Sei sulla pagina 1di 309

PERHITUNGAN PEMAKAIAN MATERIAL

Proyek Package #6 Civil Work For Wood Island Construction


PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Spoon Pile - Facility (Sout-East) NO :
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
0
110

118 19 2.23 2.6 6


1500

2 Stirrups

r = 270 118 10 0.62 1.86516 10

r = 600

118 10 0.62 4.1448 8

3 Stick for pile hole

118 13 1.04 0.6 6


600

TOTAL BERAT
Pekerjaan : Pile Cap 1CT1 - Facility (South-East)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Stirrups X
25 22 2.98 5.18 8
220
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
1050

1100
2 Stirrups y

25 22 2.98 5.18 8
220
1050

1100
3 Stirrups z

25 16 1.58 5.04 6
160
1100

1100

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan Pile Cap 2CT1 - DM Plant (FACILITY SOUTH EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Upper and Bottom Longitudinal Bars

3500
350

350
46 25 3.85 4.9 8
350

350

46 25 3.85 4.9 10
3500
Stirrups - A

160 46 16 1.58 4.464 35


1050

1100

Side Longitudinal Bars


350

350

46 16 1.58 4.328 10
3500

Pekerjaan Pile Cap 2CT1 - DM Plant - FACILITY (SOUTH-EAST)


JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
Stirrups - B

100 46 10 0.62 2.74 105


1050

200
Tie Bars
1100
100

100

46 10 0.62 1.38 58

TOTAL BERAT
Pekerjaan : Beam 1DKL1 (13) - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

11680 12000 7520


480

2 32 6.31 55.808 3
12000 12000

11810 12000 4465


285

2 19 2.23 52.636 1
12000 12000

2 Bottom Longitudinal Bars `

12000 12000 2 32 6.31 55.808 3


480

11680 12000 7520

12000 12000
285

2 19 2.23 52.636 1
11810 12000 4465

3 Side Longitudinal Bars


12000 12000
240

2 16 1.58 51.922 6
11840 12000 3778
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Beam 1DKL1 (13) - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
4 Stirrups

130 2 13 1.04 2.320 936


700

200

5 Tie Bars
300
10
0 2 10 0.62 0.580 360
0
10

TOTAL BERAT
Pekerjaan : Beam 1DL1 - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

11680 12000 7520


480

4 32 6.31 55.808 3
12000 12000

11680 12000 7195


285

4 19 2.23 55.236 1
12000 12000

2 Top Extra Bars


4500

4 32 6.31 5.396 16
0
32

32
0

3 Bottom Longitudinal Bars `

12000 12000
480

4 32 6.31 55.808 4
11680 12000 7520

12000 12000
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
285

4 19 2.23 52.636 1
11810 12000 4465

4 Side Longitudinal Bars


12000 12000
240

4 16 1.58 51.922 6
11840 12000 3778

5 Stirrups

130 4 13 1.04 2.320 1040


700

200
5 Tie Bars
300
10
0 4 10 0.62 0.580 384
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Beam 1DKL2 (13) - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

11680 12000 7520


480

3 32 6.31 55.808 3
12000 12000

11680 12000 7195


285

3 19 2.23 55.236 1
12000 12000
2 Top Extra Bars
4500

3 32 6.31 5.396 16
0
32

32
0

3 Bottom Longitudinal Bars `

12000 12000
480

3 32 6.31 55.808 4
11680 12000 7520

12000 12000
285

3 19 2.23 52.636 1
11810 12000 4465

4 Side Longitudinal Bars


12000 12000
240

3 16 1.58 51.922 6
11840 12000 3778

4 Stirrups

130 3 13 1.04 2.32 936


700

200
5 Tie Bars
300
10
0 3 10 0.62 0.540 288
0
10
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
TOTAL BERAT
Pekerjaan : Beam 1DKL3 (4) - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

7600 7600
480

480

1 32 6.31 0.128 4
12000

7600 7600
285

285

1 19 2.23 0.076 1
12000

3 Bottom Longitudinal Bars `

12000
480

480

1 32 6.31 28.416 4
7600 7600

12000
285

285

1 19 2.23 27.922 1
7600 7600
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Beam 1DKL3 (4) - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
4 Side Longitudinal Bars
12000
240

240 1 16 1.58 27.808 8


7600 7600

5 Stirrups

130 1 13 1.04 2.97 672


900

325
6 Tie Bars
400
10
0 1 10 0.62 0.640 324
0
10

TOTAL BERAT
Pekerjaan : Beam 1DKL4 (4) - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

7600 7600
480

480

8 32 6.31 28.416 4
12000

7600 7600
285

285

8 19 2.23 27.922 1
12000
2 Top Extra Bars
3000

8 32 6.31 3.896 3
0
32

32
0

3000

8 19 2.23 3.532 1
0
19

19
0

3 Bottom Longitudinal Bars `


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
12000
480

480
8 32 6.31 28.416 4
7600 7600

12000
285

285
8 19 2.23 27.922 1
7600 7600

4 Bottom Extra Bars


12000
480

480

8 32 6.31 28.416 3
7600 7600

12000
285

285

8 19 2.23 27.922 1
7600 7600
4 Side Longitudinal Bars
12000
240

240

8 16 1.58 27.808 8
7600 7600

5 Stirrups

130 8 13 1.04 2.802 336


900

345
6 Tie Bars
400
10
0 8 10 0.62 0.680 252
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Beam 1DL2 (1) - FACILITY (SOUTH-EAST)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

3100
330

330
8 22 2.98 3.936 3

3 Bottom Longitudinal Bars `

3100
480

480

8 32 6.31 4.316 2

3100
285

285

8 19 2.23 3.822 1

4 Side Longitudinal Bars


195

195

8 13 1.04 3.594 4
3100

5 Stirrups

130 8 13 1.04 1.92 18.0


500

200
6 Tie Bars
200
10
0 8 10 0.62 0.480 17
0
10

TOTAL BERAT
PekerjaColumn Z1 - DM Plant
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

28 25 3.85 5.125 12
3800
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST

875
2 Stirrups

a 28 13 1.04 2.78 38
640

130

490

b 28 13 1.04 2.2 38
130
640

200

130
c 28 13 1.04 1.9767 38
238

490
3 Preset Bar
3251

28 25 3.85 3.251 12

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Column LZ1 - DM Plant
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

4 25 3.85 4.225 16
2900

875
2 Stirrups
4 13 1.04 2.08 29
130
340

440

4 13 1.04 1.54 29
130
340

172
130
4 13 1.04 1.68 29
138

440
3 Preset Bar

4 25 3.85 3 16
3000

TOTAL BERAT
Pekerjaan : Column Z2 - DM Plant
JUMLAH DIA BERAT PANJANG JUMLAH
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

6 25 3.85 5.125 12
3800

875
2 Stirrups
6 13 1.04 2.78 38
130
640

490

6 13 1.04 2.18 38
130
640

188
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Column Z2 - DM Plant
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
130
6 13 1.04 1.98 38
238

490

3 Preset Bar
3251

6 25 3.85 3.251 12

TOTAL BERAT
Pekerjaan : Wall - DM Plant (L = 78550)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Longitudinal Bars
11650 12000 12000 11621
150
150

9 10 0.62 83.651 14
12000 12000 12000

250
9 13 1.04 2.202 1048
1900

4 Tie Bars
150
9 10 0.62 2.15 789
10

0
10
0

Pekerjaan : Wall - DM Plant (L=24700)


JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Longitudinal Bars
11810 1890
150

150

4 10 0.62 26.08 14
12000
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
250
4 13 1.04 2.202 330
1900

4 Tie Bars
150
4 10 0.62 2.15 250
10

0
10
0
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Wall - DM Plant (L=3550)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Longitudinal Bars
3550
150

150 2 10 0.62 3.93 14

250
2 13 1.04 2.202 48
1900

4 Tie Bars
150
2 10 0.62 2.15 39
10

0
10
0

Pekerjaan : Wall - DM Plant (L=9800)


JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
9800
150

150

2 10 0.62 10.18 14

250
2 13 1.04 2.202 132
1900

4 Tie Bars
150
2 10 0.62 2.15 101
10

0
10
0

TOTAL BERAT
Pekerjaan : Wall 1-L1 (1) - FACILLITY (South-East)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
6000
330

330

6 22 2.98 6.176 4
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
2 Bottom Longitudinal Bars
6000
375

375
6 25 3.85 6.2 4

3 Side Longitudinal Bars


6000
195

195
6 13 1.04 6.104 12

3 Stirrups
249
130 6 13 1.04 3.558 80
1400

300
6 10 0.62 0.50 120
10

0
10
0

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Wall 1-L2 (1) - FACILLITY (South-East)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
3250
330

330 8 22 2.98 3.426 3

2 Bottom Longitudinal Bars


3250
375

375

8 25 3.85 3.45 3

3 Side Longitudinal Bars


3250
195

195

8 13 1.04 3.354 12

3 Stirrups
250
130 8 13 1.04 3.56 22
1400

300
8 10 0.62 0.50 65
0
10

10
0

TOTAL BERAT
Pekerjaan : Wall 1-L3 (1) - FACILLITY (South-East)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
1875
330

330

2 22 2.98 2.051 3

2 Bottom Longitudinal Bars


1875
375

375

2 25 3.85 2.075 3

3 Side Longitudinal Bars


1875
195

195

2 13 1.04 1.979 10
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST

3 Stirrups
200
130 2 13 1.04 2.86 9
1100

300
2 10 0.62 0.50 28
10

0
10
0

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : Wall 1-L4 (1) - FACILLITY (South-East)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
6200
330

330 2 22 2.98 6.376 4

2 Bottom Longitudinal Bars


6200
375

375

2 25 3.85 6.4 5

3 Side Longitudinal Bars


6200
195

195

2 13 1.04 6.304 10

3 Stirrups
249
130 2 13 1.04 2.958 84
1100

300
2 10 0.62 0.50 106
0
10

10
0

TOTAL BERAT
Pekerjaan : Wall 1-L5 (1) - FACILLITY (South-East)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Wall Bars
575

575

1 13 1.04 2.706 9
1140
600

600

1 13 1.04 4.812 9
140

140

1140
940 940
560
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
560

1 13 1.04 2.886 8
140

1710
190

1 13 1.04 2.391 8
100
560

255

1190

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
Pekerjaan : SLAB
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN Ø POTONGAN POTONGAN
TYPE M/KG
(M) (Bh)
1 L = 24.55 m'

