Sei sulla pagina 1di 165

Sharma-Rasuwa Joint Venture

Tokha-10, Kathmandu
Summary
Project: Construction of 400 Beded Maternal and Child Health
Care Centre
Location: Dharan, Sunsari, Nepal
S.No. Structure Weight Remarks

1 Column 29314.82

2 Pedestal Bottom Bar 40391.07

3 Pedestal Top Bar 12723.82

4 Shear Wall 0.00

5 Raf 0.00

Total for Block 5 82429.72

*excluding inner shear wall and staircase


2

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

C Column
C.1 Basement Floor
1 Block 5
C1 (No-8)

10-25dia. +10-20dia y 8 10 800 450 0.53 5.45 5.98 478.4 25


x

y 8 10 800 450 0.53 5.45 5.98 478.4 20


x

Lap 8 5 1.13 45 25

8 5 0.90 36 20

Prepared By: Checked By: Approved By:


3

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

Stirrups m o Stirrups 8 53 800 450 0.1 2.46 1043.04 10 643.56


n

m o Stirrups 8 53 800 450 0.1 2.3 975.2 10 601.70

m o Ties 8 53 800 450 0.1 1.66 1407.68 10 868.54

n
C2 (No-5)

10-25dia. +10-20dia yb 5 10 800 450 0.53 5.45 5.98 299 25


xa

yb
5 10 800 450 0.45 5.45 5.90 295 20
xa

Prepared By: Checked By: Approved By:


4

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

Lap 5 5 1.13 28.125 25

5 5 0.90 22.5 20

Stirrups m o Stirrups 5 53 800 450 0.1 2.46 651.9 10 402.22


n

m o
Stirrups 5 53 800 450 0.1 2.3 609.5 10 376.06
n

m o Ties 5 53 800 450 0.1 1.66 879.8 10 542.84


n

C3 ( No-1)

Prepared By: Checked By: Approved By:


5

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

6-28dia+14-25dia yb a 1 6 800 450 0.7 5.45 6.15 36.9 28


xa

yb b 1 14 800 450 0.53 5.45 5.98 83.72 25


xa

Lap 1 3 1.26 3.78 28

1 7 1.13 7.875 25

Stirrups m o Stirrups 1 53 800 450 0.1 2.46 130.38 10 80.44


n

m o
Stirrups 1 53 800 450 0.1 2.3 121.9 10 75.21
n

Prepared By: Checked By: Approved By:


6

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

m o
Ties 1 53 800 450 0.1 1.66 175.96 10 108.57
n

C4

14-28dia+6-28dia yb a 1 14 800 450 0.7 5.45 6.15 86.1 28


xa

yb b 1 6 800 450 0.53 5.45 5.98 35.88 25


xa

Lap 1 3 1.26 3.78 28

1 7 1.13 7.875 25

Prepared By: Checked By: Approved By:


7

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

Stirrups m o Stirrups 1 53 800 450 0.1 2.46 130.38 10 80.44


n

m o
Stirrups 1 53 800 450 0.1 2.3 121.9 10 75.21
n

o Ties 1 53 800 450 0.1 1.66 175.96 10 108.57


m n

C5

16-25dia+8-20dia yb a 3 16 1000 450 0.53 5.45 5.98 287.04 25


xa

yb b 3 8 1000 450 0.45 5.45 5.90 141.6 20


xa

Prepared By: Checked By: Approved By:


8

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

Lap 3 8 1.13 27 25

3 4 0.90 10.8 20

Stirrups m o Stirrups 3 53 1000 450 0.1 2.86 454.74 10 280.57


n

m o
Stirrups 3 53 1000 450 0.1 2.7 429.3 10 264.88
n

m o
n Ties 3 53 1000 450 0.1 1.45 461.1 10 284.50

C6

Prepared By: Checked By: Approved By:


9

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

4-25 dia.+20-20dia yb a 4 4 1000 450 0.53 5.45 5.98 95.68 25


xa

yb b 4 20 1000 450 0.45 5.45 5.90 472 20


xa

Lap 4 2 1.13 9 25

4 10 0.90 36 20

Stirrups m o Stirrups 4 53 1000 450 0.1 2.86 606.32 10 374.10


n

m o
Stirrups 4 53 1000 450 0.1 2.7 572.4 10 353.17
n

Prepared By: Checked By: Approved By:


10

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

m o
Ties 4 53 1000 450 0.1 1.45 614.8 10 379.33
n

C7 ( No-11)

12-25dia.+12-20dia yb a 11 12 1000 450 0.53 5.45 5.98 789.36 25


xa

yb
c 11 12 1000 450 0.45 5.45 5.90 778.8 20
xa

Lap 11 6 1.13 74.25 25

11 6 0.90 59.4 20

Prepared By: Checked By: Approved By:


11

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

Stirrups m o Stirrups 11 53 1000 450 0.1 2.86 1667.38 10 1028.77


n

m o
Stirrups 11 53 1000 450 0.1 2.7 1574.1 10 971.22
n

m o
Ties 11 53 1000 450 0.1 1.45 1690.7 10 1043.16
n

C8

24-28dia. yb a 1 24 1000 450 0.7 5.45 6.15 147.6 28


xa

Lap 1 24 1.26 30.24 28

Prepared By: Checked By: Approved By:


12

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

Stirrups m o Stirrups 1 53 1000 450 0.1 2.86 151.58 10 93.52


n

m o
Stirrups 1 53 1000 450 0.1 2.7 143.1 10 88.29
n

m o
Ties 1 53 1000 450 0.1 1.45 153.7 10 94.83
n

C9

10-25dia.+10-20dia. yb a 1 10 800 450 0.53 7.05 7.58 75.8 25


xa

yb b 1 10 800 450 0.45 7.05 7.50 75 20


xa

Prepared By: Checked By: Approved By:


13

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

Lap 1 5 1.13 5.625 25

1 5 0.90 4.5 20

Stirrups m o Stirrups 1 83 800 450 0.1 2.46 204.18 10 125.98


n

m o
Stirrups 1 83 800 450 0.1 2.3 190.9 10 117.79
n

m o
Ties 1 83 800 450 0.1 1.66 275.56 10 170.02
n

C10 (No-4)

Prepared By: Checked By: Approved By:


14

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

12-25dia.+12-20dia. yb a 4 12 800 450 0.53 5.45 5.98 287.04 25


xa

yb b 4 12 800 450 0.45 5.45 5.90 283.2 20


xa

Lap 4 6 1.13 27 25

4 6 0.90 21.6 20

Stirrups m o Stirrups 4 53 800 450 0.1 2.46 521.52 10 321.78


n

m o
Stirrups 4 53 800 450 0.1 2.3 487.6 10 300.85
n

Prepared By: Checked By: Approved By:


15

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

m o
Ties 4 53 800 450 0.1 1.66 703.84 10 434.27
n

Column upto Landing lvl

yb
C1 (450*350) a 1 6 450 350 0.45 3.35 3.80 22.8 20
xa

yb
6-20dia.+4-16dia. b 1 4 450 350 0.36 3.35 3.71 14.84 16
xa

Prepared By: Checked By: Approved By:


16

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Coulmn Size Length of Lenth of Dia. of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length Total Length
L B bars 10
place bars (x) (y)

m o
Stirrups n Stirrups 1 35 450 350 0.1 2.46 86.1 10 53.12

m o
Stirrups 1 35 450 350 0.1 2.3 80.5 10 49.67
n

10793.19

Total to Column carried to the Summary

Prepared By: Checked By: Approved By:


17

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

1842.80

1179.26

173.34

88.74

Prepared By: Checked By: Approved By:


18

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=740
n= 390
o= 10*dia.

m=740
n= 155
o= 10*dia.

m=340
n= 390
o= 10*dia.

1151.75

727.18

Prepared By: Checked By: Approved By:


19

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

108.34

55.46

m=740
n= 390
o= 10*dia.

m=740
n= 155
o= 10*dia.

m=340
n= 390
o= 10*dia.

Prepared By: Checked By: Approved By:


20

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

178.23

322.49

18.26

30.33

m=740
n= 390
o= 10*dia.

m=740
n= 155
o= 10*dia.

Prepared By: Checked By: Approved By:


21

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=340
n= 390
o= 10*dia.

415.86

138.21

18.26

30.33

Prepared By: Checked By: Approved By:


22

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=740
n= 390
o= 10*dia.

m=740
n= 155
o= 10*dia.

m=340
n= 390
o= 10*dia.

1105.68

349.04

Prepared By: Checked By: Approved By:


23

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

104.00

26.62

m=940
n= 390
o= 10*dia.

m=940
n= 155
o= 10*dia.

m=232
n= 390
o= 10*dia.

Prepared By: Checked By: Approved By:


24

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

368.56

1163.48

34.67

88.74

m=940
n= 390
o= 10*dia.

m=940
n= 155
o= 10*dia.

Prepared By: Checked By: Approved By:


25

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=232
n= 390
o= 10*dia.

3040.61

1919.74

286.01

146.42

Prepared By: Checked By: Approved By:


26

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=940
n= 390
o= 10*dia.

m=940
n= 155
o= 10*dia.

m=232
n= 390
o= 10*dia.

712.91

146.06

Prepared By: Checked By: Approved By:


27

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=940
n= 390
o= 10*dia.

m=940
n= 155
o= 10*dia.

m=232
n= 390
o= 10*dia.

291.98

184.88

Prepared By: Checked By: Approved By:


28

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

21.67

11.09

m=740
n= 390
o= 10*dia.

m=740
n= 155
o= 10*dia.

m=340
n= 390
o= 10*dia.

Prepared By: Checked By: Approved By:


29

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

1105.68

698.09

104.00

53.24

m=740
n= 390
o= 10*dia.

m=740
n= 155
o= 10*dia.

Prepared By: Checked By: Approved By:


30

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=340
n= 390
o= 10*dia.

56.20

23.42

Prepared By: Checked By: Approved By:


31

Job: Rebar Schedule of Column


Block: 3,4,5
Weight
Remarks
20 25 28

m=740
n= 390
o= 10*dia.

m=740
n= 155
o= 10*dia.

6748.18 10283.87 1489.57

29314.82

Prepared By: Checked By: Approved By:


34

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule
Location: Dharan, Sunsari, Nepal Block: 5
Size nos
Notation of Hooks Length of Total Dia. of
S.No. Descrition Shape no. of nos. of Span Length (a) Spacing (b & c)
the Bar L B Bar Length bars
place bars

A Bottom Bars of Pedestal


1 Block 5

b c
E1-A1,A5 a a 3600 3750 2 37 3600 3750 100 160 4.07 301.18 16

b c b 2 39 3750 3600 100 160 3.92 305.76 16


a
Pin Bars a 2 3 3750 3.75 22.50 25

E2-C5 b c a 2955 3750 1 31 2955 3750 100 160 4.07 126.17 16


a

b c b 1 39 3750 2955 100 160 3.275 127.73 16


a
Pin Bars a 1 3 3750 3.75 11.25 25
E3- b c
G1,F1,E1,D1,G5,F5,E5,D5 a 5560 3750 8 57 5560 3750 100 160 4.07 1855.92 16
a

Prepared By: Checked By: Approved By:


35

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule
Location: Dharan, Sunsari, Nepal Block: 5
Size nos
Notation of Hooks Length of Total Dia. of
S.No. Descrition Shape no. of nos. of Span Length (a) Spacing (b & c)
the Bar L B Bar Length bars
place bars

b c b 8 39 3750 5560 100 160 5.88 1834.56 16


a
Pin Bars a 8 3 3750 3.75 90.00 25

E5-A2,A3,A4 b c a 3600 5900 3 37 3600 5900 100 160 6.22 690.42 16


a

b c b 3 60 5900 3600 100 160 3.92 705.60 16


a
Pin Bars a 3 3 5900 5.9 53.10 25

E6-C2,B2,C3,B3,C4,B4 b c a 5655 5900 6 58 5655 5900 100 160 6.22 2164.56 16


a

b c b 6 60 5900 5655 100 160 5.975 2151.00 16


a
Pin Bars a 6 3 5900 5.9 106.20 25
E7- c
G2,F2,E2,D2,G3,F3,E3,D3,G b a a 5560 5900 12 57 5560 5900 100 160 6.22 4254.48 16
4,F4,E4,D4

b c b 12 60 5900 5560 100 160 5.88 4233.60 16


a
Pin Bars a 12 3 5900 5.9 212.40 25

E8-H2,H3,H4 b c a 7025 5900 3 72 7025 5900 100 160 6.22 1343.52 16


a

Prepared By: Checked By: Approved By:


36

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule
Location: Dharan, Sunsari, Nepal Block: 5
Size nos
Notation of Hooks Length of Total Dia. of
S.No. Descrition Shape no. of nos. of Span Length (a) Spacing (b & c)
the Bar L B Bar Length bars
place bars

b c b 3 60 5900 7025 100 160 7.345 1322.10 16


a
Pin Bars a 3 3 5900 5.9 53.10 25

E9-B1,C1 b c a 5655 3750 2 58 5655 3750 100 160 4.07 472.12 16


a

b c b 2 39 3750 5655 100 160 5.975 466.05 16


a
Pin Bars a 2 3 3750 3.75 22.50 25

E10-H5 b c a 5640 7025 1 39 3750 7025 100 160 7.345 286.46 16


a

b c a 1 20 1890 4170 100 160 4.49 89.80 16


a
b c b 1 43 4170 5640 100 160 5.96 256.28 16
a
b c b 1 30 2855 3750 100 160 4.07 122.10 16
a
Pin Bars a 1 2 5640 5.64 11.28 25
Pin Bars a 1 1 3750 3.75 3.75 25

E22-H1 b c a 7025 3750 1 72 7025 3750 100 160 4.07 293.04 16


a

b c b 1 39 3750 7025 100 160 7.345 286.46 16


a

Prepared By: Checked By: Approved By:


37

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule
Location: Dharan, Sunsari, Nepal Block: 5
Size nos
Notation of Hooks Length of Total Dia. of
S.No. Descrition Shape no. of nos. of Span Length (a) Spacing (b & c)
the Bar L B Bar Length bars
place bars
a
Pin Bars a 1 3 3750 3.75 11.25 25

E2-C5 b c a 7025 3775 1 49 4725 3750 100 160 4.07 199.43 16


a

b c a 1 9 740 1075 100 160 1.395 12.56 16


a
b c b 1 28 2675 4725 100 160 5.045 141.26 16
a
b c b 1 12 1075 5465 100 160 5.785 69.42 16
a
Pin Bars a 1 3 3750 3.75 11.25 25

Sub-Total

Prepared By: Checked By: Approved By:


38

uwa Joint Venture


10, Kathmandu
Job: Rebar Schedule of Pedestal Bottom
Block: 5

Total Weight Remarks

475.26

482.49

86.63

199.10

201.55 #REF!

43.31 #REF!

2928.64 #REF!

Prepared By: Checked By: Approved By:


39

uwa Joint Venture


10, Kathmandu
Job: Rebar Schedule of Pedestal Bottom
Block: 5

Total Weight Remarks

2894.94

346.50

1089.48

1113.44

204.44

3415.68

3394.28

408.87

6713.57

6680.62

817.74

2120.07

Prepared By: Checked By: Approved By:


40

uwa Joint Venture


10, Kathmandu
Job: Rebar Schedule of Pedestal Bottom
Block: 5

Total Weight Remarks

2086.27

204.44

745.01

735.43

86.63

452.03

141.70

404.41

192.67

43.43
14.44

462.42

452.03

Prepared By: Checked By: Approved By:


41

uwa Joint Venture


10, Kathmandu
Job: Rebar Schedule of Pedestal Bottom
Block: 5

Total Weight Remarks

43.31

314.70

19.81

222.91

109.54

43.31

40391.07

Prepared By: Checked By: Approved By:


42

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal

Size Nos.
Vertical Bottom
Notation of nos. nos. of Span Length (c) Leg Length of
S.No. Description Shape Hook Spacing
the Bar L B of Bar
(b) (a)
place bars

A Top Bars at Pedestals


1 Block 5

c b
P2- B5 b a a 2062 2650 1 11 1962 2550 886 300 200 4.922
a
c b b 1 14 2550 1962 886 300 200 4.334
b a
a
-
P3- c b
b a
G1,F1,E1,D1,C1,B1,G5,F5,E a a 3650 2650 11 19 3550 2550 886 300 200 4.922
5,D5,C5
c b b 11 14 2550 3550 886 300 200 5.922
b a
a
-
P7- c b
b a
G2,F2,E2,D2,C2,B2,G3,F3,E a
a 3650 3500 18 19 3550 3400 886 300 200 5.772
3,D3,C3,B3,G4,E4,F4,D4,C4,
B4
c b b 18 18 3400 3550 886 300 200 5.922
b a
a
-

Prepared By: Checked By: Approved By:


43

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal

Size Nos.
Vertical Bottom
Notation of nos. nos. of Span Length (c) Leg Length of
S.No. Description Shape Hook Spacing
the Bar L B of Bar
(b) (a)
place bars

P8- H4 c b a 4850 3565 1 25 4750 3465 886 300 200 5.837


b a
a
c b b 1 19 3465 4750 886 300 200 7.122
b a
a
-

P10- H5 c b a 4850 3565 1 25 4750 3465 886 300 200 5.837


b a
a
c b b 1 19 3465 4750 886 300 200 7.122
b a
a
-

P27- H2,H3 c b a 4850 3640 2 25 4750 3540 886 300 200 5.912
b a
a
c b b 2 19 3540 4750 886 300 200 7.122
b a
a
-

P30- H1 c b a 4850 2450 1 25 4750 2350 886 300 200 4.722


b a
a
c b b 1 13 2350 4750 886 300 200 7.122
b a
a
-

P35- A1.A5 c b a 2550 2650 2 14 2450 2550 886 300 200 4.922
b a
a

Prepared By: Checked By: Approved By:


44

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal

Size Nos.
Vertical Bottom
Notation of nos. nos. of Span Length (c) Leg Length of
S.No. Description Shape Hook Spacing
the Bar L B of Bar
(b) (a)
place bars
c b b 2 14 2550 2450 886 300 200 4.822
b a
a
-

P36- A2,A3,A4 c b a 2550 3500 3 14 2450 3400 886 300 200 5.772
b a
a
c b b 3 18 3400 2450 886 300 200 4.822
b a
a
Sub-Total of

Prepared By: Checked By: Approved By:


45

Rasuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Pedestal Top
Block: 5, 4, 3, 2, 1

Dia. of
Total Length Total Weight Remarks
bars

54.14 16 85.44

60.68 16 95.75
-

1028.70 16 1623.29

911.99 16 1439.12
-

1974.02 16 3115.01

1918.73 16 3027.75
-

Prepared By: Checked By: Approved By:


46

Rasuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Pedestal Top
Block: 5, 4, 3, 2, 1

Dia. of
Total Length Total Weight Remarks
bars

145.93 16 230.27

135.32 16 213.53
-

145.93 16 230.27

135.32 16 213.53
-

295.60 16 466.46

270.64 16 427.06
-

118.05 16 186.28

92.59 16 146.10
-

137.82 16 217.47

Prepared By: Checked By: Approved By:


47

Rasuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Pedestal Top
Block: 5, 4, 3, 2, 1

Dia. of
Total Length Total Weight Remarks
bars

135.02 16 213.06
-

242.42 16 382.55

260.39 16 410.89

Sub-Total of Block 5 12723.82

Prepared By: Checked By: Approved By:


