Sei sulla pagina 1di 6

Bar Bending Schedule of Main Slab

Dia. Of Shape of Bar


S. No. Description of Bar No. Bar Mark
Bar, mm (All dimensions are in m)

A. Slab Reinforcement Detail

A. Main Bar 10 7.56 46 A

B. Main Bar 10 4.23 34 A*

B Extra Bar

B.2 Top (Along Width) 10 2.0 17 Ax*

Distribution bars in
A. cranked portion (along 8 17
length at ends)
0.600 0.85
0.170 0.170
1.00 2.276 0.75
0.170 0.170
Distribution bars in 1.990
cranked portion (along 8 17
width)
e of Main Slab
Total
Length Length Wt. in Kg Total Wt. Remarks
of Bar, m of Bars, in Kg
m

7.56 347.76 0.62 214.67

4.23 143.82 0.62 88.78

2 34 0.62 20.99

4.066 69.122 0.40 27.31

4.08 69.36 0.40 27.40


Bar Bending Schedule of Foundation B

Description of Dia. Of Shape of Bar Bar


S. No. No.
Bar Bar, mm (All dimensions are in m) Mark

A. Column Footing 1 (CF1)


1 Bottom Part Reinforcement

A. Main Bar 10 73 A

B. Main Bar 10 164 A*

B Extra Bar
B.1 Top 10 185 Ax
B.2 Top (Along Width) 10 83 Ax*

Top (Along Width


B.2 10 490 Axx
at Ends)

2 Top Part Reinforcement

A. Main Bars 20 8
Foundation Beam
Total
Length Length Wt. in Kg Total Wt. Remarks
of Bar, m of Bars, in Kg
m

24.4 + 2x0.5
25.34 1849.82 0.62 1141.86 -2x0.03 =
25.34m

2666.52 10.67 - 2x0.03 =


26.34 4319.76 0.62 10.61m

2.1 388.5 0.62 239.81


2.5 207.5 0.62 128.09

1 490 0.62 302.47

0.5+27.30+0.5
30.3 242.4 2.47 598.52 +1.00x2 =
30.30m