Top bar for slab


2650 11850
150

150 1 16 1.58 26.928 523


12000

Bottom bar for slab

12000
150

150

1 19 2.23 26.952 523


2650 11850

2 L = 78.55 m'
Top bar for slab

11250 11850
150

150

1 13 1.04 23.504 164

12000 12000 12000


1 13 1.04 60.104 164

12000 12000

Bottom bar for slab


12000
150

150

1 13 1.04 211.844 164


2650 11850

12000 12000 12000


1 13 1.04 60.104 164

12000 12000

TOTAL BERAT

REKAP SUB REBAR


NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Spoon Pile - Facility (Sout-East) 8337.196
2 Pile Cap 1CT1 - Facility (South-East) 7369.040
3 Pile Cap 2CT1 - DM Plant (FACILITY SOUTH EAST) 40622.398
4 Beam 1DKL1 (13) - FACILITY (SOUTH-EAST) 10455.410
5 Beam 1DL1 - FACILITY (SOUTH-EAST) 25559.972
6 Beam 1DKL2 (13) - FACILITY (SOUTH-EAST) 18292.194
7 Beam 1DKL3 (4) - FACILITY (SOUTH-EAST) 3338.616
8 Beam 1DKL4 (4) - FACILITY (SOUTH-EAST) 29421.181
9 Beam 1DL2 (1) - FACILITY (SOUTH-EAST) 1233.845
10 Column Z1 - DM Plant 18533.163
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH EAST
11 Column LZ1 - DM Plant 2419.632
12 Column Z2 - DM Plant 3965.859
13 Wall - Facility (SOUTH-EAST) 44307.097
15 Wall 1-L1 (1) - FACILLITY (South-East) 3247.809
16 Wall 1-L2 (1) - FACILLITY (South-East) 1701.620
17 Wall 1-L3 (1) - FACILLITY (South-East) 199.169
18 Wall 1-L4 (1) - FACILLITY (South-East) 1109.915
19 Wall 1-L5 (1) - FACILLITY (South-East) 114.273
14 SLAB 114329.163 114

334557.550 Kg
TOTAL
334.558 Ton
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

4104.984

1364.551

2425.869

441.792

8337.196 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

3087.280
T PEMBESIAN

3087.280

1194.480

7369.040 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

6942.320

8677.900

11355.523

3145.590

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

8205.204

2295.860

40622.398 Kg

NO :
JUMLAH
T PEMBESIAN
BERAT KETERANGAN
BERAT (KG)

2112.891

234.757

2112.891

234.757

984.441
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

4516.762

258.912

10455.410 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

4225.782

492.705

2179.121

5634.376
T PEMBESIAN

469.513

1968.882

10037.248

552.346

25559.972 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

3169.336

369.529

1634.340

4225.782

352.135

1476.662

6775.142

289.267
T PEMBESIAN

18292.194 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

3.231

0.169

717.220

62.266
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

351.493

2075.674

128.563

3338.616 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

5737.759

498.128

590.010

63.011
T PEMBESIAN

5737.759

498.128

4303.319

498.128

2811.945

7833.047

849.946

29421.181 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

281.503

435.743

68.184

119.608

287.539

41.267

1233.845 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

6629.700
T PEMBESIAN

3076.237

2434.432

2187.300

4205.494

18533.163 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

1041.040

250.931

186.188

202.273

739.200

2419.632 Kg

NO :
JUMLAH
T PEMBESIAN
BERAT KETERANGAN
BERAT (KG)

1420.650

659.194

516.131
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

468.707

901.177

3965.859 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

6534.816

21606.905

9459.635

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

905.498
T PEMBESIAN

3025.959

1333.000
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

68.225

221.374

102.641

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

176.725

603.054

269.266

44307.097 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

441.708
T PEMBESIAN

572.880

457.068

1776.154

3247.809 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

245.028

318.780

334.863

641.749

161.200

1701.620 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

36.672

47.933

41.163
T PEMBESIAN

55.770

17.631

199.169 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

152.004

246.400

131.123

514.771

65.617

1109.915 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

25.328

45.040
T PEMBESIAN
24.012

19.893

114.273 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

22251.684

31433.848

4008.842

10251.338

36132.113

10251.338

114329.163 Kg

AP SUB REBAR
KETERANGAN
T PEMBESIAN

114
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Spoon Pile - Facility (North West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
00
11

59 19 2.23 2.60 6
1500

2 Stirrups

a. r = 270 59 10 0.62 1.87 10

b. r = 600 59 10 0.62 3.77 8

3 Diagonal hang bar for spoon bar

59 13 1.04 0.60 6
600

TOTAL BERAT
Pekerjaan : Pile Cap 1CT1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Stirrups X

5 22 2.98 5.18 8
220
0
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
1050

1100

2 Stirrups y

5 22 2.98 5.18 8
220
1050

1100

3 Stirrups z
5 16 1.58 5.04 6
160
1100

1100

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Pile Cap 2CT1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Upper and Bottom Longitudinal Bars

3500
350

350
21 25 3.85 4.90 8
350

350

21 25 3.85 4.90 10
3500
Stirrups - A

160 21 16 1.58 4.46 35


1050

1100

Side Longitudinal Bars


350

350

21 16 1.58 4.33 10
3500

Stirrups - B

100 21 10 0.62 2.74 105


1050

200
Tie Bars
1100
100

100

21 10 0.62 1.38 58

TOTAL BERAT
Pekerjaan : Pile Cap 3CT1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
I. Upper and Bottom Longitudinal Bars
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
350

350
1 4 25 3.85 3.95 1
3045
350

350
2 4 25 3.85 4.20 1
3300
350

350
3 4 25 3.85 4.45 1
3554
350

350

4 4 25 3.85 4.49 1
3590
350

350

5 4 25 3.85 4.29 1
3393
350

350

6 4 25 3.85 4.10 1
3197
350

350

7 4 25 3.85 3.90 1
3000
350

350

8 4 25 3.85 4.12 2
3221
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Pile Cap 3CT1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
350

350
9 4 25 3.85 4.37 2
3474
350

350

10 4 25 3.85 4.63 2
3726
350

350

11 4 25 3.85 4.80 2
3900
350

350

12 4 25 3.85 4.68 2
3780
350

350

13 4 25 3.85 4.46 2
3560
350

350

14 4 25 3.85 4.24 2
3340
350

350

15 4 25 3.85 4.29 2
3393

Top pile bar dia 16 - 150


3045
350

350

1 4 16 1.58 3.87 1

3237
350

350

2 4 16 1.58 4.07 1

3435
350

350

3 4 16 1.58 4.26 1

3656
350

350

4 4 16 1.58 4.48 1

3585
350

350

5 4 16 1.58 4.41 1

3435
350

350

6 4 16 1.58 4.26 1
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST

3289
350

350
7 4 16 1.58 4.12 1

3144
350

350
8 4 16 1.58 3.97 1

2989
350

350

9 4 16 1.58 3.82 1

2843
350

350

10 4 16 1.58 3.67 1

2697
350

350

11 4 16 1.58 3.53 1

2547
350

350

12 4 16 1.58 3.38 1

2396
350

350

13 4 16 1.58 3.22 1

2251
350

350

14 4 16 1.58 3.08 1

2096
350

350

15 4 16 1.58 2.92 1

1950
350

350

16 4 16 1.58 2.78 1

1806
350

350

17 4 16 1.58 2.63 1
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Pile Cap 3CT1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)

1651
350

18 350 4 16 1.58 2.48 1

1505
350

350

19 4 16 1.58 2.33 1

1360
350

350

20 4 16 1.58 2.19 1

1205
350

350

21 4 16 1.58 2.03 1

1059
350

350

22 4 16 1.58 1.89 1

914
350

350

23 4 16 1.58 1.74 1

760
350

350

24 4 16 1.58 1.59 1

3509
350

350

25 4 16 1.58 4.34 1

3185
350

350

26 4 16 1.58 4.01 1

2881
350

350

27 4 16 1.58 3.71 1

2576
350

350

28 4 16 1.58 3.40 1

2274
350

350

29 4 16 1.58 3.10 1

1970
350

350

30 4 16 1.58 2.80 1
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
1666
350

350
31 4 16 1.58 2.49 1

1362
350

350
32 4 16 1.58 2.19 1

982
350

350
33 4 16 1.58 1.81 1

444
350

350

34 4 16 1.58 1.27 1

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Pile Cap 3CT1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
Bottom bar at pile dia 16-150
3045
1 4 16 1.58 3.17 1

3237
2 4 16 1.58 3.37 1

3435
3 4 16 1.58 3.56 1

3656
4 4 16 1.58 3.78 1

3585
5 4 16 1.58 3.71 1

3435
6 4 16 1.58 3.56 1

3289
7 4 16 1.58 3.42 1

3144
8 4 16 1.58 3.27 1

2989
9 4 16 1.58 3.12 1

2843
10 4 16 1.58 2.97 1

2697
11 4 16 1.58 2.83 1

2547
12 4 16 1.58 2.68 1

2396
13 4 16 1.58 2.52 1

2251
14 4 16 1.58 2.38 1
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
2096
15 4 16 1.58 2.22 1

1950
16 4 16 1.58 2.08 1

1806
17 4 16 1.58 1.93 1

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Pile Cap 3CT1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)

1651
18 4 16 1.58 1.78 1

1505
19 4 16 1.58 1.51 1

1360
20 4 16 1.58 1.36 1

1205
21 4 16 1.58 1.21 1

1059
22 4 16 1.58 1.06 1

914
23 4 16 1.58 0.91 1

760
24 4 16 1.58 0.76 1

3509
25 4 16 1.58 3.51 1

3185
26 4 16 1.58 3.19 1

2881
27 4 16 1.58 2.88 1

2576
28 4 16 1.58 2.58 1

2274
29 4 16 1.58 2.27 1

1970
30 4 16 1.58 1.97 1

1666
31 4 16 1.58 1.67 1
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
1362
32 4 16 1.58 1.36 1

982
33 4 16 1.58 1.11 1

444
34 4 16 1.58 0.57 1
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Beam 5 DL 1 (8) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11650 12000 5850
375

375 2 25 3.85 54.45 4


12000 12000

4167
375

375

2 25 3.85 5.12 14

2 Bottom Longitudinal Bars `

11650 12000 5850


375

375

2 25 3.85 54.45 5
12000 12000

11650 12000 5850


375

375

2 25 3.85 54.45 2
12000 12000
3 Side Longitudinal Bars
11650 12000 3443
195

195

2 13 1.04 51.59 6
12000 12000

4 Stirrups

130 2 13 1.04 2.45 592


700

266
5 Tie Bars
300
10 2 10 0.62 0.58 456
0
0
10

TOTAL BERAT
Pekerjaan : Beam 5 DL 2 (3) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

7600
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
375

375
1 25 3.85 8.55 3

2 Bottom Longitudinal Bars `

7600
375

375
1 25 3.85 8.55 3

3 Side Longitudinal Bars

7600
195

195

1 13 1.04 8.09 4

4 Stirrups

130 1 13 1.04 1.92 51


500

200
5 Tie Bars
200
10 2 10 0.62 0.48 52
0
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Beam 5 DL 3 (1) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars

2800
330

330

3 22 2.98 3.64 3

2 Bottom Longitudinal Bars `

2800
375

375

3 25 3.85 3.75 3

3 Side Longitudinal Bars

7600
195

195

3 13 1.04 8.09 4

4 Stirrups

130 3 13 1.04 1.92 51


500

200
5 Tie Bars
200
10 3 10 0.62 0.48 52
0
0
10

TOTAL BERAT
Pekerjaan : Beam 5 DKL 1 (9) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11650 12000 9241
375

2 25 61.90 10.19 4
375

12000 12000 4059

2 Bottom Longitudinal Bars `


11650 12000 9241
375

2 25 61.90 10.19 4
5
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST

375
12000 12000 4059

3 Side Longitudinal Bars


11650 12000 9241
2 13 61.44 9.74 6
195

195
12000 12000 4059
4 Stirrups

130 2 13 1.04 2.45 720


700

266
5 Tie Bars
300
10 2 10 0.62 0.58 411
0
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Beam 5 DKL 2 (3) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11650
375

