Customer Information
As a manufacturer of pressure equipment, especially
compressed-air receivers, Neuenhauser Kompres-
sorenbau GmbH would like to inform its customers
i
IMPORTANT!
about any dangers, necessary test intervals, safety The operator must observe the following regulations
instructions and a possible replacement. in particular:
Pressure equipment used in the European market - PED 2014/68/EU
shall be designed and manufactured in accordance - Product Safety Act (ProdSG)
with the Pressure Equipment Directive 2014/68/EU - Regulations on safety and health protection for the
provision of work equipment (German Health and
(formerly 97/23/EC) and the AD2000-regulations. Safety at Work Regulations - BetrSichV)
Furthermore, in case of pressure equipment used in - Fourteenth regulation pertaining to the Product
the marine sector, the regulations of the correspond- Safety Act (Pressure Equipment Ordinance – 14.
ProdSV)
ing marine classes are applicable (e.g. ABS, BV, DNV- - Technical Rules for Operating Safety (TRBS)
GL, …)! In addition, further regulations, which are especially 1201, 1203, 2141
listed below, have to be observed! - Industrial safety regulations
- Accident Prevention Measures (UVV)
- Association of Industrial Trade Associations-
Safety notes, Dangers Regulations BG regulations (such as DGUV regula-
tion 1, DGUV regulation 9)
Danger to persons and objects from the pressure - Industrial Safety Act (ArbSchG)
equipment can result from incorrect use, inappropri-
ate treatment and non-adherence to the safety regu- If a statement in the operating instructions does not
lations. Potentially dangerous occurrences include: correspond to the specifications required locally, the
- sudden release of energy stored in the appliance stricter version is to be applied.
through failure of pressure bearing walls, bursting In addition the operator is responsible for his em-
of the equipment, chemical reactions, explosion ployees having the necessary qualifications, for in-
- Escape or spraying out of liquids or gases at high struction on the pressure equipment / the apparatus
pressure or high temperature. and also for knowledge of the potential danger and
- Thermal danger due to high temperatures the operating instructions.
- Danger due to noise, sudden escape of compressed
air, banging noises Corrosion, Wear
Corrosion, wear and wall-thickness tolerances have
i
IMPORTANT!
generally been considered in the calculations with a
surcharge according to the regulations and/or project
In principle the following applies to all work on the (in coordination with the customer).
pressure equipment:
- Remove air from pressure equipment (make free
If the wall thicknesses are gone below by this value,
of pressure) further operation of the pressure equipment/air-
- Depressurise all pipes and pressure chambers on receiver is not permitted. This must be reviewed at
the pressure equipment and valves and fittings least at the intervals named in the previous sections.
- Secure compressed air supply against unauthor- However, we recommend more regular review and, if
ised switching on and affix repair notice applicable, coordination with NEUENHAUSER KOMPRES-
- Apply safety devices before commissioning SORENBAU GMBH.

In addition to the operating instructions, the regula- In order to protect the pressure equipment against
tions applicable for the operating company and place corrosion and wear, they are provided with an inter-
of installation as well as the respective regulations of nal and external coating by default. The coating is
the inspection company must be adhered to. resistant to the oils shown in the NK-oil-specification
The operator must ensure that the legal health and at the operating temperature given for the pressure
safety and accident prevention measures are ad- equipment.
hered to during all tasks. Different operating conditions must be agreed with
The safety conditions stipulated by the inspection the manufacturer.
bodies must be adhered to. Regulations of the coun- In spite of the full-surface coat of paint inside and
tries and regional, local and company regulations outside of the vessel, and the welded-on support, the
which are applicable for the plant and place of instal- vessel construction/design provides points of attack
lation must be observed. for corrosion. They are mostly found at/in threads,

© Neuenhauser Kompressorenbau GmbH Page 1 of 2

Revision status: 1 - Subject to modifications -


Customer Information
sealing faces (edges) and the screw head or nut sup- Internal inspections must be supplemented or re-
port surfaces. Such spots require regular inspection placed by pressure tests or other suitable inspections
by the plant operator and must be improved accord- as well if the inner inspections cannot be performed
ingly! at the required scope. Pressure tests must be re-
placed by non-destructive tests when pressure tests
i
IMPORTANT!
are not possible or not suitable due to the build or
operating mode of the pressure equipment.
The vessel must be checked regularly for corrosion If applicable, extension of the above period is possi-
and wear!
ble as well where safety is ensured otherwise and this
In addition the pressure equipment must be drained has been specified by the independent third party.
at regular intervals to prevent possible corrosion due The recurring tests are registered with the authorized
to arising condensation. The intervals are set accord- inspection body (e.g. TÜV)/the relevant marine classi-
ing to the mode of operation and amount of conden- fication and carried out by them.
sate. We recommend draining the pressure equip-
ment following each filling, but at least once per The operator is responsible for adherence to the test
week. periods and arrangement and carrying out of the
tests. These test data must be recorded in the test
Inspection Intervals log and archived.
After the pressure equipment has been subjected to The pressure equipment also must only be used as
a first successful inspection in the manufacturer's intended, after performance of the required inspec-
factory (if applicable in presence of the independent tions in time and successfully, i.e. when the corre-
third party), recurring inspections must be performed sponding requirements have been met, and this has
at specific intervals. Thus, the operational safety of been certified by an expert.
the vessel (+fittings) is ensured from until the first
recurring inspection provided that the specified us- Additionally, we as the manufacturer recommend
age thresholds are complied with and nothing un- replacing the pressure equipment after an operating
foreseen occurs. time of 25 years at most to bypass invisible risks
(such as ageing, material fatigue, tension crack cor-
The periods for the recurring inspections are speci- rosions, etc.).
fied by the expert of the notified body (e.g. TÜV), by
the marine classification, its regulations and/or na-
For further queries/questions please contact us:
tional or local provisions. The respective shortest
periods from the applicable regulations/provisions Neuenhauser Kompressorenbau GmbH
apply for this. Department: pressure equipment
As a rule an internal examination is carried out once Hans-Voshaar-Str. 5
every 5 years and a pressure test once every 10 D-49828 Neuenhaus
years. Additionally, an outer inspection should take Germany
place every 2 years, usually on the pressure equip- Tel.: +49 5941 604 - 0
ment in operation. The recommended spare part Email: nk@neuenhauser.de
kits are available on request from NEUENHAUSER
KOMPRESSORENBAU GMBH!
The times may be set differently if there are particu-
larly aggressive media, strong corrosion, certain load
change numbers (“cycles to failure”) are reached or
there are other particular operating conditions and
experiences.

i
IMPORTANT!
The prescribed inspection periods for the recurring
inspections must be observed and apply to the valve
head/fittings as well!

© Neuenhauser Kompressorenbau GmbH Page 2 of 2