railing bolts
paint rollers trusses
TILEWORKS
LENGTH WIDTH AREA
40cmx40cm Glazed Tiles 9 7 63
CEMENT MORTAR 9 7 63
FOR CLASSROOMS
WHITE CEMENT FILLER 9 7 63
TILE ADHESIVE 9 7 63
40cmx40cm Glazed Tiles 37 2.5 92.5
CEMENT MORTAR 37 2.5 92.5
FOR CORRIDOR-1
WHITE CEMENT FILLER 37 2.5 92.5
TILE ADHESIVE 37 2.5 92.5
40cmx40cm Glazed Tiles 37 2.5 92.5
CEMENT MORTAR 37 2.5 92.5
FOR CORRIDOR-2
WHITE CEMENT FILLER 37 2.5 92.5
TILE ADHESIVE 37 2.5 92.5
40cmx40cm Glazed Tiles 5 1.55 15.5
CEMENT MORTAR 5 1.55 15.5
FOR CORRIDOR-3
WHITE CEMENT FILLER 5 1.55 15.5
TILE ADHESIVE 5 1.55 15.5
20cmx20cm Unglazed Tiles 3.4 3.15 46.44
CEMENT MORTAR 3.4 3.15 46.44
FOR CR-1
WHITE CEMENT FILLER 3.4 3.15 46.44
TILE ADHESIVE 3.4 3.15 46.44
20cmx20cm Unglazed Tiles 2 1.2 29.82
CEMENT MORTAR 2 1.2 29.82
FOR CR-2
WHITE CEMENT FILLER 2 1.2 29.82
TILE ADHESIVE 2 1.2 29.82
21767
25173
TOTAL 372
2076
492
QUANTITY UNIT COST TOTAL COST
4728 pcs 0 FRONT AND REAR
72 bags 0 LEFT AND RIGHT
384 bags 0 INNER WALLS
84 bags 0 BEAMS H
6948 pcs 0 BEAM V
96 bags 0 COLUMNS
564 bags 0
132 bags 0
6948 pcs 0
96 bags 0
564 bags 0
132 bags 0
1164 pcs 0
24 bags 0
96 bags 0
24 bags 0
13932 pcs 0
48 bags 0
288 bags 0
72 bags 0
8952 pcs 0
36 bags 0
180 bags 0
48 bags 0
pcs of 40cmx40cm Glazed Tiles
pcs of 20cmx20cm Unglazed Tiles
bags of Cement Mortar TOTAL COST 0
bags of White Cement Filler
bags of Tile Adhesive
PAINTWORKS
LENGTH WIDTH AREA NEUTRALIZER PRIMER FINAL COAT UNIT COST
3.7 3.2 118.4 16 24 24
9.5 3.2 30.4 8 8 8
120.8 3.2 386.56 32 80 80
46.5 1.4 65.1 16 32 32
9.5 1.4 13.3 36 36 36
3.2 2.4 7.68 108 108 108
HEIGHT SPACING
3.2 10
LENGTH WIDTH
S-1 4.5
S-2 4.5
S-3 4.5
S-4 5
S-5 5
STEEL WORKS
REINFORCEMENT OF CHB
AREA VERTICAL REINFORCEMENT HORIZONTAL REINFORCEMENT
414.4 663.04 890.96
414.4 663.04 890.96
106.4 170.24 228.76
106.4 170.24 228.76
FOOTING REINFORCEMENT
NET LENGTH NO. OF BARS NO. OF FOOTINGS
2.5 16 9
LATERAL TIES
NO. OF LATERAL TIES NO. OF COLUMNS
32 27
TOTAL COST 0
D-3
QUANTITY UNIT COST TOTAL COST
72 0
D-4
TOTAL COST 0
TOTAL COST 0
W--4
TOTAL COST 0
HARDWARES
DESCRIPTION UNIT QUANTITY
MAHOGANY PANEL DOOR ON 50x150mm THK. MAHOGANY
JAMB WITH FIXED CLEAR GLASS TRANSOM COMPLETE WITH SETS 40
HARDWARE AND ACCESSORIES CYLINDER TYPE LOCKSET
HOLLOW CORE FLUSH TYPE SWING DOOR ON 50x150mm
CONCRETE JAMB W/ MARINE PLYWOOD FACING INSIDE
AND ORDINARY OUTSIDE COMPLETE W/ HARDWARE AND
SETS 8
ACCESSORIES PROVIDE KICK PLATE
HOLLOW CORE FLUSH TYPE SWING DOOR ON 50x100mm
CONCRETE JAMB W/ MARINE PLYWOOD FACING INSIDE
AND ORDINARY OUTSIDE COMPLETE W/ HARDWARE AND
SETS 2
ACCESSORIES PROVIDE KICK PLATE
LOUVER DOOR ON 50x100mm MAHOGANY DOOR JAMB
SETS 5
COMPLTE WITH HARDWARE ACCESSORIES
BAR DOOR ON 50x100mm HOLLOW CORE FLUSH TYPE DOOR
SETS 13
JAMB CONCRETE WITH HARDWARE ACCESSORIES
STEEL CASEMENT WINDOW 6mm THK. CLEAR GLASS SETS 40
5mm THICK JALOUSIE WINDOWS WITH CLEAR GLASS BLADES
ON STANDARD JALOUPLUS CASING AND 50x150mm
SETS 40
CONCRETE JAMB COMPLETE WITH HARDWARE AND
ACCESSORIES WITH 12mm SQ. BARS SECURITY GRILLS
5mm THICK JALOUSIE WINDOWS WITH CLEAR GLASS BLADES
ON STANDARD JALOUPLUS CASING ON 50x150mm
SETS 8
CONCRETE JAMB COMPLETE WITH HARDWARE AND
ACCESSORIES
5mm THICK JALOUSIE WINDOWS WITH CLEAR GLASS BLADES
ON STANDARD JALOUPLUS CASING ON 50x150mm
SETS 5
MAHOGANY JAMB COMPLETE WITH HARDWARE AND
ACCESSORIES
BLACKBOARD SETS 12
RAIL GUARDS SETS
CEILING WORKS
UNIT COST TOTAL COST PLYWOODS LENGTH WIDTH AREA
CLASSROOM 9 7 63.00
0 CORRIDOR 1 5 2.5 12.50
CORRIDOR 2 9 2.5 22.50
CORRIDOR 3 5 1.55 7.75
CORRIDOR 4 3.9 3.45 13.46
0
CR 1 3.4 3.1 10.54
CR 2 5 3.15 15.75
TOTAL 504
0
METAL FURRING LENGTH WIDTH NO. OF COLUMNS
CR 5 3.15 5
CORRIDOR 1 5 3.85 5
0
CORRIDOR 2 5 2.5 5
CORRIDOR 3 4.5 2.5 4
0
CLASSROOM 9 7 8
TOTAL 536
0
0
0
EILING WORKS
NO. OF ROOMS QUANTITY UNIT COST TOTAL COST
3 264 0
2 40 0
3 96 0
2 24 0
2 40 0
1 16 0
1 24 0
pcs of Fiber Cement Board TOTALCOST 0