PRE-CONSTRUCTION CONSTRUCTION
PROGRAM TOTAL NO.
NUMBER OF PROJECTS NO. OF PROJECTS STATUS
FUND SOURCE AMOUNT OF
(Php'000) PROJECTS COM- ON- ADVER CONTRACT ACTUAL COM- ON- PLANNED ACTUAL SLIPPAG
NYS BID NTP NYS
PLETED GOING -TIZED APPROVED % ACC PLETED GOING % TARGET % ACC E%
Construction of Flood Control (Ala River Basin) 40,000.00 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
Local Infrastructure Program 50,000.00 18 18 - - 18 18 18 18 100.00 18 - - 100.00 100.00 -
Construction of Rain Water Collector System
3,400.00 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
(CWRCS)
Construction of Solid Management Maaterials
152.791 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
Recovery Facilities (SM-MRF)
Construction/ Improvement of Access Roads leading
to Airports, Seaports, and Declared Tourism
3,942.188 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
Destinations - To Declared Tourism Destinations
290,959.15 Page 18 of 18
DEC
100.00
100.00
100.00
100.00
A=70.49
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
A=75.63
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
Page 1 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
A=62.36
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
A=64.42
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
a=70.78
100.00
100.00
a=69.82
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
Page 2 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
A=54.99
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
a=28.08
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
a=54.73
100.00
100.00
a=55.04
Page 3 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
a=73.40
100.00
100.00
a=58.50
Substantially completed, project delayed due to bad weather prevailing in the area. For imposition
of liquidated damages.
100.00
100.00
a=77.68
100.00
100.00
a=74.87
Page 4 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
On-going, project delayed due to bad weather condition prevailing in the area. For imposition of
liquidated damages.
100.00
100.00
On-going, calibrated action issued to the contractor. For imposition of liquidated damages.
100.00
100.00
On-going, calibrated action issued to the contractor. For revision of implementation scheduled.
100.00
100.00
On-going, project delayed due to inaccessible road leading in the project area. For imposition of
liquidated damages.
Page 5 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Page 6 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
100.00
100.00
On-going, project delayed due to inaccessible road leading to the jobsite. For imposition of
liquidated damages.
100.00
100.00
Page 7 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
100.00
100.00
On-going, project delayed due to inaccessible road leading to the jobsite. For imposition of
liquidated damages.
100.00
100.00
On-going, project delayed due to inaccessible road leading to the jobsite. For imposition of
liquidated damages.
100.00
100.00
Page 8 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
100.00
100.00
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
Page 9 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
On-going, project delayed due to peace and order problem in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, calibrated action issued to the contractor. For imposition of liquidated damages.
100.00
100.00
On-going, project delayed due to inaccessible road leading to the jobsite. For revision of project
scheduled implementation.
100.00
100.00
On-going, project delayed due to inaccessible road leading to the jobsite. For revision of project
scheduled implementation.
Page 10 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
100.00
100.00
Page 11 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
a=31.10
On-going, project delayed due to inaccessible road leading to the jobsite. For imposition of
liquidated damages.
100.00
100.00
On-going, project delayed due to inaccessible road leading to the jobsite. For imposition of
liquidated damages.
Page 12 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, project delayed due to bad weather condition prevailing in the area. For imposition of
liquidated damages.
100.00
100.00
On-going, project delayed due to bad weather condition prevailing in the area. For imposition of
liquidated damages.
Page 13 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
Page 14 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
On-going, calibrated action issued to the contractor. For imposition of liquidated damages.
100.00
100.00
100.00
100.00
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For revision of
implementation scheduled due to variation order.
Page 15 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
damages.
100.00
100.00
On-going, calibrated action issued to the contractor. For imposition of liquidated damages.
100.00
100.00
100.00
100.00
Page 16 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
100.00
100.00
100.00
100.00
Project delayed due to inaccesible road leading to project site cause of bad weather prevailing in
the area. For imposition of liquidated damages.
100.00
100.00
Project delayed due to inaccesible road leading to project site cause of bad weather prevailing in
the area. For imposition of liquidated damages.
Page 17 of 18
TATUS OF PROJECTS
ONSTRUCTION PROGRAM
al Facilities Fund (BEFF - Batch 13)
As of June 30, 2018
DEC
100.00
100.00
Project delayed due to inaccesible road leading to project site cause of bad weather prevailing in
the area. Calibrated action issued to the contractor, for imposition of liquidated damages.
Page 18 of 18
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
1. Project I.D : P00177379MN_CW1 a) 2,866.63 a) By Contract P 13.77 42.30 91.62 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0174 b) 2,866.63 b) 27-Nov-17 R 2.09 17.42 44.23 91.62 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Spur 2 Elementary School, Bagumbayan c) 06-Nov-17 c) 08-Jan-18 A 21.20 21.20 82.00 96.35 96.46 96.48
Sultan Kudarat d) FPJ CONSTRUCTION & SUPP d) 14-Jan-18 S 19.11 3.78 37.77 4.73 -3.54 -3.52
e) 2,773,171.38 e) 08-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f) 08-May-18
damages.
g) 1stry- 2CLw/ toilet g) COLOMA J.A.E
2. Project I.D : P00177380MN_CW1 a) 2,866.63 a) By Contract P 13.77 42.30 91.62 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0175 b) 2,866.63 b) 27-Nov-17 R 2.09 17.42 44.23 91.62 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Spur 2 Elementary School, Bagumbayan c) 06-Nov-17 c) 08-Jan-18 A 21.20 21.20 82.00 96.35 96.46 96.48
Sultan Kudarat d) FPJ CONSTRUCTION & SUPP d) 14-Jan-18 S 19.11 3.78 37.77 4.73 -3.54 -3.52
e) 2,773,171.38 e) 08-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f) 08-May-18
damages.
g) 1stry- 2CLw/ toilet g) COLOMA J.A.E
3. Project I.D : P00177381MN_CW1 a) 3,337.57 a) By Contract P 17.14 43.81 73.33 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0176 b) 3,337.57 b) 27-Nov-17 R 0.00 17.96 57.14 73.80 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Bagumbayan National Highschool - A, c) 06-Nov-17 c) 08-Jan-18 A 17.20 47.65 69.00 96.35 96.42 96.84
Bagumbayan, Sultan Kudarat d) ILON MULTIBUILDERS COMP d) 14-Jan-18 S 17.20 29.69 11.86 22.55 -3.58 -3.16
e) 3,180,357.85 e) 28-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 28-May-18
damages.
g) 1 pr g) SANTOS L.P.
4. Project I.D : P00177382MN_CW1 a) 3,337.57 a) By Contract P 21.24 52.10 73.25 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0177 b) 3,337.57 b) 27-Nov-17 R 21.24 52.10 73.25 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Bagumbayan National High School - (B) c) 06-Nov-17 c) 08-Jan-18 A 17.20 34.00 70.00 96.35 96.40 96.44
Bagumbayan, Sultan Kudarat d) DALANON CONST. REF SUPP d) 14-Jan-18 S -4.04 -18.10 -3.25 -3.65 -3.60 -3.56
e) 3,229,333.67 e) 28-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f)
damages.
g) 1 pr g) SANTOS L.P.
