Department of Public Works and Highways CONTRACTOR'S MONTHLY CERTIFICATE OF PAYMENT

MALABON - NAVOTAS DISTRICT ENGINEERING OFFICE As of :


C-4 Road, Bagumbayan North, Navotas City

Name of Project : Construction of Four (4) Storey, Eight (8) Classroom 14. I hereby certify that the attached statement of work is
School Building, Tanza Elementary School, correct and just and does not include items and/or
Navotas City portions thereof for which payments had already
been received. In regards to item covering advance
Name of Contracto: WILCU CONSTRUCTION payment for materials, the said materials are on site
and are properly protected.
Original Contract Amount P 26,306,954.03
Revised Contract Amount (CO #1) P
Revised Contract Amount (CO #2) P
1. Total Value of Work to Date: P MARIA MERCEDES A. MARILAO
2. Total Value of Work Previously: P Contractor's Representative
3. Total Value of Work this Billing: P
4. Deductions 15. I hereby certify that the materials incorporated in this
a). 10% Retention P monthly certificate for payment have been verified
Recoupment from Advance Payment P and tested in accordance with specifications.
Sub Total P
b). 2% Withholding Tax: P
5% VAT P
P ANTONIO B. FERNANDEZ
Others (Specify) P Chief, Quality Assurance Section
Sub Total P
TOTAL DEDUCTIONS P 16. I hereby certify that the quantity of work
5. Amount Approved for Payment: P approved for payment in the attached
6. Add : Request No. _____ for Materials Currently statement have been accomplished and that the
on hand P quantities including materials brought to
7. Less : Request _____ for previous payment site but not incorporated in the work, are
of materials on hand P correct and consistent with all previous
8. Foreign Component of Billing recommendations for payment and the
(_______________ % of 5) P work of quantities and amount are consistent
9. * Foreign Currency Equivalent with the requirements of the contract.
of Foreign Component P
10.* Local Component Approved CAMILLE D. BERLANDINO
Amount ( 5 - 6 ) P Engineer II
11.Less : Peso cost financing to
be paid directly by ADE/ ESTEBAN ARMY M. SOSA
IBRD/OECF ect.. Under Project Engineer II
category ____________% of 5 P
12.* Less : Local Expenditures Whenever applicable, otherwise those items will
category ____________% of 5 P not be filled up or should be revised accordingly
13.Net Amount due Contractor P to suit lending institution Payment Procedure.
Project ID No.: P00174789LZ-CW1
Contract ID No.: 17OA0101

CHECKED VERIFIED AND FOUND CORRECT :

ERNESTO M. GALANG
Chief - Construction Section

RECOMMENDED FOR PAYMENT :

FERNANDO C. GARCIA
Asst. District Engineer

APPROVED FOR PAYMENT :

MARLO B. CORREA
District Engineer
Sch. Physical Progress : 100.00%

Actual Physical Progress : 100.00%

Slippage (+/-) : (-) 9.37%

Expiry Date : October 11, 2016

Revised Expiry Date : February 23, 2017


Department of Public Works and Highways
MALABON - NAVOTAS DISTRICT ENGINEERING OFFICE
CONTRACTOR'S STATEMENT OF WORK ACCOMPLISHED
From :

Project: Construction of Four (4) Storey, Eight (8) Classroom School Building, Tanza Elementary School, Navotas City

Qty. Approved
ITEM NO. Scope of Works Quantity Unit Unit Cost Contract Amount in Previous
Billing
#REF! #REF!
#REF! #REF! #REF! #REF! 60,832.30 #REF! 1.00
#REF! #REF!
#REF! #REF! #REF! #REF! 4,303.32 #REF! 1.00
#REF! #REF! #REF! #REF! 7,171.31 #REF! 1.00
#REF! #REF! 7.30 #REF! 31,513.95 230,051.84 4.50
#REF! #REF! #REF! #REF! 204,973.44 #VALUE! 0.50
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
801(03) Removal of Actual Structures/Obstruction 63.00 sq.m. 244.99 15,434.37 63.00
#REF! #REF! 155.54 #REF! 3,268.66 508,407.38 155.54
#REF! #REF!
#REF! #REF! 858.29 #REF! 309.96 266,035.57 801.90
#REF! #REF!
#REF! #REF! 546.75 #REF! 201.10 109,951.43 546.75
#REF! #REF! 286.10 #REF! 828.52 237,039.57
#REF! #REF! 70.10 #REF! 1,224.05 85,805.91 28.75
#REF! #REF!
#REF! #REF!
#REF! #REF! 462.00 #REF! 4,883.32 2,256,093.84 361.63
#REF! #REF! 28.00 #REF! 4,700.75 131,621.00 26.10
#REF! #REF!
#REF! Reinforcing Steel (Grade 40) (Major) 75,899.30 #REF! 56.99 4,325,501.11 51,728.36
#REF! Reinforcing Steel (Grade 60) (Major) 26,211.05 #REF! 59.53 1,560,343.81 26,211.05
#REF! #REF!
#REF! #REF! 2,330.00 #REF! 596.22 1,389,192.60 1,441.63
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! 45.20 #REF! 481.49 21,763.35 45.20
#REF! #REF!
#REF! #REF! 10.00 #REF! 4,843.30 48,433.00
1001(8) Sewer Line Works 1 lumpsum 69821.65 69,821.65
#REF! #REF! #REF! #REF! 120,906.87 #VALUE!
1002 Plumbing
1002(9)b1 Water Closet, Round Front, Complete 12.00 set 6,927.05 83,124.60
1002(14)a1 Lavatory, Wall hung Complete, Manually Operated 1.00 set 9,361.37 9,361.37
1002(16)a1 Floor Drain Plates, 50mm dia. Stainless 23.00 set 450.13 10,352.99
1002(22) Stainless Steel Railings (38mm dia) 1.40 sq.m. 1,433.90 2,007.46
1002(24) Facial Mirror 3.35 sq.m. 7,563.19 25,336.69
1002(25) Faucet 14.00 pc 298.11 4,173.54
1002(27)a4 Water Meter, 32mm dia 1.00 pc 2,166.65 2,166.65
1002(6) Cold Water Lines 1.00 l.s. 84,381.91 84,381.91 0.20
#REF! #REF!
#REF! #REF! 322.20 #REF! 980.73 315,991.21
#REF! #REF! 8.00 pc 5,265.48 42,123.84
#REF! #REF!
#REF! #REF! 97.90 #REF! 5,127.75 502,006.73
#REF! #REF! 134.10 #REF! 1,870.20 250,793.82
#REF! #REF!
#REF! #REF! 38.20 #REF! 2,291.57 87,537.97
#REF! #REF!
#REF! Frames (jambs) (1.40x1.50 Window) 16.00 #REF! 2,454.48 39,271.68
#REF! Frames (jambs) (0.635x0.60 Window) 12.00 #REF! 840.42 10,085.04
1010(1) Frames (jambs) (0.90x2.40 Door) 16.00 set 2,429.28 38,868.48
1010(1) Frames (jambs) (0.90x2.10 Door) 1.00 set 1,859.13 1,859.13
1010(1) Frames (jambs) (0.80x2.10 Door) 10.00 set 1,752.03 17,520.30
1010(1) Frames (jambs) (0.60x1.20 Door) 11.00 set 928.62 10,214.82
1010(2)a Doors (Flush) 26.60 sq.m. 3,188.36 84,810.38
#REF! #REF! 34.60 #REF! 7,411.17 256,426.48
#REF! #REF!
#REF! Fab. Metal Roofing Accesory (Gutter) 30.90 #REF! 449.44 13,887.70
1014 PRE-PAINTED METAL SHEET
1014(1)b2 Pre-Painted Metal Sheet (Rib type Long Span) 253.7 sq.m. 639.8 162,317.26
1018 CERAMIC/GRANITE TILES
1018(1) Glazed Tiles and Trims 209.60 sq.m. 2,119.50 444,247.20
1018(2) Unglazed Tiles 49.95 sq.m. 1,972.84 98,543.36
#REF! #REF!
#REF! #REF! 3,020.30 #REF! 222.21 671,140.86 1,150.45
#REF! #REF!
#REF! #REF! 2,656.80 #REF! 377.43 1,002,756.02
#REF! #REF! 435.90 #REF! 369.69 161,147.87
#REF! #REF!
#REF! #REF! 253.70 #REF! 261.88 66,438.96
#REF! #REF!
#REF! #REF! 215.60 #REF! 969.77 209,082.41 67.73
#REF! #REF! 830.30 #REF! 1,035.98 860,174.19 248.34
#REF! #REF!
#REF! #REF! #REF! #REF! 496,597.02 #VALUE!
#REF! #REF! 6,225.30 #REF! 84.15 523,859.00
#REF! #REF!
#REF! Micro Piles (0.20m Dia)(With casing) 1,170.00 #REF! 5,591.83 6,542,441.10 1,170.00
#REF! #REF!
1053(2)a1 Stainless Steel Railings (38mm dia) 25.00 l.m. 2,221.72 55,543.00
1053(3)a2 G.I. Pipe Railings (with nosing) 144.30 l.m. 615.82 88,862.83
#REF! #REF! 95.45 #REF! 613.91 58,597.71
#REF! #REF!
1100(23) Reinforced Concrete Pedestal Slope (Service Ent.) 1.00 lot 275,187.03 275,187.03
#REF! #REF! #REF! #REF! 85,846.77 #REF! 0.40
#REF! #REF! #REF! #REF! 143,421.25 #REF!
#REF! #REF! #REF! #REF! 92,201.34 #REF!
#REF! #REF! #REF! #REF! 2,550.24 #REF!
#REF! #REF! 43.00 #REF! 1,376.05 59,170.15
#REF! #REF! 32.00 #REF! 1,679.44 53,742.08
1103(4)a7 Compact Flourescent Lamp (CFL) w/ Medium Base
,Keyless type, PRO 17.00 set 441.00 7,497.00
1202(1) Automatic Water Sprinkler Sys. (Fire Prot. Sys.) 1.00 l.s. 892,393.23 892,393.23 0.20
#REF! #REF! #REF! #REF! 44,636.09 #VALUE! 0.20
1702(5)a Shoring, Cribbing and Related Works (Shoring) 1.00 lumpsum 293,761.54 293,761.54 1.00
1016(1) Waterproofing (Cement Base) 43.88 sq.m. 338.38 14,848.11

TOTAL CONTRACT COST P #REF!


WE HEREBY CERTIFY THAT THE STATEMENT OF WORK ACCOMPLISHED ON THIS PAGE IS TRUE AND CORRECT.
PREPARED BY: CHECKED BY:

CAMILLE D. BERLANDINO ESTEBAN ARMY M. SOSA


Engineer II Project Engineer II

SUBMITTED BY: RECOMMENDING APPROVAL :

ERNESTO M. GALANG FERNANDO C. GARCIA


Chief, Construction Section Asst. District Engineer
ways
ING OFFICE
OMPLISHED

Project ID No.: P00174789LZ-CW1


Contract ID No.: 17OA0101

Qty. Approved Qty. Approved Cost of Previous


Cost of this Billing Cost to Date
in this Billing to this Date Billing

- 1.00 60,832.30 - 60,832.30


- - - -
- 1.00 4,303.32 - 4,303.32
- 1.00 7,171.31 - 7,171.31
4.50 141,812.78 - 141,812.78
- 0.50 102,486.72 - 102,486.72
- - - -
- - - -
- - - -
- - - -
- 63.00 15,434.37 - 15,434.37
- 155.54 508,407.38 - 508,407.38
- - - -
- 801.90 248,556.92 - 248,556.92
- - - -
0.00 546.75 109,951.43 - 109,951.43
0.00 - - - -
- 28.75 35,191.44 - 35,191.44
- - - -
- - - -
92.08 453.71 1,765,971.29 449,639.83 2,215,611.12
- 26.10 122,689.58 - 122,689.58
- - - -
18,859.36 70,587.72 2,947,999.24 1,074,794.93 4,022,794.16
- 26,211.05 1,560,343.81 - 1,560,343.81
- - - -
830.51 2,272.14 859,528.64 495,166.67 1,354,695.31
- - - -
- - - -
- - - -
45.20 90.40 21,763.35 21,763.35 43,526.70
- - - -
- - - -
0.80 0.80 - 55,857.32 55,857.32
- - - -
- - - -
- - - -
1.00 1.00 - 9,361.37 9,361.37
- - - -
- - - -
- - - -
- - - -
- - - -
0.60 0.80 16,876.38 50,629.15 67,505.53
- - - -
322.20 322.20 - 315,991.21 315,991.21
8.00 8.00 - 42,123.84 42,123.84
- - - -
97.90 97.90 - 502,006.73 502,006.73
43.52 43.52 - 81,391.10 81,391.10
- - - -
38.20 38.20 - 87,537.97 87,537.97
- - - -
16.00 16.00 - 39,271.68 39,271.68
12.00 12.00 - 10,085.04 10,085.04
16.00 16.00 - 38,868.48 38,868.48
1.00 1.00 - 1,859.13 1,859.13
10.00 10.00 - 17,520.30 17,520.30
11.00 11.00 - 10,214.82 10,214.82
26.60 26.60 - 84,810.38 84,810.38
34.60 34.60 - 256,426.48 256,426.48
- - - -
30.90 30.90 - 13,887.70 13,887.70
- - - -
253.70 253.70 - 162,317.26 162,317.26
- - - -
209.60 209.60 - 444,247.20 444,247.20
- - - -
- - - -
1,454.72 2,605.17 255,641.49 323,252.22 578,893.71
- - - -
1,181.63 1,181.63 - 445,980.72 445,980.72
113.70 113.70 - 42,033.75 42,033.75
- - - -
253.70 253.70 - 66,438.96 66,438.96
- - - -
142.87 210.60 65,682.52 138,551.04 204,233.56 #REF!
541.16 789.50 257,275.27 560,630.94 817,906.21
-
-
-
-
-
-
-
- #REF!
6,225.30 6,225.30 - 523,859.00 523,859.00
- - - -
1,170.00 6,542,441.10 - 6,542,441.10
- - - -
- - - -
- - - -
95.45 95.45 - 58,597.71 58,597.71
- - - -
- - - -
0.60 1.00 34,338.71 51,508.06 85,846.77
0.80 0.80 - 114,737.00 114,737.00
1.00 1.00 - 92,201.34 92,201.34
- - - -
43.00 43.00 - 59,170.15 59,170.15
32.00 32.00 - 53,742.08 53,742.08
- - - -
17.00 17.00 - 7,497.00 7,497.00
0.80 1.00 178,478.65 713,914.58 892,393.23
0.60 0.80 8,927.22 26,781.65 35,708.87
1.00 2.00 293,761.54 293,761.54 587,523.08
- - - -