375

2 25 3.85 19.75 4
7150
2 Bottom Longitudinal Bars `
11650
375

375

2 25 3.85 19.75 6
7150

3 Side Longitudinal Bars


11650
195

195

2 13 1.04 19.29 6
7150
4 Stirrups

130 2 13 1.04 2.45 127


700

266
5 Tie Bars
300
10 2 10 0.62 0.58 132
0
0
10

TOTAL BERAT
Pekerjaan : Beam 5 DKL 3 (6) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11650 12000
375

375

1 25 3.85 41.40 4
12000 4800

4866
375

375

1 25 3.85 5.82 10

2 Bottom Longitudinal Bars `


11650 12000
250

250

1 25 3.85 41.15 5
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
12000 4800

11650 12000
250

250
1 25 3.85 41.15 2
12000 4800
3 Side Longitudinal Bars
11650 12000
195

195

1 13 1.04 40.94 6
12000 4800

4 Stirrups

130 2 13 1.04 2.45 254


700

266
5 Tie Bars
300
10 2 10 0.62 0.58 264
0
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Beam 5 DKL 4 (1) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11650
375

375

1 25 3.85 14.90 6
2300
3900
375

375

1 25 3.85 4.85 2

2 Bottom Longitudinal Bars `


11650
375

375

1 25 3.85 14.90 6
2300
3 Side Longitudinal Bars
11650
240

240

1 16 1.58 19.41 8
7150
4 Stirrups

130 1 13 1.04 2.96 186


900

320
5 Tie Bars
400
10 0 1 10 0.62 0.08 186
0 10

TOTAL BERAT
Pekerjaan : Beam 5 DKL 5 (2) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11350
375

375

5 25 3.85 12.30 8

5200
375

375

5 25 3.85 6.15 8

2500
375

375

5 25 3.85 3.45 4

2 Bottom Longitudinal Bars `


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
11350
375

375
5 25 3.85 12.30 8

11350
375

375
5 25 3.85 12.30 4
3 Side Longitudinal Bars
11350
240

240

5 16 1.58 11.96 8

4 Stirrups

130 1 13 1.04 3.03 96


900

357
5 Tie Bars
500
10 1 10 0.62 0.78 226
0
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Beam 5 DKL 6 (2) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11350
375

375

5 25 3.85 12.30 6

3600
375

375

5 25 3.85 4.55 4

2 Bottom Longitudinal Bars `


11350
375

375

5 25 3.85 12.30 6

11350
375

375

5 25 3.85 12.30 2

3 Side Longitudinal Bars


11350
240

240

5 16 1.58 11.96 8
4 Stirrups

130 1 13 1.04 3.03 96


900

357
5 Tie Bars
400
10
0 1 10 0.62 0.68 226
0
10

TOTAL BERAT
Pekerjaan : Beam 7 DKL 1 (2) - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11650
375

375

2 25 3.85 15.47 4
2865
2 Bottom Longitudinal Bars `
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
11650
375

375
2 25 3.85 15.47 4
2865

3 Side Longitudinal Bars


11650
195

195

2 13 1.04 15.01 6
2865
4 Stirrups

130 2 13 1.04 2.85 160


900

266
5 Tie Bars
300
10 2 10 0.62 0.58 87
0
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Column Z1 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

21 25 3.85 5.13 12
3800

875

2 Stirrups
21 13 1.04 2.78 38
130
a

640

490
21 13 1.04 2.20 38
130
b
640

200

130 21 13 1.04 1.98 38

c
238

490
3 Preset Bar

21 25 3.85 3.25 12
3251

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Column Z2 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

2 25 3.85 5.13 12
3800

875

2 Stirrups
2 13 1.04 2.78 38
130
640

490

2 13 1.04 2.18 38
130
640

188

130 2 13 1.04 1.98 38


238

490
3 Preset Bar

2 25 3.85 3.25 12
3251

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Column LZ2 - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
190

12 19 2.23 1.83 6
1565

190
200

12 13 1.04 1.43 3
300
0
45

2 Stirrups
12 10 0.62 1.16 9
100
240

140

12 10 0.62 1.90 3
240
600

190

TOTAL BERAT
Pekerjaan : Column Z2a - Facility (North-West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

6 25 3.85 3.93 12
2600
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi 2600
: FACILITY NORTH WEST

875

2 Stirrups
6 13 1.04 2.68 26
130
640

440

6 13 1.04 2.14 26
130
640

172

130 6 13 1.04 1.88 26


238

440
3 Preset Bar

6 25 3.85 2.50 12
2500

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Wall - DM Plant (L = 48550)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Longitudinal Bars
11810 12000 2740

150
a
150

4 10 0.62 50.93 14
12000 12000

250
4 13 1.04 2.20 648
1900

4 Tie Bars
150
4 10 0.62 2.15 489
10

0
10
0

TOTAL BERAT
Pekerjaan : Wall - DM Plant (L = 16995)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Longitudinal Bars
11810
150

150

2 10 0.62 17.88 14
5685

250
2 13 1.04 2.20 228
1900

4 Tie Bars
150
2 10 0.62 2.15 173
10

0
10
0

TOTAL BERAT
Pekerjaan : Wall - DM Plant (L=6000)
JUMLAH DIA BERAT PANJANG JUMLAH
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
6000
150

150
2 10 0.62 6.38 14

250
2 13 1.04 2.20 80
1900

4 Tie Bars
150
2 10 0.62 2.15 60
0
10

10
0

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : Wall - DM Plant (L=4000)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
4000
150

150 3 10 0.62 4.38 14

250
3 13 1.04 2.20 54
1900

4 Tie Bars
150
3 10 0.62 2.15 63
10

0
10
0

TOTAL BERAT
Pekerjaan : Wall - DM Plant (L=12700)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11810
150
150

7 10 0.62 13.58 14
1390

250
7 13 1.04 2.20 170
1900

4 Tie Bars
150
7 10 0.62 2.15 130
10

0
10
0

TOTAL BERAT
Pekerjaan : Wall - DM Plant (L=7730)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
1 Top Longitudinal Bars
7730
150

150
2 10 0.62 8.11 14

250
2 13 1.04 2.20 104
1900

4 Tie Bars
150
2 10 0.62 2.15 80
10

0
10
0

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
Pekerjaan : SLAB
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN Ø POTONGAN POTONGAN
TYPE M/KG
(M) (M) (Bh)
1 L = 12,55 m'

Top bar for slab


6850 6850
150

150

1 19 2.23 14.15 324

Bottom bar for slab


150

150

1 19 2.23 14.15 324


6850 6850

2 L = 48,55 m'

Top bar for slab

8275 12000 8275


1 13 1.04 52.95 85
150

150

12000 12000

Bottom bar for slab

12000 12000
1 13 1.04 52.95 85
150

150

8275 12000 8275

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY NORTH WEST
REKAP SUB REBAR
NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Spoon Pile - Facility (North West) 4,058.33
2 Pile Cap 1CT1 - Facility (North-West) 1,473.81
3 Pile Cap 2CT1 - Facility (North-West) 18,545.01
4 Pile Cap 3CT1 - Facility (North-West) 187.62
5 Beam 5 DL 1 (8) - Facility (North-West) 9,209.74
6 Beam 5 DL 2 (3) - Facility (North-West) 387.08
7 Beam 5 DL 3 (1) - Facility (North-West) 711.3
8 Beam 5 DKL 1 (9) - Facility (North-West) 14,060.9
9 Beam 5 DKL 2 (3) - Facility (North-West) 2,680.3
10 Beam 5 DKL 3 (6) - Facility (North-West) 3,733.7
11 Beam 5 DKL 4 (1) - Facility (North-West) 1,648.8
12 Beam 5 DKL 5 (2) - Facility (North-West) 7,786.6
13 Beam 5 DKL 6 (2) - Facility (North-West) 5,261.2
14 Beam 7 DKL 1 (2) - Facility (North-West) 2,265.7
15 Column Z1 - Facility (North-West) 13,899.9
16 Column Z2 - Facility (North-West) 1,322.0
17 Column LZ2 - Facility (North-West) 464.4
18 Column Z2a - Facility (North-West) 2,868.0
19 Wall - DM Plant (L = 48550) 10,311.9
20 Wall - DM Plant (L = 16995) 1,813.8
21 Wall - DM Plant (L=6000) 637.1
22 Wall - DM Plant (L=4000) 739.3
23 Wall - DM Plant (L=12700) 4,768.7
24 Wall - DM Plant (L=7730) 831.5
25 SLAB 29,812.5

139,479.17 Kg
TOTAL
139 ton
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

6 2,052.49

10 682.28

8 1,102.67

6 220.90

4,058.33 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

8 617.46
AT PEMBESIAN

8 617.46

6 238.90

1,473.81 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

8 3,169.32

10 3,961.65

35 5,184.04

10 1,436.03

105 3,745.85

58 1,048.11

18,545.01 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)
AT PEMBESIAN

1 60.75

1 64.68

1 68.59

1 69.15

1 66.11

1 63.09

1 60.06

2 126.93

579.36
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

2 134.72

2 142.48

2 147.84

2 144.14

2 137.37

2 130.59

2 132.22

1 24.48

1 25.69

1 26.94

1 28.34

1 27.89

1 26.94
AT PEMBESIAN

1 26.02

1 25.10

1 24.12

1 23.20

1 22.28

1 21.33

1 20.38

1 19.46

1 18.48

1 17.56

1 16.65
1,364.22
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

1 15.67

1 14.74

1 13.83

1 12.85

1 11.93

1 11.01

1 10.04

1 27.41

1 25.36

1 23.44

1 21.51

1 19.60

1 17.68
AT PEMBESIAN

1 15.76

1 13.84

1 11.44

1 8.04

274.16
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

1 20.05

1 21.27

1 22.52

1 23.91

1 23.47

1 22.52

1 21.60

1 20.68

1 19.70

1 18.78

1 17.85

1 16.91

1 15.95

1 15.04
AT PEMBESIAN

1 14.06

1 13.13

1 12.22

319.65 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

1 11.24

1 9.51

1 8.60

1 7.62

1 6.69

1 5.78

1 4.80

1 22.18

1 20.13

1 18.21

1 16.28

1 14.37

1 12.45

1 10.53
AT PEMBESIAN

1 8.61

1 7.02

1 3.62

187.62
0.19
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

4 1,677.06

14 606.77

5 2,096.33

2 838.53

6 643.81

592 3,019.29

456 327.96

9,209.74 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)
AT PEMBESIAN
3 108.63

3 108.63

4 37.04

51 101.84

52 30.95

387.08 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

3 107.27

3 142.93

4 111.11

51 303.51

52 46.43

711.25 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

4 5,046.58

4 5,046.58
AT PEMBESIAN

720 3,672.12

411 295.59

14,060.87 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

4 669.13

6 1,003.70

6 264.87

127 647.72

132 94.93

2,680.35 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

4 637.56

10 246.31

5 792.14
AT PEMBESIAN

2 316.86

6 255.49

254 1,295.44

264 189.87

3,733.66 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

6 378.61

2 41.08

6 378.61

8 269.85

186 571.47

186 9.21

1,648.83 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

8 2,083.62

8 1,041.81

4 292.22
AT PEMBESIAN

8 2,083.62

4 1,041.81

8 831.32

96 302.91

226 109.29

7,786.60 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

6 1,562.72

4 385.39

6 1,562.72

2 520.91

8 831.32

96 302.91

226 95.28

5,261.24 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

4 523.95
AT PEMBESIAN

4 523.95

6 206.04

160 949.15

87 62.57

2,265.67 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

12 4,972.28

38 2,307.18

38 1,825.82

38 1,640.48

12 3,154.12

13,899.87 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

12 473.55

38 219.73

38 172.04

38 156.24

12 300.39

1,321.95 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

6 293.99

3 53.39

9 74.65

3 42.41

464.44 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

12 1,088.01
AT PEMBESIAN

26 434.80

26 347.73

26 304.47

12 693.00

2,868.02 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

14 1,768.29

648 5,938.94

489 2,604.68

10,311.91 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

14 310.31

228 1,042.44

173 461.08

1,813.84 Kg

NO :
JUMLAH JUMLAH
AT PEMBESIAN
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