48

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule of Out
Location: Dharan, Sunsari, Nepal Block: 5
nos Length of Length of Weight
Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Hook Length Total Length
(Y) bars 10 12
place bars (x)

C Outer shear wall


C.1 Basement Floor
1 Block 5
Along Grid- 1

y 2 196 125 0.3 5.45 5.75 2254 16


x
Vertical Bars

y 2 196 125 0.3 5.45 5.75 2254 12 2001.55


x

Horizontal Bars 2 37 150 50.65 50.65 3748.1 10 2312.58

Prepared By: Checked By: Approved By:


49

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule of Out
Location: Dharan, Sunsari, Nepal Block: 5
nos Length of Length of Weight
Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Hook Length Total Length
(Y) bars 10 12
place bars (x)

U-Bars from Column 2 37 150 0.15 2.52 2.67 197.58 10 121.91

450V/500H
Clip Bar 11 102 0.15 0.15 168.3 10 103.84

Lap 8 37 0.6 0.60 177.6 10 109.58

Aong Grid-5

y 2 175 125 0.3 5.45 5.75 2012.5 16


x
Vertical Bars

Prepared By: Checked By: Approved By:


50

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule of Out
Location: Dharan, Sunsari, Nepal Block: 5
nos Length of Length of Weight
Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Hook Length Total Length
(Y) bars 10 12
place bars (x)
Vertical Bars

y 2 175 125 0.3 5.45 5.75 2012.5 12 1787.10


x

Horizontal Bars 2 37 150 37.97 37.97 2809.78 10 1733.63

2 37 150 6.85 6.85 506.9 10 312.76

U-Bars from Column 4 37 150 0.15 2.52 372.96 10 230.12


450V/500H

Clip Bar 11 77 0.15 127.05 10 78.39

Prepared By: Checked By: Approved By:


51

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule of Out
Location: Dharan, Sunsari, Nepal Block: 5
nos Length of Length of Weight
Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Hook Length Total Length
(Y) bars 10 12
place bars (x)

Lap 6 37 0.6 0.60 133.2 10 82.18

Aong Grid-A

y 2 100 125 0.3 5.45 5.75 1150 16


x
Vertical Bars

y 2 100 125 0.3 5.45 5.75 1150 12 1021.20


x

Horizontal Bars 2 37 150 27 27.00 1998 10 1232.77

Prepared By: Checked By: Approved By:


52

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre Job: Rebar Schedule of Out
Location: Dharan, Sunsari, Nepal Block: 5
nos Length of Length of Weight
Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Hook Length Total Length
(Y) bars 10 12
place bars (x)

U-Bars from Column 2 37 150 0.15 2.52 186.48 10 115.06

450V/500H
Clip Bar 11 55 0.15 90.75 10 55.99

Lap 4 37 0.6 0.60 88.8 10 54.79

6543.59 4809.85

Total Shear Wall carried to the Summary 19900.

Prepared By: Checked By: Approved By:


53

edule of Outer Shear Wall

Weight
Remarks
16 20

3556.81

Prepared By: Checked By: Approved By:


54

edule of Outer Shear Wall

Weight
Remarks
16 20

3175.73

Prepared By: Checked By: Approved By:


55

edule of Outer Shear Wall

Weight
Remarks
16 20

Prepared By: Checked By: Approved By:


56

edule of Outer Shear Wall

Weight
Remarks
16 20

1814.70

Prepared By: Checked By: Approved By:


57

edule of Outer Shear Wall

Weight
Remarks
16 20

8547.24 0.00

19900.68

Prepared By: Checked By: Approved By:


Sharma-Rasuwa Join
Tokha-10, Kathma
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Length Lenth of
of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length
place bars (y)
(x)

Lift Shear
C.1 Basement Floor
1 Block 5

y a 1 52 0.3 7.05 7.35


x

y b 1 52 0.3 7.05 7.35


x

y
a 1 42 0.3 7.05 7.35
x

y
b 1 42 0.3 7.05 7.35
x

Stirrups ( up to Raf lvl ) m o Stirrups 1 70 0.1 3.92 4.12


n
Along Grid-B m o Stirrups 1 70 0.1 2.82 3.02

m o Ties 5 70 0.1 0.74 0.94

Stirrups m o Stirrups 1 70 0.1 3.9 4.1


n

m o
Along Grid-5 Stirrups 1 70 0.1 5.46 5.66
n

m o Stirrups 1 70 0.1 3.92 4.12


n

m o Ties 1 70 0.1 1.06 1.26


n

m o
Ties 7 70 0.1 0.72 0.92
n

m o Ties 1 70 0.1 1.36 1.56


n
Center & End wall m o Stirrups 2 70 0.1 3.92 4.12
n

m o Stirrups 2 70 0.1 1.06 1.26


n

m o
Ties 12 70 0.1 0.72 0.92
n

m o Ties 2 70 0.1 1.36 1.56


n

Total to lift shear wall carried out to

Sharma-Rasuwa Join
Tokha-10, Kathma
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Length Lenth of
of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook Vertical Length
place bars (y)
(x)

Lift Shear
C.1 Basement Floor
1 Block 4

y a 1 35 0.3 7.05 7.35


x
y b 1 35 0.3 7.05 7.35
x

y
a 1 30 0.3 7.05 7.35
x

y
b 1 30 0.3 7.05 7.35
x

Stirrups ( up to Raf lvl ) m o Stirrups 1 70 0.1 3.66 3.86


n

Along Grid-B m o Stirrups 1 70 0.1 3.84 4.04

m o Ties 6 70 0.1 0.74 0.94

Stirrups m o Stirrups 1 70 0.1 4.24 4.44


n

m o
Along Grid-5 Stirrups 1 70 0.1 3.24 3.44
n

m o Ties 4 70 0.1 0.74 0.94


n

m o
Ties 1 70 0.1 1.06 1.26
n
End wall m o Stirrups 1 70 0.1 5.18 5.38
n

m o Stirrups 1 70 0.1 3.98 4.18


n

m o
Ties 12 70 0.1 0.74 0.94
n

m o Ties 2 70 0.1 1.06 1.26


n

Total to lift shear wall carried out to

Sharma-Rasuwa Join
Tokha-10, Kathma
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Length Lenth of
S.No. Descrition Shape of the Bar Notation no. of nos. of of Vertical Length
Hook (y)
place bars (x)

