Technical Site Survey Report

For Stage VII

Project: Mobitel Stage-VII


Region Colombo
Site ID: KLMIL1
Site Name: Milleniya
Huawei Engineer: Mr. Chamikara
Sub Contractor name: Sierra Construction (Pvt.) Limited
Sub Contractor Engineer: Mr. Jayasekara
Survey Date: 6 November 2012
th

410791000.xlsx
l Site Survey Report
For Stage VII

410791000.xlsx
Mobitel Project - Phase 7

1. Current Information
Site Type ✘ 2G 900 2G 1800 ✘ 3G

1.1 Site Basic Information


Survey Item Survey Contents

Site locatin Site address: Suntel Tower, Millaniya.


information Coordinates Latitude: 6º 41' 04.0'' Longitude: 80º 01' 28.3'' Altitude: 63.7
Site Owner Owner : N/A Operator: Suntel
Information Telephone: Mobile phone:
Mobitel regional Name Mr. Sarath
leader Telephone: 714720073
Equipment room location Equipment installation cabinet:
Roof top ✘ Shelter
✘ Greenfield Building
Building Floor No(Excluding Ground Floor): ✘ Outdoor Cabinet
Site Other
environment Distance of Manual Transport required, (Flat land, Rocky
checking land, or Hill), if the distance is >50m Flat land250m of Rocky land hill

Hand Carry to Rooftops Floors No. -


Is there any evidence of flooding near the site? Ie water stained,wall. Yes ✘ No
Any Special Delivery System Required? Crane Boomtruck
The Distance to the Site from Colombo < 50km 50<D<150km 65
Access Restriction Yes ✘ No Please specify:
Access on 7 Day ✘ Yes No If No,Please specify:
Twenty-four hours ✘ Yes No If No,Please specify:
Prior appointment for access ( person to be informed before site access )
No ✘ Yes Telephone: 714720073
Site access Contact person: Mr. Sarath
information Site access key Mobitel Key No Key Landlord Key ✘ Other Access Key
Parking space available Yes ✘ No
Equipment delivery to its position by ✘ Hand Lift Crane Other(mention in remarks)
Safe access to all equipment parts & antennas (lifeline systems, fall arrest systems, anchors.)
✘ Yes No
If NO, please specify missing items:
Some information is unusual,please remark here:
Remarks
Mobitel Project - Phase 7

1.2 Site Existing Information


Meter Cubical Meter Cubical installed ✘ Yes NO
SPD Is Meter To ACPDB length > 20m? ✘ NO `
YES
✘ AC ✘ DC
Voltage: 230 V Voltage: -48
Armod cable length from MC to ACPDB 18 Spare breaker Qty: 6
Armod cable dimension 16mm x4
2
Breaker/Per capacity:
Additional space for Huawei ACPDB: Yes Rectifier Qty.
Existing Total Breaker Qty: 1
Power supply Existing Total Breaker capacity: 40A Rectifier 1Type out Put Amperage:
Additional breaker Qty: No Rectifier 2 Type out Put Amperage:
Additional Breaker capacity: No Battery Type and capacity:
Spare AC outlet Qty for test equipment: No Battery Type and capacity: -
✘ Three phase ✘ Single phase
If more than 1 BTS present, Are the AC power cable laid in the same path? ✘ Yes
If No, please specify the power cable length in path 2:
Avaible ECB Qty (Outdoor): 5 Available ECB Qty (Indoor):
Spare ECB holesQty(Outdoor): Please see below Spare ECB holes Qty(Indoor):
ECB
Required ECB Qty (Outdoor): No Required ECB Qty (Indoor):
Gap between available ECBs of the tower22m
Tower Type: ✘ Self Support tower (SST) Guyed Mast tower (GMT) Pole
Monopole Tower
Tower Tower Leg Qty 3LEGS ✘ 4LEGS Tower Leg type: ✘ Anguar Tubular
Tower Height: 70m
Qty of spare antenna poles : -
Transmission Equipment type ✘ MW Optical transceiver
Remarks * ACPDB is not available.
Mobitel Project - Phase 7