Page 1 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
5. Project I.D : P00177383MN_CW1 a) 3,263.89 a) By Contract P 21.53 52.18 73.18 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0178 b) 3,263.89 b) 27-Nov-17 R 21.53 52.18 73.18 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Biwang NHS-Bagumbayan Annex c) 06-Nov-17 c) 08-Jan-18 A 17.20 33.85 70.00 97.25 97.68 100.00
Bagumbayan, Sultan Kudarat d) BLIMEX CONSTRUCTION ANDd) 14-Jan-18 S -4.33 -18.33 -3.18 -2.75 -2.32 -
e) 3,251,709.97 e) 28-Apr-18
f) 105 C.D. f) Completed on June 15, 2018.
g) 1 pr g) SANTOS L.P.
6. Project I.D : P00177384MN_CW1 a) 3,283.84 a) By Contract P 14.02 57.06 81.15 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0179 b) 3,283.84 b) 27-Nov-17 R 14.02 57.06 81.15 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Busok National High School c) 06-Nov-17 c) 08-Jan-18 A 18.00 47.00 85.00 98.00 98.05 100.00
Bagumbayan, Sultan Kudarat d) MEGALINE BUILDERS AND S d) 14-Jan-18 S 3.98 -10.06 3.85 -2.00 -1.95 -
e) 3,209,722.81 e) 28-Apr-18
f) 105 C.D. f) Completed on June 20, 2018
g) 1 pr g) SANTOS L.P.
7. Project I.D : P00177385MN_CW1 a) 2,926.48 a) By Contract P 21.00 64.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0180 b) 2,926.48 b) 27-Nov-17 R 21.00 64.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Bongo-Bongo Elementary School - (A) c) 06-Nov-17 c) 08-Jan-18 A 21.25 55.00 93.00 97.00 97.06 97.11
Esperanza, Sultan Kudarat d) DALANON CONST. REF SUPP d) 14-Jan-18 S 0.25 -9.00 -4.00 -3.00 -2.94 -2.89
e) 2,917,646.82 e) 08-Apr-18
On-going, project delayed due to inaccessible road leading to the project site. For imposition of
f) 85 C.D. f)
liquidated damages.
g) 1stry- 2CLw/ toilet g) GUARDIANO R.C.
8. Project I.D : P00177386MN_CW1 a) 2,926.48 a) By Contract P 21.00 64.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0181 b) 2,926.48 b) 27-Nov-17 R 21.00 64.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Bongo-Bongo Elementary School - (B) c) 06-Nov-17 c) 08-Jan-18 A 21.25 55.00 93.25 97.00 97.05 97.08
Esperanza, Sultan Kudarat d) DALANON CONST. REF SUPP d) 14-Jan-18 S 0.25 -9.00 -3.75 -3.00 -2.95 -2.92
e) 2,917,646.82 e) 08-Apr-18
On-going, project delayed due to inaccessible road leading to the project site. For imposition of
f) 85 C.D. f)
liquidated damages.
g) 1stry- 2CLw/ toilet g) GUARDIANO R.C.
Page 2 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
9. Project I.D : P00177387MN_CW1 a) 2,866.63 a) By Contract P 20.95 57.48 95.85 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0182 b) 2,866.63 b) 27-Nov-17 R 0.00 17.51 59.20 95.85 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Salabaca National High School - (A) c) 06-Nov-17 c) 08-Jan-18 A 21.25 55.00 97.00 98.00 100.00
Esperanza, Sultan Kudarat d) CASTILLANES CONSTRUCTIOd) 14-Jan-18 S 21.25 37.49 37.80 2.15 -
e) 2,806,556.83 e) 08-Apr-18
f) 85 C.D. f) 08-May-18 Completed on May 4, 2018.
g) 1stry- 2CLw/ toilet g) SANTOS L.P.
10. Project I.D : P00177388MN_CW1 a) 2,866.63 a) By Contract P 21.74 66.06 96.63 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0183 b) 2,866.63 b) 27-Nov-17 R 0.00 18.29 66.82 96.63 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Salabaca National High School - (B) c) 06-Nov-17 c) 08-Jan-18 A 21.25 44.23 92.12 97.00 97.07 97.11
Esperanza, Sultan Kudarat d) H. ROYAL CONSTRUCTION d) 14-Jan-18 S 21.25 25.94 25.30 0.37 -2.93 -2.89
e) 2,816,513.30 e) 08-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f) 08-May-18
damages.
g) 1stry- 2CLw/ toilet g) SANTOS L.P.
11. Project I.D : P00177389MN_CW1 a) 3,263.97 a) By Contract P 12.88 32.38 73.20 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0184 b) 3,263.97 b) 27-Nov-17 R 12.88 32.38 73.20 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Esperanza National High School - (A) c) 06-Nov-17 c) 08-Jan-18 A 17.25 34.16 70.00 97.00 97.02 97.13
Esperanza, Sultan Kudarat d) ISULAN ECT CONST. &GEN. d) 14-Jan-18 S 4.37 1.78 -3.20 -3.00 -2.98 -2.87
e) 3,133,254.64 e) 28-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f)
damages.
g) 1 pr g) SANTOS L.P.
12. Project I.D : P00177390MN_CW1 a) 3,263.97 a) By Contract P 15.37 44.96 76.67 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0185 b) 3,263.97 b) 27-Nov-17 R 0.00 13.55 45.62 76.67 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Esperanza National High School - (B) c) 06-Nov-17 c) 08-Jan-18 A 17.50 34.16 72.00 96.00 96.05 97.02
Esperanza, Sultan Kudarat d) ROBETH GEN. MDSE CONST. d) 14-Jan-18 S 17.50 20.61 26.38 19.33 -3.95 -2.98
e) 3,206,917.09 e) 28-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 28-May-18
damages.
g) 1 pr g) SANTOS L.P.
Page 3 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
13. Project I.D : P00177391MN_CW1 a) 3,263.97 a) By Contract P 20.47 51.93 72.90 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0186 b) 3,263.97 b) 27-Nov-17 R 0.00 17.79 52.36 72.90 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Esperanza National High School - (C) c) 06-Nov-17 c) 08-Jan-18 A 17.20 34.16 68.45 97.00 97.05 97.07
Esperanza, Sultan Kudarat d) CURVELINE CONST. d) 14-Jan-18 S 17.20 16.37 16.09 24.10 -2.95 -2.93
e) 3,200,315.82 e) 28-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 28-May-18
damages.
g) 1 pr g) SANTOS L.P.
14. Project I.D : P00177392MN_CW1 a) 3,263.97 a) By Contract P 20.07 52.22 77.11 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0187 b) 3,263.97 b) 27-Nov-17 R 20.07 52.22 77.11 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Esperanza National High School - (D) c) 06-Nov-17 c) 08-Jan-18 A 17.20 47.00 80.00 97.85 97.92 100.00
Esperanza, Sultan Kudarat d) PALMARES GEN. MERCHANDId) 14-Jan-18 S -2.87 -5.22 2.89 -2.15 -2.08 -
e) 3,247,000.43 e) 28-Apr-18
f) 105 C.D. f) Completed on June 20, 2018
g) 1 pr g) SANTOS L.P.
15. Project I.D : P00177393MN_CW1 a) 2,866.63 a) By Contract P 14.46 48.76 94.23 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0188 b) 2,866.63 b) 27-Nov-17 R 14.46 48.76 94.23 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Pag-asa Elementary School - (A) c) 06-Nov-17 c) 10-Jan-18 A 19.20 56.00 95.00 98.85 99.20 100.00
Kalamansig, Sultan Kudarat d) ROBETH GEN. MDSE CONST. d) 16-Jan-18 S 4.74 7.24 0.77 -1.15 -0.80 -
e) 2,816,554.48 e) 10-Apr-18
f) 85 C.D. f) 10-May-18 Completed on June 1, 2018.
g) 1stry- 2CLw/ toilet g) ALANGCA H.D.