8,784,961.73 7,838,429.67 24,004,296.40


CONFORMED BY:

WILFRIDO C. CUBACUB, JR. 10,676,564.07


Gen. Mngr., Wilcu Construction

APPROVED BY :

MARLO B. CORREA
District Engineer
Project Name: Construction of Four (4) Storey, Eight (8) Classroom,
School Building, Tanza Elementary School
Location: Navotas City

DETAILED QUANTITY ESTIMATE

PART I FACILITIES FOR THE ENGINEERS

A.1.1(3) CONSTRUCTION OF FIELD OFFICE FOR THE ENGINEER


Quantity:

Quantity : Area = 20.00 sq.m. = 1.00 Lumpsum

PART II OTHER GENERAL REQUIREMENTS

B.5 (1) PROJECT BILLBOARD/SIGNBOARD (DPWH)


Quantity:

DPWH Project Billboard 1.00 each

B.5 (2) PROJECT BILLBOARD/SIGNBOARD COA)


Quantity:

COA Project Billboard 1.00 each

B.7 OCCUPATIONAL SAFETY AND HEALTH PROGRAM


Quantity:

219 Calendar Days = 7.30 months

B.9 MOBILIZATION AND DEMOBILIZATION


Quantity:

Mobilization and Demobilization (1.00 % of Civil Works)

PART III CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS


DIVISION I GENERAL
PART A EARTHWORK

801 REMOVAL OF STRUCTURES AND OBSTRUCTIONS


801(3) REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Original Quantity - - - - - - - - - - - - = -
Revised Quantity - - - - - - - - - - - - = 63.00
Qty. Subject to Change - - - - - - - - = (+) 63.00
Area:
7.00 x 9.00

Direct Unit cost - - - - - - - - - - - - - - = 201.28


OCM (12%) - - - - - - - - - - - - - - - - = 24.15
Profit (8%) - - - - - - - - - - - - - - - - = 16.10
VAT (5%) - - - - - - - - - - - - - - - - - = 12.08
Sub - total - - - - - - - - - - - - - - - - - = 253.61
Less Variance (3.40%) - - - - - - - - - = (-) 8.62
Total Cost - - - - - - - - - - - - - - - - - = 244.99
Unit Cost - - - - - - - - - - - - - - - - - - = 244.99

801 REMOVAL OF STRUCTURES AND OBSTRUCTIONS


801(6) REMOVAL OF STRUCTURES AND OBSTRUCTIONS (CONCRETE)

Original Quantity - - - - - - - - - - - - = 80.20


Revised Quantity - - - - - - - - - - - - = 155.54
Qty. Subject to Change - - - - - - - - = (+) 75.34

Volume:

Existing Slab : 20.00 x 16.50 x 0.20 x 2


7.00 x 9.00 x 0.10
Existing Structure : 1.50 x 1.50 x 0.30 x 21
0.20 x 0.20 x 3.00 x 9
0.20 x 0.20 x (27.00 + 22.50)

803 STRUCTURE EXCAVATION


803(1)a STRUCTURE EXCAVATION (COMMON SOIL) (WITH DEWATERING)

Original Quantity - - - - - - - - - - - - = 688.90


Revised Quantity - - - - - - - - - - - - = 858.29
Qty. Subject to Change - - - - - - - - = (+) 169.39

Volume:

MF - 1 : ((22.00 x 18.50) - (5.00 x 8.50)) x 2.20


Ramp : 0.40 x 0.20 x 20.00 x 2
Underground Water Tank : 3.85 x 3.15 x 1.875
Septic Vault : 5.80 x 2.50 x 2.10

804 EMBANKMENT
804(1)a EMBANKMENT (FROM ROADWAY / STRUCTURE EXCAVATION)

Original Quantity - - - - - - - - - - - - = 431.25


Revised Quantity - - - - - - - - - - - - = 546.75
Qty. Subject to Change - - - - - - - - = (+) 115.50

Volume:

MF - 1 : ((22.00 x 18.50) - (5.00 x 8.50)) x 1.50

804(1)b EMBANKMENT (FROM BORROW)


Volume:

Slab on Fill : 20.00 x 16.50 x 0.80


Steps : 2.50 x 0.90 x 0.10
2.50 x 0.70 x 0.10
2.50 x 0.50 x 0.10
2.50 x 0.30 x 0.10
2.50 x 0.10 x 0.10
Ramp : 0.40 x 2.80 x 1.675 x 2
3.60 x 0.40 x 0.50 x 1.40 x 2
(0.40 + 0.90)/2 x 6.00 x 1.45 x 2
0.90 x 1.675 x 1.45 x 2

804(4) GRAVEL FILL


Volume:

MF - 1 : ((20.00 x 16.50) - (5.00 x 8.50)) x 0.10


FTB - 1 : 0.45 x 2.50 x 0.10 x 6
FTB - 2 : 0.45 x 7.00 x 0.10 x 6
FTB - 3 : 0.45 x 0.10 x 69.00
Slab on Fill : 20.00 x 16.50 x 0.10
Septic Vault : 5.80 x 2.50 x 0.10
Underground Water Tank : 3.85 x 3.15 x 0.10

PART B PLAIN AND REINFORCED CONCRETE WORK

900 REINFORCED CONCRETE


900(1)c1 STRUCTURAL CONCRETE (CLASS "A") (28 DAYS)
Volume:

A. REINFORCED CONCRETE FOR MAT FOOTING AND WALL FOOTING


*COLUMN FOOTING
MF - 1 : ((20.00 x 16.50) - (5.00 x 8.50)) x 0.60
*WALL FOOTING
WF - 1 : 0.20 x 0.40 x 21.60
WF - 2 : ((0.25x0.30) + (0.50x0.15x0.15x2)) x 18.30

B. REINFORCED CONCRETE FOR FOOTING TIE BEAM

*TIE BEAM
FTB - 1: 0.40 x 0.50 x 2.50 x 6
FTB - 2 : 0.40 x 0.50 x 7.00 x 6
FTB - 3 : 0.40 x 0.50 x 4.50 x 4 x 3
0.40 x 0.50 x 5.00 x 3

C. REINFORCED CONCRETE FOR COLUMN AND PC

*COLUMN
C-1:
0.50 x 0.50 x 2.50 x 4
0.45 x 0.45 x 3.20 x 4
0.40 x 0.40 x 9.60 x 4
C-2:
0.65 x 0.65 x 2.50 x 7
0.60 x 0.60 x 3.20 x 7
0.55 x 0.55 x 3.20 x 7 x 2
0.45 x 0.45 x 3.20 x 7
C-3:
0.65 x 0.65 x 2.50 x 7
0.60 x 0.60 x 3.20 x 7
0.55 x 0.55 x 3.20 x 7 x 2
0.45 x 0.45 x 3.20 x 7
SC - 1 : 0.15 x 0.30 x 12.80 x 4
PC - 1 : 0.25 x 0.30 x 2.50 x 3

D. REINFORCED CONCRETE FOR SECOND FLOOR BEAM/GIRDER

G-1: 0.20 x 0.40 x 13.50


G-2: 0.30 x 0.45 x 23.00
G-3: 0.30 x 0.45 x 23.00
G-4: 0.40 x 0.40 x 2.50 x 2
G-5: 0.40 x 0.50 x 7.00 x 2
G-6: 0.40 x 0.40 x 2.50 x 5
G-7: 0.40 x 0.50 x 7.00 x 2
G-8: 0.40 x 0.50 x 7.00 x 3
CB - 1 : 0.25 x 0.40 x 2.29
CB - 2 : 0.30 x 0.45 x 2.29
B-1: 0.20 x 0.40 x 18.00
B-2: 0.30 x 0.40 x 5.00
B-3: 0.20 x 0.30 x 4.00
B-4: 0.20 x 0.40 x 2.50

E. REINFORCED CONCRETE FOR SECOND FLOOR SLAB

S-1: 3.25 x 16.40 x 0.125


S-2: 3.25 x 16.40 x 0.125
S-3: 2.25 x 18.40 x 0.125
S-4: 2.25 x 4.60 x 0.125
S-5: 2.70 x 4.60 x 0.125
S-6: 1.55 x 3.70 x 0.125

F. REINFORCED CONCRETE FOR THIRD FLOOR BEAM/GIRDER

G-1: 0.20 x 0.40 x 13.50


G-2: 0.30 x 0.45 x 23.00
G-3: 0.30 x 0.45 x 23.00
G-4: 0.40 x 0.40 x 2.50 x 2
G-5: 0.40 x 0.50 x 7.00 x 2
G-6: 0.40 x 0.40 x 2.50 x 5
G-7: 0.40 x 0.50 x 7.00 x 2
G-8: 0.40 x 0.50 x 7.00 x 3
CB - 1 : 0.25 x 0.40 x 2.29
CB - 2 : 0.30 x 0.45 x 2.29
B-1: 0.20 x 0.40 x 18.00
B-2: 0.30 x 0.40 x 5.00
B-3: 0.20 x 0.30 x 4.00
B-4: 0.20 x 0.40 x 2.50

G. REINFORCED CONCRETE FOR THIRD FLOOR SLAB

S-1: 3.25 x 16.40 x 0.125


S-2: 3.25 x 16.40 x 0.125
S-3: 2.25 x 18.40 x 0.125
S-4: 2.25 x 4.60 x 0.125
S-5: 2.70 x 4.60 x 0.125
S-6: 1.55 x 3.70 x 0.125

H. REINFORCED CONCRETE FOR FOURTH FLOOR BEAM/GIRDER


G-1: 0.20 x 0.40 x 13.50
G-2: 0.30 x 0.45 x 23.00
G-3: 0.30 x 0.45 x 23.00
G-4: 0.40 x 0.40 x 2.50 x 2
G-5: 0.40 x 0.50 x 7.00 x 2
G-6: 0.40 x 0.40 x 2.50 x 5
G-7: 0.40 x 0.50 x 7.00 x 2
G-8: 0.40 x 0.50 x 7.00 x 3
CB - 1 : 0.20 x 0.40 x 2.20
CB - 2 : 0.30 x 0.40 x 2.20
B-1: 0.20 x 0.40 x 18.00
B-2: 0.30 x 0.40 x 5.00
B-3: 0.20 x 0.30 x 4.00
B-4: 0.20 x 0.40 x 3.69

I. REINFORCED CONCRETE FOR FOURTH FLOOR SLAB

S-1: 3.25 x 16.40 x 0.125


S-2: 3.25 x 16.40 x 0.125
S-3: 2.25 x 17.30 x 0.125
S-4: ((2.25 x 4.60 x 0.125) + (0.70 x 0.94 x 0.125))
S-5: 2.70 x 4.60 x 0.125
S-6: 1.55 x 3.70 x 0.125

J. REINFORCED CONCRETE FOR ROOF BEAM

RG - 1 : 0.20 x 0.40 x 54.50


RG - 2 : 0.20 x 0.40 x 2.50 x 6
RG - 3: 0.20 x 0.50 x 7.00 x 3
RG - 4 : 0.20 x 0.40 x 5.00 x 2
RG - 5: 0.25 x 0.50 x 7.00 x 3
RB - 1 : 0.20 x 0.30 x 6.70 x 2 x 2
0.20 x 0.30 x 14.25
CB - 1 : 0.20 x 0.40 x 1.00
CB - 2 : 0.20 x 0.40 x 1.00
ROOF B - 4 : 0.15 x 0.30 x 1.19

K. REINFORCED CONCRETE FOR ROOF DECK SLAB

SLAB : 4.75 x 9.75 x 0.125

L. REINFORCED CONCRETE FOR STAIR


*MAIN STAIR
DC - 1: 0.20 x 0.20 x 1.60 x 4 x 3
FB - 1 : 0.20 x 0.40 x 5.00
STB - 1 : 0.20 x 0.40 x 3.45 x 3
STB - 2 : 0.20 x 0.40 x 3.45 x 3
Landing : 3.15 x 1.30 x 0.15 x 3
Stair Slab : 3.00 x 1.575 x 0.15 x 2 x 3
Steps : (0.50 x ((0.30 + 0.05) x 0.168) -
(0.50 x (0.168 x 0.05))) x 1.575 x 19 x 3
*STAIR FROM THIRD FLOOR TO DECK ROOF
Landing : 1.19 x 1.00 x 0.125 x 2
Stair Slab : 5.40 x 1.00 x 0.20
Steps : (0.50 x ((0.205 + 0.04) x 0.145) -
(0.50 x (0.145 x 0.04))) x 1.00 x 22

