Sei sulla pagina 1di 8

CRONOGRAMA DE ADQUISICION DE MATERI

OBRA : CONSTRUCCION DEL CAMINO RURAL SAN LUIS – SAN CRISTOBAL


EJECUTA : UNIDAD EJECUTORA PASCO SELVA CENTRAL
FINANCIA : GOBIERNO REGIONAL PASCO
COSTO DIRECTO : S/. 5,761,813.74

ITEM Descripción Insumo Unidad Cantidad Precio Parcial


1ER. MES MONTO 2DO. MES MONTO 3ER. MES MONTO 4TO. MES MONTO

01 ALAMBRE NEGRO RECOCIDO # 8 kg 60.00 6.00 360.00 25.00% 90.00 0.00% 0.00 25.00% 90.00 0.00% 0.00
02 CLAVOS PARA MADERA C/C 1 1/2 " kg 25.60 6.00 153.60 25.00% 38.40 0.00% 0.00 25.00% 38.40 0.00% 0.00
03 CLAVOS PARA MADERA C/C 2" kg 21.66 6.00 128.16 25.00% 32.04 0.00% 0.00 25.00% 32.04 0.00% 0.00
04 CLAVOS PARA MADERA C/C 3" kg 1,266.13 6.00 7,596.77 25.00% 1899.19 0.00% 0.00 25.00% 1899.19 0.00% 0.00
05 CLAVOS PARA MADERA C/C 4" kg 136.81 6.00 820.84 25.00% 205.21 0.00% 0.00 25.00% 205.21 0.00% 0.00
06 CLAVOS PARA MADERA C/C 4" kg 2.11 6.00 12.67 25.00% 3.17 0.00% 0.00 25.00% 3.17 0.00% 0.00
07 ALAMBRE NEGRO N°16 kg 1,098.98 6.00 6,593.89 25.00% 1648.47 0.00% 0.00 25.00% 1648.47 0.00% 0.00
08 ALAMBRE NEGRO N°8 kg 1,269.57 6.00 7,617.41 25.00% 1904.35 0.00% 0.00 25.00% 1904.35 0.00% 0.00
09 ALAMBRE NEGRO N°16 kg 27.76 6.00 166.53 25.00% 41.63 0.00% 0.00 25.00% 41.63 0.00% 0.00
10 CLAVOS PARA CALAMINA kg 15.36 8.00 122.88 25.00% 30.72 0.00% 0.00 25.00% 30.72 0.00% 0.00
11 FIERRO CO. FY=4200 KG/CM2 (GRADO 60) kg 19,951.45 4.00 79,805.80 25.00% 19951.45 0.00% 0.00 25.00% 19951.45 0.00% 0.00
12 ARENA FINA m3 19.71 5.00 98.56 25.00% 24.64 0.00% 0.00 25.00% 24.64 0.00% 0.00
13 MATERIAL CLASIFICADO m3 150.90 50.00 7,544.87 25.00% 1886.22 0.00% 0.00 25.00% 1886.22 0.00% 0.00
14 PIEDRA GRANDE m3 5.25 5.00 26.25 25.00% 6.56 0.00% 0.00 25.00% 6.56 0.00% 0.00
15 PIEDRA GRANDE DE RIO m3 1,981.72 5.00 9,908.61 25.00% 2477.15 0.00% 0.00 25.00% 2477.15 0.00% 0.00
16 ASFALTO RC-250 gln 98.56 12.00 1,182.72 25.00% 295.68 0.00% 0.00 25.00% 295.68 0.00% 0.00
17 TAZA LETRINA SANITARIA TIPO ETERNIT pza 2.00 250.00 500.00 25.00% 125.00 0.00% 0.00 25.00% 125.00 0.00% 0.00
18 TAPA LETRINA SANITARIA TIPO ETERNIT pza 2.00 250.00 500.00 25.00% 125.00 0.00% 0.00 25.00% 125.00 0.00% 0.00
19 CEMENTO PORTLAND TIPO I (42.5KG) BOL 16,173.53 19.00 307,297.04 25.00% 76824.26 0.00% 0.00 25.00% 76824.26 0.00% 0.00
20 CANDADO INC. ALDABA und 10.24 30.00 307.20 25.00% 76.80 0.00% 0.00 25.00% 76.80 0.00% 0.00
21 MECHA DE SEGURIDAD IMPERMEABLE BLANCA m 9,091.74 0.60 5,455.04 25.00% 1363.76 0.00% 0.00 25.00% 1363.76 0.00% 0.00
22 MECHA O GUIA NARANJA m 65,488.90 0.60 39,293.34 25.00% 9823.34 0.00% 0.00 25.00% 9823.34 0.00% 0.00
23 BARRENO 7/8" X 3P und 30.13 300.00 9,038.25 25.00% 2259.56 0.00% 0.00 25.00% 2259.56 0.00% 0.00
24 FULMINANTE und 74,051.77 0.60 44,431.06 25.00% 11107.77 0.00% 0.00 25.00% 11107.77 0.00% 0.00
25 DINAMITA kg 545.50 6.00 3,273.03 25.00% 818.26 0.00% 0.00 25.00% 818.26 0.00% 0.00
26 ANFO kg 5,859.30 2.00 11,782.87 25.00% 2945.72 0.00% 0.00 25.00% 2945.72 0.00% 0.00
CRONOGRAMA DE ADQUISICION DE MATERI
OBRA : CONSTRUCCION DEL CAMINO RURAL SAN LUIS – SAN CRISTOBAL
EJECUTA : UNIDAD EJECUTORA PASCO SELVA CENTRAL
FINANCIA : GOBIERNO REGIONAL PASCO
COSTO DIRECTO : S/. 5,761,813.74

