BOBOT
NO URAIAN PEKERJAAN
% NOVEMBER
05- 11 12- 18 19- 25 26- 02
- Pekerjaan Atap Kontainer + Pembongkaran Office Kontainer Existink 31.726 1.866 1.866 1.866
Diperiksa Oleh
Owner
PT.United Tractors Tbk
………………………………………
……………………………………..
5 6 7 8 9 10 11 12 13 14 15 16
0.779 0.779 0.779 0.779 0.779 0.779 0.779 0.779 0.779 0.779 0.779 0.779
1.866 1.866 1.866 1.866 1.866 1.866 1.866 1.866 1.866 1.866 1.866 1.866
1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061 1.061
1.266 1.266 1.266 1.266 1.266 1.266 1.266 1.266 1.266 1.266 1.266
0.589 0.589 0.589 0.589 0.589 0.589 0.589 0.589 0.589 0.589
Disetujui Oleh
Owner
PT.United TractorsTbk
……………………………
............................
17 18 19 20
KET
ARI MARET
25-03 04-10 11-17 18- 24
1.866 1.866
1.061 1.061
Syukri
Direktur
REKAPITULASI
100.000
TOTAL PROGRESS
PROGRESS REALISASI
PROGRESS RENCANA
DEVIASI
……………………………………… ............................
…………………………………….. ...........................
PROGRESS BOBOT PRESTASI
MINGGU LALU MINGGU INI S/D MINGGU INI
PRESTASI BOBOT PRESTASI BOBOT PRESTASI BOBOT
.......................... Syukri
......................... Direktur
BOBOT PROGRESS
2 Gudang sementara dan bedeng kerja (termasuk toilet) 1.353 100 1.353
10 Dokumen kontrak, as built drawing, laporan, foto dll 0.206 100 0.206
- 100 0.441
- 100 1.353
- 100 0.882
- 100 0.706
- 100 0.706
- 100 2.824
- 100 4.706
- 100 3.529
- 100 0.235
- 100 0.206
- - 100.000 15.588
BOBOT PROGRESS
31.726
II Pekerjaan Pembuatan Kamar Mandi
1 Pek.Galian Tanah untuk Sloof 0.044
2 Pek.Lantai Kerja 0.176
3 Pek.Pengecoran Rink Balk dan Sloof 0.247
4 Pek.Pengecoran Kolom Praktis 0.176
5 Pek.Pemasangan Bata 0.425
No. Uraian Pekerjaan BOBOT
%
6 Pek.Plaster dan Aci 0.304
7 Pek.Pemasangan Keramik Lantai Uk.30x30 Ex.Mulia atau Setara 0.065
8 Pek.Pemasanga Keramik Dinding KM 30x30 Ex.Mulia atau Setara 0.346
9 Pek.Pemasangan Closed Duduk Ex.toto 0.044
10 Pek.Pemasangan Closed Jongkok Ex.toto 0.162
11 Pek.Pemasangan Kran Air 0.047
12 Pek.Pemasangan Pintu Kamar Mandi 0.182
13 Pekerjaan Instalasi Air Kotor dan Bersih 0.647
14 Pekerjaan Pemasangan Bouwenligh 0.206
15 Pekerjaan Pembuatan Septitank 0.382
3.454
III Pekerjaan Mekanikal dan Elektrikal
1 Pekerjaan Pemasangan Panel 0.441
2 Pengadaan dan Pemasangan Lampu RM TL 2 X 36 watt 0.235
3 Pasang instalasi lampu downlight 0.118
4 Instalasi Saklar Single 0.103
5 Instalasi Stop kontak 0.147
6 Test Commisioning 0.235
- - 10 0.044 10 0.044
10 0.024 10 0.024 20 0.047
10 0.012 10 0.012 20 0.024
10 0.010 10 0.010 20 0.021
10 0.015 10 0.015 20 0.029
- 10 0.024 10 0.024
PROG
No. Uraian Pekerjaan BOBOT MINGGU LALU
% PRESTASI
A PEKERJAAN GALIAN TANAH
1 Pekerjaan Bouwplank 0.282 100
BANGUNAN WAREHOUSE
B.1 Pondasi
16.972 96.017
C PEKERJAAN BAJA PROFIL
C.1 Kolom
1 Kolom WF 250 x 125 x 6 x 9 mm 1.504 30
