Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Ravi
ravi
For Fabricating 10no’s for the 16Cylinder engine block , as per the customer requirement we have to do 30no’s of hydrotesting as per the DMW ,Patiala specification.
The present order is for 12no’s hydrotesting and this has to be modified as 30no’s and this has been mentioned in the PR:0920676163.
Kindly find the DMW Patiala Specification attached.
1
From: ABHISHEK CONSTRUCTION COMPANY [mailto:abhishek.const@gmail.com]
Sent: 26 February 2019 12:37 PM
To: ashish.banerjee@trf.co.in
Cc: V S Raviteja Bhamidi <V.Bhamidi@tatasteel.com>; Ravi Sharma <ravi.sharma@tatasteel.com>
Subject: Amendment of Work Order
Dear Sir,
With the reference to the above subject & referred work order please note that, Testing qty. of above work order was one time for one 16 cylinder, but as per the demand
of client the testing of cylinder done three time for one 16 cylinder, resulting qty of testing is exceed by 22 (nos.).
We therefore request you kindly amend the qty of testing in above work order, so that the job can be executed smoothly.
Thanking You,
With Regards,
Naveen Kr. Singh
For Abhishek Const. Co.