1.3 Existing GSM System information


System 1 Type
GSM 900 BTS Qty DCS 1800 BTS Qty
Ericsson 2207 Ericsson 2207
2206 2206
Huawei 3012 Huawei 3012
Existing 3012AE 3012AE
equipment 3900 3900
information 3900A 3900A
ZTE 8900 ZTE 8900
8900A 8900A
Rack Qty Rack Qty
Indoor ✘ Outdoor Indoor Outdoor
Frequency ✘ 900MHz 1800MHz 2100MHz
Ant. Type ✘ Single Band Dual Band Tri Band
Spare port Type 900MHz 1800MHz 2100MHz
Spare port condition Good Bad With Dust Cap Without Dust Cap
Antenna Sector 1 Sector 2 Sector 3
Azimuth (º)
E M E ME M Can Ajust the tilt
Downtilt (º)
0 5 0 20 4 ✘ Elec ✘
Height (m) 61 61 61
Jumper (Ant.) Length (m) 3 3 3

Jumper connector type to Ant Din Din or N Type


IF use TMA No No No Input Yes or No
TMA TMA Qty - - -
Type - - -
Type 7/8" 7/8" 7/8" Input 1/2",7/8"or 1 1/4"
Feeder connector type Din Din Din Din or N Type
Length (m) 75 75 75
Jumper (BS) Length (m) 3 3 3
Mobitel Project - Phase 7

1.4 Existing UMTS 2100 Antenna, Feeder, TMA and RF information


UMTS 2100 BTS Qty
Huawei DBS 3800
DBS 3900
Existing ✘ BTS 3900
equipment
information ZTE 8900 ZTE 8900
8900A 8900A
Rack Qty 1
Indoor ✘ Outdoor Indoor Outdoor
Share with Other System? ✘ No Yes If yes,Please specify:
Frequency 900MHz ✘ 1800MHz 2100MHz
Ant. Type ✘ Single Band Dual Band Tri Band
Spare port QTY 900MHz 1800MHz 2100MHz
Spare port condition Good Bad With Dust Cap Without Dust Cap
Antenna
Sector 1 Sector 2 Sector 3
Azimuth (º) 90 240 340
E M E M E M Can Ajust the tilt
Downtilt (º)
0 6 0 3 0 5 Elec ✘
Height (m) 63 63 63
Jumper (Ant.) Length (m) 3 3 3

Jumper connector type to RRU


Fiber from RRU 80
Length (m) 80 80
to BBU
Remarks
Mobitel Project - Phase 7

1.5 Existing MW Information


IDU Qty. 1 Dimension:(No.of U) 2U
Detail description of each unit: NEC passo link
IDU Installed in: 19''Sevice Rack ✘ In NodeB/BTS Rack TX Cabinet
IDU Information DCDB switch for IDU ✘ Yes No
E1 connecter type at end point: BNC (L) ✘ BNC (S) SMB SMZ
Link type SDH ✘ PDH
IF cable type ✘ 75 Ω 120 Ω
Patch Panel ✘Yes No If Yes,Qty : 15
Mounting Type Pole Mounting Wall Mounting ✘ Tower Mounting Other
MW Antenna Ant Qty: 1
Does Antenna mounting with ODU? ✘ Yes No

Remarks MW link has 1 + 1 configuration.


Mobitel Project - Phase 7

hill

4WD
65

Other Access Key

Other(mention in remarks)
Mobitel Project - Phase 7

Rectifier 1Type out Put Amperage:


-

No

N/A
N/A
N/A

Tower Leg type: Anguar Tubular


Mobitel Project - Phase 7

BTS Qty

Can Ajust the tilt


✘ Mech

Input 1/2",7/8"or 1 1/4"