ITEM Descripción Insumo Unidad Cantidad Precio Parcial


1ER. MES MONTO 2DO. MES MONTO 3ER. MES MONTO 4TO. MES MONTO
27 DINAMITA AL 65% kg 4,891.88 6.00 29,451.69 25.00% 7362.92 0.00% 0.00 25.00% 7362.92 0.00% 0.00
28 YESO EN BOLSAS DE 25 KG. BOL 322.81 10.00 3,228.07 25.00% 807.02 0.00% 0.00 25.00% 807.02 0.00% 0.00
29 YESO BOL 27.00 10.00 270.00 25.00% 67.50 0.00% 0.00 25.00% 67.50 0.00% 0.00
30 THINNER STANDER gln 1.58 18.00 28.51 25.00% 7.13 0.00% 0.00 25.00% 7.13 0.00% 0.00
31 SOLDADURA SUPERCITO PUNTO AZUL kg 216.00 12.00 2,592.00 25.00% 648.00 0.00% 0.00 25.00% 648.00 0.00% 0.00
32 BARRENO DE 7/8" X 3, 5 Y 8 PIES (PROMEDIO) und 154.56 300.00 46,367.87 25.00% 11591.97 0.00% 0.00 25.00% 11591.97 0.00% 0.00
33 BARRENO DE 7/8" X 8 PIES und 90.81 300.00 27,242.34 25.00% 6810.59 0.00% 0.00 25.00% 6810.59 0.00% 0.00
34 LIJA und 1.58 2.50 3.96 25.00% 0.99 0.00% 0.00 25.00% 0.99 0.00% 0.00
35 FLETE TERRESTRE DESDE LIMA A OBRA kg 12,776.78 0.20 2,555.36 25.00% 638.84 0.00% 0.00 25.00% 638.84 0.00% 0.00
36 FLETE TERRESTRE DESDE LA MERCED A OBRA kg 791,291.23 0.10 79,129.12 25.00% 19782.28 0.00% 0.00 25.00% 19782.28 0.00% 0.00
37 MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO GLB 1.00 26,064.00 26,064.00 25.00% 6516.00 0.00% 0.00 25.00% 6516.00 0.00% 0.00
38 PLANTONES FORESTALES und 2,424.00 4.00 9,696.00 25.00% 2424.00 0.00% 0.00 25.00% 2424.00 0.00% 0.00
39 ABONO ORGANICO (HUMUS) und 1,500.00 1.00 1,500.00 25.00% 375.00 0.00% 0.00 25.00% 375.00 0.00% 0.00
40 MICRORELLENO SANITARIO GLB 4.00 1,000.00 4,000.00 25.00% 1000.00 0.00% 0.00 25.00% 1000.00 0.00% 0.00
41 CLAUSURA DEL MICRORELLENO SANITARIO GLB 4.00 250.00 1,000.00 25.00% 250.00 0.00% 0.00 25.00% 250.00 0.00% 0.00
42 IMPRESIONES GLB 8.00 50.00 400.00 25.00% 100.00 0.00% 0.00 25.00% 100.00 0.00% 0.00
43 MATERIAL EDUCATIVO GLB 8.00 500.00 4,000.00 25.00% 1000.00 0.00% 0.00 25.00% 1000.00 0.00% 0.00
44 AFICHES SEGUN MODELO und 500.00 5.00 2,500.00 25.00% 625.00 0.00% 0.00 25.00% 625.00 0.00% 0.00
45 POLOS CON LOGOTIPO AMBIENTAL und 150.00 30.00 4,500.00 25.00% 1125.00 0.00% 0.00 25.00% 1125.00 0.00% 0.00
46 COORDINACION INTERINSTITUCIONAL AMBIENTAL GLB 4.00 800.00 3,200.00 25.00% 800.00 0.00% 0.00 25.00% 800.00 0.00% 0.00
47 GRASS AMERICANO (PLANTA) sac 78.00 10.00 780.00 25.00% 195.00 0.00% 0.00 25.00% 195.00 0.00% 0.00
48 CONSTENEDOR DE ALMACENES und 8.00 300.00 2,400.00 25.00% 600.00 0.00% 0.00 25.00% 600.00 0.00% 0.00
CONFORMACION DEL COMITE DE MANTENIMIENTO
49 GLB 5.00 800.00 4,000.00 25.00% 1000.00 0.00% 0.00 25.00% 1000.00 0.00% 0.00
AMBIENTAL
50 HORMIGON m3 3,507.51 5.00 17,537.57 25.00% 4384.39 0.00% 0.00 25.00% 4384.39 0.00% 0.00
51 CORDEL PARA TRAZOS m 180.00 0.20 36.00 25.00% 9.00 0.00% 0.00 25.00% 9.00 0.00% 0.00
52 WINCHA DE FIBRA DE VIDRIO DE 50 MTS. und 30.24 120.00 3,620.79 25.00% 905.20 0.00% 0.00 25.00% 905.20 0.00% 0.00
CRONOGRAMA DE ADQUISICION DE MATERI
OBRA : CONSTRUCCION DEL CAMINO RURAL SAN LUIS – SAN CRISTOBAL
EJECUTA : UNIDAD EJECUTORA PASCO SELVA CENTRAL
FINANCIA : GOBIERNO REGIONAL PASCO
COSTO DIRECTO : S/. 5,761,813.74