M. REINFORCED CONCRETE FOR STAIR ON GRADE

Steps : (0.50 x ((0.342 + 0.05) x 0.168) -


(0.50 x (0.168 x 0.05))) x 2.50 x 5
Slab : 1.00 x 2.50 x 0.125

N. REINFORCED CONCRETE FOR SUN BREAKER

Sunbreaker : 3.90 x ((0.575x0.10)+(0.05x0.575x0.10)) x 4


4.40 x ((0.575 x 0.10) + (0.05 x 0.575 x 0.10))
3.95 x ((0.575x0.10)+(0.05x0.575x0.10)) x 4 x 2
4.45 x ((0.575 x 0.10) + (0.05 x 0.575 x 0.10)) x 2

O. REINFORCED CONCRETE FOR SEPTIC VAULT

Flooring : 7.70 x 2.80 x 0.15


Wall : 7.70 x 0.35 x 0.15 x 2
2.50 x 0.35 x 0.15 x 2
` 2.50 x 0.35 x 0.10
Cover : 7.70 x 2.80 x 0.15

900(2)c STRUCTURAL CONCRETE (CLASS "B") (28 DAYS)


Volume:

A. REINFORCED CONCRETE FOR SLAB ON FILL, CORRIDOR AND RAMP

SOF/CORRIDOR : 18.00 x 14.50 x 0.10


RAMP : 15.60 x 1.20 x 0.10

902 REINFORCING STEEL


902(1)a1 REINFORCING STEEL (DEFORMED) (GRADE 40)
Materials:

A. REINFORCING STEEL FOR WALL FOOTING

*WALL FOOTING
WF - 1 : 3 pcs - 12mm Ø x 6.00m x 4
54 pcs - 12mm Ø x 0.40m
WF - 2 : 3 pcs - 12mm Ø x 6.00m x 4
46 pcs - 12mm Ø x 0.40m

B. REINFORCING STEEL FOR FOOTING TIE BEAM

*FOOTING TIE BEAM


FTB - 1/FTB - 2 :
Continuous Bar : 8 pcs - 25mmØ x 10.50m x 6
Extra Bar : 4 pcs - 25mmØ x 6.00m x 6
Stirrups : 103 pcs - 12mmØ x 1.80m x 6
103 pcs - 12mmØ x 1.30m x 6
FTB - 3 :
Continuous Bar : 8 pcs - 25mmØ x 20.80m x 3
8 pcs - 25mmØ x 6.00m x 3
Stirrups : 251 pcs - 12mmØ x 1.80m x 3
251 pcs - 12mmØ x 1.30m x 3

C. REINFORCING STEEL FOR COLUMN AND PC

*COLUMN
C-1:
Continuous Bar : 12 pcs - 25mm Ø x 10.50m x 4
12 pcs - 20mm Ø x 7.50m x 4
Lateral Ties : 31 pcs - 12mm Ø x 2.00m x 4
31 pcs - 12mm Ø x 1.33m x 4 x 2
26 pcs - 12mm Ø x 1.80m x 4
26 pcs - 12mm Ø x 1.20m x 4 x 2
26 pcs - 12mm Ø x 1.60m x 4 x 3
26 pcs - 12mm Ø x 1.07m x 4 x 3 x 2
C-2:
Continuous Bar : 16 pcs - 25mm Ø x 10.50m x 7
12 pcs - 25mm Ø x 7.50m x 7
Lateral Ties : 31 pcs - 12mm Ø x 2.60m x 7
31 pcs - 12mm Ø x 1.73m x 7 x 2
26 pcs - 12mm Ø x 2.40m x 7
26 pcs - 12mm Ø x 1.60m x 7 x 2
26 pcs - 12mm Ø x 2.20m x 7
26 pcs - 12mm Ø x 1.46m x 7 x 2
26 pcs - 12mm Ø x 2.20m x 7
26 pcs - 12mm Ø x 1.46m x 7 x 2
26 pcs - 12mm Ø x 1.80m x 7
26 pcs - 12mm Ø x 1.20m x 7 x 2
C-3:
Continuous Bar : 12 pcs - 25mm Ø x 10.50m x 7
12 pcs - 25mm Ø x 7.50m x 7
Lateral Ties : 31 pcs - 12mm Ø x 2.60m x 7
31 pcs - 12mm Ø x 1.73m x 7 x 2
26 pcs - 12mm Ø x 2.40m x 7
26 pcs - 12mm Ø x 1.60m x 7 x 2
26 pcs - 12mm Ø x 2.20m x 7
26 pcs - 12mm Ø x 1.46m x 7 x 2
26 pcs - 12mm Ø x 2.20m x 7
26 pcs - 12mm Ø x 1.46m x 7 x 2
26 pcs - 12mm Ø x 1.80m x 7
26 pcs - 12mm Ø x 1.20m x 7 x 2
SC - 1 : 4 pcs - 12mm Ø x 12.80m x 4 x 4
22 pcs - 10mm Ø x 0.90m x 4 x 4
PC - 1 : 4 pcs - 16mm Ø x 2.50m x 3
16 pcs - 10mm Ø x 1.10m x 3

D. REINFORCING STEEL FOR SECOND FLOOR BEAM/GIRDER

G - 1 / CB - 1:
Continuous Bar : 4 pcs - 20mmØ x 6.00m x 3
Extra Bar (G - 1) : 6 pcs - 20mmØ x 7.50m
Extra Bar (CB - 1) : 1 pc - 20mmØ x 7.50m
Stirrups (G - 1) : 110 pcs - 10mmØ x 1.20m
Stirrups (CB - 1) : 24 pcs - 10mmØ x 1.30m
G - 2 / CB - 2:
Continuous Bar : 6 pcs - 20mmØ x 6.00m x 5
Extra Bar (G - 2) : 5 pcs - 20mmØ x 9.00m
Extra Bar (CB - 2) : 1 pc - 20mmØ x 9.00m
Stirrups (G - 2) : 182 pcs - 10mmØ x 1.50m
Stirrups (CB - 2) : 24 pcs - 10mmØ x 1.30m
24 pcs - 10mmØ x 1.10m
G - 3:
Continuous Bar : 5 pcs - 20mmØ x 6.00m x 5
Extra Bar : 5 pcs - 20mmØ x 9.00m
Stirrups : 182 pcs - 10mmØ x 1.50m
G-4/G-5:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 2
Extra Bar : 1 pc - 25mmØ x 7.50m x 2
5 pcs - 25mmØ x 6.00m x 2
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
Stirrups : 24 pcs - 10mmØ x 1.60m x 2
24 pcs - 10mmØ x 1.10m x 2
50 pcs - 10mmØ x 1.80m x 2
50 pcs - 10mmØ x 1.30m x 2
G-6/G-7:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 2
Extra Bar : 1 pc - 25mmØ x 7.50m x 2
5 pcs - 25mmØ x 6.00m x 2
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
Stirrups : 24 pcs - 10mmØ x 1.60m x 2
24 pcs - 10mmØ x 1.10m x 2
50 pcs - 10mmØ x 1.80m x 2
50 pcs - 10mmØ x 1.30m x 2
G-6/G-8:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 3
Extra Bar : 1 pc - 25mmØ x 7.50m x 3
5 pcs - 25mmØ x 6.00m x 3
Web Bars : 2 pcs - 12mmØ x 7.50m x 3
Stirrups : 24 pcs - 10mmØ x 1.60m x 3
24 pcs - 10mmØ x 1.10m x 3
50 pcs - 10mmØ x 1.80m x 3
50 pcs - 10mmØ x 1.30m x 3
B-1:
Continuous Bar : 4 pcs - 16mmØ x 6.00m x 4
Extra Bar : 4 pcs - 16mmØ x 9.00m
4 pcs - 16mmØ x 6.00m
Stirrups : 160 pcs - 10mmØ x 1.20m
B-2:
Continuous Bar : 4 pcs - 20mmØ x 6.00m
Extra Bar : 1 pc - 20mmØ x 9.00m
1 pc - 20mmØ x 6.00m
Stirrups : 38 pcs - 10mmØ x 1.40m
B - 3:
Continuous Bar : 4 pcs - 16mmØ x 6.00m
Stirrups : 36 pcs - 10mmØ x 1.00m
B-4:
Continuous Bar : 4 pcs - 16mmØ x 3.00m
Stirrups : 24 pcs - 10mmØ x 1.20m

E. REINFORCING STEEL FOR SECOND FLOOR SLAB


HORIZONTAL BAR :
S-1/S-2: 29 pcs - 10mmØ x 19.70m x 3
S-3: 11 pcs - 10mmØ x 22.20m x 3
S-4/S-5/S-6: 21 pcs - 10mmØ x 10.50m x 3
VERTICAL BAR :
S-1/S-2/S-3: 73 pcs - 10mmØ x 10.50m x 3
S-4/S-5/S-6: 39 pcs - 10mmØ x 6.00m x 3
S-3: 10 pcs - 10mmØ x 3.00m x 3

F. REINFORCING STEEL FOR THIRD FLOOR BEAM/GIRDER

G - 1 / CB - 1:
Continuous Bar : 4 pcs - 20mmØ x 6.00m x 3
Extra Bar (G - 1) : 6 pcs - 20mmØ x 7.50m
Extra Bar (CB - 1) : 1 pc - 20mmØ x 7.50m
Stirrups (G - 1) : 110 pcs - 10mmØ x 1.20m
Stirrups (CB - 1) : 24 pcs - 10mmØ x 1.30m
G - 2 / CB - 2:
Continuous Bar : 6 pcs - 20mmØ x 6.00m x 5
Extra Bar (G - 2) : 5 pcs - 20mmØ x 9.00m
Extra Bar (CB - 2) : 1 pc - 20mmØ x 9.00m
Stirrups (G - 2) : 182 pcs - 10mmØ x 1.50m
Stirrups (CB - 2) : 24 pcs - 10mmØ x 1.30m
24 pcs - 10mmØ x 1.10m
G - 3:
Continuous Bar : 5 pcs - 20mmØ x 6.00m x 5
Extra Bar : 5 pcs - 20mmØ x 9.00m
Stirrups : 182 pcs - 10mmØ x 1.50m
G-4/G-5:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 2
Extra Bar : 1 pc - 25mmØ x 7.50m x 2
5 pcs - 25mmØ x 6.00m x 2
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
Stirrups : 24 pcs - 10mmØ x 1.60m x 2
24 pcs - 10mmØ x 1.10m x 2
50 pcs - 10mmØ x 1.80m x 2
50 pcs - 10mmØ x 1.30m x 2
G-6/G-7:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 2
Extra Bar : 1 pc - 25mmØ x 7.50m x 2
5 pcs - 25mmØ x 6.00m x 2
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
Stirrups : 24 pcs - 10mmØ x 1.60m x 2
24 pcs - 10mmØ x 1.10m x 2
50 pcs - 10mmØ x 1.80m x 2
50 pcs - 10mmØ x 1.30m x 2
G-6/G-8:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 3
Extra Bar : 1 pc - 25mmØ x 7.50m x 3
5 pcs - 25mmØ x 6.00m x 3
Web Bars : 2 pcs - 12mmØ x 7.50m x 3
Stirrups : 24 pcs - 10mmØ x 1.60m x 3
24 pcs - 10mmØ x 1.10m x 3
50 pcs - 10mmØ x 1.80m x 3
50 pcs - 10mmØ x 1.30m x 3
B-1:
Continuous Bar : 4 pcs - 16mmØ x 6.00m x 4
Extra Bar : 4 pcs - 16mmØ x 9.00m
4 pcs - 16mmØ x 6.00m
Stirrups : 160 pcs - 10mmØ x 1.20m
B-2:
Continuous Bar : 4 pcs - 20mmØ x 6.00m
Extra Bar : 1 pc - 20mmØ x 9.00m
1 pc - 20mmØ x 6.00m
Stirrups : 38 pcs - 10mmØ x 1.40m
B - 3:
Continuous Bar : 4 pcs - 16mmØ x 6.00m
Stirrups : 36 pcs - 10mmØ x 1.00m
B-4:
Continuous Bar : 4 pcs - 16mmØ x 3.00m
Stirrups : 24 pcs - 10mmØ x 1.20m

G. REINFORCING STEEL FOR THIRD FLOOR SLAB

HORIZONTAL BAR :
S-1/S-2: 29 pcs - 10mmØ x 19.70m x 3
S-3: 11 pcs - 10mmØ x 22.20m x 3
S-4/S-5/S-6: 21 pcs - 10mmØ x 10.50m x 3
VERTICAL BAR :
S-1/S-2/S-3: 73 pcs - 10mmØ x 10.50m x 3
S-4/S-5/S-6: 39 pcs - 10mmØ x 6.00m x 3
S-3: 10 pcs - 10mmØ x 3.00m x 3