14 110.76

80 366.41

60 159.96

637.13 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

14 114.06

54 373.28

63 251.94

739.28 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

14 825.12

170 2,730.54

130 1,213.03

4,768.69 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)
AT PEMBESIAN

14 140.79

104 476.64

80 214.08

831.51 Kg
AT PEMBESIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

324 10,225.10

324 10,225.10

85 4,681.13

85 4,681.13

29,812.47 Kg 29.812
AT PEMBESIAN

AP SUB REBAR
KETERANGAN

0.19

29.81
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
Pekerjaan : Spoon Pile NO :
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
0
110

59 19 2.23 2.600 6
1500

2 Stirrups

r = 270 59 10 0.62 1.865 10

r = 600 59 10 0.62 4.145 8

Diagonal hang bar for spoon bar

59 13 1.04 0.600 6
600

TOTAL BERAT
Pekerjaan : Pile Cap 2CT2 - DM Plant
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Upper and Bottom Longitudinal Bars
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST

2900
350

350
36 25 3.85 3.800 8
350

350
36 25 3.85 3.800 9
2900

Stirrups - A

160 36 16 1.58 4.540 29


1050

900

Side Longitudinal Bars


350

350

36 19 2.23 3.752 10
2900
Stirrups - B

180 36 8 0.4 3.060 72


1050

220

Tie Bars

3500
100

100

36 8 0.4 3.764 49

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
Pekerjaan : Beam 8 LL 1 (8) - Facility South West
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11692 12000 8708
330

330 2 22 2.98 57.236 4


12000 12000

2 Bottom Longitudinal Bars `


11692 12000 8708
330

330

2 22 2.98 57.236 4
12000 12000

3 Side Longitudinal Bars


11692 12000 8708
195

195

2 13 1.04 56.894 4
12000 12000

4 Stirrups

130 2 13 1.04 2.020 376


500

250
5 Tie Bars
250
10
0 2 10 0.62 0.530 376
0
10

TOTAL BERAT
Pekerjaan : Beam 8 LL 2 (7) - Facility South West
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
11692 12000 2720
330

330

2 22 2.98 51.248 4
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
12000 12000

2 Bottom Longitudinal Bars `


11692 12000 2720
330

330
2 22 2.98 51.248 4
12000 12000

3 Side Longitudinal Bars


11692 12000 2720
195

195

2 13 1.04 50.906 4
12000 12000

4 Stirrups

130 2 13 1.04 2.020 337


500

250
5 Tie Bars
250
10 2 10 0.62 0.530 336
0
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
Pekerjaan : Beam 8 LL 3 (1) - Facility South West
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
7900
375

375

4 25 3.85 8.850 4

2 Bottom Longitudinal Bars `


375

375

4 25 3.85 8.850 6
7900
375

375

4 25 3.85 8.850 6
7900

3 Side Longitudinal Bars


195

195

4 13 1.04 8.394 8
7900

4 Stirrups

130 4 13 1.04 2.160 107


500

320
5 Tie Bars
400
10
0 4 10 0.62 0.680 158
0
10

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
Pekerjaan : Column Z1 - Facility (South West)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

18 25 3.85 5.125 12
3800

875

2 Stirrups

18 13 1.04 2.780 38
130
640

490

18 13 1.04 2.200 38
130
640

200

130
18 13 1.04 1.977 38
238

490

3 Preset Bar

18 25 3.85 3.251 12
3251
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
3251
Lokasi : FACILITY SOUTH WEST

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
Pekerjaan : Column Z4 - DM Plant
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Vertical Bar
250

36 25 3.85 3.93 12
2600

875

2 Stirrups

36 13 1.04 2.480 26
130
490

490

36 13 1.04 1.877 26
130
490

188

Pekerjaan : Column Z4 - DM Plant


JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
130
36 13 1.04 1.877 26
188

490

3 Preset Bar
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
36 25 3.85 2.500 12
2500

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
Pekerjaan : Wall - DM Plant (L=7550)
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 Top Longitudinal Bars
7550
150

150 4 10 0.62 7.930 14

250
4 13 1.04 2.202 101
1900

4 Tie Bars
150
4 10 0.62 2.150 131
10

0
10
0

TOTAL BERAT
Pekerjaan : SLAB
JUMLAH DIA BERAT PANJANG JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN
TYPE Ø M/KG
(M) (Bh)
1 L = 15.200 m'

Top bar for slab


8100 8100
150

150

1 16 1.58 16.628 351

Bottom bar for slab

8100 8100
150

150

1 16 1.58 16.628 351

2 L = 52.550 m'

Top bar for slab

10280 12000 10280


1 13 1.04 56.964 102
150

150

12000 12000

Bottom bar for slab


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
12000 12000
1 13 1.04 56.964 102
150

150
8275 12000 8275

TOTAL BERAT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST

REKAP SUB REBAR


NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Spoon Pile 4168.598
2 Pile Cap 2CT2 - DM Plant 25301.040
3 Beam 8 LL 1 (8) - Facility South West 5029.279
4 Beam 8 LL 2 (7) - Facility South West 4504.190
5 Beam 8 LL 3 (1) - Facility South West 3690.898
6 Column Z1 - Facility (South West) 11914.176
7 Column Z4 - DM Plant 16753.836
8 Wall - DM Plant (L=7550) 1895.960
9 SLAB 30528.595
10
11

103786.572 Kg
TOTAL
103.787 Ton
T PEMBESIAN

JUMLAH
BERAT KETERANGAN
BERAT (KG)

2052.492

682.276

1212.934

220.896

4168.598 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)
T PEMBESIAN

4213.440

4740.120

7488.821

3012.106

3172.608

2673.946

25301.040 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

1364.506

1364.506

473.358

1579.802

247.107

5029.279 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

1221.752
T PEMBESIAN

1221.752

423.538

1416.275

220.872

4504.190 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

545.160

817.740

817.740

279.352

964.454

266.451

3690.898 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

4261.950

1977.581

1564.992

1406.122

2703.532
T PEMBESIAN

11914.18 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

6528.06

2414.131

1826.822

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

1826.822
T PEMBESIAN
4158.000

16753.836 Kg
T PEMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

275.330

922.139

698.492

1895.960 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

9221.56

9221.56

6042.74
T PEMBESIAN

6042.74

30528.59 Kg
T PEMBESIAN

AP SUB REBAR
KETERANGAN
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
Pekerjaan : Spoon Pile - (Pipe Rack) NO :
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Vertical Bar
00
11

38 19 2.23 2.60 6 1
1500

2 Stirrups
r = 270 38 10 0.62 1.87 10

r = 600 38 10 0.62 4.14 8

Diagonal hang bar for spoon bar

38 13 1.04 0.60 6
600

TOTAL BERAT 2,684.

Pekerjaan : Pile Cap 1CT1 - DM Plant


JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Stirrups X
38 22 2.98 5.18 8 4
220
1050

1100
2 Stirrups y
38 22 2.98 5.18 8 4
220
50
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
1050

1100
3 Stirrups z
38 16 1.58 5.04 6 1
160
1100

1100

TOTAL BERAT 11,200.


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
Pekerjaan : Beam 4 DKL 1 (1) - Pipe Rack
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Top Longitudinal Bars
5100
375

375

3 25 3.85 6.05 4
5100
375

375

3 25 3.85 6.05 4
2 Side Longitudinal Bars
5100
375

375

3 25 3.85 6.05 4
3 Stirrups

130 3 13 1.04 2.72 51


800

300
4 Tie Bars
300
10 3 10 0.58 78
0 0.62
0
10

5 Extra Bars
300
600

600

3 13 1.04 1.60 51

5100
250

250

16 25 3.85 5.80 4 1

TOTAL BERAT 3,067.

Pekerjaan : Beam 4 DKL 2 (1) - Pipe Rack


JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Top Longitudinal Bars
5100
375

375

16 25 3.85 6.05 4 1

2 Bottom Longitudinal Bars `


5100
375

375

16 25 3.85 6.05 4 1

5100
375

375

16 25 3.85 6.05 4 1
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
3 Side Longitudinal Bars
5100
375

375
16 25 3.85 6.05 4 1
4 Stirrups

130 16 13 1.04 2.65 102 4


800

266
5 Tie Bars
300
10 16 10 0.58 78
0 0.62
0
10

6 Extra Bars
266
600

600

16 13 1.04 1.57 102 2

5100
375

375

16 25 3.85 6.05 4 1

TOTAL BERAT 15,366.


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
Pekerjaan : Beam 4 DKL 3 (10) - Pipe Rack
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Top Longitudinal Bars
11650 12000 12000
375

375

2 25 3.85 69.13 4 2
12000 12000 8527

2 Bottom Longitudinal Bars `


11650 12000 12000
375

375

2 25 3.85 69.13 4 2
12000 12000 8527

3 Side Longitudinal Bars


11650 12000 12000
195

195

2 13 1.04 68.67 6 1
12000 12000 8527
4 Stirrups

130 2 13 1.04 2.45 720 3


700

266
5 Tie Bars
10
0 300
0
10

2 10 0.62 0.58 360

TOTAL BERAT 9,303.

Pekerjaan : Beam 4 DKL 4 (2) - Pipe Rack


JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Top Longitudinal Bars
11650
375

375

2 25 3.85 15.40 4
2800
2 Bottom Longitudinal Bars `
11650
375

375

2 25 3.85 15.40 4
2800

3 Side Longitudinal Bars


11650
5

5
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
195

195
2 13 1.04 14.94 6
2800
4 Stirrups

130 2 13 1.04 2.45 128


700

266
5 Tie Bars
300
10
0 2 10 0.62 0.58 96
0
10

TOTAL BERAT 1,912.


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
Pekerjaan : Beam 4 DKL 5 (4) - Pipe Rack
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Top Longitudinal Bars
11650 4050
375

375

2 25 3.85 28.65 4
12000
2 Bottom Longitudinal Bars `
11650 4050
375

375

2 25 3.85 28.65 4
12000
3 Side Longitudinal Bars
11650 4050
195

195

2 13 1.04 28.19 6
12000
4 Stirrups

130 2 13 1.04 2.45 288 1


700

266
5 Tie Bars
300
10 2 10 0.58 144
0 0.62
0
10

TOTAL BERAT 3,794.


Pekerjaan : Column Z3 - DM Plant
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Vertical Bar
250

38 25 3.85 3.93 12 6
2600

875
2 Stirrups

38 13 1.04 3.08 26 3
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
130
640

640

38 13 1.04 2.28 26 2
130
640

238
130
38 13 1.04 2.28 26 2
238

640
3 Preset Bar

38 25 3.85 2.50 12 4
2500

TOTAL BERAT 6,728.