ITEM Descripción Insumo Unidad Cantidad Precio Parcial


1ER. MES MONTO 2DO. MES MONTO 3ER. MES MONTO 4TO. MES MONTO
53 MADERA TORNILLO p2 4,918.69 4.20 20,658.51 25.00% 5164.63 0.00% 0.00 25.00% 5164.63 0.00% 0.00
54 MADERA TORNILLO DE 2" X 3" CORREAS p2 896.00 4.20 3,763.20 25.00% 940.80 0.00% 0.00 25.00% 940.80 0.00% 0.00
55 ESTACA DE MADERA p2 3,961.92 2.00 7,925.64 25.00% 1981.41 0.00% 0.00 25.00% 1981.41 0.00% 0.00
56 MADERA PARA ENCOFRADO p2 45.60 3.50 159.65 25.00% 39.91 0.00% 0.00 25.00% 39.91 0.00% 0.00
57 MADERA ROLLIZO p2 5,520.00 2.00 11,040.00 25.00% 2760.00 0.00% 0.00 25.00% 2760.00 0.00% 0.00
58 MADERA DE EUCALIPTO ROLIIZO DIAMETRO 3" X 3MT und 30.00 30.00 900.00 25.00% 225.00 0.00% 0.00 25.00% 225.00 0.00% 0.00
59 TRIPLAY DE 4'x8'x 4 mm pln 76.80 25.00 1,920.00 25.00% 480.00 0.00% 0.00 25.00% 480.00 0.00% 0.00
60 TRIPLAY DE 4'x8'x 18 mm pln 4,275.58 42.00 179,574.36 25.00% 44893.59 0.00% 0.00 25.00% 44893.59 0.00% 0.00
61 MADERA TORNILLO INC.CORTE P/ENCOFRADO p2 2,188.09 4.20 9,189.97 25.00% 2297.49 0.00% 0.00 25.00% 2297.49 0.00% 0.00
62 WINCHA METÁLICA DE 5.OO MTS. und 34.86 30.00 1,045.84 25.00% 261.46 0.00% 0.00 25.00% 261.46 0.00% 0.00
63 ANGULO 2 1/2"x2 1/2"x3/8" x6m. pza 30.24 200.00 6,048.00 25.00% 1512.00 0.00% 0.00 25.00% 1512.00 0.00% 0.00
64 KEROSENE DOMESTICO gln 14.78 25.00 369.60 25.00% 92.40 0.00% 0.00 25.00% 92.40 0.00% 0.00
65 PINTURA ESMALTE COLOR NARANJA gln 12.32 40.00 492.60 25.00% 123.15 0.00% 0.00 25.00% 123.15 0.00% 0.00
66 PINTURA ESMALTE SINTETICO gln 30.85 40.00 1,234.16 25.00% 308.54 0.00% 0.00 25.00% 308.54 0.00% 0.00