H. REINFORCING STEEL FOR FOURTH FLOOR BEAM/GIRDER

G - 1 / CB - 1:
Continuous Bar : 4 pcs - 20mmØ x 6.00m x 3
Extra Bar (G - 1) : 6 pcs - 20mmØ x 7.50m
Stirrups (G - 1) : 110 pcs - 10mmØ x 1.20m
Stirrups (CB - 1) : 24 pcs - 10mmØ x 1.30m
G - 2 / CB - 2:
Continuous Bar : 6 pcs - 20mmØ x 6.00m x 5
Extra Bar (G - 2) : 5 pcs - 20mmØ x 9.00m
Stirrups (G - 2) : 182 pcs - 10mmØ x 1.50m
Stirrups (CB - 2) : 24 pcs - 10mmØ x 1.30m
24 pcs - 10mmØ x 1.10m
G - 3:
Continuous Bar : 5 pcs - 20mmØ x 6.00m x 5
Extra Bar : 5 pcs - 20mmØ x 9.00m
Stirrups : 182 pcs - 10mmØ x 1.50m
G-4/G-5:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 2
Extra Bar : 1 pc - 25mmØ x 7.50m x 2
5 pcs - 25mmØ x 6.00m x 2
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
Stirrups : 24 pcs - 10mmØ x 1.60m x 2
24 pcs - 10mmØ x 1.10m x 2
50 pcs - 10mmØ x 1.80m x 2
50 pcs - 10mmØ x 1.30m x 2
G-6/G-7:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 2
Extra Bar : 1 pc - 25mmØ x 7.50m x 2
5 pcs - 25mmØ x 6.00m x 2
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
Stirrups : 24 pcs - 10mmØ x 1.60m x 2
24 pcs - 10mmØ x 1.10m x 2
50 pcs - 10mmØ x 1.80m x 2
50 pcs - 10mmØ x 1.30m x 2
G-6/G-8:
Continuous Bar : 5 pcs - 25mmØ x 10.50m x 3
Extra Bar : 1 pc - 25mmØ x 7.50m x 3
5 pcs - 25mmØ x 6.00m x 3
Web Bars : 2 pcs - 12mmØ x 7.50m x 3
Stirrups : 24 pcs - 10mmØ x 1.60m x 3
24 pcs - 10mmØ x 1.10m x 3
50 pcs - 10mmØ x 1.80m x 3
50 pcs - 10mmØ x 1.30m x 3
B-1:
Continuous Bar : 4 pcs - 16mmØ x 6.00m x 4
Extra Bar : 4 pcs - 16mmØ x 9.00m
4 pcs - 16mmØ x 6.00m
Stirrups : 160 pcs - 10mmØ x 1.20m
B-2:
Continuous Bar : 4 pcs - 20mmØ x 6.00m
Extra Bar : 1 pc - 20mmØ x 9.00m
1 pc - 20mmØ x 6.00m
Stirrups : 38 pcs - 10mmØ x 1.40m
B - 3:
Continuous Bar : 4 pcs - 16mmØ x 6.00m
Stirrups : 36 pcs - 10mmØ x 1.00m
B-4:
Continuous Bar : 4 pcs - 16mmØ x 3.00m
Stirrups : 24 pcs - 10mmØ x 1.20m

I. REINFORCING STEEL FOR FOURTH FLOOR SLAB

HORIZONTAL BAR :
S-1/S-2: 29 pcs - 10mmØ x 19.70m x 3
S-3: 11 pcs - 10mmØ x 22.20m x 3
S-4/S-5/S-6: 21 pcs - 10mmØ x 10.50m x 3
VERTICAL BAR :
S-1/S-2/S-3: 73 pcs - 10mmØ x 10.50m x 3
S-4/S-5/S-6: 39 pcs - 10mmØ x 6.00m x 3
S-3: 10 pcs - 10mmØ x 3.00m x 3

J. REINFORCING STEEL FOR ROOF DECK SLAB

HORIZONTAL BAR :
Slab : 40 pcs - 10mmØ x 6.00m x 3
VERTICAL BAR :
Slab : 20 pcs - 10mmØ x 10.50m x 3

K. REINFORCING STEEL FOR ROOF BEAM

RG - 1 :
Continuous Bar : 6 pcs - 20mmØ x 6.00m x 4 x 2
6 pcs - 20mmØ x 6.00m x 4
Stirrups : 36 pcs - 10mmØ x 1.20m x 12
RG - 2/RG - 3 :
Continuous Bar : 4 pcs - 20mmØ x 9.00m
4 pcs - 20mmØ x 6.00m
4 pcs - 20mmØ x 10.50m x 2
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
2 pcs - 12mmØ x 9.00m
Stirrups :
RG - 2: 24 pcs - 10mmØ x 1.20m x 3
16 pcs - 10mmØ x 1.20m
RG - 3: 50 pcs - 10mmØ x 1.40m x 3
16 pcs - 10mmØ x 1.40m
RG - 2/RG - 5 :
Continuous Bar : 4 pcs - 20mmØ x 9.00m
4 pcs - 20mmØ x 6.00m
4 pcs - 20mmØ x 10.50m x 2
Extra Bar : 2 pcs - 20mmØ x 7.50m x 2
2 pcs - 20mmØ x 9.00m x 2
2 pcs - 20mmØ x 6.00m x 3
2 pcs - 20mmØ x 5.00m x 3
Web Bars : 2 pcs - 12mmØ x 7.50m x 2
2 pcs - 12mmØ x 9.00m x 2
Stirrups :
RG - 2: 24 pcs - 10mmØ x 1.20m x 3
16 pcs - 10mmØ x 1.20m
RG - 5: 50 pcs - 10mmØ x 1.50m x 3
50 pcs - 10mmØ x 1.20m x 3
16 pcs - 10mmØ x 1.50m x 2
16 pcs - 10mmØ x 1.20m x 2
RG - 4 :
Continuous Bar : 4 pcs - 20mmØ x 6.00m x 2
1 pc - 20mmØ x 9.00m
Stirrups : 38 pcs - 10mmØ x 1.20m x 2
RB - 1 :
Continuous Bar : 4 pcs - 16mmØ x 7.50m x 4
4 pcs - 16mmØ x 10.50m
4 pcs - 16mmØ x 6.00m
Stirrups : 362 pcs - 10mmØ x 1.00m
CB - 1 :
Continuous Bar : 7 pcs - 16mmØ x 1.50m
Stirrups : 12 pcs - 10mmØ x 1.20m
CB - 2 :
Continuous Bar : 6 pcs - 16mmØ x 1.50m
Stirrups : 12 pcs - 10mmØ x 1.20m
ROOF B - 4 :
Continuous Bar : 4 pcs - 12mmØ x 1.50m
Stirrups : 12 pcs - 10mmØ x 0.90m

L. REINFORCING STEEL FOR STAIR

*MAIN STAIR :
DC - 1:
Footing Bar : 3 pcs - 12mmØ x 0.40m x 4 x 2
Continuous Bar : 4 pcs - 16mmØ x 2.30m x 4 x 3
4 pcs - 16mmØ x 2.00m x 4 x 3
Stirrups : 24 pcs - 10mmØ x 0.80m x 4 x 3
22 pcs - 10mmØ x 0.80m x 4 x 3
FB - 1 :
Continuous Bar : 4 pcs - 16mmØ x 6.00m
Extra Bar : 2 pcs - 16mmØ x 6.00m
Stirrups : 38 pcs - 10mmØ x 1.20m
38 pcs - 10mmØ x 1.00m
STB - 1 :
Continuous Bar : 8 pcs - 16mmØ x 3.50m x 3
Stirrups : 26 pcs - 10mmØ x 1.20m x 3
STB - 2 :
Continuous Bar : 8 pcs - 16mmØ x 3.50m x 3
Stirrups : 26 pcs - 10mmØ x 1.20m x 3
STAIR :
Main Bar : 16 pcs - 20mmØ x 6.00m x 2 x 3
Stair Temp. Bar : 15 pcs - 12mmØ x 1.80m x 2 x 3 x 2
Landing Temp. Bar: 8 pcs - 12mmØ x 3.45m x 2 x 3
23 pcs - 12mmØ x 1.40m x 2 x 3
Nosing Bar : 19 pcs - 10mmØ x 1.80m x 3
Step Bar : 5 pcs - 10mmØ x 10.50m x 3

*STAIR FROM THIRD FLOOR TO DECK ROOF :


Main Bar : 10 pcs - 20mmØ x 6.00m x 2
Stair Temp. Bar : 10 pcs - 12mmØ x 6.00m
Landing Temp. Bar: 7 pcs - 12mmØ x 6.00m
6 pcs - 12mmØ x 6.00m
Nosing Bar : 22 pcs - 10mmØ x 1.50m
Step Bar : 4 pcs - 10mmØ x 9.00m

M. REINFORCING STEEL FOR STAIR ON GRADE

Main Bar : 10 pcs - 10mmØ x 2.00m


Temp. Bar : 5 pcs - 10mmØ x 3.00m
Nosing Bar : 5 pcs - 10mmØ x 3.00m
Step Bar : 10 pcs - 10mmØ x 1.80m
Extra Bar : 6 pcs - 10mmØ x 3.00m

N. REINFORCING STEEL FOR SUN BREAKER

Sunbreaker : 4 pcs. - 10 mmØ x 6.00m x 5 x 3


16 pcs. - 10 mmØ x 1.80m x 4 x 3
18 pcs. - 10 mmØ x 1.80m x 3

O. REINFORCING STEEL FOR SEPTIC VAULT

Flooring/Wall : 14 pcs. - 12 mmØ x 9.00m


40 pcs. - 12 mmØ x 3.50m
Cover : 40 pcs. - 12 mmØ x 3.50m
14 pcs. - 10 mmØ x 9.00m
P. REINFORCING STEEL FOR SLAB ON FILL AND CORRIDOR

SOF/CORRIDOR : 60 pcs - 10mmØ x 10.50m


32 pcs - 10mmØ x 19.30m
18 pcs - 10mmØ x 10.50m
32 pcs - 10mmØ x 6.00m
RAMP : 8 pcs - 10mmØ x 7.50m
24 pcs - 10mmØ x 2.50m

902(1)a2 REINFORCING STEEL (DEFORMED) (GRADE 60)


Materials:

A. REINFORCING STEEL FOR MAT FOOTING

*MAT FOOTING
MF - 1 :
Bar X (Top/Bottom Bar) : 47 pcs. - 25 mmØ x 6.00m x 4 x 2
21 pcs. - 25 mmØ x 7.50m x 2
21 pcs. - 25 mmØ x 6.00m x 2
Bar Y (Top/Bottom Bar) : 35 pcs. - 25 mmØ x 7.50m x 2
35 pcs. - 25 mmØ x 6.00m x 2
47 pcs. - 25 mmØ x 10.50m x 2
47 pcs. - 25 mmØ x 9.00m x 2
Extra Bar : 200 pcs. - 25 mmØ x 6.00m

903 FORMWORKS AND FALSEWORKS


903(2) FORMWORKS AND FALSEWORKS
Area:

A. REINFORCED CONCRETE FOR FOOTING TIE BEAM

*TIE BEAM
FTB - 1: 1.40 x 2.50 x 6
FTB - 2 : 1.40 x 7.00 x 6
FTB - 3 : 1.40 x 4.50 x 4 x 3
1.40 x 5.00 x 3

B. REINFORCED CONCRETE FOR COLUMN AND PC

*COLUMN
C-1:
2.00 x 2.50 x 4
1.80 x 2.50 x 4
1.60 x 9.60 x 4
C-2:
2.60 x 2.50 x 7
2.40 x 3.20 x 7
2.20 x 3.20 x 7 x 2
1.80 x 3.20 x 7
C-3:
2.60 x 2.50 x 7
2.40 x 3.20 x 7
2.20 x 3.20 x 7 x 2
1.80 x 3.20 x 7
SC - 1 : 0.90 x 12.80 x 4
PC - 1 : 1.10 x 2.50 x 3

C. REINFORCED CONCRETE FOR SECOND FLOOR BEAM/GIRDER

G-1: 1.00 x 13.50


G-2: 1.20 x 23.00
G-3: 1.20 x 23.00
G-4: 1.20 x 2.50 x 2
G-5: 1.40 x 7.00 x 2
G-6: 1.20 x 2.50 x 5
G-7: 1.40 x 7.00 x 2
G-8: 1.40 x 7.00 x 3
CB - 1 : 1.05 x 2.29
CB - 2 : 1.20 x 2.29
B-1: 1.00 x 18.00
B-2: 1.10 x 5.00
B-3: 0.80 x 4.00
B-4: 1.00 x 2.50

D. REINFORCED CONCRETE FOR SECOND FLOOR SLAB

S-1: 3.25 x 16.40


S-2: 3.25 x 16.40
S-3: 2.25 x 18.40
S-4: 2.25 x 4.60
S-5: 2.70 x 4.60
S-6: 1.55 x 3.70

E. REINFORCED CONCRETE FOR THIRD FLOOR BEAM/GIRDER


G-1: 1.00 x 13.50
G-2: 1.20 x 23.00
G-3: 1.20 x 23.00
G-4: 1.20 x 2.50 x 2
G-5: 1.40 x 7.00 x 2
G-6: 1.20 x 2.50 x 5
G-7: 1.40 x 7.00 x 2
G-8: 1.40 x 7.00 x 3
CB - 1 : 1.05 x 2.29
CB - 2 : 1.20 x 2.29
B-1: 1.00 x 18.00
B-2: 1.10 x 5.00
B-3: 0.80 x 4.00
B-4: 1.00 x 2.50