- Base plate, t= 12mm 0.132 30
- Shear key plate, t= 12mm 0.222 30
- Stiffener plate t= 12mm 0.127 30
- Top plate t= 12mm 0.326 30
- Anchor Bolt Ø 22mm, L= 900mm 0.405 90
- Non Shrinkage Grouting 400x400x30t mm 0.082 30
C.2 Balok
1 Balok WF 200x100x5,5x8mm 0.542 30
- Cut from WF 200x100x5,5x8mm 0.136 30
- T from WF 200x100x5,5x8mm 0.178 30
- End plate, t= 12mm 0.116 30
- Shear key plate, t= 10mm 0.095 30
- Stiffener plate t= 10mm 0.052 30
- HTB bolt Ø 19mm 0.104 30
C.3 Rafter
1 Rafter WF 250 x 125 x 6 x 9 mm 1.128 30
- Cut from WF 250 x 125 x 6 x 9 mm 0.127 30
- End plate, t= 12mm 0.095 30
- Shear key plate, t= 10mm 0.145 30
- Stiffener plate t= 10mm 0.161 30
- Plat sambung t= 8mm 0.123 30
- HTB bolt Ø 19mm 0.113 30
4 Rangka Cladding
PurlinCNP-150x65x20x3,2 (32); 7,53 kg/m' 2.149 30
- Connecting plate t= 6mm 0.154 30
- Sagrod Ø12mm, L= 1650mm, Ulir + Mur 0.233 30
- Bolt HTB Ø12mm 0.242 30
PROG
No. Uraian Pekerjaan BOBOT MINGGU LALU
% PRESTASI
5 Rangka Talang
- CNP150x65x20x2,3 (33); 7,53 kg/m' 1.276 30
- L-60x60x6 (40); 5,42 kg/m' 1.238 30
- Plate strip t= 5mm 0.499 30
7.660 18.6323
E Pekerjaan Mekanikal dan Elektrikal
1 Instalasi Lampu TL TKO 2 X 36 W 0.221 30
2 Instalasi Saklar Singgle 0.074 30
3 Instalasi Saklar Double 0.118 30
4 Instalasi Stop kontak 0.118 30
5 Test Commisioning 0.176 30
6 Pengadaan dan pemasangan Panel Utama Warehouse 0.471 30
PROG
No. Uraian Pekerjaan BOBOT MINGGU LALU
% PRESTASI
7 Pengadaan dan pemasangan Sistem Grounding 0.588 30
0.451 - 30 0.451
0.040 - 30 0.040
0.067 - 30 0.067
0.038 - 30 0.038
0.098 - 30 0.098
0.364 - 90 0.364
0.025 - 30 0.025
0.163 - 30 0.163
0.041 - 30 0.041
0.053 - 30 0.053
0.035 - 30 0.035
0.029 - 30 0.029
0.016 - 30 0.016
0.031 - 30 0.031
0.338 - 30 0.338
0.038 - 30 0.038
0.029 - 30 0.029
0.044 - 30 0.044
0.048 - 30 0.048
0.037 - 30 0.037
0.034 - 30 0.034
0.028 - 30 0.028
PROGRESS BOBOT PRESTASI
MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT PRESTASI BOBOT PRESTASI BOBOT
0.430 - 30 0.430
0.078 - 30 0.078
0.163 - 30 0.163
0.084 - 30 0.084
0.645 - 30 0.645
0.046 - 30 0.046
0.070 - 30 0.070
0.073 - 30 0.073
PROGRESS BOBOT PRESTASI
MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT PRESTASI BOBOT PRESTASI BOBOT
0.383 - 30 0.383
0.371 - 30 0.371
0.150 - 30 0.150
0.265 - 30 0.265
4.801 - - 31.598 4.801
0.420 - 30 0.420
0.667 - 30 0.667
0.022 - 30 0.022
0.025 - 30 0.025
0.115 - 30 0.115
- - - -
0.121 - 30 0.121
0.047 - 30 0.047
0.010 - 30 0.010
- - - -
- - - -
- - - -
- - - -
- - - -
0.066 - 30 0.066
0.022 - 30 0.022
0.035 - 30 0.035
0.035 - 30 0.035
0.053 - 30 0.053
0.141 - 30 0.141
PROGRESS BOBOT PRESTASI
MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT PRESTASI BOBOT PRESTASI BOBOT
0.176 - 30 0.176
0.238 - 30 0.238
0.019 - 30 0.019
0.030 - 30 0.030
0.065 - 30 0.065
0.265 - 30 0.265
1 - - 30 1.147