OFFICE WORKS
15 7:38 12:15 12:34 5:01 DO OFFICE WORKS
16
17 SATURDAY
18 SUNDAY
19
20
21
22
23
24 SATURDAY
25 SUNDAY
26
27
28
29
30

I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:41 12:02 12:18 5:00 DO OFFICCE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
REHERSAL FOR
19 7:24 12:06 12:23 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
20 7:46 12:00 12:18 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
21 7:58 12:00 12:16 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
22 7:22 2:02 12:42 DPWH DO OFFICE WORKS
CELEBRATION
23 7:09 12:00 12:15 5:00 DPWH ANNIVERSARY CELEBRATION
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 7:00 12:05 12:22 5:00 DO OFFICE WORKS
28 7:13 12:02 12:43 5:00 DO OFFICE WORKS
29 7:50 12:02 12:18 5:01 DO OFFICE WORKS
30 7:34 12:00 12:29 5:00 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 3-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 7:34 12:00 12:29 5:00
4 7:50 12:01 12:22 5:36
5 7:59 12:23 12:40 5:06 Do office works at Construction Section
6 7:36 12:04 12:24 5:00
7 8:00 12:02 12:20 5:00
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
At Department Of Education, Division of Sultan
10 Kudarat Follow up Post Completion of Kanalan Primary School,
Still at Department of Esperanza, Sultan Kudarat for approval of Rafael C.
11 Education Division Office
12:47 5:01
Fontanilla, Ph.D., CESO V/Do Office Works
12 7:31 12:05 12:31 5:09
13 7:41 12:04 12:19 5:03 Do office works at Construction Section
14 7:40 12:00 12:49 5:00
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17 8:00 12:08 12:31 5:06
18 7:20 12:07 12:26 5:00
19 7:16 12:02 12:31 5:05 Do office works at Construction Section
20 7:28 12:24 12:34 5:08
21 7:01 12:00 12:30 5:00
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 7:45 12:06 12:15 5:06
25 7:51 12:04 12:30 5:-01
Do office works at Construction Section
26 7:33 12:04 12:34 5:04
27 7:37 12:02 12:25 5:06
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
28 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V

29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
31 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 16 - 31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:22 12:05 12:15 5:14
17 8:00 12:21 12:31 5:06 DO OFFICE WORKS
18 8:00 12:00 12:45 5:00
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 HOLIDAY HOLIDAY
22 8:00 12:06 12:17 5:02
23 7:54 12:14 12:33 5:01
DO OFFICE WORKS
24 7:59 12:21 12:42 5:00
25 7:42 12:00 12:15 5:00
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 HOLIDAY HOLIDAY
29 7:16 12:18 12:29 5:04
30 7:57 12:01 12:18 5:00 DO OFFICE WORKS
31 7:48 12:04 12:21 5:00
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1-15,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY
2 SATURDAY
3 SUNDAY
ATTENDED FLAG CEREMONY AT CAPITOL/DO
4 8:00 12:00 12:59 5:05
OFFICE WORK
5 7:39 12:00 12:28 5:01 DO OFFICE WORKS
6 7:34 12:07 12:24 5:08 DO OFFICE WORKS
7 7:39 12:15 12:29 5:03 DO OFFICE WORKS
8 7:34 12:05 12:15 5:00 DO OFFICE WORKS
9 SATURDAY SATURDAY
10 SUNDAY SUNDAY
11 6:56 12:09 12:25 5:04 DO OFFICE WORKS
12 7:34 12:12 12:26 5:04 DO OFFICE WORKS
13 7:16 12:05 12:23 5:00 DO OFFICE WORKS
14 7:35 12:02 12:22 5:00 DO OFFICE WORKS
15 7:44 12:01 12:17 5:06 DO OFFICE WORKS
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 16-30,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:35 12:08 12:26 5:03 DOING OFFICE WORKS
19 7:21 12:20 12:32 5:03 DOING OFFICE WORKS
20 7:41 12:01 12:20 5:04 DOING OFFICE WORKS
21 HOLIDAY HOLIDAY
22 7:30 12:00 12:15 5:00 DOING OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 7:08 12:09 12:20 5:01 DOING OFFICE WORKS
26 7:33 12:04 12:28 5:03 DOING OFFICE WORKS
27 7:47 12:03 12:33 5:00 DOING OFFICE WORKS
28 8:00 12:45 12:46 5:00 DOING OFFICE WORKS
29 7:48 12:05 12:27 5:00 DOING OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: OCTOBER 1 - 30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 7:43 12:05 12:27 5:01 DO OFFICE WORKS
3 7:41 12:03 12:33 5:03 DO OFFICE WORKS
4 7:25 12:08 12:34 5:00 DO OFFICE WORKS
5 7:36 12:10 12:22 5:02 DO OFFICE WORKS
6 7:24 12:05 12:20 5:00 DO OFFICE WORKS
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 7:47 12:06 12:27 5:03 DO OFFICE WORKS
10 7:39 12:08 12:28 5:00 DO OFFICE WORKS
11 7:19 12:21 12:30 5:01 DO OFFICE WORKS
12 7:31 12:06 12:15 5:02 DO OFFICE WORKS
13 7:42 12:00 12:20 5:00 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 HOLIDAY HOLIDAY
17 HOLIDAY HOLIDAY
18 7:55 12:07 12:40 5:05 DO OFFICE WORK
19 7:30 12:18 12:31 5:03 DO OFFICE WORK
20 7:38 12:00 12:19 5:00 DO OFFICE WORK
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:13 12:33 5:00 DO OFFICE WORK
24 7:27 12:12 12:22 5:02 DO OFFICE WORK
25 7:58 12:04 12:32 5:14 DO OFFICE WORK
26 7:18 12:00 12:23 5:00 DO OFFICE WORK
27 7:49 12:00 12:30 5:02 DO OFFICE WORK
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:20 12;15 12:40 5:00 DO OFFICE WORK
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: NOVEMBER 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:50 12:06 12:25 5:03 DO OFFICE WORKS
17 7:26 12:02 12:16 5:00 DO OFFICE WORKS
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:05 12:13 5:01 DO OFFICE WORKS
21 7:53 12:23 12:25 5:00 DO OFFICE WORKS
22 HOLIDAY HOLIDAY
23 7:50 12:01 12:29 5:06 DO OFFICE WORKS
24 7:31 12:00 12:15 5:00 DO OFFICE WORKS
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 LEAVE STATION TO ISULAN FOLLOW UP POST COMPLETION REPORT
28 STILL OUT AT DEPERTMENT OF EDUCATION REGION
29 RETURN STATION TO LEBAK XII, DIVISION OF SULTAN KUDARAT
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
REYNALDO C. GUARDIANO, JR.
Assistant Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: DECEMBER 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY SATURDAY
17 SUNDAY SUNDAY
18 7:37 12:07 12:26 5:05 DO OFFICE WORKS
19 HOLIDAY HOLIDAY
20 7:46 12:12 12:25 5:01 DO OFFICE WORKS
21 7:48 12:00 12:05 5:03 DO OFFICE WORKS
22 7:20 12:01 12:20 5:00 DO OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 HOLIDAY HOLIDAY
26 HOLIDAY HOLIDAY
27 7:50 12:00 12:20 5:05 DO OFFICE WORKS
28 7:35 12:10 12:30 5:05 DO OFFICE WORKS
29 7:30 12:17 12:30 5:02 DO OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 31, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 7:50 12:01 12:23 5:06 Clen/Check service vehicle daily before travel
4 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
5 7:15 12:05 12:45 5:02 personnel on their Official Travel.
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 7:25 12:01 12:36 5:10
9 7:26 12:00 12:45 5:02 Clen/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
10 7:49 12:15 12:30 5:09 personnel on their Official Travel.
11 7:50 12:13 12:36 5:05
12 7:30 12:00 12:45 5:09
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:40 12:06 12:30 5:06
16 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
17 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
18 8:00 12:16 12:18 5:02 personnel on their Official Travel.
19 7:58 12:03 12:15 5:00
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:40 12:06 12:30 5:06
23 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
24 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
25 8:00 12:16 12:18 5:02 personnel on their Official Travel.
26 7:58 12:03 12:15 5:00
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 Clen/Check service vehicle daily before travel
30 7:23 12:10 12:22 5:08 by Construction Section and Conduct the DPWH
31 8:00 12:08 12:29 5:05 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:54 12:08 12:49 5:06 Clean/Check service vehicle daily before travel by Construction Section
and Conduct the DPWH personnel on their Official Travel.
2 8:00 12:01 12:26 5:00
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00
6 8:00 12:15 12:41 5:00 Clean/Check service vehicle daily before travel
7 7:51 12:04 12:33 5:01 by Construction Section and Conduct the DPWH
8 7:53 12:10 12:19 5:04 personnel on their Official Travel.
9 7:56 12:00 12:45 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:15 5:00
13 7:50 12:01 12:23 5:06 Clean/Check service vehicle daily before travel
14 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
15 7:15 12:05 12:45 5:02 personnel on their Official Travel.
16 7:15 12:05 12:45 5:02
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:40 12:06 12:30 5:06
20 7:20 12:00 12:50 5:00 Clean/Check service vehicle daily before travel
21 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
22 8:00 12:16 12:18 5:02 personnel on their Official Travel.
23 7:58 12:03 12:15 5:00
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:40 12:06 12:30 5:06 Clean/Check service vehicle daily before travel
27 7:20 12:00 12:50 5:00 by Construction Section and Conduct the DPWH
28 8:00 12:00 12:30 5:07 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1 - 15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:37 12:08 12:49 5:07 Clean/Check service vehicle daily before travel by Construction Section
and Conduct the DPWH personnel on their Official Travel.
2 8:00 12:01 12:26 5:00
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00
6 8:00 12:01 12:32 5:05 Clean/Check service vehicle daily before travel
7 7:51 12:07 12:15 5:00 by Construction Section and Conduct the DPWH
8 7:53 12:10 12:19 5:04 personnel on their Official Travel.
9 7:56 12:00 12:45 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:15 5:00
13 7:57 12:02 12:15 5:07 Clean/Check service vehicle daily before travel
14 7:58 12:44 12:46 5:07 by Construction Section and Conduct the DPWH
15 7:15 12:05 12:45 5:02 personnel on their Official Travel.
16
17
18
19
20
21
22
23
24
25
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 16-28 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14 Clean/Check service vehicle daily before travel
15 by Construction Section and Conduct the DPWH
16 7;20 12:04 12:15 5:00 personnel on their Official Travel.
17 SATURDAY
18 SUNDAY
19 7:30 12:10 12:18 5:24
20 7:20 12:02 12:15 5:00 Clean/Check service vehicle daily before travel
21 7:50 12:00 12:15 5:00 by Construction Section and Conduct the DPWH
22 7:36 12:05 12:18 5:06 personnel on their Official Travel.
23 7:05 12:14 12:40 6:00
24 SATURDAY
25 SUNDAY
26 7:34 12:00 12:15 5:05 Clean/Check service vehicle daily before travel
27 7:45 12:02 12:32 5:01 by Construction Section and Conduct the DPWH
28 7:11 12:00 personnel on their Official Travel.
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY SUNDAY
2 8:00 12:29 12:46 5:00
3 8:00 12:06 12:15 5:l14 Clean/Check service vehicle daily before travel
4 7:53 12:06 12:22 6:07 by Construction Section and Conduct the DPWH
5 7:50 12:12 12:50 5:00 personnel on their Official Travel.
6 7:45 12:00 12:15 5:01
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:40 12:15 12:30 5:00 Clean/Check service vehicle daily before travel
11 7:20 12:08 12:30 5:00 by Construction Section and Conduct the DPWH
12 7:50 12:02 12:15 5:04 personnel on their Official Travel.
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:47 12:03 12:16 5:00
17 8:00 12:02 12:22 5:01
Clean/Check service vehicle daily before travel
18 7:36 12:07 12:28 5:12
by Construction Section and Conduct the DPWH
19 7:49 12:04 12:15 5:00
personnel on their Official Travel.
20 7:30 12:00 12:50 5:23
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:52 12:03 12:50 5:00
24 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
25 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
26 7:32 12:07 12:28 5:14 personnel on their Official Travel.
27 7:03 12:16 12:20 5:01
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
Clean/Check service vehicle daily before travel by
30 7:41 12:02 12:24 5:00 Construction Section and Conduct the DPWH
personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 HOLIDAY
2 7:40 12:05 12:26 5:19 Clean/Check service vehicle daily before travel
3 7:36 12:24 12:48 5:02 by Construction Section and Conduct the DPWH
4 7:59 12:03 12:37 5:00 personnel on their Official Travel.
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:20 12:05 12:17 5:06
8 7:54 12:34 12:45 5:02 Clean/Check service vehicle daily before travel
9 7:50 12:04 12:23 5:07 by Construction Section and Conduct the DPWH
10 7:26 12:13 12:48 5:01 personnel on their Official Travel.
11 7:52 12:02 12:28 5:02
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15 7:52 12:01 12:59 5:06
Clean/Check service vehicle daily before travel
16
by Construction Section and Conduct the DPWH
17 personnel on their Official Travel.
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section
Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
2
3
4
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7
8
9
10
11
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15
Clean/Check service vehicle daily before travel
16
by Construction Section and Conduct the DPWH
17
personnel on their Official Travel.
18
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21
22 Clean/Check service vehicle daily before travel
23 by Construction Section and Conduct the DPWH
24 personnel on their Official Travel.
25
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28
Clean/Check service vehicle daily before travel
29
by Construction Section and Conduct the DPWH
30
personnel on their Official Travel.
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
I hereby certify on my honor that the above is a true and
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2 SATURDAY
3 SUNDAY
4
5
6
7
8
9 SATURDAY
10 SUNDAY
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:50 12:03 12:27 5:00
19 7:54 12:00 12:30 5:00 Clean/Check service vehicle daily before travel
20 7:45 12:03 12:15 5:20 by Construction Section and Conduct the DPWH
21 7:30 12:00 12:45 5:45 personnel on their Official Travel.
22 7:56 12:20 12:50 5:50
23 SATURDAY
24 SUNDAY
25 7:45 12:04 12:45 5:05
26 7:56 12:31 12:34 7:02 Clean/Check service vehicle daily before travel
27 7:50 12:02 12:15 5:01 by Construction Section and Conduct the DPWH
28 7:53 12:00 12:30 6:30 personnel on their Official Travel.
29 7:25 12:30 12:50 6:00
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 SUNDAY
2 7:47 12:05 12:43 5:00 do office works
3 7:39 12:18 12:30 5:06 do office works
4 7:48 12:26 12:31 5:23 do office works
5 7:39 12:02 12:28 5:04 do office works
6 7:40 12:02 12:23 5:05 do office works
7 SATURDAY
8 SUNDAY
9 7:34 12:02 12:17 5:01 do office works
10 7:56 12:04 12:23 5:00 do office works
11 7:40 12:00 12:22 5:00 do office works
12 7:57 12:01 12:31 5:00 do office works
13 7:37 12:01 12:38 5:00 do office works
14 SATURDAY
15 SUNDAY
16 7:34 12:04 12:39 5:03 do office works
17 7:50 12:03 12:58 5:00 do office works
18 7:57 12:32 12:37 5:04 do office works
19 7:59 12:01 12:34 5:01 do office works
20 7:55 12:20 12:50 5:08 do office works
21 SATURDAY
22 SUNDAY
23 7:41 12:03 12:31 5:01 do office works
24 7:49 12:02 12:17 5:01 do office works
25 7:34 12:01 12:50 5:00 do office works
26 7:59 12:01 12:21 5:02 do office works
27 7:45 12:14 12:57 5:02 do office works
28 SATURDAY
29 SUNDAY
30 7:59 12:01 12:21 5:02 do office works
31 7:50 12:39 12:52 5:03 do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ARNEL D. GAWID REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 31, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 7:50 12:01 12:23 5:06 Clen/Check service vehicle daily before travel
4 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
5 7:15 12:05 12:45 5:02 personnel on their Official Travel.
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 7:25 12:01 12:36 5:10
9 7:26 12:00 12:45 5:02 Clen/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
10 7:49 12:15 12:30 5:09 personnel on their Official Travel.
11 7:50 12:13 12:36 5:05
12 7:30 12:00 12:45 5:09
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:58 12:04 12:43 5:04
16 8:00 12:02 12:23 5:04 Clen/Check service vehicle daily before travel
17 8:05 12:12 12:18 5:02 by Construction Section and Conduct the DPWH
18 7:53 12:00 12:30 5:01 personnel on their Official Travel.
19 8:00 12:00 12:48 5:00
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:40 12:06 12:30 5:06
23 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
24 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
25 8:00 12:16 12:18 5:02 personnel on their Official Travel.
26 7:58 12:03 12:15 5:00
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 Clen/Check service vehicle daily before travel
30 7:23 12:10 12:22 5:08 by Construction Section and Conduct the DPWH
31 8:00 12:08 12:29 5:05 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:54 12:08 12:49 5:06 DO OFFICE WORKS
2 8:00 12:01 12:26 5:00 DO OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00 DO OFFICE WORKS
6 8:00 12:15 12:41 5:00 DO OFFICE WORKS
7 7:51 12:04 12:33 5:01 DO OFFICE WORKS
8 7:53 12:10 12:19 5:04 DO OFFICE WORKS
9 7:56 12:00 12:45 5:00 DO OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:30 5:10 DO OFFICE WORKS
13 7:50 12:08 12:15 5:05 DO OFFICE WORKS
14 7:50 12:04 12:23 5:00 DO OFFICE WORKS
15
16
17 SATURDAY
18 SUNDAY
19
20
21
22
23
24 SATURDAY
25 SUNDAY
26
27
28
29
30
31 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 8:00 12:26 12:53 5:02
3 7:27 12:06 12:15 5:14
4 7:53 12:06 12:22 5:54 Cleaning and doing errands
5 8:00 12:12 12:43 5:02
6 8:00 12:04 12:27 5:01
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:49 12:23 12:52 5:01
11 8:00 12:08 12:22 6:28 Cleaning and doing errands
12 7:50 12:09 12:27 5:04
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:47 12:03 12:42 5:04
17 7:17 12:01 12:20 5:03
18 7:36 12:09 12:28 5:04 Cleaning and doing errands
19 7:36 12:04 12:29 5:06
20 6:15 12:00 12:50 5:08
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:04 12:35 5:05
24 7:31 12:00 12:52 5:24
25 7:34 12:12 12:40 5:10 Cleaning and doing errands
26 7:44 12:14 12:32 5:07
27 7:35 12:00 12:20 5:02
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:41 12:02 12:24 5:00 Cleaning and doing errands
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