16. Project I.D : P00177394MN_CW1 a) 2,866.63 a) By Contract P 14.46 48.76 94.23 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0189 b) 2,866.63 b) R 14.46 48.76 94.23 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Pag-asa Elementary School - (B) c) 06-Nov-17 c) 10-Jan-18 A 19.25 54.00 96.00 99.00 99.20 100.00
Kalamansig, Sultan Kudarat d) ROBETH GEN. MDSE CONST. d) 16-Jan-18 S 4.79 5.24 1.77 -1.00 -0.80 -
e) 2,816,554.48 e) 10-Apr-18
f) 85 C.D. f) 10-May-18 Completed on June 1, 2018.
g) 1stry- 2CLw/ toilet g) ALANGCA H.D.
Page 4 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
17. Project I.D : P00177395MN_CW1 a) 2,926.48 a) By Contract P 14.20 59.40 94.40 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0190 b) 2,926.48 b) 29-Nov-17 R 14.20 59.40 94.40 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Sangay National High School c) 06-Nov-17 c) 10-Jan-18 A 19.25 53.00 90.00 97.00 97.55 97.57
Kalamansig, Sultan Kudarat d) JV CONSTECH d) 16-Jan-18 S 5.05 -6.40 -4.40 -3.00 -2.45 -2.43
e) 2,874,413.56 e) 10-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f)
damages.
g) 1stry- 2CLw/ toilet g) GUARDIANO R.C.
18. Project I.D : P00177396MN_CW1 a) 3,397.42 a) By Contract P 6.67 33.33 62.86 91.43 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0191 b) 3,397.42 b) R 6.67 33.33 62.86 91.43 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Datu Wasay National High School c) 06-Nov-17 c) 19-Jan-18 A 6.95 23.65 58.00 89.00 90.75 90.78
Kalamansig, Sultan Kudarat d) CS CONST. & SUPPLY d) 25-Jan-18 S 0.28 -9.68 -4.86 -2.43 -9.25 -9.22
e) 3,361,389.13 e) 09-May-18
f) 105 C.D. f) On-going, calibrated action issued to the contractor. For imposition of liquidated damages.
g) 1 pr g) COLOMA J.A.E
19. Project I.D : P00177397MN_CW1 a) 3,263.89 a) By Contract P 9.36 24.85 71.33 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0192 b) 3,263.89 b) 29-Nov-17 R 9.36 24.85 71.33 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Kalamansig National High School c) 06-Nov-17 c) 10-Jan-18 A 16.20 43.00 75.00 98.25 99.02 100.00
Kalamansig, Sultan Kudarat d) JARGON CONST & SUPPLY d) 16-Jan-18 S 6.84 18.15 3.67 -1.75 -0.98 -
e) 3,172,528.97 e) 30-Apr-18
f) 105 C.D. f) 30-May-18 Completed on June 1, 2018.
g) 1 pr g) ALANGCA H.D.
20. Project I.D : P00177398MN_CW1 a) 3,315.42 a) By Contract P 7.43 41.13 80.22 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0193 b) 3,315.42 b) 29-Nov-17 R 0.00 6.00 42.00 79.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Sangay National High School c) 06-Nov-17 c) 10-Jan-18 A 16.20 43.00 68.00 90.00 92.00 92.51
Kalamansig, Sultan Kudarat d) JV CONSTECH d) 16-Jan-18 S 16.20 37.00 26.00 11.00 -8.00 -7.49
e) 3,274,576.93 e) 30-Apr-18
Substantially completed, project delayed due to bad weather prevailing in the area. For revision of
f) 105 C.D. f) 30-May-18
implementation scheduled.
g) 1 pr g) GUARDIANO R.C.
Page 5 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
21. Project I.D : P00177399MN_CW1 a) 3,263.89 a) By Contract P 4.73 23.61 61.85 95.72 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0194 b) 3,263.89 b) 29-Nov-17 R 0.00 2.95 24.38 61.85 96.62 98.31 100.00 100.00 100.00 100.00 100.00 100.00
Sta. Clara National High School c) 06-Nov-17 c) 15-Jan-18 A 11.10 11.10 30.00 70.00 92.00 94.53
Kalamansig, Sultan Kudarat d) JV CONSTECH d) 21-Jan-18 S 11.10 8.15 5.62 8.15 -4.62 -3.78
e) 3,215,000.00 e) 05-May-18
On-going, project delayed due to bad weather prevailing in the area. For revision of project
f) 105 C.D. f) 19-Jun-18
scheduled implementation due to variation order.
g) 1 pr g) ALANGCA H.D.
22. Project I.D : P00177400MN_CW1 a) 2,896.56 a) By Contract P 10.00 50.00 90.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0195 b) 2,896.56 b) 29-Nov-17 R 10.00 50.00 90.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Capilan Elementary School - (A) c) 06-Nov-17 c) 15-Jan-18 A 13.00 42.00 85.95 96.00 96.05 96.06
Lebak, Sultan Kudarat d) JARGON CONST & SUPPLY d) 21-Jan-18 S 3.00 -8.00 -4.05 -4.00 -3.95 -3.94
e) 2,790,242.55 e) 15-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f)
damages.
g) 1stry- 2CLw/ toilet g) GUARDIANO R.C.
23. Project I.D : P00177401MN_CW1 a) 2,896.56 a) By Contract P 3.97 45.66 90.13 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0196 b) 2,896.56 b) 12-Dec-17 R 3.97 45.66 90.13 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Capilan Elementary School - (B) c) 06-Nov-17 c) 19-Jan-18 A 8.95 37.95 86.59 97.00 97.60 97.66
Lebak, Sultan Kudarat d) JV CONSTECH d) 25-Jan-18 S 4.98 -7.71 -3.54 -3.00 -2.40 -2.34
e) 2,845,962.16 e) 19-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f)
damages.
g) 1stry- 2CLw/ toilet g) GUARDIANO R.C.
24. Project I.D : P00177402MN_CW1 a) 2,866.63 a) By Contract P 8.00 46.00 92.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0197 b) 2,866.63 b) 29-Nov-17 R 8.00 46.00 92.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Tran National High School c) 06-Nov-17 c) 15-Jan-18 A 13.50 30.00 83.65 96.25 98.02 98.50
Lebak, Sultan Kudarat d) ROBETH GEN. MDSE CONST. d) 21-Jan-18 S 5.50 -16.00 -8.35 -3.75 -1.98 -1.50
e) 2,811,554.48 e) 15-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f)
damages.
g) 1stry- 2CLw/ toilet g) GUARDIANO R.C.
Page 6 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
25. Project I.D : P00177403MN_CW1 a) 3,269.15 a) By Contract P 4.45 23.45 61.92 95.99 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0198 b) 3,269.15 b) 04-Dec-17 R 4.45 23.45 61.92 95.99 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
E. Arcano Mem. National High School c) 06-Nov-17 c) 15-Jan-18 A 10.65 27.00 58.00 92.00 95.22 95.23
Lebak, Sultan Kudarat d) JV CONSTECH d) 21-Jan-18 S 6.20 3.55 -3.92 -3.99 -4.78 -4.77
e) 3,221,851.72 e) 05-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f)
damages.
g) 1 pr g) MANGATONG R.
