CITRA BORNEO INDAH GROUP - DOWNSTREAM BUSINESS UNIT

NO
MAINTENANCE WORK ORDER STATUS REVISI KE
BERLAKU
SECTION : UTILITY, RO, WTP, WWTP PAGE OF
RECIEVED COMPLETED COMPLETED
NO WO NO EQP NO JOB TITLE JOB EXPLANATION
DATE DATE BY
UNIT
: FIP-MCD-01-08
: 00
: 01-06-2018
OF

STATUS /REMARKS
CITRA BORNEO INDAH GROUP - DOWNSTREAM BUSINESS UNIT

MAINTENANCE WORK ORDER STATUS


SECTION : UTILITY, RO, WTP, WWTP
RECIEVED COMPLETED
NO WO NO EQP NO JOB TITLE JOB EXPLANATION
DATE DATE

1 002/VIII/UTL/SBI/2018 Genset 20 kva Terjadi kebocoran diantara alternator Pengencangan baut cover 18/08/18 18/08/18
dan body engine head cylinder
AM BUSINESS UNIT
NO : FIP-MCD-01-08
REVISI KE : 00
BERLAKU : 01-06-2018
PAGE OF
COMPLETED
STATUS /REMARKS
BY

Syahlul dan Alpo CLOSED


CITRA BORNEO INDAH GROUP - DOWNSTREAM BUSINESS UNIT

MAINTENANCE WORK ORDER STATUS


SECTION : UTILITY, RO, WTP, WWTP
RECIEVED COMPLETED
NO WO NO EQP NO JOB TITLE JOB EXPLANATION
DATE DATE

1 001/VIII/UTL/SBI/2018 Genset 1000 kva Check & repair, low pressure fuel alarm Penggantian fuel filter 1R- 02/08/18 02/08/18
0755
2 002/VIII/UTL/SBI/2018 Genset 1000 kva Penggantian fuel filter 03/08/18 03/08/18
Repair genset, low pressure fuel alarm separator 326-1641
Pengecekan bahan bakar
3 003/VIII/UTL/SBI/2018 Genset 500 kva Genset tidak dapat start/hidup dan penggantian fuel filter 18/08/18 18/08/18
karena kotor

Pengecekan kondisi valve outlet steam Pengecekan kebocoran dan


4 01/08/UTL/18 Utility header package boiler terindikasi Penggantian valve dengan 20/08/18 20/08/18
passing yang baru
5 Utility Dilakukan pemotongan dan 28/08/18 28/08/18
Terjadi keretakan pada tong sampah pengelasan kembali
BUSINESS UNIT
NO : FIP-MCD-01-08
REVISI KE : 00
BERLAKU : 01-06-2018
PAGE OF
COMPLETED
STATUS /REMARKS
BY

Chandra CLOSED

Agus & Faris CLOSED

SPV CLOSED

SPV CLOSED

SPV CLOSED
CITRA BORNEO INDAH GROUP - DOWNSTREAM BUSINESS UNIT

MAINTENANCE WORK ORDER STATUS


SECTION : UTILITY, RO, WTP, WWTP PAGE
RECIEVED COMPLETED
NO WO NO EQP NO JOB TITLE JOB EXPLANATION
DATE DATE
Pembuatan support line clean water ke Support line telah dibuat
basis utility
1 04/09/18 05/09/18
Genset 500 kva Repair line solar di daily tank solar Pengeleman red cylicon pada
genset 500 kva karena bocor ulir tutup valve
Paku yang sudah lepas pada scrapper Penggantian rived dengan
2 15/09/2018 15/09/2018
belt conveyor baut M6 x 30L
Penggantian fuel filter 1R -
3 001/IX/UTL/SBI/2018 Genset 1000 kva Low pressure fuel alarm 18/09/2018 18/09/2018
0755