RYAN D. GAWID REYNALDO C. GUARDIANO, JR.


Utility Worker II Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 HOLIDAY HOLIDAY
2 7:30 12:00 12:15 5:00
3 7:21 12:32 12:45 5:03 Cleaning and doing errands
4 8:00 12:22 12:42 5:00
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:20 12:20 12:43 5:12
8 7:57 12:05 12:36 5:08
9 7:40 12:15 12:57 5:04 Cleaning and doing errands
10 7:26 12:03 12:39 5:10
11 7:38 12:08 12:44 5:00
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15 7:35 12:02 12:15 7:30
16
Cleaning and doing errands
17
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
RYAN D. GAWID REYNALDO C. GUARDIANO, JR.
Utility Worker II Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
2
3
4
5 SATURDAY
6 SUNDAY
7
8
9
10
11
12 SATURDAY
13 SUNDAY
14 HOLIDAY
15
16 7:23 12:04 12:16 5:29
17 7:40 12:04 12:35 8:37 Cleaning and doing errands
18 7:46 12:12 12:24 8:30
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 7:30 12:13 12:45 5:03
22 7:45 12:08 12:32 5:14
23 7:23 12:16 12:36 5:01 Cleaning and doing errands
24 7:42 12:14 12:39 5:03
25 7:44 12:20 1:00 5:11
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 7:40 12:21 12:29 5:04
29 7:39 12:11 12:32 5:45
30 7:32 12:06 12:49 5:05
31 6:05 12:00 12:15 5:30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
I hereby certify on my honor that the above is a true and
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

RYAN D. GAWID REYNALDO C. GUARDIANO, JR.


Utility Worker II Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3
4
5
6
7
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10
11
12
13
14
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17 8:00 12:06 12:19 5:06 DOING OFFICE WORKS
18 7:21 12:05 12:22 5:06 DOING OFFICE WORKS
19 7:17 12:01 12:24 5:36 DOING OFFICE WORKS
20 7:35 12:02 12:19 5:02 DOING OFFICE WORKS
21 7:30 12:00 12:30 5:30 FAMILY DAY
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24 8:00 12:01 12:26 5:15 DOING OFFICE WORKS
25 7:21 12:05 12:25 5:24 DOING OFFICE WORKS
26 8:00 12:09 12:15 5:09 DOING OFFICE WORKS
27 7:22 12:00 12:20 5:00 DOING OFFICE WORKS
28 Leave station to Isulan and Marbel Carry communication for FPJ,GEMMA,CS Construction
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: November 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 8:00 12:05 12:20 5:00 DOING OFFICE WORKS
3 LEAVE STATION TO KORONADAL CITY TO TAKE THE COMPUTER LITERACY EXAM
4 TO TAKE THE COMPUTER LITERACY EXAM AT DPWH REGIONAL OFFICE XII
5 SATURDAY NO SERVICE RENDERED
6 SUNDAY NO SERVICE RENDERED
7 7:00 12:02 1:00 5:18 ATTENDED FLAG CEREMONY AT PROVINCIAL CAPITOL

8 7:53 12:02 12:15 5:02 DOING OFFICE WORKS


9 8:00 12:02 12:15 5:09 DOING OFFICE WORKS
10 7:26 12:00 12:36 5:00 DOING OFFICE WORKS
HANDCARRY DOCUMENTS TO MINROCK
11 LEAVE STATION TO COTABATO CITY CONSTRUCTION
12 SATURDAY NO SERVICE RENDERED
13 SUNDAY NO SERVICE RENDERED
14 7:51 12:10 1:00 5:09 DOING OFFICE WORKS
15 7:34 12:00 12:15 5:00 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:15 1:00 5:00 DOING OFFICE WORKS
2 8:00 12:05 12:33 5:00 DOING OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 HOLIDAY HOLIDAY
6 8:00 12:07 1:00 5:13 DOING OFFICE WORKS
7 8:00 12:11 12:15 5:04 DOING OFFICE WORKS
8 8:00 12:07 12:38 5:00 DOING OFFICE WORKS
9 8:00 12:00 12:39 5:00 DOING OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 8:00 12:03 12:21 5:00 DOING OFFICE WORKS
14 8:00 12:02 12:19 5:15 DOING OFFICE WORKS
15 7:52 12:01 12:17 5:04 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA
Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:56 12:00 12:35 5:02 DOING OFFICE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 HOLIDAY HOLIDAY
20 8:00 12:06 12:15 5:17 DOING OFFICE WORKS
21 SK 2ND DEO CHRISTMAS PARTY SK 2ND DEO CHRISTMAS PARTY
22 8:00 12:00 12:56 5:04 DOING OFFICE WORKS
23 8:00 12:05 1:00 5:03 DOING OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 8:00 12:05 12:50 5:01 DOING OFFICE WORKS
28 7:13 12:00 12:16 5:06 DOING OFFICE WORKS
29 8:00 12:04 12:25 5:20 DOING OFFICE WORKS
30 HOLIDAY HOLIDAY
31 SATURDAY SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: January 9-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2
3
4
5
6
7 SATURDAY
8 SUNDAY
9 7:35 12:00 12:35 5:01 DO OFFICE WORKS
10 7:40 12:03 12:40 5:05 DO OFFICE WORKS
11 7:50 12:05 12:15 5:03 DO OFFICE WORKS
12 7:20 12:00 12:20 5:00 DO OFFICE WORKS
13 7:55 12:04 12:47 5:09 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:05 12:09 12:40 5:49 DO OFFICE WORKS
17 7:45 12:00 12:50 5:00 DO OFFICE WORKS
18 7:30 12:05 12:45 5:08 DO OFFICE WORKS
19 7:58 12:07 12:15 5:06 DO OFFICE WORKS
20 7:45 12:00 12:15 5:00 DO OFFICE WORKS
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:02 12:23 5:00 DO OFFICE WORKS
24 8:00 12:03 1:00 5:09 DO OFFICE WORKS
25 8:00 12:02 12:18 5:06 DO OFFICE WORKS
26 8:00 12:08 12:20 5:09 DO OFFICE WORKS
27 7:45 12:00 12:15 5:01 DO OFFICE WORKS
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:50 12:05 1:00 5:16 DO OFFICE WORKS
31 8:00 12:00 12:33 5:12 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:04 12:40 5:03 Conducted the Assistant Chief of Construction
2 8:00 12:06 12:30 5:09 Section and DPWH Personnel
3 8:00 12:01 12:18 5:00 to their Official Travel.
4 SATURDAY SATURDAY
5 SUNDAY SUNDAY
6 7:30 12:05 12:39 5:04 Conducted the Assistant Chief of Construction
7 8:00 12:03 12:38 5:06 Section and DPWH Personnel
8 8:00 12:03 12:38 5:06 to their Official Travel.
9 7:15 12:03 12:36 6:20 Conducted the Assistant Chief of Construction
10 8:00 12:06 12:33 5:06 Section and DPWH Personnel to their Official Travel
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 7:26 12:08 12:29 5:10 Conducted the Assistant Chief of Construction
14 7:30 12:01 12:40 5:05 Section and DPWH Personnel
15 8:00 12:10 12:22 5:15 to their Official Travel.
16
17
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20
21
22
23
24
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL LOIDA L. LEAL, MPA


Utility 2 / Driver 1 Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: February 16 - 28, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

16 7:32 12:00 12:35 5:23 DO OFFICE WORKS

17 absent ABSENT
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 7:53 12:02 12:15 5:04 DO OFFICE WORKS
21 7:52 12:03 12:19 5:10 DO OFFICE WORKS
22 7:30 12:20 12:23 5:04 DO OFFICE WORKS
23 7:57 12:01 12:45 5:02 DO OFFICE WORKS
Leave station to follow up t-shirt and to buy Leave station to follow up t-shirt and to buy
24 decoration for convocation. decoration for convocation.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:05 12:09 12:41 5:04 DO OFFICE WORKS
28 7:59 12:01 12:15 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 Leave station to Cotabato City and Tacurong City To follow up excise taxes of Kanalan PS,
2 At DepEd Tacurong City Bululawan ES, and Plamango PS, and to
3 Return station to DPWH Lebak, Sultan Kudarat follow up the post completion report of
4 SATURDAY Kalibuhan ES at DepEd Tacurong City.
5 SUNDAY
Attended flag ceremony at Capitol, Attended flag ceremony at Capitol, Isulan,
6 Isulan Sultan Kkudarat
5:03
Sultan Kudarat
7 7:21 12:02 12:22 5:08 Do office work
8 7:44 12:06 12:36 5:02 Do office work
9 8:00 12:05 12:46 3:30 Do office work
10 ABSENT ABSENT
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 8:00 12:06 12:46 5:01 Do office work
14 7:48 12:26 12:41 5:04 Do office work
15 8:00 Leave Station to DPWH RO XII To follow up documents and to submit documents
16
17
18 SATURDAY
19 SUNDAY
20
21
22
23
24
25
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 At Regional Office XII, Koronadal city To follow up documents and to submit documents
17 Return station to DPWH Lebak, Sultan Kudarat Return Station to DPWH Lebak, Sultan Kudarat
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:07 12:23 5:16 Do office work
21 7:58 12:03 12:16 5:01 Do office work
22 7:40 12:06 12:19 5:02 Do office work
23 7:41 12:02 12:27 5:07 Do office work
24 7:47 Leave station to DepEd Tacurong City To follow up documents.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:23 12:10 12:48 5:02 Do office work
28 7:18 12:04 12:45 5:02 Do office work
29 7:52 12:03 12:28 5:02 Do office work
30 Leave station to DAR Office, Isulan, Sultan Kudarat Hand carry documents of 16MH0050 Bugso
31 At DAR Office, Isulan, Sultan Kudarat FMR at DAR, Isulan, Sultan Kudarat.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 At Provincial Capitol, Isulan, Sultan Kudarat 5:23 Attended Flag Ceremony at Provincial Capitol, Isulan Sultan Kudarat
4 8:00 12:11 12:29 5:03 Do Office works
5 7:44 12:04 12:15 5:13 Do Office works
6 7:33 12:00 Leave station to Isulan Submitted documents of list of Infrastructure Projects CY 2010 to CY
2016 under Congressman Arnulfo F. Go at the Provincial Governors
7 Still out at Provincial Capitol, Isulan, Sultan Kudarat Office.

