Sei sulla pagina 1di 1

LINEAR HEAT SENSOR HEAT PAD

B Scale: NTS

R
A E
G L
E E
N A
T S
E

HORN W/ STROBE

POWER

ALARM
IN-A

RS485
IN-B

OUT-A

OUT-B

J8
IN-A
DEF GHI

RS485
IN-B
GROUND FAULT 2 ACK

3
OUT-A
SCROLL
OUT-B
SIGNAL SILENCE JKL MNO PQR SYSTEM
4 5 RESET

J8
6
PRE-ALARM IN+
STU VWX YZ

24 VDC PWR
SIGNAL IN-
7 8 SILENCE OUT+
SUPERVISORY

9
OUT-
DRILL
0 SHIFT (HOLD FOR

J4
SYSTEM TROUBLE LAMP TEST)

BC-01 ADDRESSABLE
CONTROL PANEL

ARIESNETLINK-ML

MPS ABORT

R
A E
G L
E E
N A
T S
E

HORN W/ STROBE

POWER

ALARM IN-A

RS485
IN-B

OUT-A

OUT-B

J8
IN-A
DEF GHI
GROUND FAULT ACK

RS485
IN-B
2 3
OUT-A
SCROLL
SIGNAL SILENCE JKL MNO PQR SYSTEM
OUT-B

4 5 6 RESET

J8
IN+
PRE-ALARM

24 VDC PWR
STU VWX YZ SIGNAL IN-

7 8 9 SILENCE
OUT+
SUPERVISORY
OUT-
DRILL
0 SHIFT (HOLD FOR

J4
SYSTEM TROUBLE LAMP TEST)

CV-01 SEGMENT 2 ADDRESSABLE


CONTROL PANEL

ARIESNETLINK-ML

MPS ABORT

CV-01 PROPOSED LINEAR HEAT DETECTION LAYOUT FOR SEGMENT 2


LINEAR HEAT SENSOR INSTALLATION DETAILS
2 Scale: NTS

Scale: NTS

NOTE: CONTRACTOR : DRAWING TITLE : OWNER :


THIS DRAWING INCLUDING THE INFORMATION IT BEARS IS THE PROPERTY OF ASISI SYSTEMS CORP.
AND MUST BE HELD IN STRICT CONFIDENCE AND PROPERLY SAFEGUARD BY THE RECIPIENT AT ALL TIMES SARANGANI ENERGY CORPORATION
PROPOSED CV-01 LINEAR HEAT DETECTION LAYOUT SEGMENT 2

ENGINEER : PROJECT TITLE :

ASISI SYSTEMS CORP.


DELUGED WATER SPRAY SYSTEM
"Protecting Lives and Properties" ROGER S. DORMIDO JR.
PROFESSIONAL ELECTRICAL ENGINEER

REG. No. : PTR No. : PROJECT LOCATION :


2824 5641959
SARANGANI, PHILIPPINES
ASISI SYSTEMS CORP. PLACE ISSUED : QUEZON CITY DATE ISSUED : JANUARY 11, 2018
00 FOR APPROVAL RMS DHL NPO 03/02/19 "Protecting Lives & Properties" DRAWING NO. : SCALE SHEET VENDOR DRAWING NO. : PROJECT NO. : P.O. NO. : CONTRACT NO. :
JMC BUILDING BLK 4 LOT 4 OCEAN PARK ST.,
SAUYO ROAD, BRGY. SAUYO, NOVALICHES Q.C.
REV. DESCRIPTION DRAWN CHECKED APPROVED DATE TELEFAX NO. 939-5759
FA 102
TEL. NOS. 983-5640

Potrebbero piacerti anche