26. Project I.D : P00177404MN_CW1 a) 3,367.50 a) By Contract P 6.95 36.46 74.50 91.24 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0199 b) 3,367.50 b) 04-Dec-17 R 6.95 36.46 74.50 91.24 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Keytodac National High School - (A) c) 06-Nov-17 c) 15-Jan-18 A 10.55 33.16 70.00 88.00 95.05 95.06
Lebak, Sultan Kudarat d) CS CONST. & SUPPLY d) 21-Jan-18 S 3.60 -3.30 -4.50 -3.24 -4.95 -4.94
e) 3,325,163.17 e) 05-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 02-Jun-18
damages.
g) 1 pr g) GUARDIANO R.C.
27. Project I.D : P00177405MN_CW1 a) 3,367.50 a) By Contract P 6.95 36.46 74.50 91.24 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0200 b) 3,367.50 b) 04-Dec-17 R 6.95 36.46 74.50 82.87 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Keytodac National High School - (B) c) 06-Nov-17 c) 15-Jan-18 A 10.55 33.16 70.00 79.00 95.04 95.06
Lebak, Sultan Kudarat d) CS CONST. & SUPPLY d) 21-Jan-18 S 3.60 -3.30 -4.50 -3.87 -4.96 -4.94
e) 3,325,142.11 e) 05-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 02-Jun-18
damages.
g) 1 pr g) GUARDIANO R.C.
28. Project I.D : P00177406MN_CW1 a) 3,263.97 a) By Contract P 6.80 36.30 76.30 91.40 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0201 b) 3,263.97 b) 04-Dec-17 R 6.80 36.30 76.30 91.40 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Lebak National High School c) 06-Nov-17 c) 15-Jan-18 A 10.65 33.00 72.00 87.00 94.82 94.85
Lebak, Sultan Kudarat d) DALANON CONST. REF SUPP d) 21-Jan-18 S 3.85 -3.30 -4.30 -4.40 -5.18 -5.15
e) 3,158,119.52 e) 05-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f)
damages.
g) 1 pr g) GUARDIANO R.C.
Page 7 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
29. Project I.D : P00177407MN_CW1 a) 3,357.52 a) By Contract P 9.52 36.19 65.71 94.29 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0202 b) 3,357.52 b) 04-Dec-17 R 9.52 36.19 65.71 94.29 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Mangudadatu National High School- c) 06-Nov-17 c) 16-Jan-18 A 9.75 31.65 62.00 92.00 92.12 92.16
Villamonte Annex, Lebak, Sultan Kudarat d) CS CONST. & SUPPLY d) 22-Jan-18 S 0.23 -4.54 -3.71 -2.29 -7.88 -7.84
e) 3,323,511.13 e) 06-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f)
damages.
g) 1 pr g) GUARDIANO R.C.
30. Project I.D : P00177408MN_CW1 a) 2,875.11 a) By Contract P 7.56 33.67 87.03 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0203 b) 2,875.11 b) 04-Dec-17 R 7.56 33.67 87.03 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Isuko Elementary School c) 06-Nov-17 c) 16-Jan-18 A 11.98 40.00 78.00 96.00 96.04 96.11
Palimbang, Sultan Kudarat d) CS CONST. & SUPPLY d) 22-Jan-18 S 4.42 6.33 -9.03 -4.00 -3.96 -3.89
e) 2,854,500.00 e) 16-Apr-18
On-going, project delayed due to inaccessible road leading to the jobsite. For imposition of liquidated
f) 85 C.D. f)
damages.
g) 1stry- 2CLw/ toilet g) COLOMA J.A.E
31. Project I.D : P00177409MN_CW1 a) 3,389.19 a) By Contract P 11.85 29.15 62.94 95.54 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0204 b) 3,389.19 b) 04-Dec-17 R 11.85 29.15 62.94 95.54 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Baluan Senior High School - (A) c) 06-Nov-17 c) 15-Jan-18 A 10.85 33.85 58.95 92.00 94.22 94.26
Palimbang, Sultan Kudarat d) DALANON CONST. REF SUPP d) 21-Jan-18 S -1.00 4.70 -3.99 -3.54 -5.78 -5.74
e) 3,340,693.32 e) 05-May-18
f) 105 C.D. f) 04-Jun-18 On-going, calibrated action issued to the contractor. For imposition of liquidated damages.
g) 1 pr g) COLOMA J.A.E
32. Project I.D : P00177410MN_CW1 a) 3,389.19 a) By Contract P 11.85 29.15 62.94 95.54 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0205 b) 3,389.19 b) 04-Dec-17 R 11.85 29.15 62.94 95.54 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Baluan Senior High School - (B) c) 06-Nov-17 c) 15-Jan-18 A 10.85 33.15 59.00 93.00 94.37 94.39
Palimbang, Sultan Kudarat d) DALANON CONST. REF SUPP d) 21-Jan-18 S -1.00 4.00 -3.94 -2.54 -5.63 -5.61
e) 3,340,693.32 e) 05-May-18
f) 105 C.D. f) 04-Jun-18 On-going, calibrated action issued to the contractor. For imposition of liquidated damages.
g) 1 pr g) COLOMA J.A.E
Page 8 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
33. Project I.D : P00177411MN_CW1 a) 3,357.61 a) By Contract P 10.00 40.00 80.00 90.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0206 b) 3,357.61 b) 04-Dec-17 R 10.00 40.00 80.00 90.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Milbuk National High School - (A) c) 06-Nov-17 c) 15-Jan-18 A 10.85 34.00 62.95 88.25 95.22 96.26
Palimbang, Sultan Kudarat d) CEK CONSTRUCTION & SUPP d) 21-Jan-18 S 0.85 -6.00 -17.05 -1.75 -4.78 -3.74
e) 2,947,474.40 e) 05-May-18
On-going, project delayed because of large volume of excavation. For imposition of liquidated
f) 105 C.D. f)
damages.
g) 1 pr g) GUIAMEL M.D.
34. Project I.D : P00177412MN_CW1 a) 3,357.61 a) By Contract P 10.00 40.00 80.00 90.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0207 b) 3,357.61 b) 04-Dec-17 R 10.00 40.00 80.00 90.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Milbuk National High School - (B) c) 06-Nov-17 c) 15-Jan-18 A 10.85 33.52 62.95 87.35 95.27 95.29
Palimbang, Sultan Kudarat d) CEK CONSTRUCTION & SUPP d) 21-Jan-18 S 0.85 -6.48 -17.05 -2.65 -4.73 -4.71
e) 2,947,474.40 e) 05-May-18
On-going, project delayed because of large volume of excavation. For imposition of liquidated
f) 105 C.D. f) 04-Jun-18
damages.
g) 1 pr g) GUIAMEL M.D.
35. Project I.D : P00177413MN_CW1 a) 3,382.82 a) By Contract P 5.00 26.80 68.20 96.70 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0208 b) 3,382.82 b) R 5.00 26.80 68.20 96.70 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Palimbang National High School - (A) c) 06-Nov-17 c) 16-Jan-18 A 9.85 38.00 62.35 92.35 92.38 92.41
Palimbang, Sultan Kudarat d) ILON MULTIBUILDERS COMP d) 22-Jan-18 S 4.85 11.20 -5.85 -4.35 -7.62 -7.59
e) 3,294,371.28 e) 06-May-18
On-going, project delayed due to bad weather prevailing in the area. For revision of project
f) 105 C.D. f) 05-Jun-18
scheduled implementation.
g) 1 pr g) MANGATONG R.