8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
10 ABSENT ABSENT
11 ABSENT ABSENT
12 ABSENT ABSENT
13 HOLIDAY HOLIDAY
14 HOLIDAY HOLIDAY
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SUNDAY SUNDAY
17 8:00 12:04 12:19 5:01 Do office works
18 7:35 12:25 12:55 5:00 Do office works
19 7:23 12:03 12:20 5:00 Do office works
20 Absent Absent
21 Absent Absent
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 HOLIDAY HOLIDAY
Leave station to Esperanza,Bagumbayan,Senator
25 Ninoy Aquino,Palimbang Sultan Kudarat Assisted QAU personnels and Project Engineers
26 Still Out and Project Inspector at Esperanza-
27 Still Out bagumbayan-Senator Ninoy Aquino and
Leave station to Esperanza,Bagumbayan,Senator Palimbang and Prepared QAU documents
28 Ninoy Aquino,Palimbang Sultan Kudarat
29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY Holiday
Attended Flag Attended flag ceremony at Provincial Capitol, Isulan,
2 Ceremony 12:16 12:44 5:04
Sultan Kudarat/Do office works
3 7:34 12:04 12:16 5:05 Do office works
4 7:47 12:04 12:31 5:05 Do office works
5 7:45 12:00 12:19 5:00 Do office works
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 ABSENT ABSENT
9 8:00 12:00 1:00 5:04 Do office works
10 7:56 12:01 12:24 5:04 Do office works
11 7:39 12:03 12:23 5:02 Do office works
12 7:29 12:00 12:17 5:00 Do office works
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:26 12:06 12:26 5:00 Do office works
16
17
18
19
20 SATURDAY
21 SUNDAY
22
23
24
25
26
27 SATURDAY
28 SUNDAY
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM
AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6 SATURDAY
7 SUNDAY
8
9
10
11
12
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15
16 7:59 12:02 12:40 5:04 Do office works
17 8:00 12:03 12:20 5:05 Do office works
18 7:35 12:01 12:19 5:04 Do office works
19 7:50 12:04 12:17 5:00 Do office works
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:25 12:07 12:21 5:05 Do office works
23 7:36 12:02 12:23 5:04 Do office works
24 7:42 LEAVE STATION TO DepEd To submit letter request for final inspection of 14MH00104
Construction of Two Units One Storey Two Classroom School
25 AT DepEd DIVISON OF SULTAN KUDARAT Building, Kalibuhan, Palimbang, Sultan Kudarat at DepEd
26 Return station at DPWH LEBAK Division of Sultan Kudarat.

27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:53 12:07 12:24 5:03 Do office works
30 8:00 12:03 12:23 5:00 Do office works
31 7:37 12:00 12:15 5:02 Do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ELISEO L. OTOC, MPA


Data Encoder I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME

1 Leave station to DepEd Division of Sultan Kudarat FOLLOW UP LIST OF CY2017 MULTI STOREY
SCHOOL BUILDING PROJECTS FOR FUNDING TO
COVER THE SOIL INVESTIGATION UNDER DepEd'S
2 Still out at DepEd Division of Sultan Kudarat 2017 BASIC EDUCATION FUND.

3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
Attended flag ceremony at Provincial Attended flag ceremony at Provincial Capitol, Isulan,
5 5:02
Capitol Sultan Kudarat/Do Office works
6 7:40 12:07 12:17 5:04 DO OFFICE WORKS
7 7:53 12:03 12:15 5:09 DO OFFICE WORKS
Leave station at
DepEd Division DO OFFICE WORKS/LEAVE STATION TO
8 7:48 12:02 12:21 of Sultan DEPARTMENT OF EDUCATION DIVISION OFFICE OF
Kudarat
SULTAN KUDARAT
9 Still out at DepEd Division of Sultan Kudarat
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 7:40 12:04 12:36 5:00 DO OFFICE WORKS
14 7:10 12:04 12:20 5:02 DO OFFICE WORKS
15 7:38 12:15 12:34 5:01 DO OFFICE WORKS
16
17 SATURDAY
18 SUNDAY
19
20
21
22
23
24 SATURDAY
25 SUNDAY
26
27
28
29
30

I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat
DAILY TIME RECORD

For the month of: June 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:41 12:02 12:18 5:00 DO OFFICCE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
REHERSAL FOR
19 7:24 12:06 12:23 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
20 7:46 12:00 12:18 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
21 7:58 12:00 12:16 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
22 7:22 2:02 12:42 DPWH DO OFFICE WORKS
CELEBRATION
23 7:09 12:00 12:15 5:00 DPWH ANNIVERSARY CELEBRATION
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 7:00 12:05 12:22 5:00 DO OFFICE WORKS
28 7:13 12:02 12:43 5:00 DO OFFICE WORKS
29 7:50 12:02 12:18 5:01 DO OFFICE WORKS
30 7:34 12:00 12:29 5:00 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 3-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 7:34 12:00 12:29 5:00
4 7:50 12:01 12:22 5:36
5 7:59 12:23 12:40 5:06 Do office works at Construction Section
6 7:36 12:04 12:24 5:00
7 8:00 12:02 12:20 5:00
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
At Department Of Education, Division of Sultan
10 Kudarat Follow up Post Completion of Kanalan Primary School,
Still at Department of Esperanza, Sultan Kudarat for approval of Rafael C.
11 Education Division Office
12:47 5:01
Fontanilla, Ph.D., CESO V/Do Office Works
12 7:31 12:05 12:31 5:09
13 7:41 12:04 12:19 5:03 Do office works at Construction Section
14 7:40 12:00 12:49 5:00
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17 8:00 12:08 12:31 5:06
18 7:20 12:07 12:26 5:00
19 7:16 12:02 12:31 5:05 Do office works at Construction Section
20 7:28 12:24 12:34 5:08
21 7:01 12:00 12:30 5:00
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 7:45 12:06 12:15 5:06
25 7:51 12:04 12:30 5:-01
Do office works at Construction Section
26 7:33 12:04 12:34 5:04
27 7:37 12:02 12:25 5:06
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
28 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V

29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
31 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 16 - 31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:22 12:05 12:15 5:14
17 8:00 12:21 12:31 5:06 DO OFFICE WORKS
18 8:00 12:00 12:45 5:00
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 HOLIDAY HOLIDAY
22 8:00 12:06 12:17 5:02
23 7:54 12:14 12:33 5:01
DO OFFICE WORKS
24 7:59 12:21 12:42 5:00
25 7:42 12:00 12:15 5:00
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 HOLIDAY HOLIDAY
29 7:16 12:18 12:29 5:04
30 7:57 12:01 12:18 5:00 DO OFFICE WORKS
31 7:48 12:04 12:21 5:00
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1-15,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY
2 SATURDAY
3 SUNDAY
ATTENDED FLAG CEREMONY AT CAPITOL/DO
4 8:00 12:00 12:59 5:05
OFFICE WORK
5 7:39 12:00 12:28 5:01 DO OFFICE WORKS
6 7:34 12:07 12:24 5:08 DO OFFICE WORKS
7 7:39 12:15 12:29 5:03 DO OFFICE WORKS
8 7:34 12:05 12:15 5:00 DO OFFICE WORKS
9 SATURDAY SATURDAY
10 SUNDAY SUNDAY
11 6:56 12:09 12:25 5:04 DO OFFICE WORKS
12 7:34 12:12 12:26 5:04 DO OFFICE WORKS
13 7:16 12:05 12:23 5:00 DO OFFICE WORKS
14 7:35 12:02 12:22 5:00 DO OFFICE WORKS
15 7:44 12:01 12:17 5:06 DO OFFICE WORKS
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 16-30,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:35 12:08 12:26 5:03 DOING OFFICE WORKS
19 7:21 12:20 12:32 5:03 DOING OFFICE WORKS
20 7:41 12:01 12:20 5:04 DOING OFFICE WORKS
21 HOLIDAY HOLIDAY
22 7:30 12:00 12:15 5:00 DOING OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 7:08 12:09 12:20 5:01 DOING OFFICE WORKS
26 7:33 12:04 12:28 5:03 DOING OFFICE WORKS
27 7:47 12:03 12:33 5:00 DOING OFFICE WORKS
28 8:00 12:45 12:46 5:00 DOING OFFICE WORKS
29 7:48 12:05 12:27 5:00 DOING OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: OCTOBER 1 - 30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2 7:43 12:05 12:27 5:01 DO OFFICE WORKS
3 7:41 12:03 12:33 5:03 DO OFFICE WORKS
4 7:25 12:08 12:34 5:00 DO OFFICE WORKS
5 7:36 12:10 12:22 5:02 DO OFFICE WORKS
6 7:24 12:05 12:20 5:00 DO OFFICE WORKS
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 7:47 12:06 12:27 5:03 DO OFFICE WORKS
10 7:39 12:08 12:28 5:00 DO OFFICE WORKS
11 7:19 12:21 12:30 5:01 DO OFFICE WORKS
12 7:31 12:06 12:15 5:02 DO OFFICE WORKS
13 7:42 12:00 12:20 5:00 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 HOLIDAY HOLIDAY
17 HOLIDAY HOLIDAY
18 7:55 12:07 12:40 5:05 DO OFFICE WORK
19 7:30 12:18 12:31 5:03 DO OFFICE WORK
20 7:38 12:00 12:19 5:00 DO OFFICE WORK
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:13 12:33 5:00 DO OFFICE WORK
24 7:27 12:12 12:22 5:02 DO OFFICE WORK
25 7:58 12:04 12:32 5:14 DO OFFICE WORK
26 7:18 12:00 12:23 5:00 DO OFFICE WORK
27 7:49 12:00 12:30 5:02 DO OFFICE WORK
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:20 12;15 12:40 5:00 DO OFFICE WORK
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: NOVEMBER 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:50 12:06 12:25 5:03 DO OFFICE WORKS
17 7:26 12:02 12:16 5:00 DO OFFICE WORKS
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:05 12:13 5:01 DO OFFICE WORKS
21 7:53 12:23 12:25 5:00 DO OFFICE WORKS
22 HOLIDAY HOLIDAY
23 7:50 12:01 12:29 5:06 DO OFFICE WORKS
24 7:31 12:00 12:15 5:00 DO OFFICE WORKS
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 LEAVE STATION TO ISULAN FOLLOW UP POST COMPLETION REPORT
28 STILL OUT AT DEPERTMENT OF EDUCATION REGION
29 RETURN STATION TO LEBAK XII, DIVISION OF SULTAN KUDARAT
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Assistant Chief, Construction Section

Approved:
REYNALDO C. GUARDIANO, JR.
Assistant Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: DECEMBER 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY SATURDAY
17 SUNDAY SUNDAY
18 7:37 12:07 12:26 5:05 DO OFFICE WORKS
19 HOLIDAY HOLIDAY
20 7:46 12:12 12:25 5:01 DO OFFICE WORKS
21 7:48 12:00 12:05 5:03 DO OFFICE WORKS
22 7:20 12:01 12:20 5:00 DO OFFICE WORKS
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 HOLIDAY HOLIDAY
26 HOLIDAY HOLIDAY
27 7:50 12:00 12:20 5:05 DO OFFICE WORKS
28 7:35 12:10 12:30 5:05 DO OFFICE WORKS
29 7:30 12:17 12:30 5:02 DO OFFICE WORKS
30 SATURDAY SATURDAY
31 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2 SATURDAY
3 SUNDAY
4
5
6
7
8
9 SATURDAY
10 SUNDAY
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:50 12:03 12:27 9:00
19 7:54 12:00 12:30 5:00
20 7:45 12:03 12:15 5:20 Cleaning and doing errands
21 7:30 12:00 12:45 5:45
22 7:56 12:20 12:50 5:50
23 SATURDAY
24 SUNDAY
25 7:45 12:08 12:38 5:02
26 7:45 12:00 12:26 5:05
27 7:50 12:00 12:30 5:00 Cleaning and doing errands
28 7:55 12:04 12:41 5:01
29 7:48 12:00 12:24 5:00
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

RYAN D. GAWID REYNALDO C. GUARDIANO, JR.


Utility Worker II Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 SUNDAY
2 7:47 12:12 12:42 5:06 do office works
3 7:38 12:10 12:31 5:01 do office works
4 7:40 12:04 12:25 5:23 do office works
5 7:39 12:02 12:28 5:04 do office works
6 7:40 12:02 12:23 5:05 do office works
7 SATURDAY
8 SUNDAY
9 7:45 12:11 12:36 5:00 do office works
10 7:56 12:04 12:23 5:00 do office works
11 7:40 12:00 12:22 5:00 do office works
12 7:57 12:01 12:31 5:00 do office works
13 7:37 12:01 12:38 5:00 do office works
14 SATURDAY
15 SUNDAY
16 7:34 12:04 12:39 5:03 do office works
17 7:50 12:03 12:20 5:00 do office works
18 7:32 12:32 12:37 5:04 do office works
19 7:59 12:01 12:34 5:01 do office works
20 7:55 12:20 12:50 5:08 do office works
21 SATURDAY
22 SUNDAY
23 7:41 12:03 12:31 5:01 do office works
24 7:32 12:01 12:18 5:03 do office works
25 7:34 12:02 12:50 5:38 do office works
26 7:28 12:07 12:36 5:06 do office works
27 7:45 12:14 12:57 5:02 do office works
28 SATURDAY
29 SUNDAY
30 7:20 12:11 12:38 5:09 do office works
31 7:50 12:00 12:15 5:00 do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

RYAN D. GAWID REYNALDO C. GUARDIANO, JR.