Lift Shear
C.1 Basement Floor
1 Block 3
y a 1 53 0.3 7.05 7.35
x

y b 1 53 0.3 7.05 7.35


x

y
a 1 48 0.3 7.05 7.35
x

y
b 1 48 0.3 7.05 7.35
x

Stirrups ( up to Raf lvl ) m o Stirrups 1 70 0.1 3.34 3.54


n

Along Grid-E m o Stirrups 1 70 0.1 4.86 5.06

m o Stirrups 1 70 0.1 3.9 4.1

At center m o Ties 1 70 0.1 1.36 1.56


n

m o 6 70 0.1 0.74 0.94


n

At End m o Ties 1 70 0.1 1.06 1.26


n

Along Grid-5 70
m o
Stirrups 1 70 0.1 3.72 3.92
n

m o Stirrups 1 70 0.1 3.92 4.12


n

m o Ties 1 70 0.1 0.74 0.94


n

Center&End wall

m o
Stirrups 2 70 0.1 4.86 5.06
n

m o Stirrups 2 70 0.1 3.66 3.86


n

m o Ties 1 70 0.1 0.74 0.94


n

Total to lift shear wall carried out to


a-Rasuwa Joint Venture
Tokha-10, Kathmandu
Job: Rebar Schedule of Shear wall lift
Block: 5
Weight
Dia. of
Total Length bars 8 10 12 16 20 25 28 32

382.2 20 942.12

382.2 20 942.12

308.7 16 487.13

308.7 16 487.13

288.4 10 177.94
211.4 10 130.43

658 10 405.99

287 10 177.08

396.2 10 244.46

576.8 10 355.89

88.2 10 54.42

450.8 10 278.14

218.4 10 134.75
1153.6 10 711.77

176.4 10 108.84

772.8 10 476.82

436.8 10 269.51

3526.032 974.26 1884.246

ft shear wall carried out to summarry 6384.53

a-Rasuwa Joint Venture


Tokha-10, Kathmandu
Job: Rebar Schedule of Shear wall lift
Block: 5
Weight
Dia. of
Total Length bars 8 10 12 16 20 25 28 32

257.25 20 634.12
257.25 20 634.12

220.5 16 347.95

220.5 16 347.95

270.2 10 166.71

282.8 10 174.49

789.6 10 487.18

310.8 10 191.76

240.8 10 148.57

263.2 10 162.39

88.2 10 54.42
753.2 10 464.72

292.6 10 180.53

789.6 10 487.18

352.8 10 217.68

2735.655 695.90 1268.243

ft shear wall carried out to summarry 4699.80

a-Rasuwa Joint Venture


Tokha-10, Kathmandu
Job: Rebar Schedule of Shear wall lift
Block: 5
Weight
Dia. of
Total Length bars 8 10 12 16 20 25 28 32
389.55 20 960.24

389.55 20 960.24

352.8 16 556.72

352.8 16 556.72

247.8 10 152.89

354.2 10 218.54

574 10 354.16

109.2 10 67.38

394.8 10 243.59

88.2 10 54.42
274.4 10 169.30

288.4

65.8 10 40.60

708.4 10 437.08

1080.8 10 666.85

65.8 10 40.60

2445.418 1113.44 1920.482

ft shear wall carried out to summarry 5479.34


8 0.395 Ld
Remarks
10 0.617 Dia. TensionCompression

12 0.888
8 453 363

16 1.578 10 566 453


12 680 544

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133

m=740
n= 390 32 6.311 28 1586 1269
o=
10*dia.
m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

m=340
n= 390
o=
10*dia.
m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

m=340
n= 390
o=
10*dia.

8 0 Ld
Remarks
10 0 Dia. TensionCompression

12 0
8 453 363

16 0 10 566 453
12 680 544

20 2.465 16 906 725


25 3.852 20 1133 906

28 4.832 25 1416 1133

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.
m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

m=340
n= 390
o=
10*dia.

8 0 Ld
Remarks
10 Err:509 Dia. TensionCompression

12 0
8 453 363

16 0 10 566 453
12 680 544
20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.
m=740
n= 390
o=
10*dia.
m=740
n= 390
o=
10*dia.
m=740
n= 155
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.
50 Cover

32 Raf Bottom

32
114 3968 4000 32
50 Cover
32 Raf Bottom

32

114 3968 4000 32


50 Cover

32 Raf Bottom

32

114 3968 4000 32


Sharma-Rasuwa Joint
Tokha-10, Kathmand
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Length of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook
place bars (x)

Shear wall attached to column


C.1 Basement Floor
1 Block 5
Grid-G/4,H/4

y a 2 12 0.3
x

y b 2 12 0.3
x

y
a 2 10 0.3
x

y
b 2 10 0.3
x

Lap 1 12

Lap 1 10

Along Grid-G/H m o Stirrups 2 53 0.1


n
m o Stirrups 2 53 0.1

m o Ties 14 53 0.1

Grid-2/H & 2/A

y a 2 12 0.3
x

y b 2 12 0.3
x

y
a 2 10 0.3
x

y
b 2 10 0.3
x

Lap 2 12

Lap 2 10

Stirrups m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n
m o Ties 14 53 0.1
n

Total to lift shear wall c

Sharma-Rasuwa Joint
Tokha-10, Kathmand
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Length of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook
place bars (x)

Shear wall attached to column


C.1 Basement Floor
1 Block 4
Grid-2/A

y a 2 23 0.3
x

y b 2 23 0.3
x

y
a 2 19 0.3
x
y
b 2 19 0.3
x

Lap 2 23

Lap 2 19

m o Stirrups 1 53 0.1
n

m o Stirrups 2 53 0.1

m o Ties 14 53 0.1

Grid-2/G & 5/G

y a 2 23 0.3
x

y b 2 23 0.3
x

y
a 2 12 0.3
x

y
b 2 12 0.3
x
Lap 2 23

Lap 2 12

Stirrups m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

Ties 14 53 0.1

Grid-3/G

y a 1 12 0.3
x

y b 1 12 0.3
x

y
a 1 12 0.3
x

y
b 1 12 0.3
x

Lap 1 12
Lap 1 12

Stirrups m o Stirrups 1 53 0.1


n

m o
Stirrups 1 53 0.1
n

m o
Ties 14 53 0.1
n

Total to lift shear wall c

Sharma-Rasuwa Joint
Tokha-10, Kathmand
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Length of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook
place bars (x)

Shear wall attached to column


C.1 Basement Floor
1 Block 3
Grid-3/A,3/F,7/A,7/F

y a 4 14 0.3
x
y b 4 14 0.3
x

y
a 4 12 0.3
x

y
b 4 12 0.3
x

Lap 4 14

Lap 4 12

Along-3,7 & A,F m o Stirrups 4 53 0.1


n

m o
Stirrups 4 53 0.1
n

m o
Ties 28 53 0.1
n

m o
Ties 4 53 0.1
n

Grid-A/9 & F/9

y a 2 27 0.3
x
y b 2 27 0.3
x

y
a 2 23 0.3
x

y
b 2 23 0.3
x

Lap 2 27

Lap 2 23

Along -9

Stirrups m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 14 53 0.1
n

m o
Ties 2 53 0.1
n
Along-A&F

Stirrups m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 14 53 0.1
n

Grid-1/B,1/E

y a 2 23 0.3
x

y b 2 23 0.3
x

y
a 2 19 0.3
x

y
b 2 19 0.3
x

Along-B/E m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n
m o
Ties 12 53 0.1
n