36. Project I.D : P00177414MN_CW1 a) 3,342.92 a) By Contract P 6.00 36.00 77.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0209 b) 3,342.92 b) R 6.00 36.00 77.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Palimbang National High School - (B) c) 06-Nov-17 c) 16-Jan-18 A 9.87 38.00 62.35 93.65 95.17 95.26
Palimbang, Sultan Kudarat d) CS CONST. & SUPPLY d) 22-Jan-18 S 3.87 2.00 -14.65 -3.35 -4.83 -4.74
e) 3,267,798.64 e) 06-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 05-Jun-18
damages.
g) 1 pr g) GUIAMEL M.D.
Page 9 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
37. Project I.D : P00177415MN_CW1 a) 3,342.92 a) By Contract P 6.00 36.00 77.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0210 b) 3,342.92 b) R 6.00 36.00 77.00 97.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Palimbang National High School - (C) c) 06-Nov-17 c) 16-Jan-18 A 9.75 38.15 62.00 93.00 95.17 96.01
Palimbang, Sultan Kudarat d) CS CONST. & SUPPLY d) 22-Jan-18 S 3.75 2.15 -15.00 -4.00 -4.83 -3.99
e) 3,267,798.64 e) 06-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 05-Jun-18
damages.
g) 1 pr g) GUIAMEL M.D.
38. Project I.D : P00177416MN_CW1 a) 2,885.08 a) By Contract P 10.00 52.30 94.60 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0211 b) 2,885.08 b) R 10.00 52.30 94.60 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Kraan ES - (A) c) 06-Nov-17 c) 16-Jan-18 A 11.85 42.00 78.00 96.35 96.38 96.41
Palimbang, Sultan Kudarat d) CS CONST. & SUPPLY d) 22-Jan-18 S 1.85 -10.30 -16.60 -3.65 -3.62 -3.59
e) 2,820,292.57 e) 16-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f) 16-May-18
damages.
g) 1stry- 2CLw/ toilet g) GUIAMEL M.D.
39. Project I.D : P00177417MN_CW1 a) 2,885.08 a) By Contract P 10.00 52.30 94.60 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0212 b) 2,885.08 b) R 10.00 52.30 94.60 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Kraan ES - (B) c) 06-Nov-17 c) 16-Jan-18 A 11.85 42.35 78.00 97.00 97.05 97.11
Palimbang, Sultan Kudarat d) CS CONST. & SUPPLY d) 22-Jan-18 S 1.85 -9.95 -16.60 -3.00 -2.95 -2.89
e) 2,820,292.15 e) 16-Apr-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 85 C.D. f) 16-May-18
damages.
g) 1stry- 2CLw/ toilet g) GUIAMEL M.D.
40. Project I.D : P00177418MN_CW1 a) 3,317.61 a) By Contract P 5.86 27.14 61.13 92.25 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0213 b) 3,317.61 b) R 5.86 27.14 61.13 92.25 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Gapok National High School - Langgal c) 06-Nov-17 c) 16-Jan-18 A 9.87 33.42 62.00 94.00 98.40 98.92
Annex, Sen. Ninoy Aquino, Sultan Kudarat d) PALMARES GEN. MERCHANDId) 22-Jan-18 S 4.01 6.28 0.87 1.75 -1.60 -1.08
e) 3,753,039.96 e) 06-May-18
On-going, delayed due to demolition of dilapidated building. For revision of implementation
f) 105 C.D. f) 05-Jun-18
scheduled.
g) 1 pr g) DURUIN P.S.
Page 10 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
41. Project I.D : P00177419MN_CW1 a) 3,848.04 a) By Contract P 9.52 36.19 65.71 94.29 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0214 b) 3,848.04 b) R 9.52 36.19 65.71 94.29 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Langgal National High School c) 06-Nov-17 c) 16-Jan-18 A 9.85 33.25 62.00 92.00 94.33 94.36
Sen. Ninoy Aquino, Sultan Kudarat d) COFEJOK CONST. & SUPPLY d) 22-Jan-18 S 0.33 -2.94 -3.71 -2.29 -5.67 -5.64
e) 3,753,039.96 e) 06-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f) 05-Jun-18
damages.
g) 1 pr g) COLOMA J.A.E
42. Project I.D : P00177420MN_CW1 a) 3,357.52 a) By Contract 7.39 21.56 54.18 95.46 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0215 b) 3,357.52 b) R 1.18 9.71 25.07 62.16 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Senator Ninoy Aquino National High School-A c) 06-Nov-17 c) 16-Jan-18 A 10.20 33.00 52.00 93.00 94.35 100.00
Sen. Ninoy Aquino, Sultan Kudarat d) ROBETH GEN. MDSE CONST. d) 22-Jan-18 S 9.02 23.29 26.93 30.84 -5.65 -
e) 3,297,159.32 e) 06-May-18
f) 105 C.D. f) 29-May-18 Completed on June 1, 2018.
g) 1 pr g) COLOMA J.A.E
43. Project I.D : P00177421MN_CW1 a) 3,357.52 a) By Contract P 7.39 21.56 54.18 95.46 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0216 b) 3,357.52 b) R 1.18 9.71 25.07 62.16 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Senator Ninoy Aquino National High School - ( c) 06-Nov-17 c) 16-Jan-18 A 10.18 33.00 52.00 93.00 95.00 100.00
Sen. Ninoy Aquino, Sultan Kudarat d) ROBETH GEN. MDSE CONST. d) 22-Jan-18 S 9.00 23.29 26.93 30.84 -5.00 -
e) 3,297,159.32 e) 06-May-18
f) 105 C.D. f) 29-May-18 Completed on June 1, 2018.
g) 1 pr g) COLOMA J.A.E
Page 11 of 12
STATUS OF PROJECTS
FY 2017 CONSTRUCTION PROGRAM
Basic Educational Facilities Fund (BEFF - Batch 7)
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE
a) Allocation (P'000) a) Mode of Impl. % CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2017-10-013589 Dated: October 23, 2017
44. Project I.D : P00177422MN_CW1 a) 3,317.61 a) By Contract P 5.86 27.15 61.13 92.25 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 17MH0217 b) 3,317.61 b) R 5.86 27.15 61.13 92.25 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Sewod National High School-Langgal Annex c) 06-Nov-17 c) 16-Jan-18 A 9.65 40.00 58.00 93.00 98.30 98.76
Sen. Ninoy Aquino, Sultan Kudarat d) PALMARES GEN. MERCHANDId) 22-Jan-18 S 3.79 12.85 -3.13 0.75 -1.70 -1.24
e) 3,270,603.64 e) 06-May-18
On-going, project delayed due to bad weather prevailing in the area. For imposition of liquidated
f) 105 C.D. f)
damages.
g) 1 pr g) DURUIN P.S.