Penggantian fuel filter 1R -


0755 dan fuel filter water
4 002/IX/UTL/SBI/2018 Genset 1000 kva Low pressure fuel alarm separator Donaldson J86 - 27/09/2018 28/09/2018
20770 (fuel separator CAT
belum tersedia)
USINESS UNIT
NO : FIP-MCD-01-08
REVISI KE : 00
BERLAKU : 01-06-2018
PAGE OF
COMPLETED
STATUS /REMARKS
BY

SPV CLOSED

SPV CLOSED

SPV CLOSED

Faris dan Agus CLOSED


CITRA BORNEO INDAH GROUP - DOWNSTREAM BUSINESS U

MAINTENANCE WORK ORDER STATUS


SECTION : UTILITY, RO, WTP, WWTP
RECIEVED
NO WO NO EQP NO JOB TITLE JOB EXPLANATION
DATE

Pemasangan nozzle & valve pada main piep 2 Mengganti dengan memasang butterfly valve 2
1 WO/004/UTL/SBI WTP 11/10/2018
clean water to jetty inch & flange to pipe/nozzle uk 2 inch

Genset trip dikarenakan overheating (indikasi


waterpump tidak berfungsi dikarenakan impeller Modifikasi pada shaft dan impeler dengan
2 WO/007/UTL/SBI Genset 125 KVA 16/10/2018
melakukan pengelasan argon
lepas

3 WO/009/UTL/SBI Utility Building Fuel feeder tidak dapat berputar Perbaikan screw fuel feeder (tersangkut batu) 18/10/2018

Dilakukan penyesuaian pada motor dikarenakan


Pemeriksaan & perbaikan pada belting ID Fan v-belt bergeser dengan cover, sehingga v-belt
4 WO/011/UTL/SBI Utility Building terlihat kendur/belt bergeser dengan casing dapat diatur dengan yang sebenarnya. Setelah di 19/10/2018
tes run hasil baik

5 WO/012/UTL/SBI Utility Building Pabrikasi sliding gate pada receiving hopper 19/10/2018

Penggantian fuel filter 1R - 0755, fuel filter water


6 014/X/012/SBI/2018 Genset 1000 KVA Low fuel pressure alarm 45 psi sepanotr CAT 326-1641 & penambahan ole SAE 19/10/2018
15W-40 2 liter

Perbaikan cone yang terlepas pada dust arrestor 19/10/2018


7 WO/013/UTL/SBI Utility Building Cone terlepas dari support-nya package boiler

Penggantian selang radiator genset 185 kva yang


8 WO/017/10/UTL/SBI/2018 Genset 185 kva Selang radiator genset 185 kva sobek robek, setelah diganti genset dapat dioperasikan 30/10/2018
dengan normal
Pabrikasi man hole karena existing man hole
9 WO/018/10/UTL/SBI/2018 Utility Building Pabrikasi man hole dust arrestor 30/10/2018
terlalu kecil

Dilakukan instalasi pipa CS, uk.2" sebanyak 48 btg


di area gudang cangkang dan batubara. Di
Instlasi jalur hydrant di area cangkang dan sepanjang jalur pipa tersebut terdapat 8 titik
10 WO/018/10/UTL/SBI/2018 WTP 10/30/2018
batubara outlet Hydrant. Sudah dilakukan leak test dan
ditemukan beberapa titik kebocoran dan sudah
dilakukan repair dan sdah ready untuk digunakan

11 WO/019/10/UTL/SBI/2018 Genset 110 kva Replace fuel filter genset 110 kva Replace fuel filter genset 110 kva 30/10/2018

Genset 250 kva Reposisi genset 185 kva dari WWTP ke terminal 2
Pemasangan genset 250 kva dan pembongkaran
12 WO/020/10/UTL/SBI/2018 31/10/2018
genset 185 kva
Reposisi genset 250 kva ex upstream dari pump
Genset 185 kva house ke WWTP
BUSINESS UNIT
NO : FIP-MCD-01-08
REVISI KE : 00
BERLAKU : 01-06-2018
PAGE OF
COMPLETED COMPLETED
STATUS /REMARKS
DATE BY