Along-1 m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 14 53 0.1
n

Total to lift shear wall c

Sharma-Rasuwa Joint
Tokha-10, Kathmand
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos Length of
S.No. Descrition Shape of the Bar Notation no. of nos. of Hook
place bars (x)

Shear wall attached to column


C.1 Basement Floor
1 Block 2
Grid-3/A&3/F

y a 2 27 0.3
x
y b 2 27 0.3
x

y
a 2 24 0.3
x

y
b 2 24 0.3
x

Lap y 2 27

Lap y 2 24

Along-A/F m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 16 53 0.1
n

Grid-3/A& 3/F

Stirrups m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n
m o
Ties 14 53 0.1
n

m o
Ties 2 53 0.1
n

Along-A&F

Stirrups m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 14 53 0.1
n

Grid-A/G,A/F

y a 2 27 0.3
x

y b 2 27 0.3
x

y
a 2 23 0.3
x

y
b 2 23 0.3
x
Lap y 2 27

Lap y 2 23

Along-A/F m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 14 53 0.1
n

Along-9 m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 14 53 0.1
n

m o
Ties 2 53 0.1
n

Grid-A/6,A/F

y a 2 14 0.3
x

y b 2 14 0.3
x
y
a 2 12 0.3
x

y
b 2 12 0.3
x

Lap y 2 14

Lap y 2 12

Along-G m o Stirrups 2 53 0.1


n

m o
Stirrups 2 53 0.1
n

m o
Ties 14 53 0.1
n

m o
Ties 2 53 0.1
n

Total to lift shear wall c


ma-Rasuwa Joint Venture
Tokha-10, Kathmandu
Job: Rebar Schedule of Shear wall
attached to shear wall
Block: 5
Lenth of Weight
Dia. of
Vertical Length Total Length bars 8 10 12 16 20 25
(y)

5.45 5.75 138 20 340.17

5.45 5.75 138 20 340.17

5.45 5.75 115 16 181.47

5.45 5.75 115 16 181.47

1.2 14.4 20 35.50

1.2 12 16 18.94

4.18 4.38 464.28 10 286.46


3.98 4.18 443.08 10 273.38

0.74 0.94 1394.96 10 860.69

5.45 5.75 138 20 340.17

5.45 5.75 138 20 340.17

5.45 5.75 115 16 181.47

5.45 5.75 115 16 181.47

1.2 28.8 20 70.99

1.2 24 16 37.87

3.24 3.44 364.64 10 224.98

3.38 3.58 379.48 10 234.14


0.68 0.88 1305.92 10 805.75

2685.406 782.69 1467.168

Total to lift shear wall carried out to summarry 4935.26

ma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Job: Rebar Schedule of Shear wall
attached to shear wall
Block: 5
Lenth of Weight
Dia. of
Vertical Length Total Length bars 8 10 12 16 20 25
(y)

5.45 5.75 264.5 20 651.99

5.45 5.75 264.5 20 651.99

5.45 5.75 218.5 16 344.79


5.45 5.75 218.5 16 344.79

1.2 55.2 20 136.07

1.2 45.6 16 71.96

5.18 5.38 285.14 10 175.93

4.1 4.3 455.8 10 281.23

0.74 0.94 1394.96 10 860.69

5.45 5.75 264.5 20 651.99

5.45 5.75 264.5 20 651.99

5.45 5.75 138 16 217.76

5.45 5.75 138 16 217.76


1.2 55.2 20 136.07

1.2 28.8 16 45.45

3.98 4.18 443.08 10 273.38

5.04 5.24 555.44 10 342.71

0.74 0.94 1394.96 10 860.69

5.45 5.75 69 20 170.09

5.45 5.75 69 20 170.09

5.45 5.75 69 16 108.88

5.45 5.75 69 16 108.88

1.2 14.4 20 35.50


1.2 14.4 16 22.72

3.98 4.18 221.54 10 136.69

4.18 4.38 232.14 10 143.23

0.74 0.94 1394.96 10 860.69

3935.238 1483.00 3255.772

Total to lift shear wall carried out to summarry 8674.01

ma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Job: Rebar Schedule of Shear wall
attached to shear wall
Block: 5
Lenth of Weight
Dia. of
Vertical Length Total Length bars 8 10 12 16 20 25
(y)

5.45 5.75 322 20 793.73


5.45 5.75 322 20 793.73

5.45 5.75 276 16 435.53

5.45 5.75 276 16 435.53

1.2 67.2 20 165.65

1.2 57.6 16 90.89

5.5 5.7 1208.4 10 745.58

4.4 4.6 975.2 10 601.70

0.74 0.94 2789.92 10 1721.38

1.06 1.26 534.24 10 329.63

5.45 5.75 310.5 20 765.38


5.45 5.75 310.5 20 765.38

5.45 5.75 264.5 16 417.38

5.45 5.75 264.5 16 417.38

1.2 64.8 20 159.73

1.2 55.2 16 87.11

5.5 5.7 604.2 10 372.79

4.4 4.6 487.6 10 300.85

0.74 0.94 1394.96 10 860.69

1.06 1.26 267.12 10 164.81


4.58 4.78 506.68 10 312.62

3.86 4.06 430.36 10 265.53

0.74 0.94 1394.96 10 860.69

5.45 5.75 264.5 20 651.99

5.45 5.75 264.5 20 651.99

5.45 5.75 218.5 16 344.79

5.45 5.75 218.5 16 344.79

3.04 3.24 343.44 10 211.90

3.24 3.44 364.64 10 224.98


0.74 0.94 1195.68 10 737.73

4.72 4.92 521.52 10 321.78

3.66 3.86 409.16 10 252.45

0.74 0.94 1394.96 10 860.69

9145.816 2573.40 4747.59

Total to lift shear wall carried out to summarry 16466.81

ma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Job: Rebar Schedule of Shear wall
attached to shear wall
Block: 5
Lenth of Weight
Dia. of
Vertical Length Total Length bars 8 10 12 16 20 25
(y)