140,189.85 Page 12 of 12
Page 1 of 1
1. Project I.D : P00121790MN-CW1 a) 40,000.00 a) by Contract P 100.00 100.00 100.00 100.00 20.74 36.70 53.19 69.68 85.64 100.00 100.00 100.00
Contract I.D : 17MH0035 b) 40,000.00 b) 8-Dec-16 R 100.00 100.00 100.00 100.00 1.64 28.30 67.12 78.20 87.08 95.24 100.00 100.00
Construction of Flood Control (Ala River Basin), c) c) 17-Apr-17 A 92.45 96.49 100.00 25.00 32.00 54.00 70.00 79.00 87.60 91.98 92.39
K0+000-K0+380, Esperanza, Sultan Kudarat d) THREE W BUILDERS, INC / d) 23-Apr-17 S -7.55 -3.51 - 23.36 3.70 -13.12 -8.20 -8.08 -7.64 -8.02 -7.61
ROBETH GEN. MDSE. e) 27-Oct-17
CONST. SUPPLY (JV) f) 10-Jan-18
e) 36,187,500.59 g) L.P. SANTOS Completed on March 12, 2018.
f) 188 C.D
RV g) 380 l.m
Page 1 of 1
PRE-CONSTRUCTION CONSTRUCTION
PROGRAM TOTAL NO.
NUMBER OF PROJECTS NO. OF PROJECTS STATUS
FUND SOURCE AMOUNT OF
PROJECTS COM- ON- ADVER CONTRACT ACTUAL COM- ON- PLANNED ACTUAL SLIPPAGE
(Php'000) PLETED GOING
NYS
-TIZED
BID
APPROVED
NTP
% ACC PLETED GOING
NYS
% TARGET % ACC %
DPWH REGULAR INFRASTRUCTURE
Replacement of Bridges (Temporary to Permanent).. 40,000.00 1 1 - - 1 1 1 1 100.00 - 1 - 100.00 95.38 -4.62
Road Upgrading (unpaved to paved) - National
89,799.00 3 3 - - 3 3 3 3 100.00 3 - - 100.00 100.00 -
Secondary Roads
Construction of Flood Control (Ala River Basin) 40,000.00 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
Local Infrastructure Program 50,000.00 34 34 - - 34 34 34 34 100.00 34 - - 100.00 100.00 -
Construction of Rain Water Collector System
3,400.00 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
(CWRCS)
Construction/Repair/Rehabilitation/ Improvement of
27,034.92 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
Various Infrastructure
Sub-total 268,102.27 43 43 - - 43 43 43 43 100.00 42 1 - 100.00 99.31 -0.69
DPWH OUTSIDE INFRASTRUCTURE
MinSAAD-DAR (1st Released) 48,100.00 1 1 - - 1 1 1 1 100.00 - 1 - 100.00 98.26 -1.74
MinSAAD-DAR (2nd Released) 37,314.62 1 1 - - 1 1 1 1 100.00 - 1 - 100.00 93.56 -6.44
Department of Agriculture (DA) 40,000.00 5 5 - - 5 5 5 5 100.00 4 1 - 100.00 99.48 -0.52
Const./Rehab. of Accessibility Facilities for Physically
16,410.00 98 98 - - 98 98 98 98 100.00 98 - - 100.00 100.00 -
Challenged Persons
CY 2017 BEFF - Batch 1 1,250.00 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
CY 2017 BEFF - Batch 4 105,809.43 33 33 - - 33 33 33 33 100.00 9 24 - 100.00 97.45 -2.55
CY 2017 BEFF - Batch 5 8,194.23 3 3 - - 3 3 3 3 100.00 - 3 - 100.00 95.37 -4.63
CY 2017 BEFF - Batch 7 140,189.85 44 44 - - 44 44 44 44 100.00 9 35 - 99.96 96.62 -3.34
CY 2017 BEFF - Batch 13 290,959.15 69 69 - - 69 69 69 69 100.00 24 45 - 99.98 96.72 -3.26
CY 2017 BEFF - Batch 10 76,919.86 26 26 - - 26 26 26 26 100.00 6 20 - 100.00 92.98 -7.02
CY 2017 BEFF - Batch 11 2,794.73 1 1 - - 1 1 1 1 100.00 1 - - 100.00 100.00 -
Sub-total 767,941.87 282 282 - - 282 282 282 282 100.00 152 130 - 99.99 96.59 -3.40
TOTAL 1,036,044.14 325 325 - - 325 325 325 325 100.00 194 131 - 99.99 97.29 -2.70
Page 1 of 1
DEC
83.93
83.93
2018
74.90
74.90
Page 1 of 1
AHA, Ph.D.
gineer
STATUS OF PROJECTS
CY 2018 CONSTRUCTION PROGRAM
Department of Agriculture (DA) Proposed Projects
As of June 30, 2018
SULTAN KUDARAT 2nd DISTRICT ENGINEERING OFFICE %
a) Allocation (P'000) a) Mode of Impl. CUMULATIVE ACCOMPLISHMENT IN PERCENT
b) Programmed (This Yr) b) Date Bid A Current Year = 2018
Name of Project/Location c) Date SARO rec'd. c) Date NTP C
(Scope of Work/Physical d) Contractor d) Start Date C
Target) e) Contract Amount e) Exp. Compl. Date O JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
f) Contract Duration f) Rev. Expiry Date M
g) Physical Target g) Project Engineer P
SARO #: SR2018-03-007322 Dated: March 05, 2018
1. Project I.D : P00266238MN_CW1 a) 10,000.00 a) By Contract P - - - - 19.99 63.54 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0087 b) 10,000.00 b) 19-Apr-18 R - - - - 19.99 63.54 100.00 100.00 100.00 100.00 100.00 100.00
Concreting of Tuka-Busok FMR, Brgy. Tuka and c) c) 09-May-18 A - - - - 25.00 60.00
Brgy. Busok, Bagumbayan, Sultan Kudarat d) RAQI BUILDERS CONST. & S d) 15-May-18 S - - - - 5.01 -3.54
e) 9,651,500.00 e) 22-Jul-18
f) 69 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area.
g) 1 km g) COLOMA, J.A.E
SARO #: SR2018-03-007320 Dated: March 05, 2018
2. Project I.D : P00266239MN_CW1 a) 10,000.00 a) By Contract P - - - - 24.64 68.12 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0088 b) 10,000.00 b) 19-Apr-18 R - - - - 24.64 68.12 100.00 100.00 100.00 100.00 100.00 100.00
Concreting of Keytodac- New Calinog FMR, c) c) 09-May-18 A - - - - 25.00 64.00
Brgy. Keytodac, Lebak, Sultan Kudarat d) MUST ENTERPRISES d) 15-May-18 S - - - - 0.36 -4.12
e) 9,657,797.76 e) 22-Jul-18
f) 69 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area.
g) 1 km g) DURUIN, P.S.
SARO #: SR2018-03-007321 Dated: March 05, 2018
3. Project I.D : P00266237MN_CW1 a) 7,000.00 a) By Contract P - - - - 24.21 79.58 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0089 b) 7,000.00 b) 19-Apr-18 R - - - - 24.21 79.58 100.00 100.00 100.00 100.00 100.00 100.00
Concreting of Purok Narra-Brgy. Poblacion FMR, c) c) 09-May-18 A - - - - 30.00 74.95
Brgy. Numo, Esperanza, Sultan Kudarat d) RAQI BUILDERS CONST. & S d) 15-May-18 S - - - - 5.79 -4.63
e) 6,756,050.00 e) 10-Jul-18
f) 57 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area.
g) 0.700 km g) SANTOS, L.P.
