1.0 OPENING & INTRODUCTION
1.1 Mr. Syafiq welcomed all attendees and started meeting with recitation Info NA
of Surah Al-Fatihah.
2.1 Mr. Shafiq briefed on the inspection schedule for DEMIN P1 & ASU 1 TA
2019 for look on maximum inspection activity per day. Info
Regarding lesson learnt from the previous TA, MMSSB introduced the
QC Runner which is new role in QC team, who has responsibility on
tracking the update.
QC COORDINATOR 1 PAX PGB 16th Mar
3.2
QC STATIC 2 PAX MMSSB
DEMIN P1 QC RUNNER 2 PAX
QC PAINTING 2 PAX
QC WORKSHOP 2 PAX
Open
MINUTES OF MEETING
INSPECTION LOADING MEETING
GPU TURNAROUND – UK DEMIN P1 & UK ASU 1 TA 2019
PETRONAS GAS BERHAD (PGB)
In order to make sure QC part shall execute with excellent, a few key
success factors considered for better improvement;
Open
MINUTES OF MEETING
INSPECTION LOADING MEETING
GPU TURNAROUND – UK DEMIN P1 & UK ASU 1 TA 2019
PETRONAS GAS BERHAD (PGB)
Support and embrace from PGB to ensure all partners can give best
cooperation to further success of UK TA 2019;
3.8 Info
• Convenience of facilities ie: printer/workstation for inspector.
• Pool of box-up cert signed personnel (Alvin, Suhailan, Zul).
• Full time inspection team at site ie: Reviewer, DC.
4.1 The meeting was adjourned at 1300hrs with a closing and doa Info