F. REINFORCED CONCRETE FOR THIRD FLOOR SLAB

S-1: 3.25 x 16.40


S-2: 3.25 x 16.40
S-3: 2.25 x 18.40
S-4: 2.25 x 4.60
S-5: 2.70 x 4.60
S-6: 1.55 x 3.70

G. REINFORCED CONCRETE FOR FOURTH FLOOR BEAM/GIRDER

G-1: 1.00 x 13.50


G-2: 1.20 x 23.00
G-3: 1.20 x 23.00
G-4: 1.20 x 2.50 x 2
G-5: 1.40 x 7.00 x 2
G-6: 1.20 x 2.50 x 5
G-7: 1.40 x 7.00 x 2
G-8: 1.40 x 7.00 x 3
CB - 1 : 1.00 x 2.20
CB - 2 : 1.10 x 2.20
B-1: 1.00 x 18.00
B-2: 1.10 x 5.00
B-3: 0.80 x 4.00
B-4: 1.00 x 3.69

H. REINFORCED CONCRETE FOR FOURTH FLOOR SLAB


S-1: 3.25 x 16.40
S-2: 3.25 x 16.40
S-3: 2.25 x 17.30
S-4: ((2.25 x 4.60) + (0.70 x 0.94))
S-5: 2.70 x 4.60
S-6: 1.55 x 3.70

I. REINFORCED CONCRETE FOR ROOF BEAM

RG - 1 : 1.00 x 54.50
RG - 2 : 1.00 x 2.50 x 6
RG - 3: 1.20 x 7.00 x 3
RG - 4 : 1.00 x 5.00 x 2
RG - 5: 1.25 x 7.00 x 3
RB - 1 : 0.80 x 6.70 x 2 x 2
0.80 x 14.25
CB - 1 : 1.00 x 1.00
CB - 2 : 1.00 x 1.00
ROOF B - 4 : 0.75 x 1.19

J. REINFORCED CONCRETE FOR ROOF DECK SLAB

SLAB : 4.75 x 9.75

K. REINFORCED CONCRETE FOR STAIR

*MAIN STAIR
DC - 1: 0.80 x 1.60 x 4 x 3
FB - 1 : 1.00 x 5.00
STB - 1 : 1.00 x 3.45 x 3
STB - 2 : 1.00 x 3.45 x 3
Landing : 3.15 x 1.30 x 3
Stair Slab : 3.00 x 1.575 x 2 x 3
Steps : 0.168 x 1.575 x 19 x 3
*STAIR FROM THIRD FLOOR TO DECK ROOF
Landing : 1.19 x 1.00 x 2
Stair Slab : 5.40 x 1.00
Steps : 0.145 x 1.00 x 22

L. REINFORCED CONCRETE FOR SUN BREAKER

Sunbreaker : 3.90 x 0.575 x 4


4.40 x 0.575
3.95 x 0.575 x 4 x 2
4.45 x 0.575 x 2

M. REINFORCED CONCRETE FOR SEPTIC VAULT

Wall : 7.70 x 0.35 x 2


2.50 x 0.35 x 2
` 2.50 x 0.35
Cover : 7.70 x 2.80

N. REINFORCED CONCRETE FOR UNDERGROUND WATER TANK (CISTERN TANK)

Wall : 13.30 x 1.50


Cover : 3.85 x 3.15

DIVISION II BUILDINGS
PART C FINISHING

1000 TERMITE CONTROL WORK


1000(1) SOIL POISONING
Quantity:

((20.00 x 16.50) - (5.00 x 8.50)) / 6.36 sq.m./ltr.

1001 STORM DRAINAGE AND SEWERAGE SYSTEM


1001(6)a CATCH BASIN, CONCRETE
Quantity:

Quantity = 5 + 5

1001(8) SEWER LINE WORKS


Quantity:

Quantity : 1.00 Lumpsum

1001(9) STORM DRAINAGE AND DOWNSPOUT


Quantity:

Quantity : 1.00 Lumpsum

1002 PLUMBING
1002(9)b1 WATER CLOSET, ROUND FRONT, COMPLETE, TANK TYPE
Quantity:

Quantity : 12 sets - Water Closet


.
1002(14)a1 LAVATORY, WALL HUNG, COMPLETE, MANUALLY OPERATED
Quantity:

Quantity : 1 set - Lavatory

1002(16)a1 FLOOR DRAIN PLATES, 50 MM DIA., STAINLESS


Quantity:

Quantity : 23 sets - Floor Drain

1002(22) STAINLESS STEEL GRAB BAR, 38MM DIA.


Length:

Length : 0.70m + 0.70m

1002(24) FACIAL MIRROR


Area:

Area : 1.40 x 0.60 x 4

1002(25) FAUCET
Quantity:

Quantity : 14 pieces - Faucet

1002(27)a4 WATER METER, 32MM DIA.


Quantity:

Quantity : 1 piece - Water Meter

1002(28) COLD WATER LINES


Quantity:

Quantity : 1.00 - Lumpsum

1003 CARPENTRY AND JOINERY WORKS


1003(1)a1 CEILING (METAL FRAME)
Area:

Building (4S8C) : ((19.20 x 16.60) - (7.60 x 4.10))


C.R. Ceiling : ((5.00 x 3.00) - (1.00 x 3.45)) x 3
1003(9) WALL FRAME (BLACKBOARD)
Quantity:

Building (4S8C) : Quantity = 2 + 2 + 2 + 2

1005 STEEL WINDOWS


1005(1) RESIDENTIAL CASEMENT
Area:

W-1: 16 sets - 3.60 x 1.70 Steel Casement Window

1005(5) GRILLE WINDOW (SECURITY GRILLS)


Area:

W-2: 16 sets - 1.60 x 1.70 Security Grills


Corridor Grills : 3 sets - 4.60 x 1.90 Security Grills
3 sets - 4.10 x 1.90 Security Grills
3 sets - 3.60 x 1.90 Security Grills
5 sets - 2.15 x 1.90 Security Grills

1009 JALOUSIE WINDOWS


1009(1)a JALOUSIE WINDOW (GLASS)
Area:

W-2: 16 sets - 1.40 x 1.50 Glass Jalousie Window


W-3: 12 sets - 0.635 x 0.60 Glass Jalousie Window

1010 WOODEN DOORS AND WINDOWS


1010(1) FRAMES (JAMBS) (1.40 x 1.50 Window)
Quantity:

W-2: 16 sets - 1.40 x 1.50 Window Frame

1010(1) FRAMES (JAMBS) (0.635 x 0.60 Window)


Quantity:

W-3: 12 sets - 0.635 x 0.60 Window Frame

1010(1) FRAMES (JAMBS) (0.90 x 2.40 Door)


Quantity:

D-1: 16 sets - 0.90 x 2.40 Door Frame (Classroom)

1010(1) FRAMES (JAMBS) (0.90 x 2.10 Door)


Quantity:

D-2: 1 set - 0.90 x 2.10 Door Frame (Disabled)

1010(1) FRAMES (JAMBS) (0.80 x 2.10 Door)


Quantity:

D-3: 9 sets - 0.80 x 2.10 Door Frame (Toilet)


D-4: 1 set - 0.80 x 2.10 Door Frame (Storage)

1010(1) FRAMES (JAMBS) (0.60 x 1.20 Door)


Quantity:

BD - 1 : 11 sets - 0.60 x 1.20 Door Frame (Toilet Cubicle)

1010(2)a DOOR (FLUSH)


Area:

D-2: 1 set - 0.90 x 2.10 Disabled


D-3: 9 sets - 0.80 x 2.10 Toilet
D-4: 1 set - 0.80 x 2.10 Storage
BD - 1 : 11 sets - 0.60 x 1.20 Toilet Cubicle

1010(2)b DOOR (WOOD PANEL)


Area:

D-1: 16 sets - 0.90 x 2.40 Panel Door (Classroom)

1013 CORRUGATED METAL ROOFING


1013(2)c FABRICATED METAL ROOFING ACCESSORY (GUTTER)
Length:

Gutter : 19.20 + 11.70

1014 PRE-PAINTED METAL SHEET


1014(1)b2 PRE-PAINTED METAL SHEET (RIB TYPE) (LONG SPAN)
Area:
Building (4S8C) : 19.20 x 6.83
7.60 x 6.83
0.50 x 6.25 x 6.83 x 2
4.10 x 6.83

1018 CERAMIC / GRANITE TILES


1018(1) GLAZED TILES AND TRIMS
Area:

C.R. Wall :
a.) C.R. Wall (Ground) : 28.20 x 1.60
b.) C.R. Wall (2nd to 4th) : 24.15 x 1.60 x 3
c.) Counter Sink 11.66 x 0.60 x 4
11.66 x 0.30 x 4
9.26 x 0.50
9.60 x 0.20

1018(2) UNGLAZED TILES


Area:

C.R. Flooring :
a.) C.R. Floor (Ground) : ((3.00 x 5.00) - (3.00 x 1.00))
b.) C.R. Floor (2nd to 4th) : ((3.00 x 5.00) - (3.45 x 1.00)) x 3
c.) Urinal 1.10 x 0.75 x 4

1027 CEMENT PLASTER FINISH


1027(1) CEMENT PLASTER FINISH
Area:

*CHB WALL (100 mm)


Area:

A.) First Floor :


Corridor : 11.75 x 0.90 x 2
2.50 x 0.90 x 2
Comfort Room : 18.30 x 3.00 x 2
Septic Tank : 2.50 x 2.00 x 2
Ramp : 0.40 x 2.80
0.40 x 1.675
3.60 x 0.40 x 0.50 x 2
(0.40 + 0.90)/2 x 6.00
0.90 x 1.675
1.40 x 0.90

B.) Second Floor :


Corridor : 13.50 x 0.90 x 2
2.50 x 0.90 x 2 x 2
Comfort Room : 10.40 x 3.00 x 2

C.) Third Floor :


Corridor : 13.50 x 0.90 x 2
2.50 x 0.90 x 2 x 2
Comfort Room : 10.40 x 3.00 x 2

C.) Fourth Floor :


Corridor : 13.50 x 0.90 x 2
4.20 x 0.90 x 2
Comfort Room : 10.40 x 3.00 x 2

*FOR CHB WALL (150mm)

A.) First Floor :


BELOW FFL : 55.20 x 1.00
GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20) + (5.00 - (0.60 x 0.635 x 3)) x 2
CISTERN TANK : 20.40 x 2.00 x 2
FLOOR TOPPING : ((18.00 x 14.50) - (5.00 x 8.50))
STAIR TOPPING : ((1.575 x 0.30 x 19) + (1.575 x 0.168 x 19))

B.) Second Floor :


GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20) + (5.00 - (0.60 x 0.635 x 3)) x 2
FLOOR TOPPING : ((18.00 x 14.50) - (5.00 x 8.50))
STAIR TOPPING : ((1.575 x 0.30 x 19) + (1.575 x 0.168 x 19))

C.) Third Floor :


GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20) + (5.00 - (0.60 x 0.635 x 3)) x 2
FLOOR TOPPING : ((18.00 x 14.50) - (5.00 x 8.50))
STAIR TOPPING : ((1.575 x 0.30 x 19) + (1.575 x 0.168 x 19))

D.) Fourth Floor :


GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20 ) + (5.00 - (0.60 x 0.635 x 3))
FLOOR TOPPING : ((18.00 x 14.50) - (5.00 x 8.50))
TOP SIDE WALL : 9.50 x 2.50 x 0.50 x 2
19.25 x 2.50

1032 PAINTING, VARNISHING AND OTHER RELATED WORKS


1032(1)a PAINTING WORKS (MASONRY/CONCRETE)
Area:

*FOR CHB WALL (150mm)

A.) First Floor :


BELOW FFL : 55.20 x 1.00
GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20) + (5.00 - (0.60 x 0.635 x 3)) x 2
SLAB : ((18.00 x 14.50) - (5.00 x 8.50))
STAIR ((1.575 x 0.30 x 19) + (1.575 x 0.168 x 19))
CORRIDOR : 11.75 x 0.90 x 2
2.50 x 0.90 x 2
COMFORT ROOM : 18.30 x 1.60 x 2
RAMP : 0.40 x 2.80
0.40 x 1.675
3.60 x 0.40 x 0.50 x 2
(0.40 + 0.90)/2 x 6.00
0.90 x 1.675
1.40 x 0.90
B.) Second Floor :
GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20) + (5.00 - (0.60 x 0.635 x 3)) x 2
SLAB : ((18.00 x 14.50) - (5.00 x 8.50))
STAIR ((1.575 x 0.30 x 19) + (1.575 x 0.168 x 19))
SUNBREAKER : 3.90 x 1.20 x 4
4.40 x 1.20
CORRIDOR : 13.50 x 0.90 x 2
2.50 x 0.90 x 2 x 2
COMFORT ROOM : 10.40 x 1.60 x 2

C.) Third Floor :


GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20) + (5.00 - (0.60 x 0.635 x 3)) x 2
SLAB : ((18.00 x 14.50) - (5.00 x 8.50))
STAIR ((1.575 x 0.30 x 19) + (1.575 x 0.168 x 19))
SUNBREAKER : 3.95 x 1.20 x 4
4.45 x 1.20
CORRIDOR : 13.50 x 0.90 x 2
2.50 x 0.90 x 2 x 2
COMFORT ROOM : 10.40 x 1.60 x 2

D.) Fourth Floor :