5.45 5.75 310.5 20 765.38


5.45 5.75 310.5 20 765.38

5.45 5.75 276 16 435.53

5.45 5.75 276 16 435.53

1.2 1.20 64.8 20 104.80 5659.2 16

29.8 0.96 46.08 16 78.08 3747.84 16

3.98 4.18 443.08 10 273.38

5.08 5.28 559.68 10 345.32

0.74 0.94 1594.24 10 983.65

5.5 5.7 604.2 10 372.79

4.4 4.6 487.6 10 300.85


0.74 0.94 1394.96 10 860.69

1.06 1.26 267.12 10 164.81

4.58 4.78 506.68 10 312.62

3.86 4.06 430.36 10 265.53

0.74 0.94 1394.96 10 860.69

5.45 5.75 310.5 20 765.38

5.45 5.75 310.5 20 765.38

5.45 5.75 264.5 16 417.38

5.45 5.75 264.5 16 417.38


1.2 1.20 64.8 20 104.80 5659.2 16

29.8 0.96 44.16 16 76.16 3503.36 16

4.58 4.78 506.68 10 312.62

3.88 4.08 432.48 10 266.84

0.74 0.94 1394.96 10 860.69

5.48 5.68 602.08 10 371.48

4.4 4.6 487.6 10 300.85

0.74 0.94 1394.96 10 860.69

1.06 1.26 267.12 10 164.81

5.45 5.75 161 20 396.87

5.45 5.75 161 20 396.87


5.45 5.75 138 16 217.76

5.45 5.75 138 16 217.76

1.2 1.20 33.6 20 73.60 2060.8 16

29.8 0.96 23.04 16 55.04 1320.96 16

4.58 4.78 506.68 10 312.62

3.88 4.08 432.48 10 266.84

0.74 0.94 1394.96 10 860.69

1.06 1.26 267.12 10 164.81

9975.77 2237.35 3855.26

Total to lift shear wall carried out to summarry 16068.38


ule of Shear wall
wall

8 0.395 Ld
Remarks
10 0.617 Dia. TensionCompression

12 0.888
8 453 363

16 1.578 10 566 453


12 680 544

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133

0.00

m=740
n= 390 32 6.311 28 1586 1269
o=
10*dia.
m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133

0.00

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.
m=340
n= 390
o=
10*dia.

ule of Shear wall


wall

8 0 Ld
Remarks
10 0 Dia. TensionCompression

12 0
8 453 363

16 0 10 566 453
12 680 544

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133


0.00

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133


0.00

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133

0.00
m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

ule of Shear wall


wall

8 0 Ld
Remarks
10 0 Dia. TensionCompression

12 0
8 453 363

16 0 10 566 453
12 680 544

20 2.465 16 906 725


25 3.852 20 1133 906

28 4.832 25 1416 1133

0.00

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=340
n= 390
o=
10*dia.

20 2.465 16 906 725


25 3.852 20 1133 906

28 4.832 25 1416 1133

0.00

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.
m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

16 0 10 566 453
12 680 544

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.
m=340
n= 390
o=
10*dia.

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

ule of Shear wall


wall

8 0 Ld
Remarks
10 0 Dia. TensionCompression

12 0
8 453 363

16 0 10 566 453
12 680 544

20 2.465 16 906 725


25 3.852 20 1133 906

28 4.832 25 1416 1133

Err:504

Err:504

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.
m=740
n= 390
o=
10*dia.

m=740
n= 155
o=
10*dia.

16 0 10 566 453
12 680 544

20 2.465 16 906 725

25 3.852 20 1133 906

28 4.832 25 1416 1133


Err:504

Err:504

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.

12 680 544

20 2.465 16 906 725

25 3.852 20 1133 906


28 4.832 25 1416 1133

Err:504

Err:504

m=740
n= 390 32 0 28 1586 1269
o=
10*dia.

m=740
n= 155 32 1813 1450
o=
10*dia.

m=340
n= 390
o=
10*dia.
50 Cover

32 Raf Bottom

32
114 3968 4000 32

50 Cover

32 Raf Bottom
50 Cover

32 Raf Bottom
32

114 3968 4000 32

50 Cover

32 Raf Bottom
50 Cover

32 Raf Bottom
50 Cover
32 Raf Bottom

32

114 3968 4000 32

50 Cover
32 Raf Bottom
50 Cover

32 Raf Bottom

32

114 3968 4000 32


32

178 3968 4000 32

50 Cover
32 Raf Bottom

32

114 3968 4000 32


50 Cover

32 Raf Bottom
32

114 3968 4000 32

32

178 3968 4000 32

50 Cover

32 Raf Bottom
32

114 3968 4000 32


140

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

Raft Slab
C.1 Basement Floor
Block-4

Grid 1- 5 (Top and y 2 224 200 44.775 29.8 29.7 0.65 31.00 13888 16
Bottom) placing A-G
x

y 2 224 200 44.775 29.8 0.9 0.90 403.2 16

Grid A- G ( Top and y 2 150 200 29.8 45.625 45.625 0.65 46.93 14077.5 16
Bottom) Placing 1-5
x

Lap y 2 150 200 29.8 45.625 0.9 0.90 270 16

Prepared By: Checked By: Approved By:


141

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)
z z
y y
Lif Raf ( Bottem Bar ) 1 26 200 9.05 0.3 9.65 250.9 16

z z
y 1 25 200 9.05 0.3 9.65 241.25 16
y
x

Top Bar y y 1 28 200 4.65 0.92 6.49 181.72 16

y y 1 25 200 5.205 0.92 7.05 176.125 16

Side lif y y 1 58 200 2.2 0.3 2.80 162.4 16

z z

Prepared By: Checked By: Approved By:


142

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)
z z
y y
Distribution bar 1 5 15.06 0.3 15.66 78.3 16

Lap y 1 5 0.9 0.90 4.5 16

z z
y y
Side lif 1 6 11.272 0.3 11.87 71.232 16

Lap y 1 6 0.9 0.90 5.4 16

outer side drop leg z y 1 71 1.26 2 3.26 231.46 16

Prepared By: Checked By: Approved By:


143

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

z
Manhole open (600 x600) y 4 6 3.22 77.28 16
x

Vertical bar y 4 20 1.25 1.25 100 10

Diagonal bar y 4 8 1.25 1.25 40 16

z
Chairs y 1 335 2.64 883.06 20
x

Total
Total of Raft carried to the Summary

2 Block -5

Prepared By: Checked By: Approved By:


144

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

Along Grid 1- 5 (Top and y 2 260 200 51.825 29.8 29.7 0.65 31.00 16120 16
Bottom) placing A-H
x

y
2 260 200 51.825 29.8 0.9 0.90 468 16

Along GridA- H ( Top and y 2 150 200 29.8 51.825 52.725 0.65 53.38 16012.5 16
Bottom) Placing 1-5
x

y 2 150 200 29.8 51.825 0.9 0.90 270 16

z z
y y
Lif Raf ( Bottem Bar ) 1 27 11.58 0.3 12.18 328.86 16

Prepared By: Checked By: Approved By:


145

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

y 1 27 0.9 0.90 24.3 16

z z
y 1 37 8.325 0.3 8.93 330.225 16
y

Top Bar y y 1 27 7.18 0.92 9.02 243.54 16

y y 1 37 5.2 0.92 7.04 260.48 16

Side lif y y 1 70 2.2 0.3 2.80 196 16

z z

Prepared By: Checked By: Approved By:


146

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)
z z
y y
Distribution bar 1 5 17.59 0.3 18.19 90.95 16

y 1 5 0.9 0.90 4.5 16

z z
y y
Side lif 1 7 13.83 0.3 14.43 101.01 16

y 1 7 0.9 0.90 6.3 16

outer side drop leg z y 1 71 1.26 2 5.26 373.46 16

Prepared By: Checked By: Approved By:


147

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

z
Manhole open (600 x600) y 3 6 3.22 57.96 16
x

y 3 20 1.25 1.25 75 10

Diagonal bar y 3 8 1.25 1.25 30 16

z
Chairs y 1 387 2.64 1020.13 20
x

Total
Total of Raft carried to the Summary

3 Block 3

Prepared By: Checked By: Approved By:


148

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

Along Grid- 3- 9 (Top and y 4 42 200 8.275 43.8 43.8 0.65 45.10 7576.8 16
Bottom) Placing A-H,E-H
x

y 16 42 200 8.275 43.8 0.9 0 0.90 604.8 16

Along Grid 1- 9 ( Top and y


2 104 200 20.85 51.725 52.625 0.65 53.93 11216.4 16
Bottom) Placing B-E
x

y 8 104 200 20.85 51.725 0.9 0 0.90 748.8 16

Along Grid B- E ( Top and y


2 45 200 8.875 20.9 20.75 0.65 22.05 1984.5 16
Bottom) Placing 1-3
x

Prepared By: Checked By: Approved By:


149

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

y 2 45 200 8.875 20.9 0.9 0 0.90 81 16

Along Grid A- F ( Top and y


2 150 200 29.8 35.45 35.45 35.45 10635 16
Bottom) Placing 1-5
x

y 2 150 200 29.8 35.45 0.9 0 0.90 270 16

Along Grid A- F ( Top and y


2 66 200 13.1 37.4 37.3 0.65 38.60 5095.2 16
Bottom) Placing 7-9
x

y 6 66 200 13.1 37.4 0.9 0 0.90 356.4 16

Prepared By: Checked By: Approved By:


150

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)
z z
y y
Lif Raf ( Bottem Bar ) 1 34 9.755 0.3 10.36 352.07 16

z z
y y 1 28 10.83 0.3 11.43 320.04 16

Top Bar y y 1 34 5.355 0.92 7.20 244.63 16

y y 1 28 6.43 0.92 8.27 231.56 16

Side lif y y 1 82 2.2 0.3 2.80 229.6 16

Prepared By: Checked By: Approved By:


151

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

Distribution bar y 1 5 23.57 23.57 117.85 16

y 1 10 0.9 0.90 9 16

Distribution bar y 1 6 16.1 16.10 96.6 16

y 1 6 0.9 0.90 5.4 16

outer side drop leg z y 1 70 1.26 2 5.26 368.2 16

Prepared By: Checked By: Approved By:


152

Sharma-Rasuwa Joint Venture


Tokha-10, Kathmandu
Project: Construction of 400 Beded Maternal and Child Health Care Centre
Location: Dharan, Sunsari, Nepal
nos
Length of Length of
Whole Dia. of
S.No. Descrition Shape of the Bar no. of nos. of Spacing Span Hook Length Total Length
Length Bar (y) bars
place bars (x)

z
Chairs y 1 360 2.64 948.96 20
x

Total
Total of Raft carried to the Summary

Prepared By: Checked By: Approved By:


153

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

21915.26

636.25

22214.30

426.06

Prepared By: Checked By: Approved By:


154

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=4650
395.92 y= 2200
z= 300

x=5205
y=
380.69 2190,935
z= 300

x=4650
286.75 y= 920

x=5205
277.93 y= 920

x=2200 y=
256.27 300

Prepared By: Checked By: Approved By:


155

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=4650
123.56 y= 5205
z= 300

7.10

x=2782
112.40 y= 4255
z= 300

8.52

x=2000
365.24 y= 300 z=
960

Prepared By: Checked By: Approved By:


156

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=960 y=
121.95 300 z=
700

61.70

63.12

x=250 y=
2176.74 568 z=
1000

61.70 0.00 47591.32 2176.74


49829.77

Prepared By: Checked By: Approved By:


157

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

25437.36

738.50

25267.73

426.06

x=7180
518.94 y= 2200 z=
300

Prepared By: Checked By: Approved By:


158

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

38.35

x=5200
y=
521.10 2190,935
z= 300

x=7180
384.31 y=920

x=5200
411.04 y=920

x=2200
309.29 y=300

Prepared By: Checked By: Approved By:


159

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=7180
143.52 y= 5200 z=
300

x=7180
7.10 y= 5200 z=
300

x=5310 y=
159.39 4260 z=
300

9.94

x=2000
589.32 y= 300 z=
960

Prepared By: Checked By: Approved By:


160

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=960 y=
91.46 300 z=
700

46.28

47.34

x=250 y=
2514.63 568 z=
1000

46.28 0.00 55100.74 2514.63


57661.64

Prepared By: Checked By: Approved By:


161

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

11956.19

954.37

17699.48

1181.61

3131.54

Prepared By: Checked By: Approved By:


162

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

127.82

16782.03

426.06

8040.23

562.40

Prepared By: Checked By: Approved By:


163

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=5355
555.57 y= 2200
z= 300

x=6430
505.02 y= 2200
z= 300

x=5355
386.03 y=920

x=6430
365.40 y=920

x=2200
362.31 y=300

Prepared By: Checked By: Approved By:


164

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=5355
185.97 y=6430

14.20

x=3490
152.43 y=4560

8.52

x=2000
581.02 y= 300 z=
960

Prepared By: Checked By: Approved By:


165

asuwa Joint Venture


ha-10, Kathmandu
Job: Rebar Schedule of Raft
Block: 3,4,5
Weight
Remarks
10 12 16 20

x=250 y=
2339.19 568 z=
1000

0.00 63978.20 2339.19


66317.38

Prepared By: Checked By: Approved By:

Potrebbero piacerti anche