67 PINTURA ANTICORROSIVA gln 1.58 60.00 95.04 25.00% 23.76 0.00% 0.00 25.00% 23.76 0.00% 0.00
68 PINTURA ESMALTE gln 3.17 40.00 126.72 25.00% 31.68 0.00% 0.00 25.00% 31.68 0.00% 0.00
69 ALCANTARILLA METALICA D=36" C-12 m 593.19 440.00 261,003.60 25.00% 65250.90 0.00% 0.00 25.00% 65250.90 0.00% 0.00
70 ALCANTARILLA METALICA D=48" C-12 m 126.75 700.00 88,725.00 25.00% 22181.25 0.00% 0.00 25.00% 22181.25 0.00% 0.00
71 PLANCHA GALVANIZADA DE 4´X 8' E=1/32" pln 12.00 200.00 2,400.00 25.00% 600.00 0.00% 0.00 25.00% 600.00 0.00% 0.00
72 ALCANTARILLA METALICA D=24" C-12 m 132.60 300.00 39,780.00 25.00% 9945.00 0.00% 0.00 25.00% 9945.00 0.00% 0.00
73 ALCANTARILLA METALICA D=60" C-12 m 20.28 950.00 19,266.00 25.00% 4816.50 0.00% 0.00 25.00% 4816.50 0.00% 0.00
74 PLANCHA DE FIERRO DE 5"X 5" E=3/8" pza 90.72 50.00 4,536.00 25.00% 1134.00 0.00% 0.00 25.00% 1134.00 0.00% 0.00
75 TUBO Fo.GALV. DE 1 1/2" m 784.00 25.00 19,600.00 25.00% 4900.00 0.00% 0.00 25.00% 4900.00 0.00% 0.00
76 BARANDA DE Fo.GALV. DE 3", SEGUN DISEÑO m 79.20 300.00 23,760.00 25.00% 5940.00 0.00% 0.00 25.00% 5940.00 0.00% 0.00
77 TUBO PVC SAP 3" C-7.5 m 33.60 10.00 336.00 25.00% 84.00 0.00% 0.00 25.00% 84.00 0.00% 0.00
78 CALAMINA DE PLANCHA GALVANIZADA DE 1.80x0.83M e=.22mm pln 64.00 25.00 1,600.00 25.00% 400.00 0.00% 0.00 25.00% 400.00 0.00% 0.00
79 SEÑALES PREVENTIVAS DE 0.60X0.60 SEGUN DISEÑO und 212.00 100.00 21,200.00 25.00% 5300.00 0.00% 0.00 25.00% 5300.00 0.00% 0.00
CRONOGRAMA DE ADQUISICION DE MATERI
OBRA : CONSTRUCCION DEL CAMINO RURAL SAN LUIS – SAN CRISTOBAL
EJECUTA : UNIDAD EJECUTORA PASCO SELVA CENTRAL
FINANCIA : GOBIERNO REGIONAL PASCO
COSTO DIRECTO : S/. 5,761,813.74