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
Pekerjaan : Wall - Pipe Rack (L = 60675)
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Longitudinal Bars
11650 12000 12000
375

375

2 25 3.85 67.88 3
12000 12000 7275

11650 12000 12000


375

375

2 25 3.85 67.88 3
12000 12000 7275

2 Side Bars
11650 12000 12000
195

195

2 13 1.04 64.15 12
12000 12000 4003

3 Stirrups
150
100 2 10 0.62 3.50 405
1400

4 Tie Bars
150
2 10 0.62 2.15 1214
10

0
10
0

Pekerjaan : Wall - Pipe Rack (L = 24675)


1 Longitudinal Bars
11650 3525
375

375

2 25 3.85 28.13 3
12000
11650 3525
375

375

2 25 3.85 28.13 3
12000
2 Side Bars
11922 2053
195

195

2 13 1.04 26.47 12
12000

3 Stirrups
150
100 2 10 0.62 3.50 165
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
1400

4 Tie Bars
150
2 10 0.62 2.15 494
10

0
10
0

13
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
Pekerjaan : Wall - Pipe Rack (L=4716)
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 Top Longitudinal Bars
4716
150

150

9 10 0.62 5.10 14

250
9 13 1.04 2.20 63
1900

4 Tie Bars
150
9 10 0.62 2.15 94
10

0
10
0

TOTAL BERAT 2,825.

Pekerjaan : Wall - 4-L1 (Pipe Rack)


JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
L = 60000
1 Longitudinal Bars
11670 3230
375

375

1 25 3.85 27.85 4
12000
1 25 3.85 2.40 3
2400

2 Longitudinal Bottom Bars


11670 3230
195

195

1 13 1.04 27.39 5
12000
3 Side Bars
11805 1895
195

195

1 13 1.04 26.19 5
12000
4 Stirrups
130 1 13 1.04 2.82 299
900

249
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
5 Tie Bars
300
1 10 0.62 2.30 299
10

0
10
0

TOTAL BERAT 2,036


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK
Pekerjaan : SLAB
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1 L =4.700 m'

Top bar for slab


4700
150

1 13 1.04 5.10 405 2


150

Bottom bar for slab


150

150

1 13 1.04 5.10 405 2


4700

2 L = 60.700 m'

Top bar for slab


2350
2350
1 13 1.04 5.10 32
150

150

12000 12000 12000


1 13 1.04 60.00 32 1

12000 12000

Bottom bar for slab


2350

1 13 1.04 5.10 32
150

150

2350

12000 12000 12000


1 13 1.04 60.00 32 1

12000 12000

TOTAL BERAT 8,632


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : PIPE RACK

REKAP SUB REBAR


Lokasi : PIPE RACK
NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Spoon Pile - (Pipe Rack) 2684.860
2 Pile Cap 1CT1 - DM Plant 11200.941
3 Beam 4 DKL 1 (1) - Pipe Rack 3067.782
4 Beam 4 DKL 2 (1) - Pipe Rack 15366.441
5 Beam 4 DKL 3 (10) - Pipe Rack 9303.369
6 Beam 4 DKL 4 (2) - Pipe Rack 1912.955
7 Beam 4 DKL 5 (4) - Pipe Rack 3794.670
8 Column Z3 - DM Plant 6728.321
9 Wall Pipe Rack 16542.956
10 Wall - 4-L1 (Pipe Rack) 2036.475
11 SLAB 8632.932

81271.701 Kg
TOTAL
81.27 Ton
EMBESIAN

JUMLAH
BERAT KETERANGAN
BERAT (KG)

1,321.94

439.43

781.21

142.27

2,684.86 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

4,692.67

4,692.67
EMBESIAN

1,815.61

11,200.94 Kg
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

279.51

279.51

307.46

432.81

84.15

255.23

1,429.12

3,067.78 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

1,490.72

1,490.72

1,490.72
EMBESIAN

1,788.86

4,501.19

448.78

2,664.73

1,490.72

15,366.44 Kg
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

2,129.11

2,129.11

1,114.12

3,672.12

258.91

9,303.37 Kg

NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

474.32

474.32
EMBESIAN
242.45

652.82

69.04

1,912.96 Kg
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

882.42

882.42

457.42

1,468.85

103.56

3,794.67 Kg
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

6,890.73

3,164.76
EMBESIAN

2,339.32

2,339.32

4,389.00

6,728.32 Kg
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

1,567.91

1,567.91

1,601.11

1,755.53

3,235.19

649.69

649.69

660.67

713.93
EMBESIAN

1,315.67

13,717.30
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

398.10

1,296.00

1,131.56

2,825.66 Kg
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

428.89

27.72

142.45

136.21

875.31
EMBESIAN

425.90

2,036.47 Kg
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

2,149.80

2,149.80

169.86

1,996.80

169.86

1,996.80

8,632.93 Kg
EMBESIAN

UB REBAR

KETERANGAN
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : DMW TANK
Pekerjaan : Spoon Pile - DMW Tank
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
1 Vertical Bar
00
11

75 19 2.23 2.6 6 2609.100


1500

2 Stirrups

r = 270 75 10 0.62 1.9 10 867.299

r = 600 75 10 0.62 4.1 8 1541.866

Diagonal hang bar for spoon bar

75 13 1.04 0.6 6 280.800


600

TOTAL BERAT 5299.07


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
I. Upper Bars
9316 4334
1
1900
1900

3 25 3.85 17.65 2

9316 4328
2
1900
1900

3 25 3.85 17.64 2

9316 4308
3
1900
1900

3 25 3.85 17.62 2

9316 4230
4
1900
1900

3 25 3.85 17.55 2

9316 4276
5
1900
1900

3 25 3.85 17.59 2

9316 4172
6
1900
1900

3 25 3.85 17.49 2

9316 4100
7
1900
1900

3 25 3.85 17.42 2

9316 4014
8
1900
1900

3 25 3.85 17.33 2

9316 3914
9 3 25 3.85 17.23 2
1900
1900

9316 3800
10 3 25 3.85 17.12 2
1900
1900

9316 3671
11 3 25 3.85 16.99 2
900
00
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN

1900
1900

9316 3527
12 3 25 3.85 16.84 2
1900
1900

9316 3367
13 3 25 3.85 16.68 2
1900
1900

9316 3191
14 3 25 3.85 16.51 2
1900
1900

9316 2997
15 3 25 3.85 16.31 2
1900
1900

9316 2786
16 3 25 3.85 16.10 2
1900
1900

6,3
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
9316 2555
17 3 25 3.85 15.87 2
1900
1900

9316 2303
18 3 25 3.85 15.62 2
1900
1900

9316 2030
19 3 25 3.85 15.35 2
1900
1900

5524 5524
20 3 25 3.85 15.05 2
1900
1900

5524 5200
21 3 25 3.85 14.72 2
1900
1900

5524 4847
22 3 25 3.85 14.37 2
1900
1900

5524 4462
23 3 25 3.85 13.99 2
1900
1900

5524 4040
24 3 25 3.85 13.56 2
1900
1900

5524 3575
25 3 25 3.85 13.10 2
1900
1900

5524 3058
26 3 25 3.85 12.58 2
1900
1900

5524 2479
27 3 25 3.85 12.00 2
1900
1900
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN

28 6093
1900 3 25 3.85 10.09 2
1900

5322
29 3 25 3.85 9.32 2
1900
1900

4382
30 3 25 3.85 8.38 2
1900
1900

3124
31 3 25 3.85 7.12 2
1900
1900

r= 6200
32 3 19 2.23 41.81 5 1,3

5,8
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT

II. Bottom Bars

1114 1114
1 3 32 6.31 19.25 2
804

804

9954 4946

1114 1114
2 3 32 6.31 19.25 2
804

804

9954 4943

1114 1114
3 3 32 6.31 19.23 2
804

804

9954 4932

1114 1114
4 3 32 6.31 19.22 2
804

804

9954 4916

1114 1114
5 3 32 6.31 19.19 2
804

804

9954 4892

1114 1114
6 3 32 6.31 19.16 2
804

804

9954 4861

1114 1114
7 3 32 6.31 19.13 2
804

804

9954 4824

1114 1114
8 3 32 6.31 19.08 2
804

804

9954 4779
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
1114 1114
3 32 6.31 19.03 2
804

804
9
9954 4728

1114 1114
3 32 6.31 18.97 2
804

804

10
9954 4669

1114 1114
11 3 32 6.31 18.91 2
804

804

9954 4603

1114 1114
12 3 32 6.31 18.83 2
804

804

9954 4530

1114 1114
13 3 32 6.31 18.75 2
804

804

9954 4450

9,3
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT

1114 1114
14 3 32 6.31 18.66 2
804

804

9954 4361

15 1114 1114
3 32 6.31 18.57 2
804

804

9954 4265

16 1114 1114
3 32 6.31 18.46 2
804

804

9954 4162

17 1114 1114
3 32 6.31 18.35 2
804

804

9954 4050

18 1114 1114
3 32 6.31 18.23 2
804

804

9954 3929

19 1114 1114
3 32 6.31 18.10 2
804

804

9954 3800

1114 1114
20 3 32 6.31 16.97 2
804

804

9954 2663

1114 1114
21 3 32 6.31 17.82 2
804

804

9954 3516

1114 1114
22 3 32 6.31 17.66 2
04

04
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
804

804
9954 3359

23 1114 1114
3 32 6.31 17.50 2
804

804

9954 3193

24 1114 1114
3 32 6.31 17.33 2
804

804

9954 3025

25 1114 1114
3 32 6.31 17.13 2
804

804

9954 2829

1114 1114
26 3 32 6.31 16.93 2
804

804

6292 6292

8,7
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT

1114 1114
27 3 32 6.31 16.72 2
804

804

6292 6081

1114 1114
28 3 32 6.31 16.50 2
804

804

6292 5857

1114 1114
29 3 32 6.31 16.26 2
804

804

6292 5620

1114 1114
3 32 6.31 16.01 2
804

804

30
6292 5368

1114 1114
3 32 6.31 15.74 2
804

804

31
6292 5100

1114 1114
32 3 32 6.31 15.46 2
804

804

6292 4816

1114 1114
33 3 32 6.31 15.15 2
804

804

5403 5403

1114 1114
34 3 32 6.31 14.83 2
804

804

5403 5079

1114 1114
35 3 32 6.31 14.48 2
804

804
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
804

804
5403 4733

1114 1114
36 3 32 6.31 14.11 2
804

804

5403 4361

1114 1114
37 3 32 6.31 13.69 2
804

804

5403 3941

1114 1114
38 3 32 6.31 11.42 2
804

804

7327

6,8
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUML
NO. BENTUK POTONGAN POTONGAN POTONGAN BERA
TYPE Ø M/KG
(M) (Bh) BERAT
1114 1114
3 32 6.31 10.94 2
804

804

6851

1114 1114
3 32 6.31 10.42 2
804

804

6325

1114 1114
3 32 6.31 9.83 2
804

804

5735

1114 1114
3 32 6.31 9.15 2
804

804

5060

1114 1114
3 32 6.31 8.35 2
804

804

4258

1114 1114
3 32 6.31 7.33 2
804

804

3237

3 32 6.31 5.38 2
804

1628

r= 6650 3 19 2.23 44.63 8 2,3


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN

TOTAL BERAT 4,713.1


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
REKAP SUB REBAR
Lokasi : DMW TANK
NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Spoon Pile - DMW Tank 5299.065
2 Water Tank Foundation 41848.410