Mobitel Project - Phase 7

Outdoor

Can Ajust the tilt


✘ Mech
Mobitel Project - Phase 7

TX Cabinet

Other
Mobitel Project - Phase 7

2. New Huawei equipment information


Site Type 2G 900 ✘ 2G 1800 3G LTE

2.1 Site information


Equipment Type Indoor ✘ Outdoor

Expansion Type ✘ With BBU Without BBU

✘ Yes
Enough Space for BBU installation in BTS cabinet? ( BBU installation sites onl No N/A

Enough Space for BBU installation in NodeB cabinet? ( BBU installation sites oYes No N/A

Existing MW IDU relocation necessary ( BBU installation sites✘ oYes No N/A



Separate Rack installation necessary for MW IDU ( BBU installation sites only) Yes No N/A

DRFU removal necessary Yes No Qty:

Existing feeder dismantling necessary? Yes No Qty:

Existing Antenna dismantling necessary? Yes No Qty:

Space Need Site acquisition(Just for outdoor sites)? Yes No
Checking ✘
Enough vertical cable space? Yes No

Need Extention Bars for Vertical Ladder Yes No

Enough Space for Extention Bars Yes No

Extension Bars (Provide The Drawing) No Yes Qty:

Enough horizontal cable space for fiber & power ✘ Yes No

Need extention ladder from tower to cabinet? Yes ✘ No

Enough Space for Ant?(Include Sectoral & MW) ✘ Yes No

Need additional Ant-mount? No ✘ Yes Qty:

Enough space for mount Huawei RRU ✘ Yes No

Enough space for mount Huawei RRU ✘ Yes No


In case of "No" for the above requirement,specify solution:
Comments

Need aditional ECBs for Tower ✘ No Yes Qty:


ECB
ECB interconnected ground cable Lenghth(35mm 2) :
CEB supply AC power available? ✘ Yes No
AC Phase: 3 Phase ✘ 1 Phase
MC To ACDB Power Cable Length (4X16mm2):
Mobitel Project - Phase 7

2.2 GSM Solution


GSM System 1
GSM 900 Qty ✘ DCS1800 Qty
ZTE BS8900 BC8910 ZTE BS8900 BC8910
PC8910 PC8910
RC8910 RC8910
BTS Ericsson 2207 Ericsson 2207
Configuration 2206 2206
Huawei TP48200 Huawei TP48200
DBS3900 DBS3900
3900 3900
3900A ✘ 3900A 1

Equipment Base Need Additional Steel Frame? ✘ No Yes If Yes,Qty:


Can share existing antennas ✘ No Yes System Type :
Antenna Band New Ant. Ant.type Ant. Height Azimuth Tilt(°)
900MHz Cell1 DCS Antenna 40 90 3
Antenna and ✘ 1800MHz Cell2 DCS Antenna 40 200 3
TMA
2100MHz Cell3 DCS Antenna 40 310 3
TMA Need TMA? ✘ No Yes If Yes,Qty:
Need NSBT? ✘ No Yes If Yes,Qty:
Cell1 Cell 2 Cell 3
Jumper Length from Antenna To Feeder/TMA (m) 3 3 3
Feeder,
Fiber Length (m) 70 70 70
Jumper etc.
Jumper Length from Feeder/NSBT To BTS (m) N/A N/A N/A
If have TMA,Jumper Length from TMA To Feeder (m)
ACPDB To BTS Power Cable Length (4X6mm2): N/A
SPD Ground Cable Length (25 mm2): N/A
Battety Cabinet Ground Cable Length (25 mm ):2
N/A
BTS/BBU Ground Cable Length (25mm ): 2
2m
Cable & Pipe
SPD Pole Ground Cable Length (35 mm2): N/A
GI Pipe from Meter to BTS N/A
PVC Pipe from the BTS to RRU (fiber & Power)
E1 cable Lenghth: 5m Alarm cable Length: 5m
Remarks PVC for fibre 1/2 inch 55 x 3 = 165m PVC for power 1 1/4 inch 5x3 = 15m.
Mobitel Project - Phase 7

ation
Mobitel Project - Phase 7

Tilt(°)
3
3
3

Cell 3
3
70
N/A

5m PVC for power 1 1/4 inch 5x3 = 15m.