GRID LINE A : ((18.00 x 3.20) - (3.60 x 1.70 x 4)) x 2
GRID LINE B : ((18.00 x 3.20) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4)) x 2
GRID LINE C : 7.00 x 3.20 x 2
GRID LINE D : 7.00 x 3.20 x 2
GRID LINE 1 : 7.00 x 3.20 x 2
GRID LINE 3 : 7.00 x 3.20 x 2
GRID LINE 5 : ((7.00 x 3.20 ) + (5.00 - (0.60 x 0.635 x 3))
SUNBREAKER : 3.95 x 1.20 x 4
4.45 x 1.20
TOP SIDE WALL : 9.50 x 2.50 x 0.50 x 2
19.25 x 2.50
CORRIDOR : 13.50 x 0.90
4.20 x 0.90
COMFORT ROOM : 10.40 x 1.60 x 2

1032(1)b PAINTING WORKS (WOOD)


Area:

Ceiling : ((19.20 x 16.60) - (7.60 x 4.10))


C.R. Ceiling : ((5.00 x 3.00) - (1.00 x 3.45)) x 3
D-1: 16 sets - 0.90 x 2.10 x 2 Panel Door (Classroom)
D-2: 1 set - 0.90 x 2.10 x 2 Disabled
D-3: 9 sets - 0.80 x 2.10 x 2 Toilet
D-4: 1 set - 0.80 x 2.10 x 2 Storage
BD - 1 : 11 sets - 0.60 x 1.20 x 2 Toilet Cubicle

1038 REFLECTIVE INSULATION


1038(1) REFLECTIVE INSULATION
Area:

Building (4S8C) : 19.20 x 6.83


7.60 x 6.83
0.50 x 6.25 x 6.83 x 2
4.10 x 6.83

1046 MASONRY WORKS


1046(1)a1 CHB LOAD BEARING (INCLUDING REINFORCING STEEL) (100 mm)
Area:

A.) First Floor :


Corridor : 11.75 x 0.90
2.50 x 0.90
Comfort Room : 18.30 x 3.00
Septic Tank : 2.50 x 2.00

B.) Second Floor :


Corridor : 13.50 x 0.90
2.50 x 0.90 x 2
Comfort Room : 10.40 x 3.00

C.) Third Floor :


Corridor : 13.50 x 0.90
2.50 x 0.90 x 2
Comfort Room : 10.40 x 3.00
D.) Fourth Floor :
Corridor : 13.50 x 0.90
4.20 x 0.90
Comfort Room : 10.40 x 3.00

1046(1)a2 CHB LOAD BEARING (INCLUDING REINFORCING STEEL) (150 mm)


Area:

A.) First Floor :


BELOW FFL : 92.50 x 1.00
GRID LINE A : ((18.00 x 2.75) - (3.60 x 1.70 x 4))
GRID LINE B : ((18.00 x 2.75) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4))
GRID LINE C : 7.00 x 2.70
GRID LINE D : 7.00 x 2.70
GRID LINE 1 : 7.00 x 2.70
GRID LINE 3 : 7.00 x 2.70
GRID LINE 5 : ((7.00 x 2.70 ) + (5.00 - (0.60 x 0.635 x 3))
SEPTIC TANK : 20.40 x 2.00

B.) Second Floor :


GRID LINE A : ((18.00 x 2.75) - (3.60 x 1.70 x 4))
GRID LINE B : ((18.00 x 2.75) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4))
GRID LINE C : 7.00 x 2.70
GRID LINE D : 7.00 x 2.70
GRID LINE 1 : 7.00 x 2.70
GRID LINE 3 : 7.00 x 2.70
GRID LINE 5 : ((7.00 x 2.70 ) + (5.00 - (0.60 x 0.635 x 3))

C.) Third Floor :


GRID LINE A : ((18.00 x 2.75) - (3.60 x 1.70 x 4))
GRID LINE B : ((18.00 x 2.75) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4))
GRID LINE C : 7.00 x 2.70
GRID LINE D : 7.00 x 2.70
GRID LINE 1 : 7.00 x 2.70
GRID LINE 3 : 7.00 x 2.70
GRID LINE 5 : ((7.00 x 2.70 ) + (5.00 - (0.60 x 0.635 x 3))

D.) Fourth Floor :


GRID LINE A : ((18.00 x 2.80) - (3.60 x 1.70 x 4))
GRID LINE B : ((18.00 x 2.80) - (2.40 x 0.90 x 4) - (1.50 x 1.40 x 4))
GRID LINE C : 7.00 x 2.70
GRID LINE D : 7.00 x 2.70
GRID LINE 1 : 7.00 x 2.70
GRID LINE 3 : 7.00 x 2.70
GRID LINE 5 : ((7.00 x 2.70 ) + (5.00 - (0.60 x 0.635 x 3))
TOP SIDE WALL : 9.50 x 2.50 x 0.50 x 2
19.25 x 2.50

1047 METAL STRUCTURES


1047(1) STRUCTURAL STEEL (FIRE ESCAPE)
Quantity:

Quantity : 1.00 Lumpsum

1047(2)a STRUCTURAL STEEL (ROOF FRAMING)


Quantity:

*TRUSS T - 1 AND TRUSS T - 2


Top/Bottom Chord - A : 16 pcs - L 65mm x 65mm x 6mm x 6.00 m, BC & TC
King Post - B : 8 pcs - L 65mm x 65mm x 6mm x 6.00 m, V1 & D1
Web Member - C : 12 pcs - L 50mm x 50mm x 6.00mm x 6.00 m, V2 & D2
Bottom Chord - B : 2 pcs - L 65mm x 65mm x 6.00mm x 6.00 m, H1
*Gusset Plate
(2/S-7) : 2 pcs - 150mm x 250mm x 6mm
(3/S-7) : 4 pcs - 150mm x 250mm x 6mm
(4/S-7) : 8 pcs - 300mm x 300mm x 6mm
(5/S-7) : 12 pcs - 250mm x 250mm x 6mm
(6/S-7) : 1 pc - 500mm x 400mm x 6mm
Filler Plate : 22 pcs - 50mm x 50mm x 6mm
*HALF TRUSS HT - 1
Top/Bottom Chord - A : 4 pcs - L 65mm x 65mm x 6mm x 6.00 m, BC & TC
King Post - B : 2 pcs - L 65mm x 65mm x 6mm x 6.00 m, V1 & D1
Web Member - C : 3 pcs - L 50mm x 50mm x 6.00mm x 6.00 m, V2 & D2
*Gusset Plate
(2/S-7) : 1 pc - 150mm x 250mm x 6mm
(3/S-7) : 1 pc - 150mm x 250mm x 6mm
(4/S-7) : 2 pcs - 300mm x 300mm x 6mm
(5/S-7) : 1 pc - 250mm x 250mm x 6mm
(6/S-7) : 1 pc - 500mm x 400mm x 6mm
Filler Plate : 7 pcs - 50mm x 50mm x 6mm
*HALF TRUSS HT - 2
Top/Bottom Chord - A : 4 pcs - L 65mm x 65mm x 6mm x 6.00 m, BC & TC
King Post - B : 2 pcs - L 65mm x 65mm x 6mm x 6.00 m, V1 & D1
Web Member - C : 3 pcs - L 50mm x 50mm x 6.00mm x 6.00 m, V2 & D2
Bottom Chord - B : 1 pc - L 65mm x 65mm x 6.00mm x 6.00 m, H1
*Gusset Plate
(2/S-7) : 1 pc - 150mm x 250mm x 6mm
(3/S-7) : 1 pc - 150mm x 250mm x 6mm
(4/S-7) : 2 pcs - 300mm x 300mm x 6mm
(5/S-7) : 3 pcs - 250mm x 250mm x 6mm
(6/S-7) : 1 pc - 500mm x 400mm x 6mm
Filler Plate : 11 pcs - 50mm x 50mm x 6mm
*HALF TRUSS HT - 3
Top/Bottom Chord - A : 6 pcs - L 65mm x 65mm x 6mm x 6.00 m, BC & TC
King Post - B : 2 pcs - L 65mm x 65mm x 6mm x 6.00 m, V1 & D1
Web Member - C : 5 pcs - L 50mm x 50mm x 6.00mm x 6.00 m, V2 & D2
Bottom Chord - B : 1 pc - L 65mm x 65mm x 6.00mm x 6.00 m, H1
*Gusset Plate
(2/S-7) : 1 pc - 150mm x 250mm x 6mm
(3/S-7) : 1 pc - 150mm x 250mm x 6mm
(4/S-7) : 4 pcs - 300mm x 300mm x 6mm
(5/S-7) : 5 pcs - 250mm x 250mm x 6mm
(6/S-7) : 1 pc - 500mm x 400mm x 6mm
Filler Plate : 17 pcs - 50mm x 50mm x 6mm
C Purlins : 100 pcs - 50mm x 150mm x 2.00mm x 6.00m
C Purlins : 8 pcs - 50mm x 100mm x 1.20mm x 6.00m
C Purlins Bolts : 192 pcs - 10mmØ x 0.05m w/ nuts & washer, A 307 Bolts
Gusset Welded to Truss TC : 7 pcs - 100mm x 100mm x 6mm
Base Plate : 8 pcs - 350mm x 350mm x 12mm
Anchor Bolt : 32 pcs - 16mmØ x 0.35m w/ nuts & washer
Cross Bracing : 14 pcs - 16mmØ x 7.50m
Turn buckles : 14 pcs - 16mmØ, Turn buckles
Sagrod w/ nut and washer : 212 pcs - 12mmØ x 0.60m
Shelf Angle : 1 pc - 75mm x 75mm x 6mm x 6.00m
Shelf Angle Bolt : 10 pcs - 12mmØ x 0.15m, w/ nut and washer
Angular Base Plate : 8 pcs - L 100mm x 100mm x 6.00mm x 6.00m
Purlin Connector Plate: 141 pcs - 125mm x 125mm x 50mm x 4.00mm
Buckle Plate : 6 pcs - 400mm x 300mm x 10mm

1052 PILING
1052(29) MICRO PILES (0.20mØ)
Length:

MF - 1 : 78 holes x 15.00 m.

1053 MISCELLANEOUS HARDWARES


1053(2)a1 STAINLESS STEEL RAILINGS (38mm dia)
Length:

Length = 25.00 meters

1053(2)a2 G.I. PIPE RAILING (WITH NOSING)


Length:
*MAIN STAIR
Stair Railings : 9.00 x 3
Stair Nosing : 1.50 x 19 x 3
*STAIR FROM THIRD FLOOR TO DECK ROOF
Stair Railings : 1.19 + 5.40 + 1.23 + 1.00 + 1.00
Stair Nosing : 1.00 x 22

1053(2)a2 G.I. PIPE RAILING (50MM DIA) (CORRIDOR RAILING)


Length:

Length : 14.25 + 25.50 +25.50 + 24.70

PART D ELECTRICAL

1100 CONDUIT, BOXES AND FITTINGS


1100(23) REINFORCED CONCRETE PEDESTAL POLE (SERVICE ENTRANCE)
Quantity:

Quantity : 1.00 lot

1100(30) CONDUIT, BOXES AND FITTINGS


Quantity:

Quantity : 1.00 Lumpsum

1101 WIRES AND WIRING DEVICES


1101(42) WIRES AND WIRING DEVICES
Quantity:

Quantity : 1.00 Lumpsum

1102 POWER LOAD CENTER, SWITCHGEAR AND PANELBOARDS


1102(1)a4 PANELBOARD WITH MAIN AND BRANCH BREAKERS
Quantity:

Quantity : 1.00 set

1102(26) KILOWATT METER WITH BASE


Quantity:

Quantity : 1.00 set

1103 LIGHTING FIXTURES


1103(2)a33 FLUORESCENT LIGHTING FIXTURE WITH HPF - NCPF BALLAST ( 1 x 36W)
Quantity:

Quantity : 43 sets - 1 x 36W Flourescent Lamp Box Type

1103(2)a34 FLUORESCENT LIGHTING FIXTURE WITH HPF - NCPF BALLAST (( 2 x 36W)


Quantity:

Quantity : 32 sets - 2 x 36W Flourescent Lamp Box Type

1103(4)a7 COMPACT FLUORESCENT LAMP (CFL) WITH MEDIUM BASE, KEYLESS TYPE, PORCELAIN RECEPTACLE OUT
Quantity:

Quantity : 17 sets - 18W Compact Flourescent Lamp (CFL)

1202 AUTOMATIC WATER SPRINKLER SYSTEM


1202(1) AUTOMATIC WATER SPRINKLER SYSTEM (FIRE PROTECTION SYSTEM
Quantity:

Quantity : 1 - Lumpsum

1208 FIRE ALARM SYSTEM


1208(1) FIRE ALARM SYSTEM
Quantity:

Quantity : 1 - Lumpsum

1702(5)a Shoring, Cribbing and Related Works (Shoring)

Original Quantity - - - - - - - - - - - - = -
Revised Quantity - - - - - - - - - - - - = 1.00
Qty. Subject to Change - - - - - - - - = (+) 1.00

Qty:
1.00 lumpsum

Direct Unit cost - - - - - - - - - - - - - - = 241,349.98


OCM (12%) - - - - - - - - - - - - - - - - = 28,962.00
Profit (8%) - - - - - - - - - - - - - - - - = 19,308.00
VAT (5%) - - - - - - - - - - - - - - - - - = 14,481.00
Sub - total - - - - - - - - - - - - - - - - - = 304,100.97
Less Variance (3.40%) - - - - - - - - - = (-) 10,339.43
Total Cost - - - - - - - - - - - - - - - - - = 293,761.54
Unit Cost - - - - - - - - - - - - - - - - - - = 293,761.54

1016(1) Waterproofing (Cement Base)


Original Quantity - - - - - - - - - - - - = -
Revised Quantity - - - - - - - - - - - - = 1.00
Qty. Subject to Change - - - - - - - - = (+) 1.00

Area
9.75 x 4.50 43.88

Direct Unit cost - - - - - - - - - - - - - - = 278.01


OCM (12%) - - - - - - - - - - - - - - - - = 33.36
Profit (8%) - - - - - - - - - - - - - - - - = 22.24
VAT (5%) - - - - - - - - - - - - - - - - - = 16.68
Sub - total - - - - - - - - - - - - - - - - - = 350.29
Less Variance (3.40%) - - - - - - - - - = (-) 11.91
Total Cost - - - - - - - - - - - - - - - - - = 338.38
Unit Cost - - - - - - - - - - - - - - - - - - = 338.38

Prepared By: Checked By:

CAMILLE D. BERLANDINO MA. JANELLE SIGRID M. LUCINA


Engineer II Project Engineer I
Accomplishment ccomplishment 2ndAccomplishment 3rd

= 1.00 l.s. 1 0

= 1.00 each 1 0

= 1.00 each 1 0

7.30 mo. 4.5 tba

1.00 l.s. 0.5 0

sq.m.
sq.m.
sq.m.
= 63.00 sq.m. 63 0

/sq.m.

cu.m.
cu.m.
cu.m.