27,000.00 Page 1 of 1
PREPARED BY: CHECKED BY: SUBMITTED BY:
1. Project I.D : a) 3,366.00 a) By Contract P - - - 21.67 46.67 72.50 98.33 100.00 100.00 100.00 100.00
Contract I.D : 18MH0058 b) 3,366.00 b) 10-Apr-18 R - - - 21.67 46.67 72.50 98.33 100.00 100.00 100.00 100.00
Construction of Rain Water Collection System c) c) 30-Apr-18 A - - - 5.00 22.00 47.00
(RWCS) d) JV CONSTECH d) 06-May-18 S - - - 5.00 0.33 0.33
1. Ugis ES, Esperanza 11. Buenaflores ES, SNA e) 3,281,000.00 e) 02-Sep-18
2. Sultan Sinanggayan IS, 12. Salangsang ES, Lebak f) 120 C.D. f)
Esperanza 13. Bululawan ES, Lebak g) 2.80 lane Km. g) DURUIN, P.S.
3. Numo ES, Esperanza 14. Mangudadatu NHS-
4. Pamantingan ES, Villamonte Annex, Lebak
5. Salumpipng NHS, 15. S.A. Balabagan ES, Lebak
6. Spur 2 ES, Bagumbayan 16. Salaman CES, Lebak On-going
7. San Vicente ES, 17. Pasandalan ES, Lebak
Bagumbayan
8. Kapaya ES, Bagumbayan
9. Gapok NHS, SNA
10. Malegdeg ES, SNA
Page 1 of 1
1. Project I.D : P00253471MN_CW1 a) 1,000.00 a) by Contract P - - 7.65 55.41 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0028 b) 1,000.00 b) 13-Feb-18 R - - 7.65 55.41 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Datu Guiabar Pilot School, Brgy. Poblacion, c) c) 22-Mar-18 A - - 8.00 70.00 100.00
Kalamansig, Sultan Kudarat d) JV CONSTECH d) 28-Mar-18 S - - 0.35 14.59 -
e) 986,274.51 e) 21-May-18
f) 55 C.D. f) Completed on May 21, 2018.
g) 1 CL g) ALANGCA, H.D.
2. Project I.D : P00253472MN_CW1 a) 1,000.00 a) by Contract P - - 7.65 55.41 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0030 b) 1,000.00 b) 13-Feb-18 R - - 7.65 55.41 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Barurao 2 Primary School - Pakil Elementary c) c) 22-Mar-18 A - - 8.25 70.00 96.00 97.55
School Annex, Brgy. Barurao 2, Lebak, d) JV CONSTECH d) 28-Mar-18 S - - 0.60 14.59 -4.00 -2.45
Sultan Kudarat e) 986,274.51 e) 21-May-18
f) 55 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area. For imposition of liquidated
g) 1 CL g) ALANGCA, H.D. damages.
3. Project I.D : P00253473MN_CW1 a) 1,000.00 a) by Contract P - - 0.34 47.24 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0029 b) 1,000.00 b) 13-Feb-18 R - - 0.34 47.24 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
SNA National High School, Brgy. Kulaman, c) c) 22-Mar-18 A - - 7.50 60.00 95.25 95.28
Senator Ninoy Aquino, Sultan Kudarat d) ALBANOR CONSTRUCTION d) 28-Mar-18 S - - 7.16 12.76 -4.75 -4.72
e) 987,496.61 e) 21-May-18
f) 55 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area. For imposition of liquidated
damages.
g) 1 CL g) COLOMA, J.A.E
4. Project I.D : P00253460MN_CW1 a) 1,000.00 a) by Contract P - - 4.98 51.72 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0027 b) 1,000.00 b) 13-Feb-18 R - - 4.97 51.72 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Construction of Barangay Hall, Capilan, c) c) 22-Mar-18 A - - 8.25 65.00 96.00 96.05
Lebak, Sultan Kudarat d) JV CONSTECH d) 28-Mar-18 S - - 3.28 13.28 -4.00 -3.95
e) 985,345.40 e) 21-May-18
f) 55 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area. For imposition of liquidated
damages.
RA g) 1 CL g) GUARDIANO, R.C.
5. Project I.D : P00253461MN_CW1 a) 1,000.00 a) by Contract P - - 20.35 81.16 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0009 b) 1,000.00 b) 14-Dec-17 R - - 20.35 81.16 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Construction of Barangay Hall, Malatunol, c) c) 16-Mar-18 A - - 18.35 70.00 98.10 98.16
Palimbang, Sultan Kudarat d) FPJ CONST. & SUPPLY d) 22-Mar-18 S - - -2.00 -11.16 -1.90 -1.84
e) 989,216.41 e) 15-May-18
f) 55 C.D. f) On-going, for imposition of liquidated damages.
g) 1 CL g) MANGATONG, R.
Page 1 of 13
STATUS OF PROJECTS
CY 2018 CONSTRUCTION PROGRAM
Local Infrastructure Program
As of June 30, 2018
1. Project I.D : P00230235MN_CW1 a) 49,500.00 a) By Contract P - - 0.70 24.60 34.80 49.79 64.03 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0041 b) 49,500.00 b) 30-Jan-18 R - - 0.70 24.60 34.80 49.79 64.03 100.00 100.00 100.00 100.00 100.00
NRJ leading to Marguez Hotspring, c) c) 22-Mar-18 A - - 6.50 17.00 35.00 50.00
Brgy. Marguez, Esperanza, Sultan Kudarat d) R. SEMILLA CONST. & MARKEd) 28-Mar-18 S - - 5.80 -7.60 0.20 0.21
e) 39,654,920.43 e) 23-Aug-18
f) 149 C.D. f) On-going
g) 2.80 lane Km. g) L.P.SANTOS
Page 1 of 1
1. Project I.D : P00220943MN_CW1 a) 50,000.00 a) by Contract P - - 0.65 5.00 17.84 40.84 66.05 87.74 92.38 94.54 99.45 100.00
Contract I.D : 18MH0002 b) 50,000.00 b) 14-Dec-17 R - - 0.65 5.00 17.84 40.84 66.05 87.74 92.38 94.54 99.45 100.00
Construction of River Bank Protection/ c) c) 22-Mar-18 A - - 5.00 9.00 20.00 41.00
Flood Control at Brgy. Daladap, d) C.B. GARAY PHILWIDE BUIL d) 28-Mar-18 S - - 4.35 4.00 2.16 0.16
Esperanza, Sultan Kudarat e) 46,385,847.64 e) 02-Dec-18
f) 250 C.D. f) On-going
g) 380 ln.m g) L.P. SANTOS
2. Project I.D : P00220960MN_CW1 a) 50,000.00 a) by Contract P - - - 7.60 20.00 32.00 44.40 56.80 68.80 81.20 93.20 100.00
Contract I.D : 18MH0048 b) 50,000.00 b) 27-Mar-18 R - - - 7.60 20.00 32.00 44.40 56.80 68.80 81.20 93.20 100.00
Construction of River Bank Protection/ c) c) 06-Apr-18 A - - - 5.50 21.00 24.00
Flood Control at Brgy. Badiangon, d) LEGACY CONST. CORP. d) 12-Apr-18 S - - - -2.10 1.00 -8.00
Palimbang, Sultan Kudarat e) 46,488,126.00 e) 17-Dec-18
K0+000-K0+480 f) 250 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area.
