CONSTRUCTION PROCEDURE
permissions from fire fighting before start the work

check ceeling level with plumb bob


C - shape m.s chanel fixation
apply paint for interior portion
fixing the gypsum board
apply fiber tsbe tape for all joints
laying p.op elite -90 (3-4 mm thick)
cleaning and handing over

then 4-6 hours later apply sand paper for improve finishness.
Then texture will apply with the 4-5 mm thikness on structure in next day
and again sand paper will apply on structure

Then acralic Paint will apply on texture as a 1st coat

Again apply second coat after 1 day of 1 st coat paint


Clean the work area where paint spots are placed after done the texture
paint work.
TESTS, INSPECTIONS
PRE-REQUISITES
REPORTS & RECORDS

plumb bob and line dori VISUAL INSPECTION

right angle and line dori VISUAL INSPECTION


PAINT,TDS AND MSDS FOR
PAINT
gyupsum board VISUAL INSPECTION

fiber tape VISUAL INSPECTION


TDS, MSDS FOR TEXTURE

final inspection CONSULTANT FINAL INSPECTION

SAND PAPER APPROVAL OF MATERIAL

TEXTURE PAINT,TDS, MSDS


`
FOR TEXTURE

PAINT,TDS AND MSDS FOR


VISUAL INSPECTION
PAINT

PAINT,TDS AND MSDS FOR


VISUAL INSPECTION
PAINT

FINAL INSPECTION CONSULTANT FINAL INSPECTION


RELEVANT HIRA MINUTES MATERIAL
DURATION UNIT QTY RATE AMOUNT

PPEs, BARRICATED AREA,


HOUSEKEEPING

2 min/sqm kg

5 min/sqm kg
PPES FACE MASK

7 min/sqm kg 0.055 20 1.1

MSDS AND RELEVANT


MEASURES 54 sec/sqm kg 0.1 20 2

MSDS AND RELEVANT


MEASURES 38SEC/AQM KG 0.1 20 2

HOUSEKEEPING
MANPOWER MACHINER
CAT QTY RATE AMOUNT UNIT

H 0.0041666667 550 2.2916666667

M 0.0041666667 700 2.9166666667

H 0.0145833333 550 8.0208333333


M 0.0145833333 700 10.2083333333

H 0.001875 550 1.03125


M 0.001875 700 1.3125

H 0.0013125 550 0.721875

M 0.0013125 700 0.91875


MACHINERY OVERHEADS
QTY RATE AMOUNT CATEGORY DURATION

DRAFTSMAN 1

2/480

SUPERVISOR 5/480

JE 0.63/480
COST
DC+IDC
s.no
CONSTRUCTION PROCEDURE PRE-REQUISITES
permissions from fire fighting before
1
start the work

plumb bob and line dori


2 check ceeling level with plumb bob

right angle and line dori


3 C - shape m.s chanel fixation
PAINT,TDS AND MSDS FOR
apply paint for interior portion PAINT

gyupsum board
4 fixing the gypsum board

5 apply fiber tape for all joints fiber tape

TDS, MSDS FOR TEXTURE


6 laying p.op elite -90 (3-4 mm thick)

final inspection
7 cleaning and handing over
TESTS, INSPECTIONS
RELEVANT HIRA MINUTES MATERIAL
REPORTS & RECORDS DURATION UNIT QTY RATE

PPEs, BARRICATED
VISUAL INSPECTION AREA,
HOUSEKEEPING

VISUAL INSPECTION
kg 1.2 40

3min/sqm kg 0.09 20

VISUAL INSPECTION

VISUAL INSPECTION

2min/sqm kg 1.2 12

water lit 0.08

CONSULTANT FINAL INSPECTION


ATERIAL MANPOWER MACHINERY
AMOUNT CAT QTY RATE AMOUNT UNIT QTY RATE AMOUNT

48 M 0.06 700 42 0.9

1.8 H 0.00625 495 3.09375

M 0.00625 600 3.75

14.4 H 0.004167 550 2.291667

M 0.004167 700 2.916667

0.096
OVERHEADS COST
CATEGORY DURATION DC+IDC

DRAFTSMAN

90.9

4.9

3/480
3.75

8.65

SUPERVISOR 2/480
16.695833

2.9166667

19.7085