ITEM Descripción Insumo Unidad Cantidad Precio Parcial


1ER. MES MONTO 2DO. MES MONTO 3ER. MES MONTO 4TO. MES MONTO
80 SEÑALES INFORMATIVAS DE 2.00X1.00 SEGUN DISEÑO, INC. und 6.00 1,800.00 10,800.00 25.00% 2700.00 0.00% 0.00 25.00% 2700.00 0.00% 0.00
PERNOS
SEÑALIZACION DE MANEJO AMBIENTAL DE 1.00X0.50M und 30.00 150.00 4,500.00
81 25.00% 1125.00 0.00% 0.00 25.00% 1125.00 0.00% 0.00
C/PLANCHA METALICA E01/32, BASTIDORES DE MADERA
MADERA CORRIENTE p2 4,240.00 3.00 12,720.00
82 25.00% 3180.00 0.00% 0.00 25.00% 3180.00 0.00% 0.00
TORNILLO DE 2"X2"
83 PERNO HEXAGONAL DE 3/4" X 3 1/2" pza 18.00 8.00 144.00 25.00% 36.00 0.00% 0.00 25.00% 36.00 0.00% 0.00
84 LOSA LETRINA SANITARIA TIPO ETERNIT pza 2.00 2,500.00 5,000.00 25.00% 1250.00 0.00% 0.00 25.00% 1250.00 0.00% 0.00

