P'DA estino Proced re ;;;

With P'DCheck
Rev. October 2009

1
These instructions 'do not. purport to cover ell detel/s or variations in equipment nor to provide tor 9very possible contingency
to 'be met in connection with instel/8tion, oper8tion or maintenance. Shouldfurther· infonnation be desired ·or·should particular
problems arise which aTe not- covered sufficiently for the purchaser's purposes ·the matter should b.e referred "to the GE
Company

···..·..·0~·
..:~}..!,\-(~p-' ~r.·
t~ ~.,:
I

'':ovI'''~~ •
"ama! Dlscnara p.naIVSI:' 3aselfnF Testmt: wur. PCCnecl

After the generator has been baseloaded for a minimum of two hour, the following
procedures can be taken 10 perform a PDA baseline rest on the generator.

1. Open the PDCheck enclosure, open the metallic cover. using a crossover Ethernet cable to
connect the PDCheck box with the PDCheck laptopt See GE Drawing lumber 30_A6239.
Diagram #3 on page 8).

') Run the PDC Control software on the laptop to connect to PDCheck.

3. Perform the baseline test using PDC Control software.

4. After the data acquisition is completed. set up the PDCheck to start monitoring partial discharge.

5. Close the software and disconnect the Ethernet cable.

6. Close the PDCheck enclosure.

2
These instructions do.not:purport·fo cover all detaIls or variations in ~quipment nor to provide. for every possible conti'lgency
to ·bemet In connection with installation, operation 'Or maintenance. Should fariher·infonnation 'be -desired or should .particular
problems arise -which are not cover-ed sufficiently-for thepurchas&f's purposes -the matter should 'be referred to the GEE
Company

-:j. .> ••.

Potrebbero piacerti anche