47147.475 Kg
TOTAL
47.147 TON
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

2609.100

867.299

1541.866

280.800

Kg
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

407.72

407.58

407.11

405.31

406.38

403.97

402.31

400.32

398.01

395.38

392.40
EMBESIAN

389.07

385.38

381.31

376.83

371.96

6,331.04
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

366.62

360.80

354.49

347.61

340.12

331.97

323.08

313.33

302.59

290.64

277.27
EMBESIAN

233.15

215.34

193.62

164.56

1,398.41

5,813.61
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

728.73

728.62

728.20

727.59

726.68

725.51

724.11

722.41
EMBESIAN
720.48

718.24

715.74

712.98

709.95

9,389.24
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

706.58

702.95

699.05

694.81

690.23

685.34

642.29

674.59

668.65
EMBESIAN

662.36

656.00

648.58

641.05

8,772.46
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

633.06

624.58

615.60

606.06

595.92

585.16

573.73

561.46

548.36
EMBESIAN

534.28

518.38

432.32

6,828.92
EMBESIAN
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

414.30

394.39

372.05

346.49

316.13

277.48

203.54

2,388.76
EMBESIAN

4,713.14 Kg
EMBESIAN
UB REBAR

KETERANGAN
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FACILITY SOUTH WEST
Pekerjaan : Spoon Pile
JUMLAH DIA BERAT PANJANG
NO. BENTUK POTONGAN Ø POTONGAN
TYPE M/KG
(M) (M)
1 Vertical Bar
0
110

16 19 2.23 2.60
1500

2 Stirrups

r = 270 16 10 0.62 1.87

r = 600 16 10 0.62 4.14

3 Diagonal hang bar for spoon bar

16 13 1.04 0.60
600

TOTAL BERAT
Pekerjaan : PONDASI RAFT
JUMLAH DIA BERAT PANJANG
NO. BENTUK POTONGAN Ø POTONGAN
TYPE M/KG
(M) (M)
1 Bottom Bars dia 25 - 150
a. P= 16400 arah ke L = 10400
1400

9150 1 0.025 3.85 10.55

1400
9150 1 0.025 3.85 10.55

b. P= 10400 arah ke L = 16400

1 0.025 3.85 7.55


1400

6150

1 0.025 3.85 7.55


1400

6150

2 Upper Bars dia 22 - 150


a P= 16400 arah ke L = 10400
1400

9150 1 0.025 2.98 10.55


1400

9150 1 0.025 2.98 10.55

b P= 10400 arah ke L = 16400

1 0.025 3.85 7.55


1400

6150

1 0.025 3.85 7.55


1400

6150

TOTAL BERAT

JUMLAH DIA BERAT PANJANG


NO. BENTUK POTONGAN Ø POTONGAN
TYPE M/KG
(M) (M)
3 Peminggang keliling dia 19 - 150
Tinggi Wall (h) = 1600
a. P= 16400 arah ke L = 10400

1400
9150 2 0.019 2.23 10.55

1400
9150 2 0.019 2.23 10.55

b. P= 10400 arah ke L = 16400

2 0.019 2.23 7.55


1400

6150

2 0.019 2.23 7.55


1400

6150

4 Space Bars dia 13 - 600


a P= 16400 arah ke L = 10400
1400

9150 1 0.025 2.98 10.55


1400

9150 1 0.025 2.98 10.55

b P= 10400 arah ke L = 16400

1 0.025 3.85 7.55


1400

6150

1 0.025 3.85 7.55


1400

6150

TOTAL BERAT
Pekerjaan : Wall - DM Plant (L=7550)
JUMLAH DIA BERAT PANJANG
NO. BENTUK POTONGAN POTONGAN
TYPE Ø M/KG
(M)
1 Top Longitudinal Bars
7550
150

150

4 10 0.62 7.93

250
4 13 1.04 2.20
1900

4 Tie Bars
150
4 10 0.62 2.15
0
10

10
0

TOTAL BERAT
Pekerjaan : SLAB
JUMLAH DIA BERAT PANJANG
NO. BENTUK POTONGAN POTONGAN
TYPE Ø M/KG
NO. BENTUK POTONGAN
TYPE Ø M/KG
(M)
1 L = 15.200 m'

2 L = 52.550 m'

###

10280 12000 10280


1 13 1.04 56.96
150

150
12000 12000

###

12000 12000
1 13 1.04 56.96
150

150

8275 12000 8275

TOTAL BERAT

REKAP SUB REBAR


NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGA
1 Spoon Pile 1130.467
2 PONDASI RAFT 22877.610
3 #REF! #REF!
4 #REF! #REF!
5 0 #REF!
6 #REF! #REF!
7 #REF! #REF!
8 Wall - DM Plant (L=7550) 1895.960
9 SLAB 12085.482
10
11

#REF! Kg
TOTAL
#REF! Ton
SIAN
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

6 556.61

10 185.02 0.17

8 328.93 0.377

6 59.90

1,130.47 Kg
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)

70 2,843.23

70 2,843.23

110 3,197.43

110 3,197.43

70 2,200.73

70 2,200.73

110 3,197.43

110 3,197.43

22,877.61 Kg

JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)
10 470.53

10 470.53

10 336.73

10 336.73

70 2,200.73

70 2,200.73

110 3,197.43

110 3,197.43

12,410.83 Kg
NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
(Bh) BERAT (KG)
SUB UPPER
#REF! #REF! Kg
14 275.33

101 922.14

131 698.49

1,895.96 Kg

NO :
JUMLAH JUMLAH
POTONGAN BERAT KETERANGAN
KETERANGAN
(Bh) BERAT (KG)

102 6,042.74

102 6,042.74

12,085.48 Kg

AR
KETERANGAN
#REF!
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : FILTRATE TANK
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
Pekerjaan : Spoon pile
1 Vertical Bar
00
11

14 19 2.23 2.60 6 487


1500

2 Stirrups

r = 270 14 10 0.62 1.87 10 161

r = 600 14 10 0.62 4.14 8 287

3 Diagonal hang bar for spoon bar

14 13 1.04 0.60 6 52
600

TOTAL BERAT 989.16


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
1 Upper Bars
5910 5910
1750
1750

1 25 3.85 15.52 2 119


5893 5893
1750
1750

1 25 3.85 15.49 4 238


5871 5871
1750
1750

1 25 3.85 15.44 4 237


5841 5841
1750
1750

1 25 3.85 15.38 4 236


5802 5802
1750
1750

1 25 3.85 15.30 4 235


5753 5753
1750
1750

1 25 3.85 15.21 4 234


5695 5695
1750
1750

1 25 3.85 15.09 4 232


5625 5625
1750
1750

1 25 3.85 14.95 4 230


5549 5549
1750
1750

1 25 3.85 14.80 4 227


5459 5459
1 25 3.85 14.62 4 225
1750
1750

8216
1 25 3.85 11.92 4 183
1750
1750

7989
1 25 3.85 11.69 4 180
1750
1750

7734
1 25 3.85 11.43 4 176
1750
1750
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG

7450
1 25 3.85 11.15 4 171
1750
1750

7132
1 25 3.85 10.83 4 166
1750
1750

6775
1 25 3.85 10.48 4 161
1750
1750

6374
1 25 3.85 10.07 4 155
1750
1750

5918
1 25 3.85 9.62 4 148
1750
1750

5395
1 25 3.85 9.10 4 140
1750
1750

4781
1 25 3.85 8.48 4 130
1750
1750

4038
1 25 3.85 7.74 4 119
1750
1750

3070
1 25 3.85 6.77 4 104
1750
1750

1491
1 25 3.85 5.19 4 79
1750
1750

r = 4660 1 19 2.23 41.81 7 652


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG

2 Bottom Bars
1683 2727
1 32 6.31 16.90 4 426
750
750

6600 6600
1683 2727
1 32 6.31 19.62 2 247
750
750

6597 6597
1683 2727
1 32 6.31 19.59 2 247
750
750

6585 6585
1683 2727
1 32 6.31 19.57 2 246
750
750

6573 6573
1683 2727
1 32 6.31 19.59 2 247
750
750

6585 6585
1683 2727
1 32 6.31 19.50 2 246
750

750

6540 6540
1683 2727
1 32 6.31 19.46 2 245
750

750

6518 6518
1683 2727
1 32 6.31 19.41 2 244
750

750

6492 6492

1683 2727
1 32 6.31 16.15 2 203
750
750

4863 4863

1683 2727
1 32 6.31 19.28 2 243
750
750

6430 6430
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT

1683 2727
1 32 6.31 19.21 2 242

750
750

6394 6394
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
1683 2727
1 32 6.31 19.13 2 241
750
750

6353 6353
1683 2727
1 32 6.31 19.34 2 244
750
750

6459 6459
1683 2727
1 32 6.31 18.94 2 239
750
750

6261 6261
1683 2727
1 32 6.31 18.84 2 237
750
750

6208 6208
1683 2727
1 32 6.31 18.73 2 236
750
750

6152 6152
1683 2727
1 32 6.31 18.60 2 234
750
750

6091 6091
1683 2727
1 32 6.31 18.47 2 233
750
750

6025 6025
1683 2727
1 32 6.31 18.33 2 231
750
750

5955 5955
1683 2727
1 32 6.31 18.18 2 229
750
750

5879 5879
1683 2727
1 32 6.31 18.02 2 227
750
750

5799 5799
1683 2727
1 32 6.31 17.85 2 225
750
750

5712 5712
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
1683 2727
1 32 6.31 17.66 2 222

750
750

5620 5620
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
1683 2727
1 32 6.31 17.46 2 220
750

750

5521 5521
1683 2727
1 32 6.31 17.25 2 217
750

750

5415 5415

1683 2727
1 32 6.31 17.02 2 214
750

750

5301 5301
1683 2727
1 32 6.31 13.58 2 171
750

750

3580 3580
1683 2727
1 32 6.31 16.52 2 208
750

750

5049 5049
1683 2727
1 32 6.31 16.24 2 204
750

750

4907 4907
1683 2727
1 32 6.31 15.93 2 201
750

750

4755 4755
1683 2727
1 32 6.31 15.60 2 196
750

750

4589 4589
1683 2727
1 32 6.31 11.78 2 148
750

750

5613
1683 2727
1 32 6.31 11.38 2 143
750

750

5212
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
1683 2727
1 32 6.31 10.93 2 137
750

750

4762
1683 2727
1 32 6.31 10.42 2 131
750

750

4250

1683 2727
1 32 6.31 9.82 2 123
750

750

3649
1683 2727
1 32 6.31 9.07 2 114
750

750

2904
1683 2727
1 32 6.31 8.02 2 101
750

750

1849
1683 2727
1 32 6.31 21.22 2 267
750

750

7400 7400
1683 2727
1 32 6.31 21.21 2 267
750

750

7395 7395

1683 2727
1 32 6.31 21.20 2 267
750

750

7388 7388
1683 2727
1 32 6.31 21.14 2 266
750

750

7358 7358
1683 2727
1 32 6.31 21.09 2 266
750

750

7335 7335
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
1683 2727
1 32 6.31 21.03 2 265
750