TOTAL S/. 1,580,034.56 395,008.64 0.00 395,008.64 0.00


ADQUISICION DE MATERIALES

MESES
5TO. MES MONTO 6TO. MES MONTO 7MO. MES MONTO 8AVO. MES MONTO 9ENO. MES MONTO 10IMO. MES MONTO

20.00% 72.00 0.00% 0.00 15.00% 54.00 0.00% 0.00 15.00% 54.00 0.00% 0.00
20.00% 30.72 0.00% 0.00 15.00% 23.04 0.00% 0.00 15.00% 23.04 0.00% 0.00
20.00% 25.63 0.00% 0.00 15.00% 19.22 0.00% 0.00 15.00% 19.22 0.00% 0.00
20.00% 1519.35 0.00% 0.00 15.00% 1139.52 0.00% 0.00 15.00% 1139.52 0.00% 0.00
20.00% 164.17 0.00% 0.00 15.00% 123.13 0.00% 0.00 15.00% 123.13 0.00% 0.00
20.00% 2.53 0.00% 0.00 15.00% 1.90 0.00% 0.00 15.00% 1.90 0.00% 0.00
20.00% 1318.78 0.00% 0.00 15.00% 989.08 0.00% 0.00 15.00% 989.08 0.00% 0.00
20.00% 1523.48 0.00% 0.00 15.00% 1142.61 0.00% 0.00 15.00% 1142.61 0.00% 0.00
20.00% 33.31 0.00% 0.00 15.00% 24.98 0.00% 0.00 15.00% 24.98 0.00% 0.00
20.00% 24.58 0.00% 0.00 15.00% 18.43 0.00% 0.00 15.00% 18.43 0.00% 0.00
20.00% 15961.16 0.00% 0.00 15.00% 11970.87 0.00% 0.00 15.00% 11970.87 0.00% 0.00
20.00% 19.71 0.00% 0.00 15.00% 14.78 0.00% 0.00 15.00% 14.78 0.00% 0.00
20.00% 1508.97 0.00% 0.00 15.00% 1131.73 0.00% 0.00 15.00% 1131.73 0.00% 0.00
20.00% 5.25 0.00% 0.00 15.00% 3.94 0.00% 0.00 15.00% 3.94 0.00% 0.00
20.00% 1981.72 0.00% 0.00 15.00% 1486.29 0.00% 0.00 15.00% 1486.29 0.00% 0.00
20.00% 236.54 0.00% 0.00 15.00% 177.41 0.00% 0.00 15.00% 177.41 0.00% 0.00
20.00% 100.00 0.00% 0.00 15.00% 75.00 0.00% 0.00 15.00% 75.00 0.00% 0.00
20.00% 100.00 0.00% 0.00 15.00% 75.00 0.00% 0.00 15.00% 75.00 0.00% 0.00
20.00% 61459.41 0.00% 0.00 15.00% 46094.56 0.00% 0.00 15.00% 46094.56 0.00% 0.00
20.00% 61.44 0.00% 0.00 15.00% 46.08 0.00% 0.00 15.00% 46.08 0.00% 0.00
20.00% 1091.01 0.00% 0.00 15.00% 818.26 0.00% 0.00 15.00% 818.26 0.00% 0.00
20.00% 7858.67 0.00% 0.00 15.00% 5894.00 0.00% 0.00 15.00% 5894.00 0.00% 0.00
20.00% 1807.65 0.00% 0.00 15.00% 1355.74 0.00% 0.00 15.00% 1355.74 0.00% 0.00
20.00% 8886.21 0.00% 0.00 15.00% 6664.66 0.00% 0.00 15.00% 6664.66 0.00% 0.00
20.00% 654.61 0.00% 0.00 15.00% 490.95 0.00% 0.00 15.00% 490.95 0.00% 0.00
20.00% 2356.57 0.00% 0.00 15.00% 1767.43 0.00% 0.00 15.00% 1767.43 0.00% 0.00
ADQUISICION DE MATERIALES