Utility Worker II Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 31, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 7:50 12:01 12:23 5:06 Clean/Check service vehicle daily before travel
4 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
5 7:15 12:05 12:45 5:02 personnel on their Official Travel.
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 7:25 12:01 12:36 5:10
9 7:26 12:00 12:45 5:02 Clean/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
10 7:49 12:15 12:30 5:09 personnel on their Official Travel.
11 7:50 12:13 12:36 5:05
12 7:30 12:00 12:45 5:09
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:58 12:04 12:43 5:04
16 8:00 12:02 12:23 5:04 Clean/Check service vehicle daily before travel
17 8:05 12:12 12:18 5:02 by Construction Section and Conduct the DPWH
18 7:53 12:00 12:30 5:01 personnel on their Official Travel.
19 8:00 12:00 12:48 5:00
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:40 12:06 12:30 5:06
23 7:20 12:00 12:50 5:00 Clean/Check service vehicle daily before travel
24 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
25 8:00 12:16 12:18 5:02 personnel on their Official Travel.
26 7:58 12:03 12:15 5:00
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 Clean/Check service vehicle daily before travel
30 7:23 12:10 12:22 5:08 by Construction Section and Conduct the DPWH
31 8:00 12:08 12:29 5:05 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:54 12:08 12:49 5:06 Clean/Check service vehicle daily before travel by Construction Section
and Conduct the DPWH personnel on their Official Travel.
2 8:00 12:01 12:26 5:00
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00
6 8:00 12:15 12:41 5:00 Clean/Check service vehicle daily before travel
7 7:51 12:04 12:33 5:01 by Construction Section and Conduct the DPWH
8 7:53 12:10 12:19 5:04 personnel on their Official Travel.
9 7:56 12:00 12:45 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:50 12:02 12:42 5:00
13 8:00 12:15 12:41 5:00 Clean/Check service vehicle daily before travel
14 7:51 12:04 12:33 5:01 by Construction Section and Conduct the DPWH
15 7:53 12:10 12:19 5:04 personnel on their Official Travel.
16 7:56 12:00 12:45 5:00
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:50 12:02 12:42 5:00
20 8:00 12:15 12:41 5:00 Clean/Check service vehicle daily before travel
21 7:51 12:04 12:33 5:01 by Construction Section and Conduct the DPWH
22 7:53 12:10 12:19 5:04 personnel on their Official Travel.
23 7:56 12:00 12:45 5:00
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:50 12:02 12:42 5:00 Clean/Check service vehicle daily before travel
27 8:00 12:15 12:41 5:00 by Construction Section and Conduct the DPWH
28 7:51 12:04 12:33 5:01 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:36 12:05 12:21 5:02 Clean/Check service vehicle daily before travel by
Construction Section and Conduct the DPWH
2 7:58 12:04 12:14 5:04 personnel on their Official Travel.
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:43 12:00 12:15 5:00
6 7:56 12:11 12:29 5:07 Clean/Check service vehicle daily before travel
7 7:55 12:00 12:17 5:04 by Construction Section and Conduct the DPWH
8 7:24 12:08 12:18 5:03 personnel on their Official Travel.
9 7:58 12:01 12:20 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:52 12:04 12:15 5:22
Clean/Check service vehicle daily before travel
13 7:56 12:02 12:13 5:00
by Construction Section and Conduct the DPWH
14 7:43 12:01 12:30 5:00 personnel on their Official Travel.
15 8:00 12:05 12:48 5:20
16
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19
20
21
22
23
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY SUNDAY
2 7:49 12:19 12:24 5:01
3 8:00 12:08 12:22 6:28 Clean/Check service vehicle daily before travel
4 7:50 12:02 12:15 5:04 by Construction Section and Conduct the DPWH
5 7:47 12:08 12:51 5:10 personnel on their Official Travel.
6 5:00 5:00 5:00 5:00
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
11 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
12 7:32 12:07 12:28 5:14 personnel on their Official Travel.
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:36 12:07 12:28 5:12
17 7:49 12:04 12:15 5:00 Clean/Check service vehicle daily before travel
18 7:41 12:02 12:24 5:00 by Construction Section and Conduct the DPWH
19 7:55 12:32 12:35 5:00 personnel on their Official Travel.
20 7:32 12:07 12:28 5:14
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:55 12:32 12:35 5:00
24 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
25 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
26 7:32 12:07 12:28 5:14 personnel on their Official Travel.
27 7:03 12:16 12:20 5:01
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
Clean/Check service vehicle daily before travel by
30 5:00 12:02 12:24 5:00 Construction Section and Conduct the DPWH
personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
2 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
3 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
4 7:32 12:07 12:28 5:14 personnel on their Official Travel.
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:55 12:32 12:35 5:00
8 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
9 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
10 7:32 12:07 12:28 5:14 personnel on their Official Travel.
11 7:03 12:16 12:20 5:01
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15 7:47 12:08 12:51 5:10
Clean/Check service vehicle daily before travel
16
by Construction Section and Conduct the DPWH
17
personnel on their Official Travel.
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: October 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY NO SERVICE RENDERED
2 SUNDAY NO SERVICE RENDERED
3
4
5
6
7
8 SATURDAY NO SERVICE RENDERED
9 SUNDAY NO SERVICE RENDERED
10
11
12
13
14
15 SATURDAY NO SERVICE RENDERED
16 SUNDAY NO SERVICE RENDERED
17 8:00 12:06 12:19 5:06 DOING OFFICE WORKS
18 7:21 12:05 12:22 5:06 DOING OFFICE WORKS
19 7:17 12:01 12:24 5:36 DOING OFFICE WORKS
20 7:35 12:02 12:19 5:02 DOING OFFICE WORKS
21 7:30 12:00 12:30 5:30 FAMILY DAY
22 SATURDAY NO SERVICE RENDERED
23 SUNDAY NO SERVICE RENDERED
24 8:00 12:01 12:26 5:15 DOING OFFICE WORKS
25 7:21 12:05 12:25 5:24 DOING OFFICE WORKS
26 8:00 12:09 12:15 5:09 DOING OFFICE WORKS
27 7:22 12:00 12:20 5:00 DOING OFFICE WORKS
28 Leave station to Isulan and Marbel Carry communication for FPJ,GEMMA,CS Construction
29 SATURDAY NO SERVICE RENDERED
30 SUNDAY NO SERVICE RENDERED
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: November 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 8:00 12:05 12:20 5:00 DOING OFFICE WORKS
3 LEAVE STATION TO KORONADAL CITY TO TAKE THE COMPUTER LITERACY EXAM
4 TO TAKE THE COMPUTER LITERACY EXAM AT DPWH REGIONAL OFFICE XII
5 SATURDAY NO SERVICE RENDERED
6 SUNDAY NO SERVICE RENDERED
7 7:00 12:02 1:00 5:18 ATTENDED FLAG CEREMONY AT PROVINCIAL CAPITOL

8 7:53 12:02 12:15 5:02 DOING OFFICE WORKS


9 8:00 12:02 12:15 5:09 DOING OFFICE WORKS
10 7:26 12:00 12:36 5:00 DOING OFFICE WORKS
HANDCARRY DOCUMENTS TO MINROCK
11 LEAVE STATION TO COTABATO CITY CONSTRUCTION
12 SATURDAY NO SERVICE RENDERED
13 SUNDAY NO SERVICE RENDERED
14 7:51 12:10 1:00 5:09 DOING OFFICE WORKS
15 7:34 12:00 12:15 5:00 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 1-15, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:15 1:00 5:00 DOING OFFICE WORKS
2 8:00 12:05 12:33 5:00 DOING OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 HOLIDAY HOLIDAY
6 8:00 12:07 1:00 5:13 DOING OFFICE WORKS
7 8:00 12:11 12:15 5:04 DOING OFFICE WORKS
8 8:00 12:07 12:38 5:00 DOING OFFICE WORKS
9 8:00 12:00 12:39 5:00 DOING OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 8:00 12:03 12:21 5:00 DOING OFFICE WORKS
14 8:00 12:02 12:19 5:15 DOING OFFICE WORKS
15 7:52 12:01 12:17 5:04 DOING OFFICE WORKS
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.
LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA
Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: December 16-31, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:56 12:00 12:35 5:02 DOING OFFICE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 HOLIDAY HOLIDAY
20 8:00 12:06 12:15 5:17 DOING OFFICE WORKS
21 SK 2ND DEO CHRISTMAS PARTY SK 2ND DEO CHRISTMAS PARTY
22 8:00 12:00 12:56 5:04 DOING OFFICE WORKS
23 8:00 12:05 1:00 5:03 DOING OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 8:00 12:05 12:50 5:01 DOING OFFICE WORKS
28 7:13 12:00 12:16 5:06 DOING OFFICE WORKS
29 8:00 12:04 12:25 5:20 DOING OFFICE WORKS
30 HOLIDAY HOLIDAY
31 SATURDAY SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: January 9-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY
2
3
4
5
6
7 SATURDAY
8 SUNDAY
9 7:35 12:00 12:35 5:01 DO OFFICE WORKS
10 7:40 12:03 12:40 5:05 DO OFFICE WORKS
11 7:50 12:05 12:15 5:03 DO OFFICE WORKS
12 7:20 12:00 12:20 5:00 DO OFFICE WORKS
13 7:55 12:04 12:47 5:09 DO OFFICE WORKS
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:05 12:09 12:40 5:49 DO OFFICE WORKS
17 7:45 12:00 12:50 5:00 DO OFFICE WORKS
18 7:30 12:05 12:45 5:08 DO OFFICE WORKS
19 7:58 12:07 12:15 5:06 DO OFFICE WORKS
20 7:45 12:00 12:15 5:00 DO OFFICE WORKS
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:50 12:02 12:23 5:00 DO OFFICE WORKS
24 8:00 12:03 1:00 5:09 DO OFFICE WORKS
25 8:00 12:02 12:18 5:06 DO OFFICE WORKS
26 8:00 12:08 12:20 5:09 DO OFFICE WORKS
27 7:45 12:00 12:15 5:01 DO OFFICE WORKS
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:50 12:05 1:00 5:16 DO OFFICE WORKS
31 8:00 12:00 12:33 5:12 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO LOIDA L. LEAL, MPA


Engineering Aide Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 8:00 12:04 12:40 5:03 Conducted the Assistant Chief of Construction
2 8:00 12:06 12:30 5:09 Section and DPWH Personnel
3 8:00 12:01 12:18 5:00 to their Official Travel.
4 SATURDAY SATURDAY
5 SUNDAY SUNDAY
6 7:30 12:05 12:39 5:04 Conducted the Assistant Chief of Construction
7 8:00 12:03 12:38 5:06 Section and DPWH Personnel
8 8:00 12:03 12:38 5:06 to their Official Travel.
9 7:15 12:03 12:36 6:20 Conducted the Assistant Chief of Construction
10 8:00 12:06 12:33 5:06 Section and DPWH Personnel to their Official Travel
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 7:26 12:08 12:29 5:10 Conducted the Assistant Chief of Construction
14 7:30 12:01 12:40 5:05 Section and DPWH Personnel
15 8:00 12:10 12:22 5:15 to their Official Travel.
16
17
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20
21
22
23
24
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL LOIDA L. LEAL, MPA


Utility 2 / Driver 1 Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: February 16 - 28, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

16 7:32 12:00 12:35 5:23 DO OFFICE WORKS

17 absent ABSENT
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 7:53 12:02 12:15 5:04 DO OFFICE WORKS
21 7:52 12:03 12:19 5:10 DO OFFICE WORKS
22 7:30 12:20 12:23 5:04 DO OFFICE WORKS
23 7:57 12:01 12:45 5:02 DO OFFICE WORKS
Leave station to follow up t-shirt and to buy Leave station to follow up t-shirt and to buy
24 decoration for convocation. decoration for convocation.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:05 12:09 12:41 5:04 DO OFFICE WORKS
28 7:59 12:01 12:15 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL LOIDA L. LEAL, MPA


Driver I Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 Leave station to Cotabato City and Tacurong City To follow up excise taxes of Kanalan PS,
2 At DepEd Tacurong City Bululawan ES, and Plamango PS, and to
3 Return station to DPWH Lebak, Sultan Kudarat follow up the post completion report of
4 SATURDAY Kalibuhan ES at DepEd Tacurong City.
5 SUNDAY
Attended flag ceremony at Capitol, Attended flag ceremony at Capitol, Isulan,
6 Isulan Sultan Kkudarat
5:03
Sultan Kudarat
7 7:21 12:02 12:22 5:08 Do office work
8 7:44 12:06 12:36 5:02 Do office work
9 8:00 12:05 12:46 3:30 Do office work
10 ABSENT ABSENT
11 SATURDAY SATURDAY
12 SUNDAY SUNDAY
13 8:00 12:06 12:46 5:01 Do office work
14 7:48 12:26 12:41 5:04 Do office work
15 8:00 Leave Station to DPWH RO XII To follow up documents and to submit documents
16
17
18 SATURDAY
19 SUNDAY
20
21
22
23
24
25
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL LOIDA L. LEAL, MPA


Driver I Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: March 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 At Regional Office XII, Koronadal city To follow up documents and to submit documents
17 Return station to DPWH Lebak, Sultan Kudarat Return Station to DPWH Lebak, Sultan Kudarat
18 SATURDAY SATURDAY
19 SUNDAY SUNDAY
20 8:00 12:07 12:23 5:16 Do office work
21 7:58 12:03 12:16 5:01 Do office work
22 7:40 12:06 12:19 5:02 Do office work
23 7:41 12:02 12:27 5:07 Do office work
24 7:47 Leave station to DepEd Tacurong City To follow up documents.
25 SATURDAY SATURDAY
26 SUNDAY SUNDAY
27 7:23 12:10 12:48 5:02 Do office work
28 7:18 12:04 12:45 5:02 Do office work
29 7:52 12:03 12:28 5:02 Do office work
30 Leave station to DAR Office, Isulan, Sultan Kudarat Hand carry documents of 16MH0050 Bugso
31 At DAR Office, Isulan, Sultan Kudarat FMR at DAR, Isulan, Sultan Kudarat.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 At Provincial Capitol, Isulan, Sultan Kudarat 5:23 Attended Flag Ceremony at Provincial Capitol, Isulan Sultan Kudarat
4 8:00 12:11 12:29 5:03 Do Office works
5 7:44 12:04 12:15 5:13 Do Office works
6 7:33 12:00 Leave station to Isulan Submitted documents of list of Infrastructure Projects CY 2010 to CY
2016 under Congressman Arnulfo F. Go at the Provincial Governors
7 Still out at Provincial Capitol, Isulan, Sultan Kudarat Office.