g) 380 ln.m g) M.D. GUIAMEL
3. Project I.D : P00220961MN_CW1 a) 50,000.00 a) by Contract P - - 1.95 10.65 28.29 48.94 72.49 89.30 93.55 96.43 100.00 100.00
Contract I.D : 18MH0001 b) 50,000.00 b) 14-Dec-17 R - - 1.95 10.65 28.29 48.94 72.49 89.30 93.55 96.43 100.00 100.00
Construction of River Bank Protection/ c) c) 12-Mar-18 A - - 6.00 14.50 35.00 44.00
Flood Control Brgy. Biwang, Bagumbayan, d) JARGON CONSTRUCTION & Sd) 18-Mar-18 S - - 4.05 3.85 6.71 -4.94
Sultan Kudarat e) 47,285,046.91 e) 22-Nov-18
f) 250 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area.
g) 380 ln.m g) R.C. GUARDIANO
4. Project I.D : P00220962MN_CW1 a) 50,000.00 a) by Contract P - - 1.98 16.83 32.18 47.03 62.38 77.72 95.57 100.00 100.00 100.00
Contract I.D : 18MH0040 b) 50,000.00 b) 30-Jan-18 R - - 1.98 16.83 32.18 47.03 62.38 77.72 95.57 100.00 100.00 100.00
Construction of Sea Wall Protection, c) c) 22-Mar-18 A - - 5.00 12.95 27.65 48.01
Brgy. Milbuk, Palimbang, Sultan Kudarat d) CS CONST. & SUPPLY d) 28-Mar-18 S - - 3.02 -3.88 -4.53 0.98
e) 46,520,000.00 e) 15-Oct-18
f) 202 C.D. f) On-going
g) 1,400 ln.m g) M.D. GUIAMEL
5. Project I.D : P00221063MN_CW1 a) 15,000.00 a) by Contract P - - - 22.58 47.58 71.77 96.77 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0045 b) 15,000.00 b) 20-Feb-18 R - - - 22.58 47.58 71.77 96.77 100.00 100.00 100.00 100.00 100.00
Construction of Sea Wall Protection, c) c) 28-Mar-18 A - - 5.00 25.00 45.00 70.86
Brgy. Sta. Clara, Kalamansig, Sultan Kudarat d) CS CONST. & SUPPLY & JV C d) 03-Apr-18 S - - 5.00 2.42 -2.58 -0.91
e) 14,406,379.79 e) 04-Aug-18
f) 124 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area.
g) 425 ln.m g) H.D. ALANGCA
Page 1 of 2
STATUS OF PROJECTS
CY 2018 CONSTRUCTION PROGRAM
CY 2018 Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
As of June 30, 2018
1. Project I.D : P00200974MN_CW1 a) 39,870.00 a) by Contract P - - - 9.93 37.46 69.69 91.34 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0051 b) 39,870.00 b) 27-Mar-18 R - - - 9.93 37.46 69.69 80.43 100.00 100.00 100.00 100.00 100.00
Domolol Br. (B00159MN) along c) c) 06-Apr-18 A - - - 11.00 32.00 65.00
Awang-Upi-Lebak-Kalamansig-Palimbang d) ABU CONSTRUCTION d) 12-Apr-18 S - - - 1.07 -5.46 -4.69
-Sarangani Rd e) 38,076,105.83 e) 28-Aug-18
f) 139 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area. For revision of
g) g) MANGATONG, R. implementation scheduled.
2. Project I.D : P00200978MN_CW1 a) 12,650.00 a) by Contract P - - - 4.20 57.89 79.81 94.34 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0052 b) 12,650.00 b) 27-Mar-18 R - - - 4.20 57.89 79.81 94.34 100.00 100.00 100.00 100.00 100.00
San Roque Br. (B00396MN) Awang-Upi- c) c) 06-Apr-18 A - - - 12.00 37.00 75.00
Kalamansig-Palimbang-Sarangani-Rd d) ABU CONSTRUCTION d) 12-Apr-18 S - - - 7.80 -20.89 -4.81
e) 12,136,063.05 e) 09-Aug-18
f) 120 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area. For revision of
g) g) GUIAMEL, M.D. implementation scheduled.
3. Project I.D : P00200972MN_CW1 a) 9,930.00 a) by Contract P - - - 9.50 35.20 77.80 92.40 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0053 b) 9,930.00 b) 27-Mar-18 R - - - 9.50 35.20 77.80 92.40 100.00 100.00 100.00 100.00 100.00
Colubi Br. 1 (B00400MN) Awang-Upi- c) c) 06-Apr-18 A - - - 13.20 39.00 72.95
Kalamansig-Palimbang-Sarangani-Rd d) ABU CONSTRUCTION d) 12-Apr-18 S - - - 3.70 3.80 -4.85
e) 9,525,482.94 e) 03-Aug-18
f) 114 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area. For revision of
implementation scheduled.
g) g) GUIAMEL, M.D.
4. Project I.D : P00200973MN_CW1 a) 12,250.00 a) by Contract P - - - 4.00 58.00 87.00 99.00 100.00 100.00 100.00 100.00 100.00
Contract I.D : 18MH0054 b) 12,250.00 b) 27-Mar-18 R - - - 4.00 58.00 87.00 99.00 100.00 100.00 100.00 100.00 100.00
Colubi Br. 2 (B00401MN) Awang-Upi- c) c) 06-Apr-18 A - - - 12.85 37.95 82.12
Kalamansig-Palimbang-Sarangani-Rd d) ABU CONSTRUCTION d) 12-Apr-18 S - - - 8.85 -20.05 -4.88
e) 11,749,065.92 e) 08-Aug-18
f) 119 C.D, f) On-going, project delayed due to bad weather condition prevailing in the area. For revision of
implementation scheduled.
g) g) GUIAMEL, M.D.
5. Project I.D : P00200975MN_CW1 a) 50,000.00 a) by Contract P - - - - 7.58 38.68 52.39 68.69 77.50 95.15 99.54 100.00
Contract I.D : 18MH0055 b) 50,000.00 b) 10-Apr-18 R - - - - 7.58 38.68 52.39 68.69 77.50 95.15 99.54 100.00
Kraan Br.1 (B00402MN) Awang-Upi- c) c) 30-Apr-18 A - - - 5.00 12.00 33.75
Kalamansig-Palimbang-Sarangani-Rd d) ABU CONSTRUCTION d) 06-May-18 S - - - 5.00 4.42 -4.93
e) 48,138,809.94 e) 10-Dec-18
f) 219 C.D. f) On-going, project delayed due to bad weather condition prevailing in the area. For revision of
g) g) GUIAMEL, M.D. implementation scheduled.
Page 1 of 2
STATUS OF PROJECTS
CY 2018 CONSTRUCTION PROGRAM
CY 2018 Rehabilitation/Major Repair of Permanent Bridges
As of June 30, 2018
PRE-CONSTRUCTION CONSTRUCTION
PROGRAM TOTAL NO.
FUND SOURCE AMOUNT OF NUMBER OF PROJECTS NO. OF PROJECTS STATUS
(Php'000) PROJECTS COM- ON- ADVER CONTRACT ACTUAL COM- ON- PLANNED ACTUAL SLIPPAGE
NYS BID NTP NYS
PLETED GOING -TIZED APPROVED % ACC PLETED GOING % TARGET % ACC %
DPWH REGULAR INFRASTRUCTURE
opt
# OF SETS FOR Project Monitoring System (PMS)
CONSOLIDATED
15th 30th
region 5 extra 5 copies of summary
de 1 1
ade 1 1
chief 1 1
laloi 1 1
jane 1 1
pe 1 1
pds 1
qas 1 1
gso 1
auditor 1
budget 1
7 16
dbm c/o
budget
1 quarterly
7 17
mutual
SUMMARY SUMMARY