11/10/2018 spv CLOSED

Juliarto, Ikhwan,
16/10/2018 CLOSED
Roqi, Faris

18/10/2018 Syahlul, Anjas CLOSED

11/22/2018 Alponsius dan Yahya CLOSED

OUTSTANDING

19/10/2018 Alpen, Rahmadi CLOSED

30/10/2018 spv CLOSED

2/11/2018 Alponsius CLOSED


Musli, Alponsius,
31/10/2018 CLOSED
Faris

Mahmudi, Sakrim,
Ikhwan, Roqi,
11/15/2018 CLOSED
Muslih, Yudi dan
Hariadi

30/10/10/2018 spv CLOSED

Pak Warman,
31/10/18 CLOSED
Sahlul dan Faris
CITRA BORNEO INDAH

MAINTENANCE WORK O
SECTION : UTILITY, RO, WTP, WWTP

NO WO NO EQP NO JOB TITLE

Perbaikan bandul pelampung


1 WO/023/11/UTL/SBI/2018 tangki CWT 1 karena bandul
terlalu berat

Penggantian fuel filter dan filter


2 WO/025/11/UTL/SBI/2018 separator genset 1000 kva

Flange pada line inlet clarifier


Cllarifier &
3 WO/026/11/UTL/SBI/2018 bocor dan blower no 9 abnormal
Blower noise

Perbaikan roller belt conveyor


4 WO/030/11/UTL/SBI/2018 shell package boiler

Genset 1000 Replace fuel filter dan fuel


5 WO/032/11/UTL/SBI/2018 separator genset 1000 kva karean
kva kotor

Repair wall scrapper belt


Fuel belt
6 WO/033/11/UTL/SBI/2018 conveyor untuk package boiler
Conveyor utility karena rusak
CITRA BORNEO INDAH GROUP - DOWNSTREAM BUSINESS UNIT
NO
MAINTENANCE WORK ORDER STATUS REVISI KE
BERLAKU
PAGE OF
RECIEVED COMPLETED COMPLETED
JOB EXPLANATION
DATE DATE BY

Pengelasan bandul untuk gantungan tali


pengukur level tangki dan pemotongan bandul 6/11/2018 6/11/2018 Sahlul dan Sakrim
karena bandul terlalu berat

Penggantian fuel filter dan filter separator genset


1000 kva dikarenakan low fuel pressure dibawah
40 psi. Setelah dilakukan penggatian fuel filter 11/20/2018 11/20/2018 Ade dan Benny
dan fuel separator didapat pressure 96 psi.
Genset berjalan normal

Dilakukan penggantian gasket yang rusak pada


inlet clrifier yang bocor dan setting safety valve 22/11/2018 24/11/2018 Ade dan Benny
dischard blower no 9 di pressure 0,5 bar

1 pcs roller belt conveyor mengalami kerusakan,


dilakukan pengelasan pada bagian roller yang Roqi, Sahlul dan
26/11/2018 26/11/2018
retak dan pemasangan kembali dan conveyor Yahya
sudah beroperasi dengan normal

Genset 1000 kva utility terindikasi alarm low fuel


pressure 28 psi, dilakukan penggantian fuel filter
dan water separator fuel filter, setelah dilakukan 30/11/2018 30/11/2018 Ade dan Benny
penggantian genset dapat kembali beroperasi
dengan normal, fuel pressure 101 psi

Wall scrapper belt conveyor package boiler


banyak yang terlepas dari posisi. Dilakukan Ade, Benny,
perbaikan pada wall scrapper dan pemasangan 11/30/2018 12/4/2018 Sahlul dan
kembali menggunakan B/N M8 x 35 mm dan wall Rahmadi
scrapper yang terlepas sudah dipasang kembali
: FIP-MCD-01-08
: 00
: 01-06-2018
OF