8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
10 ABSENT ABSENT
11 ABSENT ABSENT
12 ABSENT ABSENT
13 HOLIDAY HOLIDAY
14 HOLIDAY HOLIDAY
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: April 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SUNDAY SUNDAY
17 8:00 12:04 12:19 5:01 Do office works
18 7:35 12:25 12:55 5:00 Do office works
19 7:23 12:03 12:20 5:00 Do office works
20 Absent Absent
21 Absent Absent
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 HOLIDAY HOLIDAY
Leave station to Esperanza,Bagumbayan,Senator
25 Ninoy Aquino,Palimbang Sultan Kudarat Assisted QAU personnels and Project Engineers
26 Still Out and Project Inspector at Esperanza-
27 Still Out bagumbayan-Senator Ninoy Aquino and
Leave station to Esperanza,Bagumbayan,Senator Palimbang and Prepared QAU documents
28 Ninoy Aquino,Palimbang Sultan Kudarat
29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL ELISEO L. OTOC, MPA


Driver I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1 - 15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY Holiday
Attended Flag Attended flag ceremony at Provincial Capitol, Isulan,
2 Ceremony 12:16 12:44 5:04
Sultan Kudarat/Do office works
3 7:34 12:04 12:16 5:05 Do office works
4 7:47 12:04 12:31 5:05 Do office works
5 7:45 12:00 12:19 5:00 Do office works
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 ABSENT ABSENT
9 8:00 12:00 1:00 5:04 Do office works
10 7:56 12:01 12:24 5:04 Do office works
11 7:39 12:03 12:23 5:02 Do office works
12 7:29 12:00 12:17 5:00 Do office works
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:26 12:06 12:26 5:00 Do office works
16
17
18
19
20 SATURDAY
21 SUNDAY
22
23
24
25
26
27 SATURDAY
28 SUNDAY
29
30
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL ELISEO L. OTOC, MPA


Driver I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM
AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6 SATURDAY
7 SUNDAY
8
9
10
11
12
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15
16 7:59 12:02 12:40 5:04 Do office works
17 8:00 12:03 12:20 5:05 Do office works
18 7:35 12:01 12:19 5:04 Do office works
19 7:50 12:04 12:17 5:00 Do office works
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:25 12:07 12:21 5:05 Do office works
23 7:36 12:02 12:23 5:04 Do office works
24 7:42 LEAVE STATION TO DepEd To submit letter request for final inspection of 14MH00104
Construction of Two Units One Storey Two Classroom School
25 AT DepEd DIVISON OF SULTAN KUDARAT Building, Kalibuhan, Palimbang, Sultan Kudarat at DepEd
26 Return station at DPWH LEBAK Division of Sultan Kudarat.

27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:53 12:07 12:24 5:03 Do office works
30 8:00 12:03 12:23 5:00 Do office works
31 7:37 12:00 12:15 5:02 Do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL ELISEO L. OTOC, MPA


Driver I Concurrent Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME

1 Leave station to DepEd Division of Sultan Kudarat FOLLOW UP LIST OF CY2017 MULTI STOREY
SCHOOL BUILDING PROJECTS FOR FUNDING TO
COVER THE SOIL INVESTIGATION UNDER DepEd'S
2 Still out at DepEd Division of Sultan Kudarat 2017 BASIC EDUCATION FUND.

3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
Attended flag ceremony at Provincial Attended flag ceremony at Provincial Capitol, Isulan,
5 5:02
Capitol Sultan Kudarat/Do Office works
6 7:40 12:07 12:17 5:04 DO OFFICE WORKS
7 7:53 12:03 12:15 5:09 DO OFFICE WORKS
Leave station at
DepEd Division DO OFFICE WORKS/LEAVE STATION TO
8 7:48 12:02 12:21 of Sultan DEPARTMENT OF EDUCATION DIVISION OFFICE OF
Kudarat
SULTAN KUDARAT
9 Still out at DepEd Division of Sultan Kudarat
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 HOLIDAY HOLIDAY
13 7:40 12:04 12:36 5:00 DO OFFICE WORKS
14 7:10 12:04 12:20 5:02 DO OFFICE WORKS
15 7:38 12:15 12:34 5:01 DO OFFICE WORKS
16
17 SATURDAY
18 SUNDAY
19
20
21
22
23
24 SATURDAY
25 SUNDAY
26
27
28
29
30

I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat
DAILY TIME RECORD

For the month of: June 16-30, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:41 12:02 12:18 5:00 DO OFFICCE WORKS
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
REHERSAL FOR
19 7:24 12:06 12:23 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
20 7:46 12:00 12:18 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
21 7:58 12:00 12:16 DPWH DO OFFICE WORKS
CELEBRATION
REHERSAL FOR
22 7:22 2:02 12:42 DPWH DO OFFICE WORKS
CELEBRATION
23 7:09 12:00 12:15 5:00 DPWH ANNIVERSARY CELEBRATION
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 HOLIDAY HOLIDAY
27 7:00 12:05 12:22 5:00 DO OFFICE WORKS
28 7:13 12:02 12:43 5:00 DO OFFICE WORKS
29 7:50 12:02 12:18 5:01 DO OFFICE WORKS
30 7:34 12:00 12:29 5:00 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 3-15, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SATURDAY SATURDAY
2 SUNDAY SUNDAY
3 7:34 12:00 12:29 5:00
4 7:50 12:01 12:22 5:36
5 7:59 12:23 12:40 5:06 Do office works at Construction Section
6 7:36 12:04 12:24 5:00
7 8:00 12:02 12:20 5:00
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
At Department Of Education, Division of Sultan
10 Kudarat Follow up Post Completion of Kanalan Primary School,
Still at Department of Esperanza, Sultan Kudarat for approval of Rafael C.
11 Education Division Office
12:47 5:01
Fontanilla, Ph.D., CESO V/Do Office Works
12 7:31 12:05 12:31 5:09
13 7:41 12:04 12:19 5:03 Do office works at Construction Section
14 7:40 12:00 12:49 5:00
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17 8:00 12:08 12:31 5:06
18 7:20 12:07 12:26 5:00
19 7:16 12:02 12:31 5:05 Do office works at Construction Section
20 7:28 12:24 12:34 5:08
21 7:01 12:00 12:30 5:00
22 SATURDAY SATURDAY
23 SUNDAY SUNDAY
24 7:45 12:06 12:15 5:06
25 7:51 12:04 12:30 5:-01
Do office works at Construction Section
26 7:33 12:04 12:34 5:04
27 7:37 12:02 12:25 5:06
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
28 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V

29 SATURDAY SATURDAY
30 SUNDAY SUNDAY
Follow up Post Completion Report of Limulan
At Department Of Education, Division of Sultan
31 Elementary School, Kalamansig, Sultan Kudarat for
Kudarat approval of Rafael C. Fontanilla, Ph. D., CESO V
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 16 - 31, 2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 7:22 12:05 12:15 5:14
17 8:00 12:21 12:31 5:06 DO OFFICE WORKS
18 8:00 12:00 12:45 5:00
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 HOLIDAY HOLIDAY
22 8:00 12:06 12:17 5:02
23 7:54 12:14 12:33 5:01
DO OFFICE WORKS
24 7:59 12:21 12:42 5:00
25 7:42 12:00 12:15 5:00
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 HOLIDAY HOLIDAY
29 7:16 12:18 12:29 5:04
30 7:57 12:01 12:18 5:00 DO OFFICE WORKS
31 7:48 12:04 12:21 5:00
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1-15,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY
2 SATURDAY
3 SUNDAY
ATTENDED FLAG CEREMONY AT CAPITOL/DO
4 8:00 12:00 12:59 5:05
OFFICE WORK
5 7:39 12:00 12:28 5:01 DO OFFICE WORKS
6 7:34 12:07 12:24 5:08 DO OFFICE WORKS
7 7:39 12:15 12:29 5:03 DO OFFICE WORKS
8 7:34 12:05 12:15 5:00 DO OFFICE WORKS
9 SATURDAY SATURDAY
10 SUNDAY SUNDAY
11 6:56 12:09 12:25 5:04 DO OFFICE WORKS
12 7:34 12:12 12:26 5:04 DO OFFICE WORKS
13 7:16 12:05 12:23 5:00 DO OFFICE WORKS
14 7:35 12:02 12:22 5:00 DO OFFICE WORKS
15 7:44 12:01 12:17 5:06 DO OFFICE WORKS
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

SHERWIN A. LEAL REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 31, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 7:50 12:01 12:23 5:06 Clen/Check service vehicle daily before travel
4 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
5 7:15 12:05 12:45 5:02 personnel on their Official Travel.
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 7:25 12:01 12:36 5:10
9 7:26 12:00 12:45 5:02 Clen/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
10 7:49 12:15 12:30 5:09 personnel on their Official Travel.
11 7:50 12:13 12:36 5:05
12 7:30 12:00 12:45 5:09
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:40 12:06 12:30 5:06
16 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
17 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
18 8:00 12:16 12:18 5:02 personnel on their Official Travel.
19 7:58 12:03 12:15 5:00
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 7:40 12:06 12:30 5:06
23 7:20 12:00 12:50 5:00 Clen/Check service vehicle daily before travel
24 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
25 8:00 12:16 12:18 5:02 personnel on their Official Travel.
26 7:58 12:03 12:15 5:00
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 Clen/Check service vehicle daily before travel
30 7:23 12:10 12:22 5:08 by Construction Section and Conduct the DPWH
31 8:00 12:08 12:29 5:05 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:54 12:08 12:49 5:06 Clean/Check service vehicle daily before travel by Construction Section
and Conduct the DPWH personnel on their Official Travel.
2 8:00 12:01 12:26 5:00
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00
6 8:00 12:15 12:41 5:00 Clean/Check service vehicle daily before travel
7 7:51 12:04 12:33 5:01 by Construction Section and Conduct the DPWH
8 7:53 12:10 12:19 5:04 personnel on their Official Travel.
9 7:56 12:00 12:45 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:15 5:00
13 7:50 12:01 12:23 5:06 Clean/Check service vehicle daily before travel
14 7:48 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
15 7:15 12:05 12:45 5:02 personnel on their Official Travel.
16 7:15 12:05 12:45 5:02
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:40 12:06 12:30 5:06
20 7:20 12:00 12:50 5:00 Clean/Check service vehicle daily before travel
21 8:00 12:00 12:30 5:07 by Construction Section and Conduct the DPWH
22 8:00 12:16 12:18 5:02 personnel on their Official Travel.
23 7:58 12:03 12:15 5:00
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:40 12:06 12:30 5:06 Clean/Check service vehicle daily before travel
27 7:20 12:00 12:50 5:00 by Construction Section and Conduct the DPWH
28 8:00 12:00 12:30 5:07 personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 7:36 12:05 12:21 5:02 Clean/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
2 7:58 12:04 12:14 5:04
personnel on their Official Travel.
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:43 12:00 12:15 5:00
6 7:56 12:11 12:29 5:07 Clean/Check service vehicle daily before travel
7 7:55 12:00 12:17 5:04 by Construction Section and Conduct the DPWH
8 7:24 12:08 12:18 5:03 personnel on their Official Travel.
9 7:58 12:01 12:20 5:00
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:52 12:04 12:15 5:22
13 7:56 12:02 12:13 5:00 Clean/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
14 7:43 12:01 12:30 5:00
personnel on their Official Travel.
15 8:00 12:05 12:48 5:20
16
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19
20
21
22
23
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26
27
28
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 16-28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13 Clean/Check service vehicle daily before travel
14 by Construction Section and Conduct the DPWH
15 personnel on their Official Travel.
16 8:00 12:05 12:48 5:20
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:43 12:00 12:15 5:00
20 7:56 12:11 12:29 5:07 Clean/Check service vehicle daily before travel
21 7:55 12:00 12:17 5:04 by Construction Section and Conduct the DPWH
22 7:24 12:08 12:18 5:03 personnel on their Official Travel.
23 7:58 12:01 12:20 5:00
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:52 12:04 12:15 5:22 Clean/Check service vehicle daily before travel
27 7:56 12:02 12:13 5:00 by Construction Section and Conduct the DPWH
28 7:43 12:01 12:30 5:00 personnel on their Official Travel.
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 SUNDAY SUNDAY
2 7:49 12:19 12:24 5:01
3 8:00 12:08 12:22 6:28 Clean/Check service vehicle daily before travel
4 7:50 12:02 12:15 5:04 by Construction Section and Conduct the DPWH
5 7:47 12:08 12:51 5:10 personnel on their Official Travel.
6 5:00 5:00 5:00 5:00
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
11 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
12 7:32 12:07 12:28 5:14 personnel on their Official Travel.
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:36 12:07 12:28 5:12
17 7:49 12:04 12:15 5:00 Clean/Check service vehicle daily before travel
18 7:41 12:02 12:24 5:00 by Construction Section and Conduct the DPWH
19 7:55 12:32 12:35 5:00 personnel on their Official Travel.
20 7:32 12:07 12:28 5:14
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 7:55 12:32 12:35 5:00
24 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
25 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
26 7:32 12:07 12:28 5:14 personnel on their Official Travel.
27 7:03 12:16 12:20 5:01
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
Clean/Check service vehicle daily before travel by
30 5:00 12:02 12:24 5:00 Construction Section and Conduct the DPWH
personnel on their Official Travel.
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME
REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
2 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
3 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
4 7:32 12:07 12:28 5:14 personnel on their Official Travel.
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:55 12:32 12:35 5:00
8 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
9 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
10 7:32 12:07 12:28 5:14 personnel on their Official Travel.
11 7:03 12:16 12:20 5:01
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15 7:47 12:08 12:51 5:10
Clean/Check service vehicle daily before travel
16
by Construction Section and Conduct the DPWH
17
personnel on their Official Travel.
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1 HOLIDAY
2
3
4
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7
8
9
10
11
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15
Clean/Check service vehicle daily before travel
16 7:42 12:10 12:39 5:20
by Construction Section and Conduct the DPWH
17 7:55 12:32 12:35 5:00
personnel on their Official Travel.
18 7:32 12:07 12:28 5:14
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 7:55 12:32 12:35 5:00
22 7:42 12:10 12:39 5:20 Clean/Check service vehicle daily before travel
23 7:55 12:32 12:35 5:00 by Construction Section and Conduct the DPWH
24 7:32 12:07 12:28 5:14 personnel on their Official Travel.
25 7:03 12:16 12:20 5:01
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 7:42 12:10 12:39 5:20
Clean/Check service vehicle daily before travel
29 7:55 12:32 12:35 5:00
by Construction Section and Conduct the DPWH
30 7:32 12:07 12:28 5:14
personnel on their Official Travel.
31 7:55 12:32 12:35 5:00
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1 - 15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
Clean/Check service vehicle daily before travel by
1 7:32 12:00 12:15 5:00 Construction Section and Conduct the DPWH
personnel on their Official Travel.
2 SATURDAY
3 SUNDAY

