Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
QUOTATION
To /Kepada : PT.Beiersdorf Indonesia From /Dari : PT. Panca Intikarya Mandiri
Address/ Alamat : Malang Date/ Tanggal : 3 1 October 2018
Attn/ up. : Bpk . Pangki Subject/Perihal : Media MBBR XLB
Telp : - Reff No : Q-014/BDF/JZ/X/18
Mobile Phone : 0813-8983-3252
E-mail :
Inq No / RFQ : 01 Email : darrell.justine@gmail.com
Hole number : 5
Density : 0,96-0,98 g/cm3
Weight : 140 kg/m3
Calculation:
a. BOD removal
b. NH4 Removal
- NH4 balance -7.2 mg/L
- NH4 Loading -612 g.NH4/day
- NH4 loading - g.NH4/m3.day
- Flux MBRR 0.5 g NH4/m2.day (pit in range NH3 loading)
-
- Volume media Required - m3 media
- clogging % 20%
- Volume media required - m3 media
- Fill media 50% Rate : 15%-70%
- Volume aeration - m3
- HRT - hour
PT. PANCA INTIKARYA MANDIRI
GENERAL CONTRACTORS AND SERVICES
Jl. Raya Bantar - Gebang, Grand Regency C1. No. 09Jawa Barat 17422
c. Eksekutif Summary
Please take noted that any changes parameters coming from source stream will affect into the quality
of effluent.
PT ARCHETYPE INDONESIA
Menara 165, 12th Floor
Jl. TB Simatupang Kav. 1
Cilandak Timur
Jakarta Selatan 12560
Indonesia
Shaping Tomorrow
PT Archetype Indonesia
MBBR Process Data Sheet
Project number: C-TID-EXT-18-016-B00
Document number: DS-BD-PR-SI-1002-01
Revision: 1
16th October 2018
© Copyright Archetype
All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means
without permission of the publisher.
MOVING BED BIO REACTOR
Spec./Data sheet for:
Additional Information:
Proposal Requirements
Budgeting ( 26 -10 - 2018 ) Purchase ( xx - xx- 2018 )
(Check one)
Project Timing: Submittal ( xx - xx- 2018 ) PO Placement ( xx - xx- 2018 ) Kick-Off ( xx - xx- 2018 )
Target Installation Period: Engineering ( xx - xx- 2018 ) Equipment ( xx - xx- 2018 ) Completion ( xx - xx- 2018 )
Regulatory Agency: Meet the standard discharge permen LH No.51 tahun 1995