750

7306 7306
1683 2727
1 32 6.31 20.96 2 264
750

750

7271 7271
1683 2727
1 32 6.31 20.88 2 263
750

750

7231 7231
1683 2727
1 32 6.31 20.79 2 262
750

750

7185 7185
1683 2727
1 32 6.31 20.69 2 261
750

750

7133 7133
1683 2727
1 32 6.31 20.57 2 259
750

750

7075 7075
1683 2727
1 32 6.31 20.44 2 258
750

750

7011 7011
1683 2727
1 32 6.31 20.30 2 256
750

750

6941 6941
1683 2727
1 32 6.31 20.13 2 254
750

750

6854 6854
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG

1683 2727
1 32 6.31 19.98 2 252
750

750

6780 6780
1683 2727
1 32 6.31 19.80 2 249
750

750

6688 6688
1683 2727
1 32 6.31 19.60 2 247
750

750

6589 6589
1683 2727
1 32 6.31 19.39 2 244
750

750

6482 6482
1683 2727
1 32 6.31 19.15 2 241
750

750

6366 6366
1683 2727
1 32 6.31 18.90 2 238
750

750

6240 6240
1683 2727
1 32 6.31 18.63 2 235
750

750

6105 6105
1683 2727
1 32 6.31 18.34 2 231
750

750

5958 5958
1683 2727
1 32 6.31 18.02 2 227
750

750

5798 5798
1683 2727
1 32 6.31 17.67 2 223
750

750

5625 5625
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
Pekerjaan : Water Tank Foundation
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG
1683 2727
1 32 6.31 17.30 2 218
750

750

5437 5437
1683 2727
1 32 6.31 16.88 2 213
750

750

5230 5230
1683 2727
1 32 6.31 16.43 2 207
750

750

5002 5002
1683 2727
1 32 6.31 15.92 2 200
750

750

4747 4747
1683 2727
1 32 6.31 11.22 2 141
750

750

5056
1683 2727
1 32 6.31 10.43 2 131
750

750

4264
1683 2727
1 32 6.31 9.41 2 118
750

750

3248
1683 2727
1 32 6.31 7.80 2 98
750

750

1636

1 19 2.23 33.91 5 378


5000

5800

3 Spacer Bar

1 13 1.04 2.16 16 36
0

13
13

0
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
1800

TOTAL BERAT 20,785.74


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
REKAP SUB REBAR
Lokasi : FILTRATE TANK
NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Spoon pile 989.159
2 Water Tank Foundation 20785.744

21774.903 Kg
TOTAL
21.775 Ton
PEMBESIAN
JUMLAH
BERAT KETERANGAN
BERAT (KG)

487.03

161.90

287.81

52.42

Kg
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

119.50

238.48

237.81

236.88

235.68

234.17

232.39

230.23

227.89

225.12

183.51

180.01

176.08
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

171.71

166.81

161.32

155.14

148.12

140.06

130.61

119.17

104.26

79.94

652.59
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

426.43

247.55

247.25

246.95

247.25

246.12

245.56

244.90

203.79

243.34
242.43
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

241.40

244.07

239.07

237.74

236.32

234.78

233.12

231.35

229.43

227.41

225.22
222.89
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

220.40

217.72

214.84

171.40

208.48

204.90

201.06

196.87

148.65

143.59
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

137.91

131.45

123.87

114.46

101.15

267.82

267.70

267.52

266.76

266.18
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

265.45

264.57

263.56

262.40

261.08

259.62

258.00

256.24

254.04
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

252.17

249.85

247.35

244.65

241.72

238.54

235.14

231.43

227.39

223.02
NO :
JUMLAH
BERAT KETERANGAN
BERAT (KG)

218.28

213.05

207.30

200.86

141.62

131.63

118.80

98.46

378.12

36.83
Kg 20.786 Ton
SUB REBAR
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
Pekerjaan :Pile Cap 1CT1 - DM Plant NO :
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT KETERAN
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
1 Stirrups X

69 22 2.98 5.18 8 8520.893


220
1050

1100

2 Stirrups y

69 22 2.98 5.18 8 8520.893


220
1050

1100

3 Stirrups z

69 16 1.58 5.04 6 3296.765


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
160
1100

1100

TOTAL BERAT 20338.550 Kg 20.339


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN

Pekerjaan :Pile Cap 2CT1 - DM Plant NO :


JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT KETERAN
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
1 Upper and Bottom Longitudinal Bars

3500
350

350
67 25 3.85 4.9 8 10111.640
350

350

67 25 3.85 4.9 10 12639.550


3500

Stirrups - A

160 67 16 1.58 4.464 35 16539.566


1050

1100

Side Longitudinal Bars


350

350

67 16 1.58 4.328 10 4581.621


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
3500
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
Stirrups - B

100 67 10 0.62 2.74 105 11951.058


1050

200

Tie Bars
1100
100

100

67 10 0.62 1.38 58 3343.970

TOTAL BERAT 59167.405 Kg 59.167


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN

Pekerjaan :Pile Cap 2CT2 - DM Plant NO :


JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT KETERAN
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
1 Upper and Bottom Longitudinal Bars

2900
350

350
36 25 3.85 3.8 8 4213.440
350

350

36 25 3.85 3.8 9 4740.120


2900

Stirrups - A

160 36 16 1.58 4.54 29 7488.821


1050

900

Side Longitudinal Bars


350

350

36 19 2.23 3.752 10 3012.106


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
2900
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
Stirrups - B

180 36 8 0.4 3.06 72 3172.608


1050

220

Tie Bars

3500
100

100

36 8 0.4 3.764 49 2673.946

TOTAL BERAT 25301.040 Kg 25.301


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN

Pekerjaan :Pile Cap 2CT3 - DM Plant NO :


JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT KETERAN
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
1 Upper and Bottom Longitudinal Bars

4200
350

350
4 25 3.85 5.1 8 628.320
350

350

4 25 3.85 5.1 8 628.320


4200

Stirrups - A

130 4 13 1.04 4.82 42 842.150


1050

1100

Side Longitudinal Bars


350

350

4 19 2.23 5.052 10 450.638


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
4200
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
Stirrups - B

180 4 8 0.4 3.02 108 521.856


1050

200

Tie Bars

3500
100

100

4 8 0.4 3.764 70 421.568

TOTAL BERAT 3492.853 Kg 3.493


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN

Pekerjaan :Pile Cap 3CT1 - DM Plant NO :


JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT KETERAN
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
1 Upper and Bottom Longitudinal Bars
350

350
4 25 3.85 7.579 2 233.433
6679
350

350
4 25 3.85 8.02 2 247.016
7120
350

350

4 25 3.85 8.46 2 260.568


7560
350

350

4 25 3.85 8.701 2 267.991


7801
350

350

4 25 3.85 8.352 2 257.242


7452
350

350

4 25 3.85 7.847 2 241.688


6947
350

350

4 25 3.85 7.342 2 226.134


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
350 6442

350
4 25 3.85 3.945 2 121.506
3045
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
350

350
4 25 3.85 4.2 2 129.360
3300
350

350
4 25 3.85 4.454 2 137.183
3554
350

350
4 25 3.85 4.49 1 69.146
3590
350

350

4 25 3.85 3.9 1 60.060


3000
350

350

4 25 3.85 4.097 1 63.094


3197
350

350

4 25 3.85 4.293 1 66.112


3393
350

350

4 25 3.85 4.293 1 66.112


3393
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN

3800
350

350
4 25 3.85 4.7 1 72.380
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
350 3652

350
4 25 3.85 4.552 1 70.101

3505
350

350
4 25 3.85 4.405 1 67.837

3375
350

350
4 25 3.85 4.275 1 65.835

3210
350

350

4 25 3.85 4.11 1 63.294

3062
350

350

4 25 3.85 3.962 1 61.015

2915
350

350

4 25 3.85 3.815 1 58.751

2767
350

350

4 25 3.85 3.667 1 56.472

2620
350

350

4 25 3.85 3.52 1 54.208

2472
350

350

4 25 3.85 3.372 1 51.929


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN

2325
350

350
4 25 3.85 3.225 1 49.665
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
350 2177

350
4 25 3.85 3.077 1 47.386

2030
350

350
4 25 3.85 2.93 1 45.122

1882
350

350
4 25 3.85 2.782 1 42.843

1734
350

350

4 25 3.85 2.634 1 40.564

1587
350

350

4 25 3.85 2.487 1 38.300

1437
350

350

4 25 3.85 2.337 1 35.990

1292
350

350

4 25 3.85 2.192 1 33.757

1144
350

350

4 25 3.85 2.044 1 31.478

997
350

350

4 25 3.85 1.897 1 29.214


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN

849
350

350
4 25 3.85 1.749 1 26.935
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
350 3227

350
4 25 3.85 4.127 1 63.556

3418
350

350
4 25 3.85 4.318 1 66.497

3609
350

350
4 25 3.85 4.509 1 69.439

3600
350

350

4 25 3.85 4.5 5 346.500

3498
350

350

4 25 3.85 4.398 2 135.458

3193
350

350

4 25 3.85 4.093 2 126.064

2888
350

350

4 25 3.85 3.788 2 116.670

2583
350

350

4 25 3.85 3.483 2 107.276


PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
350 2278

350
4 25 3.85 3.178 2 97.882
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
350 1973

350
4 25 3.85 2.873 2 88.488

1668
350

350
4 25 3.85 2.568 2 79.094

1363
350

350
4 25 3.85 2.263 2 69.700

901
350

350

4 25 3.85 1.801 2 55.471

360
350

350

4 25 3.85 1.26 2 38.808

TOTAL BERAT 4950.623 Kg 4.951


NO :

KETERANGAN
20.339 Ton
NO :

KETERANGAN
59.167 Ton
NO :

KETERANGAN
25.301 Ton
NO :

KETERANGAN
3.493 Ton
NO :

KETERANGAN
4.951 Ton
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi : DM Plant
BESTAT PEMBESIAN
Pekerjaan : Kolom - DM Plant NO :
NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Column Z1 - DM Plant 42412.586
2 Column LZ1 - DM Plant 2265.632
3 Column Z2 - DM Plant 4424.711
4 Column LZ2 - DM Plant 464.436
5 Column Z2a - DM Plant 3143.896
6 Column Z3 - DM Plant 18025.883
7 Column Z4 - DM Plant 15714.336
8
9
10

TOTAL 86451.479 Kg

15% 99419.2006506666 Kg

99.419 Ton
KETERANGAN
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
Pekerjaan : Spoon pile
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGANPOTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
Pekerjaan : Spoon pile

1 Vertical Bar
00
11

14 19 2.23 2.60 6 487.03


1500

2 Stirrups
r = 270 14 10 0.62 1.70 10 147.18

r = 600 14 10 0.62 3.77 8 261.65

3 Diagonal hang bar for spoon bar

14 13 1.04 0.60 6 52.42


600

TOTAL BERAT 948.28 Kg


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
Pekerjaan : TW TANK FONDATION
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGANPOTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
I. Upper Bars
5525 5525
1
1750
1750

1 25 3.85 14.75 2 113.58


5521 5521
2
1750
1750

1 25 3.85 14.74 4 227.03


5506 5506
3
1750
1750

1 25 3.85 14.71 4 226.56


5483 5483
4
1750
1750

1 25 3.85 14.67 4 225.86


5450 5450
5
1750
1750

1 25 3.85 14.60 4 224.84


5407 5407
6
1750
1750

1 25 3.85 14.51 4 223.52


8206
7 1 25 3.85 11.91 4 183.35
1750
1750

8079
8 1 25 3.85 11.78 4 181.40
1750
1750

7929
9 1 25 3.85 11.63 4 179.09
1750
1750

7755
10 1 25 3.85 11.46 4 176.41
1750
1750

7557
11 1 25 3.85 11.26 4 173.36
1750
1750

7331
12 1 25 3.85 11.03 4 169.88
1750
1750

7075
13 1 25 3.85 10.78 4 165.94
1750
1750

6787 1 25 3.85 10.49 4 161.50


1750
1750

14
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
6461 1 25 3.85 10.16 4 156.48

