Sei sulla pagina 1di 3

Construction of Secondary Containment at Process Area

S.No. Item Description Unit QTY Rate Total Amount

1 Site Clearnce, dressing, levelling & Compaction SqM 60 0

2 Brick Masonry Works (4-1/2" Th.)

Providing and laying first class burnt brick masonry set in 1:4
Cu.M 3 0
cement sand mortar.
3 Cement plaster
Providing and applying 20mm thick cement plaster to internal /
Sq.M 60 0
external block masonry and concrete smooth, curing etc.
PCC Floor (1:2:4) incuding ramp. At 08 different locations in
4
process area to access folk lifter.Size : (8ft X 8Ft)
Cu.M 20 0

The approximate cost estimate for the civil works will be Pk RS. 500,000

Dimensions BM- Cft Plaster - Sft Floor PCC


Length Height / D Width / B
36 1 0.33 11.88 72 45.5
24 1 0.33 7.92 48 24.5
24 1 0.33 7.92 48 24.5
44 1 0.33 14.52 88 59.5
44 1 0.33 14.52 88 51
28 1 0.33 9.24 56 31.5
36 1 0.33 11.88 72 45.5
44 1 0.33 14.52 88 59.5

Sft / Cft 92.4 560 341.5

Cu.ft / CuM 2.616082 52.0446097


Ramp PCC

32
32
32
32
32
32
32
32

256 597.5

16.916761