= 132.00
= 6.30
= 14.18
= 1.08
= 1.98
155.54 cu.m. 155.54 0

cu.m.
cu.m.
cu.m.

= 801.90
= 3.20
= 22.74
= 30.45
858.29 cu.m. 801.9 0
cu.m.
cu.m.
cu.m.

= 546.75 cu.m. 546.75

= 264.00
= 0.23
= 0.18
= 0.13
= 0.08
= 0.03
= 3.75
= 2.02
= 11.31
= 4.37
286.09
286.10 cu.m. 264.00

= 28.75 28.75
= 0.68 0.68
= 1.89 1.89
= 3.11 3.11
= 33.00 33.00
= 1.45
= 1.21
70.09
70.10 cu.m. 28.75 38.68
= 172.50 172.5

= 1.73
= 1.78 1.78
176.01 172.5 1.78 1.73

= 3.00 3.00
= 8.40 8.40
= 10.80 10.80
= 3.00 3.00
25.20 0 25.20

= 2.50 0.5 2
= 2.59 2.59
= 6.14 3.07

= 7.39 2.11 5.28


= 8.06 8.06
= 13.55 13.55
= 4.54

= 7.39 2.11 5.28


= 8.06 8.06
= 13.55 13.55
= 4.54
= 2.30 0.7666666667
= 0.56
81.17 4.725 62.2016666667 14.24

= 1.08 1.08
= 3.11 3.11
= 3.11 3.11
= 0.80 0.80
= 2.80 2.80
= 2.00 2.00
= 2.80 2.80
= 4.20 4.20
= 0.23 0.23
= 0.31 0.31
= 1.44 1.44
= 0.60 0.60
= 0.24 0.24
= 0.20 0.20
22.92 0 22.92

= 6.66 6.66
= 6.66 6.66
= 5.18 5.18
= 1.29 1.29
= 1.55 1.55
= 0.72 0.72
22.06 0 22.06

= 1.08 1.08
= 3.11 3.11
= 3.11 3.11
= 0.80 0.80
= 2.80 2.80
= 2.00 2.00
= 2.80 2.80
= 4.20 4.20
= 0.23 0.23
= 0.31 0.31
= 1.44 1.44
= 0.60 0.60
= 0.24 0.24
= 0.20 0.20
22.92 0 22.92

= 6.66 6.66
= 6.66 6.66
= 5.18 5.18
= 1.29 1.29
= 1.55 1.55
= 0.72 0.72
22.06 0 22.06
= 1.08
= 3.11
= 3.11
= 0.80
= 2.80
= 2.00
= 2.80
= 4.20
= 0.18
= 0.26
= 1.44
= 0.60
= 0.24
= 0.30
22.92 0 22.92

= 6.66
= 6.66
= 5.18
= 1.38
= 1.55
= 0.72
22.15 0 22.15

= 4.36
= 1.20
= 2.10
= 0.80
= 2.63
= 1.61
= 0.86
= 0.08
= 0.08
= 0.05
13.77 0 13.77

= 5.79 5.79
= 0.77 0.2566666667 0.51
= 0.40 0.40
= 0.83 0.2766666667 0.55
= 0.83 0.2766666667 0.55
= 1.84 0.6133333333 1.23
= 4.25 1.4166666667 2.83

= 2.45 0.8166666667 1.63

= 0.30
= 1.08

= 0.33
13.08 0 4.0566666667 26.87

= 0.36
= 0.31
0.67 0

= 0.94 0.94
= 0.27 0.27
= 1.91
= 0.54
3.66 0 1.21 2.45

= 3.23
= 0.81
= 0.26
= 0.09
= 3.23
7.62 0
total 462.00 cu.m.
TOTAL 177.23 184.41 92.08

= 26.10 26.10
= 1.87
27.97
28.00 cu.m. 26.10

= 63.94
= 19.18
= 63.94 63.94
= 16.34 16.34
163.40 0 80.28 83.12

= 1942.42 1942.42
= 554.98 554.98
= 987.81 987.81
= 713.42 713.42
0.00
= 1923.92 1923.92
= 554.98 554.98
= 1203.60 1203.60
= 869.26 869.26
8750.39 0 8750.39

= 1942.42 1386 556.42


= 887.76 443.88
= 220.22 220.22 220.22
= 292.90 292.9 292.90
= 166.23 166.23
= 221.64 221.64
= 443.29
= 592.90

= 4532.30 3234 1298.30


= 2428.02 1821.015
= 501.01 501.01
= 666.73 666.73
= 387.88 387.88
= 517.17 517.17
= 355.56 355.56
= 471.92 471.92
= 355.56 355.56
= 471.92 471.92
= 290.91
= 387.88

= 3399.23 2425.5 973.73


= 2428.02 1821.015
= 501.01 501.01
= 666.73 666.73
= 387.88 387.88
= 517.17 517.17
= 355.56 355.56
= 471.92 471.92
= 355.56 355.56
= 471.92 471.92
= 290.91
= 387.88
= 727.45 242.4833333333
= 195.15 65.05
= 47.37
= 32.52
27370.50 9894.1 13242.90 4233.50

= 177.55 177.55
= 110.97 110.97
= 18.50 18.50
= 81.31 81.31
= 19.22 19.22
0.00
= 443.88 443.88
= 110.97 110.97
= 22.19 22.19
= 168.17 168.17
= 19.22 19.22
= 16.26 16.26
0.00
= 369.90 369.90
= 110.97 110.97
= 168.17 168.17
0.00
= 404.67 404.67
= 57.81 57.81
= 231.24 231.24
= 26.64 26.64
= 47.31 47.31
= 32.52 32.52
= 110.88 110.88
= 80.08 80.08
0.00
= 404.67 404.67
= 57.81 57.81
= 231.24 231.24
= 26.64 26.64
= 47.31 47.31
= 32.52 32.52
= 110.88 110.88
= 80.08 80.08
0.00
= 607.01 607.01
= 86.72 86.72
= 346.86 346.86
= 39.96 39.96
= 70.96 70.96
= 48.79 48.79
= 166.32 166.32
= 120.12 120.12
0.00
= 151.58 151.58
= 56.84 56.84
= 37.90 37.90
= 118.27 118.27
0.00
= 59.18 59.18
= 22.19 22.19
= 14.80 14.80
= 32.77 32.77
0.00
= 37.90 37.90
= 22.18 22.18
0.00
= 18.95 18.95
= 17.74 17.74
5896.62 0 5896.62
= 1055.76 1055.76
= 451.28 451.28
= 407.48 407.48
0.00
= 1416.49 1416.49
= 432.43 432.43
= 55.44 55.44
3818.88 0 3818.88

= 177.55 177.55
= 110.97 110.97
= 18.50 18.50
= 81.31 81.31
= 19.22 19.22
0.00
= 443.88 443.88
= 110.97 110.97
= 22.19 22.19
= 168.17 168.17
= 19.22 19.22
= 16.26 16.26
0.00
= 369.90 369.90
= 110.97 110.97
= 168.17 168.17
0.00
= 404.67 404.67
= 57.81 57.81
= 231.24 231.24
= 26.64 26.64
= 47.31 47.31
= 32.52 32.52
= 110.88 110.88
= 80.08 80.08
0.00
= 404.67 404.67
= 57.81 57.81
= 231.24 231.24
= 26.64 26.64
= 47.31 47.31
= 32.52 32.52
= 110.88 110.88
= 80.08 80.08
0.00
= 607.01 607.01
= 86.72 86.72
= 346.86 346.86
= 39.96 39.96
= 70.96 70.96
= 48.79 48.79
= 166.32 166.32
= 120.12 120.12
0.00
= 151.58 151.58
= 56.84 56.84
= 37.90 37.90
= 118.27 118.27
0.00
= 59.18 59.18
= 22.19 22.19
= 14.80 14.80
= 32.77 32.77
0.00
= 37.90 37.90
= 22.18 22.18
0.00
= 18.95 18.95
= 17.74 17.74
5896.62 0 5896.62

= 1055.76 1055.76
= 451.28 451.28
= 407.48 407.48
0.00
= 1416.49 1416.49
= 432.43 432.43
= 55.44 55.44
3818.88 0 3818.88

= 177.55
= 110.97
= 81.31
= 19.22
= 443.88
= 110.97
= 168.17
= 19.22
= 16.26

= 369.90
= 110.97
= 168.17

= 404.67
= 57.81
= 231.24
= 26.64
= 47.31
= 32.52
= 110.88
= 80.08

= 404.67
= 57.81
= 231.24
= 26.64
= 47.31
= 32.52
= 110.88
= 80.08

= 607.01
= 86.72
= 346.86
= 39.96
= 70.96
= 48.79
= 166.32
= 120.12

= 151.58
= 56.84
= 37.90
= 118.27

= 59.18
= 22.19
= 14.80
= 32.77
= 37.90
= 22.18

= 18.95
= 17.74
5855.93 0 0.00 5855.93

= 1055.76
= 451.28
= 407.48

= 1416.49
= 432.43
= 55.44
3818.88 0 3818.88

= 443.52

= 388.08
831.60 0 831.6

= 710.21
= 355.10
= 319.33

= 88.78
= 59.18
= 207.14
= 26.64
= 15.98

= 53.22
= 11.83
= 129.36
= 13.80

= 88.78
= 59.18
= 207.14
= 73.98
= 88.78
= 88.78
= 73.98
= 26.64
= 31.97

= 53.22
= 11.83
= 138.60
= 110.88
= 29.57
= 23.65

= 118.37
= 22.19
= 56.18

= 189.48
= 66.32
= 37.90
= 222.99

= 16.58
= 8.87

= 14.21
= 8.87

= 5.33
= 6.65
3871.49 0 3871.49

= 8.52
= 174.32
= 151.58
= 141.93
= 130.10

= 37.90
= 18.95
= 28.09
= 23.41

= 132.64
= 57.66

= 132.64
= 57.66

= 1420.42
= 287.71
= 147.05
= 171.56
= 63.20
= 97.02

= 295.92
= 53.28
= 37.30
= 31.97
= 20.33
= 22.18
3743.34 0

= 12.32
= 9.24
= 9.24
= 11.09
= 11.09
52.98 0

= 221.76 147.84
= 212.89 141.9266666667
= 59.88 39.92
494.53 0 329.6866666667 164.84

= 111.89
= 124.32
= 124.32
= 77.62
438.15 0

= 388.08
= 380.44
= 116.42
= 118.27
= 36.96
= 36.96
1077.13 0
75899.32 9894.10 41834.26 18859.36
total 75899.30 kgs.