STATUS /REMARKS

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED

CLOSED
CITRA BORNEO

MAINTENANCE W
SECTION : UTILITY, RO, WTP, WWTP

NO WO NO EQP NO

1 WO/034/11/UTL/SBI/2018 Screw Feeder 02

2 035/11/UTL/SBI/2018 Genset 250 kva

3 WO/038/12/UTL/SBI/2018 Genset 1000 kva

4 040/12/UTL/SBI/2018 Baby Tank 1000 L

5 041/12/UTL/SBI/2018 Genset 1000 kva

6 042/12/UTL/SBI/2018
7 WO/046/12/UTL/SBI/2018 Daily Tank Solar

8 WO/047/12/UTL/SBI/2018 Genset 500 kva


CITRA BORNEO INDAH GROUP - DOWNSTREAM BUSINESS UN

MAINTENANCE WORK ORDER STATUS

JOB TITLE JOB EXPLANATION

Dilakukan pengelasan menggunakan elektroda RB-


26 sebanyak 2 pcs dikarenakan terjadi kebocoran
Welding fuel fan transfer drain no 2 pada drain fuel transfer no.02, setelah di test
running kebocoran tidak ditemukan lagi

V-Belt water pump genset 250 kva WWTP putus,


setelah dilakukan pengecekan disebabkan karena
pulley tensioner unbalance dan bearing rusak
sehingga tegangan v-belt tidak merata. Dilakukan
Penggantian van belt genset 250 kva modifikasi pada pulley tensioner agar v-belt dapat
di adjust dan dilakukan penggantian v-belt baru.
Setelah v-belt di install kembali genset dapat
beroperasi normal

Indikasi awal pressure fuel 20 psi, dilakukan


penggantian fuel water separtor dan cleaning fuel
Penggantain fuel filter genset 1000 kva filter dan pemasangan fuel water separator dan fuel
filter, setelah di test hasil baik, fuel pressure 73 psi

Modifikasi valve outlet baby tank 1000 L untuk Fabrikasi penutup/nozle outlet solar dari baby tank
keperluan unloading solar di natai untuk digunakan di WTP natai

Genset terindikasi alarm low pressure fuel.


Dilakukan penggantian fuel separtor dan
Penambahan oli dan cleaning fuel filter pemberishan fuel filter. Genset normal kembali saat
running

Pembuatan jalur inject soda ash untuk adjust


PN di clarifier (settler)
Dilakukan reinstal pada valve dengan mengganti
Perbaikan valve outlet baby tank yang bocor rubber packing dan di lem menggunakan lem
tembak dan lem G

Mohon dilakukan penggantian air radiator Dilakukan penggantian air radiator dengan
genset menggunakan demin water sebanyak 250 L
NSTREAM BUSINESS UNIT
NO : FIP-MCD-01-08
REVISI KE : 00
BERLAKU : 01-06-2018
PAGE OF
RECIEVED COMPLETED COMPLETED
STATUS /REMARKS
DATE DATE BY

Alponsius,
12/7/2018 12/7/2018 Closed
Ikhwan dan Yahya

Closed(pengerjaan sudah
Ikhwan dan diselesaikan pada tgl 7/12
12/8/2018 12/7/2018 Benny namun wo dibuat user
menyusul pada tgl 08/12)

Closed(pengerjaan sudah
diselesaikan pada tgl
20/12/2018 12/19/2018 19/12 namun wo dibuat
user menuyusul pada tgl
20/12)

20/12/2018 12/27/2018 Ade dan Benny Closed

Closed(pengerjaan sudah
diselesaikan pada tgl
26/12/2018 12/21/2018 Ade dan Faris 21/12 namun WO dibuat
user menyusul pada tgl
26/12)

26/12/2018 Outstanding
31/12/2018 31/12/2018 Benny Closed

Ikhwan dan
31/12/2018 31/12/2018 Closed
Sakrim