4 7:55 12:02 12:17 5:00


Clean/Check service vehicle daily before travel by
5 7:50 12:00 12:15 5:00 Construction Section and Conduct the DPWH
6 7:30 12:02 12:19 5:30 personnel on their Official Travel.
7 7:55 12:20 12:35 5:09
8 7:32 12:01 12:15 5:08
9 SATURDAY
10 SUNDAY
Clean/Check service vehicle daily before travel by
11 7:55 12:00 12:15 5:00 Construction Section and Conduct the DPWH
personnel on their Official Travel.
12 HOLIDAY
13 7:42 12:06 12:20 5:07 Clean/Check service vehicle daily before travel
by Construction Section and Conduct the DPWH
14 7:32 12:06 12:15 5:00
personnel on their Official Travel.
15 HOLIDAY
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23 SATURDAY
24 SUNDAY
25
26
27
28
29
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS REMARKS
IN OUT IN OUT ME TIME
1
2 SATURDAY
3 SUNDAY
4
5
6
7
8
9 SATURDAY
10 SUNDAY
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:50 12:03 12:27 5:00
19 7:54 12:00 12:30 5:00 Clean/Check service vehicle daily before travel
20 7:45 12:03 12:15 5:20 by Construction Section and Conduct the DPWH
21 7:30 12:00 12:45 5:45 personnel on their Official Travel.
22 7:56 12:20 12:50 5:50
23 SATURDAY
24 SUNDAY
25 7:45 12:04 12:45 5:05
26 7:56 12:31 12:34 7:02 Clean/Check service vehicle daily before travel
27 7:50 12:02 12:15 5:01 by Construction Section and Conduct the DPWH
28 7:53 12:00 12:30 6:30 personnel on their Official Travel.
29 7:25 12:30 12:50 6:00
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ELPEDIO M. MAHUSAY, JR. REYNALDO C. GUARDIANO, JR.


Driver I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 16-30,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:56 12:22 12:53 5:04 DOING OFFICE WORKS
19 7:45 12:28 1:00 5:04 DOING OFFICE WORKS
20 8:00 12:02 12:18 5:00 DOING OFFICE WORKS
21 HOLIDAY HOLIDAY
22 ABSENT ABSENT
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
ATTENDED STAFF MEETING AT DPWH RO XII
25 STAFF MEETING AT DPWH R.O. XII KORONADAL CITY
26 8:12 12:04 12:17 5:03 DOING OFFICE WORKS
27 8:10 12:04 12:59 5:01 DOING OFFICE WORKS
28 8:14 12:04 12:47 5:00 DOING OFFICE WORKS
29 8:16 12:12 12:22 5:00 DOING OFFICE WORKS
30 SATURDAY SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

JOHAIRA M. MAGARANG REYNALDO C. GUARDIANO, JR.


Engineer I Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer/Concurrent Chief, Construction Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: January 1 - 31, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM
AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 LEAVE STATION TO DPWH RO XII,KORONADAL CITY
AT REGIONAL OFFICE XII, KORONADAL CITY At DPWH Regional Office XII, Koronadal City for
4
COMPUTER PROFICENCY EXAMINATION
5 RETURN STATION TO LEBAK, SULTAN KUDARAT
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 8:44 12:02 12:21 5:01 Do office works
9 7:50 12:00 12:15 5:04 Do office works/Construction Meeting
LEAVE STATION TO
10 8:02 12:01 ESPERANZA BAGYMBAYAN
PROJECTS Assisted Project Engineer in supervisionof projects at
Esperanza and Bagumbayan, Sultan Kudarat
11 STILL OUT AT ESPERANZA BAGUMBAYAN
12 RETURN STATION TO LEBAK, SULTAN KUDARAT
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 LEAVE STATION AT ESPERANZA AND BAGUMBAYAN
16
STILL OUT AT ESPERANZAAND BAGUMBAYAN, Assisted Project Engineer in supervision of on-going
17 SULTAN KUDARAT projects at Esperanza and Bagumbayan, Sultan Kudarat.
18
19 RETURN STATION TO LEBAK, SULTAN KUDARAT
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 8:05 12:02 12:37 5:01 Do office works
23 8:11 12:04 12:31 5:03 Do office works
24 LEAVE STATION AT ESPERANZA AND BAGUMBAYAN
Assisted Project Engineer in supervision of on-going
STILL OUT AT ESPERANZA AND BAGUMBAYAN.
25 projects at Esperanza and Bagumbayan, Sultan
SULTAN KUDARAT
Kudarat.
26 RETURN STATION TO LEBAK, SULTAN KUDARAT
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:20 12:05 12:27 5:00 Do office works
LEAVE STATION TO
30 8:04 12:13 ESPERANZA BAGUMBAYAN Assisted Project Engineer in supervision of on-going
PROJECTS
projects at Esperanza and Bagumbayan, Sultan
STILL OUT AT ESPERANZA AND BAGUMBAYAN, Kudarat.
31
SULTAN KUDARAT
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Assistant Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 16-31 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15 Assisted Project Engineer in supervision of on-going
16 RETURN STATION TO LEBAK, S.K. projects at Esperanza and Bagumbayan, Sultan Kudarat.
17 SATURDAY
18 SUNDAY
19 7:30 12:08 12:41 5:23
LEAVE STATION
20 7:50 12:07 12:38 TO ESPERANZA &
BAGUMBAYAN Assisted Project Engineer in supervision of on-going
projects at Esperanza and Bagumbayan, Sultan Kudarat.
21 STILL OUT
22 STILLOUT
23 RETURN STATION TO LEBAK, S.K.
24 SATURDAY
25 SUNDAY
LEAVE STATION TO ESPERANZA &
26
BAGUMBAYAN
Assisted Project Engineer in supervision of on-going
projects at Esperanza and Bagumbayan, Sultan
27 STILL OUT
Kudarat.
28 RETURN STATION TO LEBAK, S.K.
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
31 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Assistant Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1 SUNDAY
2 7:30 12:08 12:41 5:23 DO OFFICE WORKS
3 7:50 12:07 12:38 5:04 DO OFFICE WORKS
4 8:00 12:04 12:29 5:03 DO OFFICE WORKS
5 8:00 12:19 12:20 5:06 DO OFFICE WORKS
6 7:30 12:08 12:41 5:23 DO OFFICE WORKS
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:50 12:07 12:38 5:03 DO OFFICE WORKS
11 7:35 12:08 12:26 5:04 DO OFFICE WORKS
12 8:00 12:19 12:20 5:06 DO OFFICE WORKS
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:50 12:07 12:38 5:04 DO OFFICE WORKS
17 8:00 12:04 12:29 5:03 DO OFFICE WORKS
18 LEAVE STATION TO ESPERANZA & BAGUMBAYAN Assisted Project Engineer in supervision of on-going
19 RETURN STATION TO LEBAK, S.K. projects at Esperanza and Bagumbayan, Sultan Kudarat.

BRILLE'S CHICKEN PALACE, ISULAN, SULTAN TRAINING/SEMINAR ON PROJECT PROPER IMPLEMENTATION


20
KUDARAT AND MATERIALS QUALITY CONTROL

21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 8:00 12:06 12:20 5:01 DO OFFICE WORKS
24 7:50 12:07 12:38 5:04 DO OFFICE WORKS
25 7:50 12:07 12:38 5:03 DO OFFICE WORKS
26 7:58 12:08 12:26 5:04 DO OFFICE WORKS
27 8:00 12:19 12:20 5:06 DO OFFICE WORKS
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:30 12:08 12:41 5:23 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Assistant Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY HOLIDAY
2 LEAVE STATION TO ESPERANZA & BAGUMBAYAN
Assisted Project Engineer in supervision of on-going
3 STILL OUT
projects at Esperanza and Bagumbayan, Sultan Kudarat.
4 RETURN STATION TO LEBAK, S.K.
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:20 12:16 12:32 5:02 DO OFFICE WORKS
8 8:00 12:11 12:29 5:01 DO OFFICE WORKS
9 7:53 12:03 12:22 5:09 DO OFFICE WORKS
10 LEAVE STATION TO ESPERANZA & BAGUMBAYAN Assisted Project Engineer in supervision of on-going
11 RETURN STATION TO LEBAK, S.K. projects at Esperanza and Bagumbayan, Sultan Kudarat.
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15 LEAVE STATION TO ESPERANZA & BAGUMBAYAN
16 Assisted Project Engineer in supervision of on-going
17 projects at Esperanza and Bagumbayan, Sultan Kudarat.
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Assistant Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 STILL OUT AT ESPERANZA & BAGUMBAYAN ASSIST PI,PE IN SUPERVISION OF ON GOING PROJECTS
17 STILL OUT AT ESPERANZA & BAGUMBAYAN AT ESPERANZA & BAGUMBAYAN, SULTAN KUDARAT
18 RETURN STATION
19 SATURDAY
20 SUNDAY
21 8:00 12:O6 12:32 5:03 DO OFFICE WORKS
22 7:45 12:02 12:24 5:06 DO OFFICE WORKS
23 LEAVE STATION AT ESPERANZA & BAGUMBAYAN, S.K.
ASSIST PI,PE IN SUPERVISION OF ON GOING PROJECTS
24 STILL OUT AT ESPERANZA & BAGUMBAYAN
AT ESPERANZA & BAGUMBAYAN, SULTAN KUDARAT
25 LEAVE STATION AT ESPERANZA & BAGUMBAYAN, S.K.
26 SATURDAY
27 SUNDAY
28 LEAVE STATION AT ESPERANZA & BAGUMBAYAN, S.K.
29 STILL OUT AT ESPERANZA & BAGUMBAYAN ASSIST PI,PE IN SUPERVISION OF ON GOING PROJECTS
30 STILL OUT AT ESPERANZA & BAGUMBAYAN AT ESPERANZA & BAGUMBAYAN, SULTAN KUDARAT
31 RETURN STATION
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.
I hereby certify on my honor that the above is a true and
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief.,Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS IME
REMARKS
IN OUT IN OUT TIME
1
2 SATURDAY
3 SUNDAY
4
5
6
7
8
9 SATURDAY
10 SUNDAY
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:50 12:03 12:27 5:00 DO OFFICE WORKS
19 7:54 12:00 12:30 5:00 DO OFFICE WORKS
20 7:45 12:03 12:15 5:20 DO OFFICE WORKS
21 7:30 12:00 12:45 5:45 DO OFFICE WORKS
22 7:56 12:20 12:50 5:50 DO OFFICE WORKS
23 SATURDAY
24 SUNDAY
25 7:45 12:04 12:25 5:01 DO OFFICE WORKS
26 8:00 12:07 12:25 5:00 DO OFFICE WORKS
27 LEAVE STATION
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
28 STILL OUT
GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
29 RETURN STATION
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief.,Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2 SATURDAY
3 SUNDAY
4
5
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
6
GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
7
8
9 SATURDAY
10 SUNDAY
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23 SATURDAY
24 SUNDAY
25
26
27
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
28
GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
29
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA 0
Engineer I 0

Approved:

0
0

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS IME
REMARKS
IN OUT IN OUT TIME
1 SUNDAY
2 8:00 12:08 12:20 5:01 do office works
3 Leave station to Esperanza & Bagumbayan
4 ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
Still Out
5 GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
6 Return Station to Lebak
7 SATURDAY
8 SUNDAY
9 7:40 12:05 12:37 5:02 do office works
10 8:00 12:03 12:20 5:00 do office works
11 8:00 12:13 12:26 5:02 do office works
12 7:30 12:00 12:15 5:00 do office works
13 7:50 12:01 12:20 5:00 do office works
14 SATURDAY
15 SUNDAY
16 7:35 12:21 12:31 5:02 do office works
17 Leave station to Esperanza & Bagumbayan ASSIST PROJECT ENGINEER IN SUPERVISION OF
18 ON GOING PROJECTS AT BAGUMBAYAN AND
Still Out
19 ESPERANZA.
20 Return Station to Lebak
21 SATURDAY
22 SUNDAY
23 7:45 12:06 12:39 5:01 do office works
24 7:57 12:19 12:20 5:02 do office works
25 Leave station to Esperanza & Bagumbayan
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
26 Still Out
GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
27 Return Station to Lebak
28 SATURDAY
29 SUNDAY
30 7:42 12:04 12:28 5:04 do office works
31 8:00 12:43 12:44 5:01 do office works
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief.,Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 Still Out
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
2 Still Out
GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
3 Return Station to Lebak, Sultan Kudarat
4 SATURDAY
5 SUNDAY
6 7:54 12:26 12:27 5:05 do office works
7 7:49 12:03 1:00 5:04 do office works
8 7:42 12:00 Leave Station
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
9 Still Out
GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
10 Leave Station to Bagumbayan to Esperanza
11 SATURDAY
12 SUNDAY
13 7:44 12:21 12:22 5:31 do office works
14 Leave Station to Bagumbayan to Esperanza ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
15 Still Out GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief.,Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: August 16-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS IME
REMARKS
IN OUT IN OUT TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ASSIST PROJECT ENGINEER IN SUPERVISION OF
16 Still out
ON GOING PROJECTS AT BAGUMBAYAN AND
17 Return Station to Lebak, Sultan Kudarat
ESPERANZA.
18 SATURDAY
19 SUNDAY
20 Leave Station to Esperanza and Bagumbayan
21 HOLIDAY
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
22 Still out
GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
23 Still out
24 Return Station to Lebak, Sultan Kudarat
25 SATURDAY
26 SUNDAY
27 HOLIDAY
28 Leave Station to Esperanza and Bagumbayan
29 Still out ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
30 Still out GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
31 Leave Station to Esperanza and Bagumbayan
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief.,Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: September 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERTI OVER
DAYS ME REMARKS
IN OUT IN OUT TIME
1 SATURDAY
2 SUNDAY
3 7:45 12:05 12:20 5:02
4 LEAVE STATION
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON GOING
5 ESPERANZA & BAGUMBAYAN PROJECTS AT BAGUMBAYAN AND ESPERANZA.
6 ESPERANZA & BAGUMBAYAN
7 RETURN STATION
8 SATURDAY SATURDAY
9 SUNDAY SUNDAY
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON GOING PROJECTS AT
10 7:48 12:03 12:25 5:01 BAGUMBAYAN AND ESPERANZA.