3. Photos List
NO. Necessary photos must provided:
1 Overall Site View
2 Panoramic Photo(45Deg per)( Should be over lap)
3 Exiting Tower View
4 Existing Room/Cabinet inside (can have several photos to cover the place)
5 Existing Equipment detail Inlook (close and inside veiw of the equipment)
6 Existing Equipment detail Outlook (take with proper distance to fit to the hard copy)
7 Existing Rectifier Rack inside
8 Existing RF antenna (all operator) (need to check the space to installe antennas)
9 Existing vertical cable ladder
10 Existing horizontal cable ladder
11 Location for Huawei Equipment( if can pre-installation)(Proposed Location)
12 All ECB connection ponit (Should be clearly visible)
13 Cable Entry Port Photo(To be taken parralally to horiziontal)

3.Photos list
If taken
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

3.Photos list
Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Overall Site View


Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Panoramic Photos

0° 45°

90° 135°

180° 225°

270° 315°
Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing Tower View

KLMIL1
Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing Room/Cabinet Inside


Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing Eqiupment Detail Inlook


Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing Eqipment Detail Out Look
Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing Rectifier Rack Inside


Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing RF Antenna


Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing Vertical Cable Ladder


Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Existing Horizontal Cable Ladder

Proposed Location

Proposed Location
Mobitel Project — Phase 7

Site ID KLMIL1 Site Name Millaniya Location for Huawei Eqipment


Mobitel Project — Phase 7

Peragahamula
Site ID ZBIY09 Site Name
Junction
All ECB Connection Points
Mobitel Project — Phase 7

Site ID Site Name


3. Layout List
NO. Necessary Layouts must provided:
1 Exsting Equipment Layout
2 Proposed Equipment Layout
3 Exsting Antenna Location Layout
4 Proposed Antenna Location Layout ( With RRU)
5 Proposed BBU Layout ( BBU installation sites only)

<本文中的所有信息均为中兴通讯股份有限公司内部信息,未经允许,不得外传> 共 35 页 , 第 25 页
If taken
Yes
Yes
Yes
Yes
Yes

<本文中的所有信息均为中兴通讯股份有限公司内部信息,未经允许,不得外传> 共 35 页 , 第 26 页
3. Material List
NO. Material Requirment
1 BBU with All cards(GTMU, UELP, UPEU, UEIU etc)
2 Optical Transcivers
3 RRU 900
4 RRU 1800
5 Optical Fiber
6 Fiber Clamps (6 in 1)
7 E1 Cable
8 RRU DC power cable
9 Antenna -900
10 Antenna - 1800
11 Antenna - Dual band
12 Antenna - Triple-band
13 GSM Antennae brackets
14 RRU Brackets
15 GSM Antenna pole
16 Extension Bar
17 Ant Jumper Cable
18 Insulation tapes
19 Bonding tapes
20 PVC pipes
21 GI pipes
22 Flexible GI Pipes
23 Installation Accessories
24 ECB
25 DC Cable(25 sqmm) Blue
26 DC Cable (25 sqmm) Black
27 DC Cable (16mm) Black
28 DC Cable(16mm) Blue
29 Ground cable 25 sqmm
30 Green outdoor cable 35 sqmm
31 4×6mm2 power cord
32 4×16mm2 power cord
33 BBU Power cable
34 Alarm Cable

<本文中的所有信息均为中兴通讯股份有限公司内部信息,未经允许,不得外传> 共 35 页 , 第 27 页
Qty Unit(Box/m/Pcs)

3 Pcs
0
3 Pcs
3 x 80 m
80 Pcs
1x5 m
3 x 80 m
0
Pcs
3 Pcs
0
0
3 Pcs
0
0
3 Pcs
4 Box
4 Box
240 m
0
15 m
1 Set
0
0
0
0
0
0
0
0
0
5 m
5 m

<本文中的所有信息均为中兴通讯股份有限公司内部信息,未经允许,不得外传> 共 35 页 , 第 28 页