BRIDGE AT PHAPHAMAU
DATE- 22/08/2016
INDEX MAP
1
OBJECTIVES OF THE PROJECT
EXISTING STRUCTURES
One major road bridge and 2 nos. minor bridges on the approaches of
proposed Phaphamau Bridge.
Existing 2-lane Phaphamau Bridge has 29 spans of 31.15m and 2 spans of
19.35m with the total length of 969.95m.
It has PSC T-Beam and slab type superstructure supported on single Circular
Cellular RCC piers resting on Well foundations.
It has 7.5 m wide carriageway, 1.5m footpath on both sides and 250mm wide
hand rails. It has overall deck width of 11.0m.
The bearings are rocker-roller type and expansion joints are strip seal type.
Depth of well foundation varies from 38.0m to 40.0m.
The condition of existing bridge is satisfactory with no visual signs of distress
noticed in superstructure and substructure.
Some components of structure such as expansion joints, drainage spouts and
wearing coat need repair and rehabilitation measures.
There is no speed or load limitation for movement of traffic on the bridge.
The volume of traffic, however, is sufficiently large for a 2-lane Bridge.
Some photographs of the existing Phaphamau Bridge given below:
2
PHOTOGRAPHS OF EXISTING BRIDGE
ROADWAY GEOMETRICS
The project approach road has sharp curves at some locations which
reduce the speed.
The project road passes through Army Cantonment on Allahabad Side
and congested market area on both sides of Ganga Bridge, which
reduce the speed.
On Phaphamau side, there is one location with deficient sight distance
near junction of project road with road to Phoolpur.
There is sharp horizontal curve in the project road at this location.
According to PWD-NH Division officers, this is a black spot where
frequently accidents take place.
The existing RoW is shown below
3
SITING OF THE PROPOSED BRIDGE
OPTION-1 OPTION-2
There is ~ 75 m wide gap The proposed bridge will be at upstream side of
between existing 2 Lane road existing Ganga Bridge. On Allahabad side, there
Bridge and Rail cum Road are 2-3 story houses in about 100 m length which
Curzon Bridge. There are will require to be acquired. Thereafter, alignment will
temples on both sides on river pass through government land and boundaries of
banks in this stretch. Alignment government complexes, part of which will required
of approach roads on to be acquired, before merging with existing road.
Phaphamau and Allahabad side There will be sharp horizontal curve on Allahabad
have to be realigned for traffic side as the alignment moves away from the existing
circulation through existing and approach road
new bridges
The Consultants are of the opinion that Option 1 for siting of proposed 6 – Lane
is more advantageous. It will avoid land acquisition, residential area and
improvement geometrics of approaches
7
Improvement Proposal
Main Bridge:
A six lane new bridge will be provided adjacent to existing Road Bridge.
Piers of the proposed bridge will be aligned with piers of existing Road
Bridge.
Type of superstructure will be finalized keeping aesthetic considerations
in view. General arrangement drawings have been prepared for aesthetic
options considering cable stay, extradosed and balanced cantilever
options of superstructure have been prepared.
The tentative cost estimates also attached in Inception Report.
Detailed design will be taken up for option selected and approved by the
Client.
Elevated Approaches:
Phaphamau Bridge approaches are passing through congested urban area, Army
cantonment area on Allahabad side and congested urban area on Phaphamau side
which warrants provision of elevated approaches.
Locations for bringing down elevated approaches to ground level shall be very
carefully selected keeping minimum inhabitation and land acquisition into
consideration.
Options for such locations on both sides of the bridge will be presented to the Client
and detailed studies will be carried out on the selected location on each side.
8
4
Approval of Client is required for following
OPTION-1
Each 3 – lane carriageway of new 6- lane bridge / structures shall have as per
IRC:SP:87-2015, 10.5 m carriageway width, 1.5 m wide paved shoulder
towards outer edge, 0.25m wide edge shyness near crash barrier & median,
0.45 m wide crash barrier, 1.5 m wide footpath and 0.3 m wide railing towards
outer end of the deck and 0.25m wide edge shyness/1.2 m wide median at
center. Total deck width of the proposed bridge shall be 30.7m.
10
10
5
DIFFERENT OPTIONS FOR DECK WIDTH
OPTION-2
Approaches of the proposed bridge are elevated with approximate ~ total length
of 6.3 km., footpaths can be removed as pedestrian and cyclists will use only at
grade facility i.e. existing 2-Lane Road Bridge. The deck width without footpath
works out to 27.2 m.
11
11
OPTION-3
Considering congestion in approaches and passage through army cantonment
and in order to reduce land acquisition, provision of paved shoulders may be
omitted. Resultant overall deck width, without footpath and paved shoulders,
works out to 24.2m.
12
12
6
DECK WIDTH AS PER IRC:SP-87:2010
13
13
14
7
Superstructure options for Main Bridge
S
Three types of structure options have been considered with long span bridges in
the main channel viz.
Cantilever Bridge Extradosed bridge Cable-stayed bridge
15
16
8
VIADUCTS
Preliminary cost of Viaduct works out to Rs. 49,300/- per sq.m. Since, elevated
approaches are feasible, cost for approaches have been based on 6-Lane
configuration only since widening of elevated approaches in future will not be
feasible.
Total length of elevated portion on Phaphamau side is 2.6 km. from
(Km 144+900 to 147+500) and on Allahabad side and 3.7 km from
(Km. 148+300 to Km. 152+000).
Total length of elevated approach roads work out to 6.3 km. length of main bridge is
969.15m. Thus, the total length of bridge including viaducts is 7.27 km.
TOTAL COST OF BRIDGE INCLUDING VIADUCTS
Option Type of bridge Main bridge Cost of Total cost
No. cost elevated (Rs. in
(Rs. in structure Crores)
Crores) (Rs. in Crores)
Balanced Cantilever
I 241 953 1194
type superstructure
Extradosed type
II 334 953 1287
superstructure
Cable stay type
III 456 953 1409
superstructure
17
17
18
18
9
FINAL RECOMMENDATIONS
19
19
GEOTECHNICAL INVESTIGATION
As per clause 4.11.4 of RFP, bore holes are proposed to be carried out as shown
below.
S. No. Description No of boreholes Remarks
20
20
10
GEOTECHNICAL INVESTIGATION
Note: The depth of drilling worked out above is tentative for approval and
payment will be requested for based on actual depth of drilling carried out based on
approved span arrangement and geotechnical investigation proposal for number and
depth of boreholes.
21