11 HOLIDAY HOLIDAY
12 8:00 12:20 12:21 5:19
ASSIST PROJECT ENGINEER IN SUPERVISION OF ON
13 7:39 12:11 12:25 5:01 GOING PROJECTS AT BAGUMBAYAN AND ESPERANZA.
14 LEAVE STATION TO ESPERANZA & BAGUMBAYAN
15 SATURDAY SATURDAY
16 SUNDAY SUNDAY
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE D. LEDDA REYNALDO C. GUARDIANO, JR.


Engineer I Acting Chief.,Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JULY 1-31, 2016
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 Out to Keytodac, NHS, Lebak, S.K. To Supervise & Conduct/Monitor Projects.
2 SATURDAY No services Rendered
3 SUNDAY No services Rendered
4 7:35 12:00 12:36 5:03 Doing Office Works
5 8:00 12:04 12:21 5:06 Doing Office Works
6 HOLIDAY HOLIDAY
7 Out to Esperanza & Bagumbayan, Sultan
To Supervise & Conduct/Monitor Projects.
8 Kudarat
9 SATURDAY No services Rendered
10 SUNDAY No services Rendered
11 7:53 12:14 12:36 5:30 Doing Office Works
12 Out to R.O.XII to Discuss Matters Relative to the Projects
w/o Project Inspector & To Update Project Contract On Training/Seminar
13 Management Application (PCMA).
14 Still Out to attend two (2) day seminar on Multi Year
Programming&Scheduling(MYPS)&Project Contract On Training/Seminar
15 Management Application(PCMA)
16 SATURDAY No services Rendered
17 SUNDAY No services Rendered
18 7:13 12:05 12:19 5:05 Doing Office Works
19 7:39 12:00 12:20 5:57 Doing Office Works
20 Out to Bululawan ES, Lebak, S.K. To Supervise & Conduct/Monitor Projects.
21 Out to Esperanza & Bagumbayan, Sultan
To Supervise & Conduct/Monitor Projects.
22 Kudarat
23 SATURDAY No services Rendered
24 SUNDAY No services Rendered
25 7:31 12:05 12:34 5:18 Doing Office Works
26 8:20 Out to R.O. XII
27 To submit Report & Reconcile PMS data with
28 Still out to R.O. XII the Regional Monitoring Engineer.
29
30 SATURDAY No services Rendered
31 SUNDAY No services Rendered
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

LAILA P. SANTOS LOIDA L. LEAL, MPA


Engineer II Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD


For the month of: JANUARY 1 - 30, 2018
Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 HOLIDAY HOLIDAY
2 HOLIDAY HOLIDAY
3 LEAVE STATION TO DPWH RO XII,KORONADAL CITY SCHEDULE EXAMINATION FOR CLE AT
4 AT REGIONAL OFFICE XII, KORONADAL CITY DPWH REGIONAL OFFICE XII, KORONADAL
CITY
5 RETURN STATION TO LEBAK, SULTAN KUDARAT
6 SATURDAY SATURDAY
7 SUNDAY SUNDAY
8 ABSENT ABSENT
9 ABSENT ABSENT
10 ABSENT ABSENT
11 ABSENT ABSENT
12 ABSENT ABSENT
13 SATURDAY SATURDAY
14 SUNDAY SUNDAY
15 7:58 12:04 12:43 5:04 DO OFFICE WORKS
16 8:00 12:02 12:23 5:04 DO OFFICE WORKS
17 8:05 12:12 12:18 5:02 DO OFFICE WORKS
DO OFFICE WORKS/CONSTRUCTION
18 7:53 12:00 12:30 5:01 COORDINATION MEETING
19 8:00 12:00 12:48 5:00 DO OFFICE WORKS
20 SATURDAY SATURDAY
21 SUNDAY SUNDAY
22 ABSENT ABSENT
23 ABSENT ABSENT
24 ABSENT ABSENT
25 8:03 12:16 12:18 5:02 DO OFFICE WORKS
26 7:58 12:03 12:15 5:00 DO OFFICE WORKS
27 SATURDAY SATURDAY
28 SUNDAY SUNDAY
29 7:56 12:01 12:20 5:07 DO OFFICE WORKS
30 7:23 12:10 12:22 5:08 DO OFFICE WORKS
31 8:00 12:08 12:29 5:05 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: FEBRUARY 1 - 28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 7:54 12:08 12:49 5:06 DO OFFICE WORKS
2 8:00 12:01 12:26 5:00 DO OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:50 12:02 12:42 5:00 DO OFFICE WORKS
6 8:00 12:15 12:41 5:00 DO OFFICE WORKS
7 7:51 12:04 12:33 5:01 DO OFFICE WORKS
8 7:53 12:10 12:19 5:04 DO OFFICE WORKS
9 7:56 12:00 12:45 5:00 DO OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 8:00 12:03 12:30 5:10 DO OFFICE WORKS
13 7:50 12:08 12:15 5:05 DO OFFICE WORKS
14 7:49 12:04 12:23 5:00 DO OFFICE WORKS
15 7:56 12:02 12:31 5:01 DO OFFICE WORKS
16 HOLIDAY HOLIDAY
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:42 12:04 12:15 5:06 DO OFFICE WORKS
20 7:51 12:08 12:24 5:06 DO OFFICE WORKS
21 8:00 12:07 12:17 5:04 DO OFFICE WORKS
22 7:52 12:07 12:47 5:06 DO OFFICE WORKS
23 7:47 12:09 12:22 5:04 DO OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:50 12:18 12:31 5:04 DO OFFICE WORKS
27 7:59 12:11 12:31 5:00 DO OFFICE WORKS
28 7:58 12:00 12:15 5:00 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 7:36 12:05 12:21 5:02 DO OFFICE WORKS
2 7:58 12:04 12:14 5:04 DO OFFICE WORKS
3 SATURDAY SATURDAY
4 SUNDAY SUNDAY
5 7:43 12:00 12:15 5:00 DO OFFICE WORKS
6 7:56 12:11 12:29 5:07 DO OFFICE WORKS
7 7:55 12:00 12:17 5:04 DO OFFICE WORKS
8 7:24 12:08 12:18 5:03 DO OFFICE WORKS
9 7:58 12:01 12:20 5:00 DO OFFICE WORKS
10 SATURDAY SATURDAY
11 SUNDAY SUNDAY
12 7:52 12:04 12:15 5:22 DO OFFICE WORKS
13 7:56 12:02 12:13 5:00 DO OFFICE WORKS
LEAVE STATION TO SUBMIT/PROCESS CONTRACT OF SERVICE FOR
14 7:43 12:01 DPWH RO XII JOB ORDER (HIRE) PERSONNEL OF
CONSTRUCTION SECTION AT DPWH RO. XII,
15 AT DPWH RO XII, KORONADAL CITY KORONADAL CITY
16
17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19
20
21
22
23
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26
27
28
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: MARCH 16-28, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
SUBMIT/PROCESS CONTRACT OF SERVICE FOR
RETURN STATION TO LEBAK, SULTAN JOB ORDER (HIRE) PERSONNEL OF
16 CONSTRUCTION SECTION AT DPWH RO. XII,
KUDART
KORONADAL CITY

17 SATURDAY SATURDAY
18 SUNDAY SUNDAY
19 7:40 12:03 12:29 5:49 DO OFFICE WORKS
20 7:50 12:14 12:42 5:31 DO OFFICE WORKS
21 7:40 12:06 12:35 8:00 DO OFFICE WORKS
22 7:55 12:00 12:31 5:00 DO OFFICE WORKS
23 7:50 12:04 12:46 5:00 DO OFFICE WORKS
24 SATURDAY SATURDAY
25 SUNDAY SUNDAY
26 7:38 12:09 12:26 5:03 DO OFFICE WORKS
27 7:46 12:00 12:15 5:05 DO OFFICE WORKS
28 7;34 12:02 DO OFFICE WORKS
29 HOLIDAY HOLIDAY
30 HOLIDAY HOLIDAY
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Data Encoder I Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 SUNDAY
2 8:00 12:06 12:19 5:16 DO OFFICE WORKS
3 8:00 12:06 12:15 5:l14 DO OFFICE WORKS
4 7:53 12:06 12:22 6:07 DO OFFICE WORKS
5 8:00 12:12 12:43 5:02 DO OFFICE WORKS
6 7:58 12:01 12:16 5:01 DO OFFICE WORKS
7 SATURDAY SATURDAY
8 SUNDAY SUNDAY
9 HOLIDAY HOLIDAY
10 7:49 12:19 12:24 5:01 DO OFFICE WORKS
11 8:00 12:08 12:22 6:28 DO OFFICE WORKS
12 7:50 12:02 12:15 5:04 DO OFFICE WORKS
13 HOLIDAY HOLIDAY
14 SATURDAY SATURDAY
15 SUNDAY SUNDAY
16 7:47 12:08 12:51 5:10
17 8:00 12:03 12:48 5:01 DO OFFICE WORKS
18 7:36 12:07 12:28 5:12 DO OFFICE WORKS
19 7:49 12:04 12:15 5:00 DO OFFICE WORKS
TRAINING/SEMINAR ON PROJECT PROPER
BRILLE'S CHICKEN PALACE, ISULAN, SULTAN
20 IMPLEMENTATION AND MATERIALS QUALITY
KUDARAT CONTROL
21 SATURDAY SATURDAY
22 SUNDAY SUNDAY
23 DPWH REGIONAL OFFICE XII, KORONADAL CITY FOLLOW UP AUTORITY TO HIRE
24 7:42 12:10 12:39 5:20 DO OFFICE WORKS
25 7:55 12:32 12:35 5:00 DO OFFICE WORKS
26 7:32 12:07 12:28 5:14 DO OFFICE WORKS
27 7:03 12:16 12:20 5:01 DO OFFICE WORKS
28 SATURDAY SATURDAY
29 SUNDAY SUNDAY
30 7:41 12:02 12:24 5:00 DO OFFICE WORKS
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Engineering Assistant Acting Chief, Construction Section

Approved:
LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 1-15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
2 7:40 12:01 12:51 5:02 DO OFFICE WORKS
3 7:36 12:23 12:46 5:00 DO OFFICE WORKS
4 7:59 12:03 12:37 5:00 DO OFFICE WORKS
5 SATURDAY SATURDAY
6 SUNDAY SUNDAY
7 7:20 12:05 12:17 5:06 DO OFFICE WORKS
8 7:54 12:18 12:20 5:02 DO OFFICE WORKS
9 7:50 12:11 12:35 5:19 DO OFFICE WORKS
10 7:30 12:13 12:48 5:01 DO OFFICE WORKS
11 7:52 12:02 12:28 5:02 DO OFFICE WORKS
12 SATURDAY SATURDAY
13 SUNDAY SUNDAY
14 HOLIDAY HOLIDAY
15 7:52 12:01 12:59 5:06 DO OFFICE WORKS
16
17
18
19 SATURDAY
20 SUNDAY
21
22
23
24
25
26 SATURDAY
27 SUNDAY
28
29
30
31
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Engineering Assistant Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: May 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 HOLIDAY
2
3
4
5 SATURDAY
6 SUNDAY
7
8
9
10
11
12 SATURDAY
13 SUNDAY
14 HOLIDAY
15
16 7:50 12:10 12:15 5:11 DO OFFICE WORK
17 7:20 12:13 12:33 5:04 DO OFFICE WORK
18 7:46 12:04 12:32 5:27 DO OFFICE WORK
19 SATURDAY SATURDAY
20 SUNDAY SUNDAY
21 7:52 12:01 12:18 5:05 DO OFFICE WORK
22 7:39 12:00 12:18 5:02 DO OFFICE WORK
23 7:48 12:00 12:15 5:01 DO OFFICE WORK
24 7:56 12:30 12:33 5:01 DO OFFICE WORK
25 7:47 12:02 12:19 5:05 DO OFFICE WORK
26 SATURDAY SATURDAY
27 SUNDAY SUNDAY
28 7:55 12:03 12:29 5:04 DO OFFICE WORK
29 7:39 12:11 12:32 5:45 DO OFFICE WORK
30 7:58 12:04 12:43 5:51 DO OFFICE WORK
31 7:40 12:00 12:15 5:30 DO OFFICE WORK
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Engineering Assistant Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 1 - 15, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 8:00 12:17 12:23 5:02 DO OFFICE WORKS
2 SATURDAY
3 SUNDAY
4 7:50 12:05 12:18 5:00 DO OFFICE WORKS
5 7:45 12:00 12:15 5:00 DO OFFICE WORKS
6 7:30 12:08 12:19 5:30 DO OFFICE WORKS
7 7:45 12:09 12:23 5:45 DO OFFICE WORKS
8 7:20 12:34 12:36 5:45 DO OFFICE WORKS
9 SATURDAY
10 SUNDAY
11 7:45 12:01 12:11 5:58 DO OFFICE WORKS
12 HOLIDAY
13 7:45 12:04 12:27 5:56 DO OFFICE WORKS
14 7:59 12:00 12:45 5:25 DO OFFICE WORKS
15 HOLIDAY
16 SATURDAY
17 SUNDAY
18
19
20
21
22
23 SATURDAY
24 SUNDAY
25
26
27
28
29
30 SATURDAY
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Engineering Assistant Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: June 16-30, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1
2 SATURDAY
3 SUNDAY
4
5
6
7
8
9 SATURDAY
10 SUNDAY
11
12
13
14
15
16 SATURDAY
17 SUNDAY
18 7:50 12:03 12:27 9:00 do office works
19 7:54 12:00 12:30 5:00 do office works
20 7:45 12:03 12:15 5:20 do office works
21 7:30 12:00 12:45 5:45 do office works
22 7:56 12:20 12:50 5:50 do office works
23 SATURDAY
24 SUNDAY
25 7:45 12:08 12:38 5:02 do office works
26 7:45 12:00 12:26 5:05 do office works
27 7:50 12:00 12:30 5:00 do office works
28 7:55 12:04 12:41 5:01 do office works
29 7:48 12:00 12:24 5:00 do office works
30 SATURDAY
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Engineering Assistant Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: July 1-31, 2018