1750
1750

15
6091
16 1 25 3.85 9.79 4 150.78

1750
1750

5669
17 1 25 3.85 9.37 4 144.28
1750
1750

5183
18 1 25 3.85 8.88 4 136.80
1750
1750

4611
19 1 25 3.85 8.31 4 127.99
1750
1750

3917
20 1 25 3.85 7.62 4 117.30
1750
1750

3017
21 1 25 3.85 6.72 4 103.44
1750
1750

1595
22 1 25 3.85 5.30 4 81.54
1750
1750

r = 4275 1 19 2.23 26.85 11 638.60


23
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
Pekerjaan : TW TANK FONDATION
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGANPOTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG)

II. Bottom Bars

1683 2832
1 1 32 6.31 16.40 1 103.45
750
750

6350 6350

1683 2832
2 1 32 6.31 19.22 2 242.54
750
750

6346 6346
1683 2832
3 1 32 6.31 19.19 2 242.22
750
750

6333 6333
1683 2832
4 1 32 6.31 28.61 2 361.00
750
750

11039 11039
1683 2832
5 1 32 6.31 19.13 2 241.43
750
750

6302 6302
1683 2832
6 1 32 6.31 19.09 2 240.90
750

750

6281 6281
1683 2832
7 1 32 6.31 19.04 2 240.27
750

750

6256 6256
1683 2832
8 1 32 6.31 18.98 2 239.54
750

750

6227 6227
1683 2832
9 1 32 6.31 18.91 2 238.68
750
750

6193 6193
1683 2832
10 1 32 6.31 18.84 2 237.75
750
750
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
6156 6156
1683 2832
11 1 32 6.31 18.76 2 236.69

750
750

6114 6114
1683 2832
12 1 32 6.31 18.66 2 235.51
750
750

6067.5 6067.5
1683 2832
13 1 32 6.31 18.56 2 234.24
750
750

6017 6017
1683 2832
14 1 32 6.31 18.45 2 232.83
750
750

5961 5961
1683 2832
15 1 32 6.31 18.33 2 231.31
750
750

5901 5901
1683 2832
750

16 1 32 6.31 18.20 2 229.65


750

5835 5835
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
Pekerjaan : TW TANK FONDATION
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGANPOTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG)

1683 2832
17 1 32 6.31 18.06 2 227.85
750
750

5764 5764
1683 2832
18 1 32 6.31 17.90 2 225.91
750
750

5687 5687
1683 2832
19 1 32 6.31 17.74 2 223.84
750
750

5605 5605
1683 2832
750

20 1 32 6.31 17.56 2 221.59


750

5516 5516
1683 2832
750

21 1 32 6.31 17.37 2 219.17


750

5420 5420
1683 2832
750

22 1 32 6.31 17.16 2 216.57


750

5317 5317
1683 2832
750

23 1 32 6.31 16.94 2 213.77


750

5206 5206
1683 2832
24 1 32 6.31 16.70 2 210.74
750

750

5086 5086
1683 2832
25 1 32 6.31 16.44 2 207.49
750

750

4957 4957
1683 2832
26 1 32 6.31 16.16 2 203.95
750

750

4817 4817
1683 2832
27 1 32 6.31 15.86 2 200.09
750

750

4664 4664
1683 2832
28 1 32 6.31 12.07 2 152.26
750

750

5794
1683 2832
29 1 32 6.31 11.70 2 147.63
750

750

5427
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
1683 2832
30 1 32 6.31 11.29 2 142.48
750

750
5019
1683 2832
31 1 32 6.31 10.83 2 136.66
750

750
4558
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
Pekerjaan : TW TANK FONDATION
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGANPOTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG)

1683 2832
32 1 32 6.31 10.30 2 129.97
750

750

4028
1797.5 1697.5
33 1 32 6.31 8.65 2 109.11
750

750

3395
1392.5 1292.5
34 1 32 6.31 7.03 2 88.67
750

750

2585
751 651
35 1 32 6.31 4.46 2 56.29
750

750

1302
1392.5 1292.5
36 1 32 6.31 18.50 2 233.43
750

750

6900 6900
1392.5 1292.5
37 1 32 6.31 18.49 2 233.31
750

750

6895 6895
1392.5 1292.5
38 1 32 6.31 18.45 2 232.83
750

750

6876 6876
1392.5 1292.5
39 1 32 6.31 18.41 2 232.37
750

750

6858 6858
1392.5 1292.5
40 1 32 6.31 18.37 2 231.77
750

750

6834 6834
1392.5 1292.5
41 1 32 6.31 18.31 2 231.01
750

750

6804 6804
1392.5 1292.5
42 1 32 6.31 18.24 2 230.13
750

750

6769 6769
1392.5 1292.5
43 1 32 6.31 18.15 2 229.09
750

750

6728 6728
1392.5 1292.5
44 1 32 6.31 18.06 2 227.93
750

750

6682 6682
1392.5 1292.5
45 1 32 6.31 17.96 2 226.59
750

750

6629 6629
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
1392.5 1292.5
46 1 32 6.31 17.84 2 225.10
750

750
6570 6570
1392.5 1292.5
47 1 32 6.31 17.71 2 223.46
750

750
6505 6505
1392.5 1292.5
48 1 32 6.31 17.56 2 221.65
750

750

6433 6433
1392.5 1292.5
49 1 32 6.31 17.41 2 219.65
750

750

6354 6354
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
Pekerjaan : TW TANK FONDATION
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGANPOTONGAN BERAT
TYPE Ø M/KG
(M) (Bh) BERAT (KG)

1392.5 1292.5
50 1 32 6.31 17.23 2 217.48
750

750

6268 6268
1392.5 1292.5
51 1 32 6.31 17.05 2 215.11
750

750

6174 6174
1392.5 1292.5
52 1 32 6.31 16.84 2 212.53
750

750

6072 6072
1392.5 1292.5
53 1 32 6.31 16.62 2 209.73
750

750

5961 5961
1392.5 1292.5
54 1 32 6.31 16.38 2 206.68
750

750

5840 5840
1392.5 1292.5
55 1 32 6.31 16.12 2 203.37
750

750

5709 5709
1392.5 1292.5
56 1 32 6.31 15.83 2 199.79
750

750

5567 5567
1392.5 1292.5
57 1 32 6.31 15.52 2 195.88
750

750

5412 5412

1392.5 1292.5
58 1 32 6.31 15.18 2 191.61
750

750

5243 5243
1392.5 1292.5
59 1 32 6.31 14.81 2 186.94
750

750

5058 5058
1392.5 1292.5
60 1 32 6.31 13.95 2 176.04
750

750

4626 4626
1392.5 1292.5
61 1 32 6.31 9.98 2 125.95
750

750

5539
1392.5 1292.5
62 1 32 6.31 9.39 2 118.53
750

750

4951
1392.5 1292.5
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
63 1 32 6.31 8.70 2 109.78
750

750
4258
1392.5 1292.5
64 1 32 6.31 7.84 2 98.88
750

750
3394
1182 1082
65 1 32 6.31 6.18 2 78.04
750

750

2164

1 19 2.23 31.56 5 351.86


66
4750

5300

3 Tie Bars

1 13 1.04 2.16 15 34.32


0

13
13

1800

TOTAL BERAT 17,742.39 Kg


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DEMINERALIZATION PLANT
BESTAT PEMBESIAN
Lokasi : TW TANK
REKAP SUB REBAR
Pekerjaan : TW TANK NO :
NO JENIS STRUKTUR JUMLAH BERAT (Kg) KETERANGAN
1 Spoon pile 948.276
2 TW TANK FONDATION 17742.395

TOTAL 18690.671 Kg

0% 18.691 TON
T PEMBESIAN
NO :

KETERANGAN

0.948 Ton
T PEMBESIAN
NO :

KETERANGAN
T PEMBESIAN
T PEMBESIAN
NO :

KETERANGAN
T PEMBESIAN
T PEMBESIAN
NO :

KETERANGAN
T PEMBESIAN
T PEMBESIAN
NO :

KETERANGAN
T PEMBESIAN
T PEMBESIAN
NO :

KETERANGAN
T PEMBESIAN
T PEMBESIAN
P SUB REBAR
PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DM PLANT
REKAPITULASI BESTAT PEMBESIAN
NO JENIS STRUKTUR JUMLAH BERAT (TON) KETERANGAN
1 FACILITY (SOUTH-EAST) 334.56
2 FACILITY NORTH WEST 139.48
3 FACILITY (SOUTH-WEST) 103.79
4 PIPE RACK 81.27
5 DMW TANK 47.15
6 FILTRATE TANK 21.77
7 TW TANK 18.69

TOTAL 746.708 TON


PERHITUNGAN PEMAKAIAN MATERIAL
Proyek Package #6 Civil Work For Wood Island Construction
PT. OKI PULP & PAPER MILLSS
Area : DM PLANT
REKAPITULASI BESTAT PEMBESIAN

NO JENIS STRUKTUR JUMLAH BERAT (KG) KETERANGAN


SUB UPER
1 FACILITY SOUTH EAST 144,629.85 189,927.70
2 FACILITY NORTH WEST 72,010.06 67,469.11
3 FACILITY SOUTH WEST 42,694.00 61,092.57
4 PIPE RACK 47,331.02 33,940.68
5 DMW TANK 5,299.07 41,848.41
6 FILTRATE TANK 989.16 20,785.74
7 TW TANK 948.28 17,742.39

313,901.44 432,806.61 KG

TOTAL 313.90 432.81


TON
746.71
BESI BETON / MILD STEEL ROUND BAR BESI BETON SPIRAL / DEFORMED BARS

Diameter Panjang Berat Berat / M Diameter Panjang Berat Berat / M


(mm) (M) (Kg) (Kg) (mm) (M) (Kg) (Kg)
1 6 12 2.66 0.22 10 12 7.4 0.62
2 6.5 12 3.2 0.27 13 12 12.48 1.04
3 8 12 4.74 0.40 16 12 18.96 1.58
4 9 12 6 0.50 19 12 26.76 2.23
5 10 12 7.4 0.62 22 12 35.76 2.98
6 12 12 10.66 0.89 25 12 46.2 3.85
7 13 12 12.48 1.04 29 12 62.28 5.19
8 16 12 18.96 1.58 32 12 75.72 6.31
9 19 12 26.76 2.23 36 12 95.22 7.94
10 22 12 35.76 2.98
11 25 12 46.2 3.85
12 28 12 57.96 4.83
13 32 12 75.72 6.31
14 36 12 95.88 7.99
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi :
BESTAT PEMBESIAN
Pekerjaan : NO :
JUMLAH DIA BERAT PANJANG JUMLAH JUMLAH
NO. BENTUK POTONGAN POTONGAN POTONGAN BERAT KETERANGAN
TYPE Ø M/KG
(M) (Bh) BERAT (KG)
PT. MODERN WIDYA TEHNICAL
Project : OKI PULP & PAPER
Lokasi :
BESTAT PEMBESIAN

Potrebbero piacerti anche