MESES
5TO. MES MONTO 6TO. MES MONTO 7MO. MES MONTO 8AVO. MES MONTO 9ENO. MES MONTO 10IMO. MES MONTO
20.00% 5890.34 0.00% 0.00 15.00% 4417.75 0.00% 0.00 15.00% 4417.75 0.00% 0.00
20.00% 645.61 0.00% 0.00 15.00% 484.21 0.00% 0.00 15.00% 484.21 0.00% 0.00
20.00% 54.00 0.00% 0.00 15.00% 40.50 0.00% 0.00 15.00% 40.50 0.00% 0.00
20.00% 5.70 0.00% 0.00 15.00% 4.28 0.00% 0.00 15.00% 4.28 0.00% 0.00
20.00% 518.40 0.00% 0.00 15.00% 388.80 0.00% 0.00 15.00% 388.80 0.00% 0.00
20.00% 9273.57 0.00% 0.00 15.00% 6955.18 0.00% 0.00 15.00% 6955.18 0.00% 0.00
20.00% 5448.47 0.00% 0.00 15.00% 4086.35 0.00% 0.00 15.00% 4086.35 0.00% 0.00
20.00% 0.79 0.00% 0.00 15.00% 0.59 0.00% 0.00 15.00% 0.59 0.00% 0.00
20.00% 511.07 0.00% 0.00 15.00% 383.30 0.00% 0.00 15.00% 383.30 0.00% 0.00
20.00% 15825.82 0.00% 0.00 15.00% 11869.37 0.00% 0.00 15.00% 11869.37 0.00% 0.00
20.00% 5212.80 0.00% 0.00 15.00% 3909.60 0.00% 0.00 15.00% 3909.60 0.00% 0.00
20.00% 1939.20 0.00% 0.00 15.00% 1454.40 0.00% 0.00 15.00% 1454.40 0.00% 0.00
20.00% 300.00 0.00% 0.00 15.00% 225.00 0.00% 0.00 15.00% 225.00 0.00% 0.00
20.00% 800.00 0.00% 0.00 15.00% 600.00 0.00% 0.00 15.00% 600.00 0.00% 0.00
20.00% 200.00 0.00% 0.00 15.00% 150.00 0.00% 0.00 15.00% 150.00 0.00% 0.00
20.00% 80.00 0.00% 0.00 15.00% 60.00 0.00% 0.00 15.00% 60.00 0.00% 0.00
20.00% 800.00 0.00% 0.00 15.00% 600.00 0.00% 0.00 15.00% 600.00 0.00% 0.00
20.00% 500.00 0.00% 0.00 15.00% 375.00 0.00% 0.00 15.00% 375.00 0.00% 0.00
20.00% 900.00 0.00% 0.00 15.00% 675.00 0.00% 0.00 15.00% 675.00 0.00% 0.00
20.00% 640.00 0.00% 0.00 15.00% 480.00 0.00% 0.00 15.00% 480.00 0.00% 0.00
20.00% 156.00 0.00% 0.00 15.00% 117.00 0.00% 0.00 15.00% 117.00 0.00% 0.00
20.00% 480.00 0.00% 0.00 15.00% 360.00 0.00% 0.00 15.00% 360.00 0.00% 0.00

20.00% 800.00 0.00% 0.00 15.00% 600.00 0.00% 0.00 15.00% 600.00 0.00% 0.00

20.00% 3507.51 0.00% 0.00 15.00% 2630.64 0.00% 0.00 15.00% 2630.64 0.00% 0.00
20.00% 7.20 0.00% 0.00 15.00% 5.40 0.00% 0.00 15.00% 5.40 0.00% 0.00
20.00% 724.16 0.00% 0.00 15.00% 543.12 0.00% 0.00 15.00% 543.12 0.00% 0.00
ADQUISICION DE MATERIALES