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM OVER
DAYS UNDERTIME REMARKS
IN OUT IN OUT TIME
1 SUNDAY
2 7:47 12:11 12:47 5:00 do office works
3 8:00 12:02 12:42 5:04 do office works
4 7:50 12:20 12:27 5:01 do office works
5 7:58 3:19 12:37 5:02 do office works
6 7:40 12:02 12:23 5:05 do office works
7 SATURDAY
8 SUNDAY
9 7:45 12:11 12:36 5:00 do office works
10 7:56 12:04 12:23 5:00 do office works
11 7:40 12:00 12:22 5:00 do office works
12 7:57 12:01 12:31 5:00 do office works
13 7:57 12:01 12:31 5:00 do office works
14 SATURDAY
15 SUNDAY
16 7:45 12:04 12:21 5:01 do office works
17 7:50 12:03 12:20 5:00 do office works
18 7:40 12:06 12:15 5:07 do office works
19 7:59 12:08 12:36 5:03 do office works
20 7:55 12:20 12:50 5:08 do office works
21 SATURDAY
22 SUNDAY
23 7:41 12:08 12:39 5:02 do office works
24 7:49 12:02 12:34 5:03 do office works
25 7:57 12:08 12:50 5:08 do office works
26 7:50 12:00 12:15 5:06 do office works
27 7:45 12:05 12:20 5:02 do office works
28 SATURDAY
29 SUNDAY
30 7:20 12:05 12:45 5:01 do office works
31 7:50 12:00 12:15 5:00 do office works
I hereby certify on my honor that the above is a true and correct Verified as to the prescribed office hours
report of the hours of work performed, record of which are made at the time of
arrival and departure from the office.

LOURDES JEAN A. ESMERO REYNALDO C. GUARDIANO, JR.


Engineering Assistant Acting Chief, Construction Section

Approved:

LEVIE D. TRABADO
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of:


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER
DAYS OVER TIME REMARKS
IN OUT IN OUT TIME
1 7:00
Still Out to Bagumbvayan & SNA Assisted QAU Inspection
2 6:59
3 SATURDAY No services Rendered
4 SUNDAY No services Rendered
5 6:58
To assist in the QAU inspection of all on-going
6 7:01
Out to Esperanza, Baghumbayan, projects thereat
7 7:05
SNA & DPWH RO XII
8 7:07
To attend in the QAU CO exit conference
9 7:01
10 SATURDAY No services Rendered
11 SUNDAY No services Rendered
12 7:10
13 7:02
Out to Esperanza, Bagumbayan &
14 6:59 To conduct inspection of on-going projects thereat
SNA
15 7:06
16 7:02
17 SATURDAY No services Rendered
18 SUNDAY No services Rendered
19 7:12
20 7:09
Out to Esperanza, Bagumbayan &
21 7:13 To conduct inspection of on-going projects thereat
SNA
22 7:09
23 7:06
24 SATURDAY No services Rendered
25 SUNDAY No services Rendered
26 7:14
27 6:59
Out to Esperanza, Bagumbayan &
28 7:13 To conduct inspection of on-going projects thereat
SNA
29 7:00
30 7:10
31 SATURDAY No services Rendered
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ROSABELLA V. LAVALLE ELISEO L. OTOC


Engineer III OIC - Assistant District Engineer
Chief, Construction Section
Approved:

REY R FRANCISCO
District Engineer
0.54

1
1
1.3

1.01

5.85
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of:


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER
DAYS OVER TIME REMARKS
IN OUT IN OUT TIME
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ROSABELLA V. LAVALLE
Engineer III
Chief, Construction Section
Approved:

ELISEO L. OTOC
OIC-Assistant District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1-30, 2015


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1 07:00 Out to Esperanza, SNA & Palimbang ret
sta 9/2/15 12:54 p.m. out @ 07:25 p.m. To assist the CPES in the follow-up inspection
2
3
Out to Esperanza, SNA & Palimbang To conduct inspection
4
5 SATURDAY No services Rendered
6 SUNDAY No services Rendered
7 7:00 Out to kalamansig, S. K., ret 12:46 p.m. & Out toDPWH ROXII To conduct inspection
8
To attend the NEDA RDC XII 3rd Quarter Meeting and to
9 Still out to Viajera, Gensan Drive,
confer with the Chief, QAHD re: Schedule of ME
10 Koronadal City & DPWH ROXII
Accreditation Practical Exam.
11
12 SATURDAY No services Rendered
13 SUNDAY No services Rendered
14 6:55 To conduct inspection of on-going projects thereat.
Out to Kalamansig, Sultan Kudarat
15
and to DPWH-BRS, Diliman, Quezon
16 City To take the DPWH Materials Engineer Accrediation Exam
17
18 To Lebak & Kalamansig Conduct inspection of on-going projects thereat
19 SATURDAY No services Rendered
20 SUNDAY No services Rendered
21 6:58 Out to Lebak & Kalamansig, S.K., To conduct inspection of on-going projects thereat.
22
Out to Bagumbayan, SNA & Palimbang, To conduct inspection of on-going and completed projects
23 Sultan Kudarat. thereat.
24
25 MUSLIM HOLIDAY No services Rendered
26 SATURDAY No services Rendered
27 SUNDAY No services Rendered
28 6:06
Out to Bagumbayan & SNA, To assist the QAU CO inspection of various on-going and
29 Sultan Kudarat completed projects thereat.
30
1 WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

ROSABELLA V. LAVALLE ELISEO L. OTOC


Engineer III OIC - Assistant District Engineer
Chief, Construction Section

Approved:

REY R. FRANCISCO
District Engineer
1.25
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: DECEMBER 1-31, 2015


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1
2
ON-LEAVE ON-LEAVE
3
4
5 SATURDAY No services Rendered
6 SUNDAY No services Rendered
7
8
OUT TO DPWH RO XII, Attended the DPWH 2015 Sports Fest at the DPWH
9
Koronadal City Ragional Office No XII, Koronadal, City
10
11
12 SATURDAY No services Rendered
13 SUNDAY No services Rendered
14 8:00 12:11 12:47 5:00
Various Office Works
15 7:59 12:02 12:59 6:06
16
OUT TO DPWH RO XII, Attended the Culmination of the 2015 Sport Fest at
17
Koronadal City DPWH Regional; Office No. XII, Koronadal city.
18
19 SATURDAY No services Rendered
20 SUNDAY No services Rendered
21
Out to Esperanza,Bagumbayan & SNA To inspect various on-going projects thereat.
22
23 Muslim Holiday No services Rendered
24 HOLIDAY No services Rendered
25 HOLIDAY (CHRISTMAS) No services Rendered
26 SATURDAY No services Rendered
27 SUNDAY No services Rendered
28 7:25 12:01 12:55 5:02
Various Office Works
29 7:58 12:11 12:46 5:00
30 HOLIDAY No services Rendered
31 HOLIDAY No services Rendered
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

ROSABELLA V. LAVALLE ELISEO L. OTOC


Engineer III OIC - Assistant District Engineer
Chief, Construction Section
Approved:

MAMINTAL T. TAHA, MPS


OIC - District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: JANUARY 1-31,2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1 HOLIDAY New Year's Eve
2 SATURDAY No services Rendered
3 SUNDAY No services Rendered
4 8:02 12:05 12:45 5:47 Various office works
5 8:04 12:089 12:55 5:00 "do"
6 8:11 12:02 12:44 5:34 Various office works
7 To conduct inspection of concreting at Marguez
Out to Esperanza, Sultan Kudarat
8 Farm to Market Road.
9 SATURDAY No services Rendered
10 SUNDAY No services Rendered
11
12
13 ON-LEAVE ON-LEAVE
14
15
16 SATURDAY No services Rendered
17 SUNDAY No services Rendered
18 8:08 12:19 12:51 5:45 Various office works
19 8:12 12:14 12:41 5:51 "do"
20 8:07 12:10 12:59 6:30 "do"
21 8:08 12:10 1:08 6:10 "do"
22 8:04 12:12 12:59 5:05 Various office works
23 SATURDAY No services Rendered
24 SUNDAY No services Rendered
25 9:00 12:12 12:55 6:54 Various office works
26 8:08 12:00 12:31 6:42 "do"
27
28 ON-LEAVE ON-LEAVE
29
30 SATURDAY No services Rendered
31 SUNDAY No services Rendered
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ROSABELLA V.,LAVALLE ELISEO L. OTOC


Engineer III OIC-Assistant District Engineer
Chief, Construction Section
Approved:

MAMINTAL T. TAHA,MPS
OIC-District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: NOVEMBER 1-30, 2015


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1 SUNDAY No services Rendered
2 7:55 5:08
3 7:48 Out to Esperanza, 5:11
To conduct inspection of various on-going projects
4 7:39 Bagumbayan & SNA, 5:00
thereat.
5 7:50 S.K. 5:05
6 7:42 5:12
7 SATURDAY No services Rendered
8 SUNDAY No services Rendered
9 7:54 5:17
10 7:49 5:10
Out to Esperanza, SNA & To conduct inspection of various on-going projects
11 7:53 5:14
Palimbang, S.K. thereat.
12 7:40 5:01
13 7:36 5:09
14 SATURDAY No services Rendered
15 SUNDAY No services Rendered
16
17
18 ON LEAVE ON LEAVE
19
20
21 SATURDAY No services Rendered
22 SUNDAY No services Rendered
23
24
25 ON LEAVE ON LEAVE
26
27
28 SATURDAY No services Rendered
29 SUNDAY No services Rendered
30
ON LEAVE ON LEAVE
1
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

ROSABELLA V. LAVALLE ELISEO L. OTOC


Engineer III OIC - Assistant District Engineer
Chief, Construction Section

Approved:

MAMINTAL T. TAHA, MPS


OIC - District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: APRIL 1-30, 2016


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDERT OVER
DAYS REMARKS
IN OUT IN OUT IME TIME
1
2 SATURDAY No services Rendered
3 SUNDAY No services Rendered
4
5
6
7
8
9 SATURDAY No services Rendered
10 SUNDAY No services Rendered
11
12
13
14
15
16 SATURDAY No services Rendered
17 SUNDAY No services Rendered
18
19
20
21
22
23 SATURDAY No services Rendered
24 SUNDAY No services Rendered
25
26
27
28
29
30 SATURDAY No services Rendered
1
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made at
the time of arrival and departure from the office.

ROSABELLA V.,LAVALLE ELISEO L. OTOC, MPA


Engineer III Assistant District Engineer
Chief, Construction Section
Approved:

MAMINTAL T. TAHA, MPS


OIC-District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1 - 30,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1 HOLIDAY HOLIDAY
2 SATURDAY SATURDAY
3 SUNDAY SUNDAY
4 7:32 12:01 12:27 5:00 DO OFFICE WORKS
5 7:52 12:05 12:28 5:06 DO OFFICE WORKS
6 7:29 LEAVE STATION Attended meeting at NEDA XII at Koronadal City and
7 AT NEDA XII, KORONADAL CITY supervise on going projects at Bagumbayan, Sultan
8 AT BAGUMBAYAN, SULTAN KUDARAT Kudarat

9 SATURDAY SATURDAY
10 SUNDAY SUNDAY
11 7:38 12:09 12:27 5:02 DO OFFICE WORKS
12 7:40 12:04 12:21 5:00 DO OFFICE WORKS
13 LEAVE STATION Supervise on going projects at Senator Ninoy
14 AT SENATOR NINOY AQUINO, SULTAN KUDARAT Aquino, Sultan Kudarat and Bagumbayan, Sultan
15 AT BAGUMBAYAN, SULTAN KUDARAT Kudarat
16 SATURDAY SATURDAY
17 SUNDAY SUNDAY
18 At Regional Office XII
Attended the twenty two (22) days on-the-job
19 At Regional Office XII
Training materials Testing Technology
20 At Regional Office XII
21 HOLIDAY HOLIDAY
Attended the twenty two (22) days on-the-job
22 At Regional Office XII
Training materials Testing Technology
23 SATURDAY SATURDAY
24 SUNDAY SUNDAY
25 At Regional Office XII
26 At Regional Office XII
Attended the twenty two (22) days on-the-job
27 At Regional Office XII
Training materials Testing Technology
28 At Regional Office XII
29 At Regional Office XII
30 SATURDAY
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

JOSE AVERIL E. COLOMA REYNALDO C. GUARDIANO, JR


Engineer II Assistant Chief, Construction Section

Approved:

ELISEO L. OTOC, MPA


Assistant District Engineer
SATURDAY No services Rendered
SUNDAY No services Rendered

1:24
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Sultan Kudarat 2nd District Engineering Office
Lebak, Sultan Kudarat

DAILY TIME RECORD

For the month of: SEPTEMBER 1 - 30,2017


Official Hours
Regular Days 8:00 - 12:00 AM 1:00 - 5:00 PM
Saturdays AM PM

AM PM UNDER OVER
DAYS REMARKS
IN OUT IN OUT TIME TIME
1 SUNDAY No services Rendered
2
3
4
5
6
7 SATURDAY No services Rendered
8 SUNDAY No services Rendered
9
10
11
12
13
14 SATURDAY No services Rendered
15 SUNDAY No services Rendered
16
17
18
19
20
21 SATURDAY No services Rendered
22 SUNDAY No services Rendered
23
24
25
26
27
28 SATURDAY No services Rendered
29 SUNDAY No services Rendered
30
31
I hereby certify on my honor that the above is a true and Verified as to the prescribed office hours
correct report of the hours of work performed, record of which are made
at the time of arrival and departure from the office.

LOURDES JEAN A. ESMERO ROSABELLA V. LAVALLE


Engineering Aide Engineer III
Chief, Construction Section
Approved:
ELISEO L. OTOC, MPA
Assistant District Engineer

Potrebbero piacerti anche