= 8694.62 8694.62
= 1214.01 1214.01
= 971.21 971.21
= 2023.35 2023.35
= 1618.68 1618.68
= 3803.90 3803.90
= 3260.48 3260.48
= 4624.80 4624.80
26211.05 kgs. 26211.05

= 21.00 21.00
= 58.80 58.80
= 75.60 75.60
= 21.00 21.00
176.40 0.00 176.40
= 20.00 8 12
= 18.00 18
= 61.44 46.08

= 45.50 13 32.50
= 53.76 53.76
= 98.56 98.56
= 40.32

= 45.50 13 32.50
= 53.76 53.76
= 98.56 98.56
= 40.32
= 46.08
= 8.25
630.05 34.00 445.72 150.33

= 13.50 13.50
= 27.60 27.60
= 27.60 27.60
= 6.00 6.00
= 19.60 19.60
= 15.00 15.00
= 19.60 19.60
= 29.40 29.40
= 2.40 2.40
= 2.75 2.75
= 18.00 18.00
= 5.50 5.50
= 3.20 3.20
= 2.50 2.50
192.65 0.00 192.65

= 53.30 53.30
= 53.30 53.30
= 41.40 41.40
= 10.35 10.35
= 12.42 12.42
= 5.74 5.74
176.51 0.00 176.51
= 13.50 13.50
= 27.60 27.60
= 27.60 27.60
= 6.00 6.00
= 19.60 19.60
= 15.00 15.00
= 19.60 19.60
= 29.40 29.40
= 2.40 2.40
= 2.75 2.75
= 18.00 18.00
= 5.50 5.50
= 3.20 3.20
= 2.50 2.50
192.65 0.00 192.65

= 53.30 53.30
= 53.30 53.30
= 41.40 41.40
= 10.35 10.35
= 12.42 12.42
= 5.74 5.74
176.51 0.00 176.51

= 13.50
= 27.60
= 27.60
= 6.00
= 19.60
= 15.00
= 19.60
= 29.40
= 2.20
= 2.42
= 18.00
= 5.50
= 3.20
= 3.69
193.31 0.00 193.31
= 53.30
= 53.30
= 38.93
= 11.01
= 12.42
= 5.74
174.70 0.00 174.70

= 54.50
= 15.00
= 25.20
= 10.00
= 26.25
= 21.44
= 11.40
= 1.00
= 1.00
= 0.89
166.68 0.00 166.68

= 46.31 46.31

= 15.36 5.12 10.24


= 5.00 5.00 0.00
= 10.35 3.45 6.90
= 10.35 3.45 6.90
= 12.29 4.0966666667 8.19
= 28.35 9.45 18.90
= 15.08 5.0266666667 10.05

= 2.38
= 5.40
= 3.19
107.75 0.00 35.59 61.19

= 8.97 2.99
= 2.53 0.8433333333
= 18.17 6.0566666667
= 5.12 1.7066666667
34.79 0.00 11.60 23.19

= 5.39
= 1.75
= 0.88
= 21.56
29.58 0.00

= 19.95
= 12.13
32.08 0.00
2329.97 34.00 1407.63 830.51
total 2330.00 sq.m. 34.00

= 45.20 liter 45.2

= 10.00 each

= 1.00 l.s. 0.8

= 1.00 l.s.
= 12.00 sets

= 1.00 set 1

= 23.00 sets

= 1.40 l.m.

= 3.36
3.35 sq.m.

= 14.00 pcs.

= 1.00 pc.

= 1.00 l.s. 0.2 0.6

= 287.56
= 34.65
322.21
322.20 sq.m. 322.20

8.00
= 8.00 pcs.

= 97.92
97.90 sq.m. 97.90

= 43.52 43.52
= 26.22
= 23.37
= 20.52
= 20.43
134.06 43.52
134.10 sq.m.

= 33.60
= 4.57
38.17
38.20 sq.m. 38.20

= 16.00 sets 16.00

= 12.00 sets 12.00


= 16.00 sets 16.00

= 1.00 set 1.00

= 9.00
= 1.00
10.00 sets 10.00

= 11.00 sets 11

= 1.89
= 15.12
= 1.68
= 7.92
26.61
26.60 sq.m. 26.60

= 34.56
34.60 sq.m. 34.60

= 30.90 l.m. 30.90


= 131.14
= 51.91
= 42.69
= 28.00
253.74
253.70 sq.m. 253.70

= 45.12
= 115.92
= 27.98
= 13.99
= 4.63
= 1.92
209.56
209.60 sq.m. 209.60

= 12.00
= 34.65
= 3.30
49.95 sq.m.

= 21.15 21.15
= 4.50 4.50
= 109.80 109.80
= 10.00
= 1.12
= 0.67
= 1.44
= 3.90
= 1.51
= 1.26

= 24.30 12.15
= 9.00 4.50
= 62.40 31.20

= 24.30
= 9.00
= 62.40

= 24.30
= 7.56
= 62.40

= 55.20 55.20
= 66.24 66.24
= 81.12 81.12
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 37.09 37.09
= 81.60
= 218.50 218.50
= 14.00

= 66.24 66.24
= 81.12 81.12
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 37.09 37.09
= 218.50 218.50
= 14.00 14.00

= 66.24 66.24
= 81.12 81.12
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 37.09 37.09
= 218.50 218.50
= 14.00

= 66.24 66.24
= 81.12 81.12
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 44.80 44.80
= 37.09 37.09
= 218.50 218.50
= 23.75 24.065
= 48.13
3020.29
3020.30 sq.m. 1150.45 1454.72

= 55.20 55.20
= 66.24 33.12
= 81.12 81.12
= 44.80 22.4
= 44.80
= 44.80 22.4
= 44.80 44.80
= 37.09 18.545
= 218.50 218.50
= 14.00
= 21.15 21.15
= 4.50 4.50
= 58.56 58.56
= 1.12
= 0.67
= 1.44
= 3.90
= 1.51
= 1.26
= 66.24 33.12
= 81.12 81.12
= 44.80 22.4
= 44.80
= 44.80 22.4
= 44.80 44.80
= 37.09 18.545
= 218.50
= 14.00
= 18.72
= 5.28
= 24.30 24.30
= 9.00
= 33.28 33.28

= 66.24
= 81.12
= 44.80
= 44.80
= 44.80
= 44.80
= 37.09
= 218.50
= 14.00
= 18.96
= 5.34
= 24.30 24.30
= 9.00
= 33.28

= 66.24 33.12
= 81.12 81.12
= 44.80 22.4
= 44.80
= 44.80 22.4
= 44.80 44.80
= 37.09 18.545
= 18.96
= 5.34
= 23.75
= 48.13
= 41.40 41.40
= 3.06
= 33.28 33.28
2656.79
2656.80 sq.m. 1181.63

= 287.56
= 34.65
= 60.48 60.48
= 3.78 3.78
= 30.24 30.24
= 3.36 3.36
= 15.84 15.84
435.91
435.90 sq.m. 113.70

= 131.14
= 51.91
= 42.69
= 28.00
253.74
253.70 sq.m. 253.70

= 10.58 10.58
= 2.25 2.25
= 54.90 54.90
= 5.00

= 12.15
= 4.50
= 31.20

= 12.15
= 4.50
= 31.20
= 12.15
= 3.78
= 31.20
215.56
215.60 sq.m. 67.73 142.87

= 92.50 92.50
= 25.02 25.02
= 32.46 32.46
= 18.90 18.90
= 18.90 18.90
= 18.90 18.90
= 18.90 18.90
= 22.76 22.76
= 40.80

= 25.02
= 32.46
= 18.90
= 18.90
= 18.90
= 18.90
= 22.76

= 25.02
= 32.46
= 18.90
= 18.90
= 18.90
= 18.90
= 22.76

= 25.92
= 33.36
= 18.90
= 18.90
= 18.90
= 18.90
= 22.76
= 23.75
= 48.13
830.34
830.30 sq.m. 248.34 541.16

= 1.00 l.s.

= 576.36
= 283.68
= 321.84
= 70.92

= 3.53
= 7.07
= 33.93
= 35.34
= 9.42
= 2.59

= 141.84
= 70.92
= 80.46

= 1.77
= 1.77
= 8.48
= 2.95
= 9.42
= 0.82

= 141.84
= 70.92
= 80.46
= 35.46

= 1.77
= 1.77
= 8.48
= 8.84
= 9.42
= 1.30

= 212.76
= 70.92
= 134.10
= 35.46

= 1.77
= 1.77
= 16.96
= 14.73
= 9.42
= 2.00
= 2544
= 97.44
= 5.91
= 3.30
= 92.36
= 17.68
= 165.80
= 22.11
= 112.95
= 41.22
= 1.33
= 444.48
= 96.90
= 56.55
6225.29
6225.30 kg. 6225.30

= 1170.00 l.m. 1170

= 25.00 l.m.
= 27.00
= 85.50

= 9.82
= 22.00
144.32
144.30 l.m.

= 95.45 l.m. 95.45

= 1.00 lot

= 1.00 l.s. 0.4 0.6

= 1.00 l.s. 0.8

= 1.00 set 1

= 1.00 set
43.00
= 43.00 sets

= 32.00 sets 32.00

ECEPTACLE OUTLET

= 17.00 sets 17.00

= 1.00 l.s. 0.2 0.8

= 1.00 l.s. 0.2 0.6

l.s.
l.s
l.s. 1

/l.s.
l.s.
l.s
l.s.

sq.m.

/sq.m.

GRID M. LUCINARIO
180 calendar days

can change prior to the design of foundation

can add/subtract the quantities later before finalization


can add/subtract the quantities later before finalization
152.85

30.78

68.05
18.72

16.4

18.72

16.4
18.72

16.4

13.62
11.45
0.20 x 0.40 x 21.60 = 1.73
((0.25x0.30) + (0.50x0.15x0.15x2)) x 18.30 = 1.78

15858 -15694.60

FTB - 1: 0.40 x 0.50 x 2.50 x 6 =


FTB - 2 : 0.40 x 0.50 x 7.00 x 6 =
FTB - 3 : 0.40 x 0.50 x 4.50 x 4 x 3 =
0.40 x 0.50 x 5.00 x 3 =

23.70 / 5.20 x 6.0m

10343.65 -1593.26

971.21

110.11
146.45

3172.61
350.707
466.711

2889.3455

425.8585
566.7205

9099.7225

36 - 4.5m 38 - 5.0m

36 - 4.5m 38 - 5.0m
36 - 4.5m 38 - 5.0m

B-1: 0.20 x 0.40 x 18.00 =


B-2: 0.30 x 0.40 x 5.00 =
B-3: 0.20 x 0.30 x 4.00 =
B-4: 0.20 x 0.40 x 3.69 =

40

38

36

24
4000

2421.99
plus 9 bars for cantilever = 1.50 meters spaced @ 0.175m

36 - 4.5m 38 - 5.0m

36 - 4.5m 38 - 5.0m

36 - 4.5m 38 - 5.0m
B-1: 0.20 x 0.40 x 18.00 =
B-2: 0.30 x 0.40 x 5.00 =
B-3: 0.20 x 0.30 x 4.00 =
B-4: 0.20 x 0.40 x 3.69 =

40

38

36

24
4000

plus 9 bars for cantilever = 1.50 meters spaced @ 0.175m

36 - 4.5m 38 - 5.0m
36 - 4.5m 38 - 5.0m

36 - 4.5m 38 - 5.0m

B-1: 0.20 x 0.40 x 18.00 =


B-2: 0.30 x 0.40 x 5.00 =
B-3: 0.20 x 0.30 x 4.00 =
B-4: 0.20 x 0.40 x 3.69 =

40

38
36

24
4000

plus 9 bars for cantilever = 1.50 meters spaced @ 0.175m

plus 9 bars for cantilever = 1.50 meters spaced @ 0.175m

2300 kg
2300 kg

1971
183.89
Total

10 MM 0.616
12 MM 0.888
16 MM 1.579
20 MM 2.466
25 MM 3.854

for 300 mm spacing


40 pcs. - 25 mmØ x 6.00m x 4 x 2 = 7399.68
18 pcs. - 25 mmØ x 7.50m x 2 = 1040.58
18 pcs. - 25 mmØ x 6.00m x 2 = 832.46
30 pcs. - 25 mmØ x 7.50m x 2 = 1734.30
30 pcs. - 25 mmØ x 6.00m x 2 = 1387.44
40 pcs. - 25 mmØ x 10.50m x 2 = 3237.36
40 pcs. - 25 mmØ x 9.00m x 2 = 2774.88
172 pcs. - 25 mmØ x 6.00m = 3977.33
33194.5 22384.03

30.78
68.05

18.72

16.4
18.72

16.4

18.72
16.4

13.62

11.45
386

sir uly with engr paw


sir uly with engr paw
748.85
302.52

83.52
562.37
UNIT WEIGHT ESTIMATE
5.91 8 PER TRUSS
5.91 4 PER TRUSS
4.47 6 PER TRUSS
5.91 1 PER TRUSS
gusset plate
7854 1 pc
7854 2 pcs
7854 4 pcs
7854 6 pcs
7854 1 pc
7854 11 pcs
UNIT WEIGHT ESTIMATE
5.91 8 PER TRUSS
5.91 4 PER TRUSS
4.47 6 PER TRUSS
gusset plate
7854 1 pc
7854 2 pcs
7854 4 pcs
7854 6 pcs
7854 1 pc
7854 11 pcs
UNIT WEIGHT ESTIMATE
5.91 8 PER TRUSS
5.91 4 PER TRUSS
4.47 6 PER TRUSS
5.91 1 PER TRUSS
gusset plate
7854 1 pc
7854 2 pcs
7854 4 pcs
7854 6 pcs
7854 1 pc
7854 11 pcs
UNIT WEIGHT ESTIMATE
5.91 8 PER TRUSS
5.91 4 PER TRUSS
4.47 6 PER TRUSS
5.91 1 PER TRUSS
gusset plate
7854 1 pc
7854 2 pcs
7854 4 pcs
7854 6 pcs
7854 1 pc
7854 11 pcs
4.24
2.03 front and rear side view
0.616 15 pcs per half trusses
7854 1 pcc per half truss on the top chord section
7854 3 pcs per whole truss
1.579 4 pcs per base plate
1.579 2 pcs per half truss
1.579 2 pcs per half truss
0.888 28 per half truss
6.87
0.888 8/s-7 - connection of h-1(B) on column
9.26 RB-1
7854 15 PER HALF TRUSS
7854 plate for cross bracing
45 2.5
26.1 1.45

45 2.5
26.1 1.45
3.00
8.40
10.80
3.00
1.44
0.60
0.24
0.30
1.44
0.60
0.24
0.30
1.44
0.60
0.24
0.30
kgs.

Potrebbero piacerti anche