MESES
5TO. MES MONTO 6TO. MES MONTO 7MO. MES MONTO 8AVO. MES MONTO 9ENO. MES MONTO 10IMO. MES MONTO
20.00% 4131.70 0.00% 0.00 15.00% 3098.78 0.00% 0.00 15.00% 3098.78 0.00% 0.00
20.00% 752.64 0.00% 0.00 15.00% 564.48 0.00% 0.00 15.00% 564.48 0.00% 0.00
20.00% 1585.13 0.00% 0.00 15.00% 1188.85 0.00% 0.00 15.00% 1188.85 0.00% 0.00
20.00% 31.93 0.00% 0.00 15.00% 23.95 0.00% 0.00 15.00% 23.95 0.00% 0.00
20.00% 2208.00 0.00% 0.00 15.00% 1656.00 0.00% 0.00 15.00% 1656.00 0.00% 0.00
20.00% 180.00 0.00% 0.00 15.00% 135.00 0.00% 0.00 15.00% 135.00 0.00% 0.00
20.00% 384.00 0.00% 0.00 15.00% 288.00 0.00% 0.00 15.00% 288.00 0.00% 0.00
20.00% 35914.87 0.00% 0.00 15.00% 26936.15 0.00% 0.00 15.00% 26936.15 0.00% 0.00
20.00% 1837.99 0.00% 0.00 15.00% 1378.50 0.00% 0.00 15.00% 1378.50 0.00% 0.00
20.00% 209.17 0.00% 0.00 15.00% 156.88 0.00% 0.00 15.00% 156.88 0.00% 0.00
20.00% 1209.60 0.00% 0.00 15.00% 907.20 0.00% 0.00 15.00% 907.20 0.00% 0.00
20.00% 73.92 0.00% 0.00 15.00% 55.44 0.00% 0.00 15.00% 55.44 0.00% 0.00
20.00% 98.52 0.00% 0.00 15.00% 73.89 0.00% 0.00 15.00% 73.89 0.00% 0.00
20.00% 246.83 0.00% 0.00 15.00% 185.12 0.00% 0.00 15.00% 185.12 0.00% 0.00
20.00% 19.01 0.00% 0.00 15.00% 14.26 0.00% 0.00 15.00% 14.26 0.00% 0.00
20.00% 25.34 0.00% 0.00 15.00% 19.01 0.00% 0.00 15.00% 19.01 0.00% 0.00
20.00% 52200.72 0.00% 0.00 15.00% 39150.54 0.00% 0.00 15.00% 39150.54 0.00% 0.00
20.00% 17745.00 0.00% 0.00 15.00% 13308.75 0.00% 0.00 15.00% 13308.75 0.00% 0.00
20.00% 480.00 0.00% 0.00 15.00% 360.00 0.00% 0.00 15.00% 360.00 0.00% 0.00
20.00% 7956.00 0.00% 0.00 15.00% 5967.00 0.00% 0.00 15.00% 5967.00 0.00% 0.00
20.00% 3853.20 0.00% 0.00 15.00% 2889.90 0.00% 0.00 15.00% 2889.90 0.00% 0.00
20.00% 907.20 0.00% 0.00 15.00% 680.40 0.00% 0.00 15.00% 680.40 0.00% 0.00
20.00% 3920.00 0.00% 0.00 15.00% 2940.00 0.00% 0.00 15.00% 2940.00 0.00% 0.00
20.00% 4752.00 0.00% 0.00 15.00% 3564.00 0.00% 0.00 15.00% 3564.00 0.00% 0.00
20.00% 67.20 0.00% 0.00 15.00% 50.40 0.00% 0.00 15.00% 50.40 0.00% 0.00
20.00% 320.00 0.00% 0.00 15.00% 240.00 0.00% 0.00 15.00% 240.00 0.00% 0.00
20.00% 4240.00 0.00% 0.00 15.00% 3180.00 0.00% 0.00 15.00% 3180.00 0.00% 0.00
ADQUISICION DE MATERIALES

MESES
5TO. MES MONTO 6TO. MES MONTO 7MO. MES MONTO 8AVO. MES MONTO 9ENO. MES MONTO 10IMO. MES MONTO
20.00% 2160.00 0.00% 0.00 15.00% 1620.00 0.00% 0.00 15.00% 1620.00 0.00% 0.00
20.00% 900.00 0.00% 0.00 15.00% 675.00 0.00% 0.00 15.00% 675.00 0.00% 0.00
20.00% 2544.00 0.00% 0.00 15.00% 1908.00 0.00% 0.00 15.00% 1908.00 0.00% 0.00
20.00% 28.80 0.00% 0.00 15.00% 21.60 0.00% 0.00 15.00% 21.60 0.00% 0.00
20.00% 1000.00 0.00% 0.00 15.00% 750.00 0.00% 0.00 15.00% 750.00 0.00% 0.00

316,006.91 0.00 237,005.18 0.00 237,005.18 0.00

Potrebbero piacerti anche