INSPECTION TEST RECORD (ITR) - A

JACKET POST LOADOUT ST09-A


Project No.
Project Title
Facilities
INFORMATION
Area No Ref Drawing
System Inspection Date
Sub System Location

INSPECTION / TEST OK N/A P/L No.


GENERAL CHECKLIST ITEMS ON JACKET LAUNCH BARGE & PILES BARGE: POST
LOADOUT
• Check for barge emergency lines are installed complete with Norwegian buoy and
located at accessible location.
• Check navigation lights are operational.
• Check condition of emergency towing line operational (if any).
1 • Check and confirm all manholes are closed prior to sailaway.
• Check barge condition for any damage prior to sailaway.
• Check ballast pattern as per approved transportation study and identify draft mark
at bow and stern of the barge.
• Brief personnel in charge for sailaway i.e Tug boat captain and crews on passage
plan and Emergency Response Plan (ERP).
• Check weather forecast prior sailaway.
DRILLING DECK
• Check overall dimension especially deck leg spacing (as-built).
• Check stabbing cone OD to be verified.
• Check level/vertical height length dimension (as-built).
• Check pre-installed lifting rigging make-up, layout, and I.D. and tie-down
arrangement.
• Check padeyes as-built-NDT reports.
• Position of bottom Deck leg seam weld especially relative to top stub piles(as
built).

2 • Review ship loose arrangement layout on top of deck for potential interferences
when rigging up and de-rigging lifting slings (if applicable).
• Stairway hinged up and secured under deck. Vertical ladder from access deck to
jacket seadeck secured on access deck.
• Check all bolted connections secured.
• Check grating clip secured.
• Review any structure/piping/cable tray protruding 1.5 meter radius around design elevation
of deck that may interfere with stabbing point or any permanent structure
at the jacket.
• Check dimensions of stabbing cones and painted on each deck leg for offshore
identification i.e B1, B2, C1&C2.