Sei sulla pagina 1di 6

OBRA :

VIVIENDA MULTIFAMILIAR

PROPIETARIO: RUTH POCCORPACHI ECHAVARRIA

01. ESTRUCTURAS

Nº de Nº de
Descripción
Partida VECES
01.00.00.00 ESTRUCTURA

01.01.00.00 OBRAS PROVISIONALES


01.01.01 CERCO PROVISIONAL DE ARPILLERIA
1

01.02.00.00 TRABAJOS PRELIMINARES


01.02.01 LIMPIEZA DE TERRENO MANUAL
1

01.02.02 TRAZO DURANTE LA EJECUCION DE LA OBRA


1

01.03.00.00 MOVIMIENTO DE TIERRAS

01.03.01 EXCAVACION DE TERRENO MANUAL


Zapatas
Z-1 6
Z-2 9
CIMIENTOS CORRIDOS
EJE 2-2 ENTRE EJE F-A 1
EJE A"-A" 1
EJE A"-A" ENTRE D-C 1
EJE 1-1 ENTRE EJE F-A 1
EJE F-F ENTRE 2-1 1
EJE 1-2 ENTRE E-D 1
EJE C-C ENTRE 2-1 1
EJE B-B ENTRE 2-1 1
EJE A-A ENTRE 2-1 1

01.03.02 ELIMINACION DE MATERIAL EXCEDENTE

01.03.03 RELLENO COMPACTADO CON MATERIAL PROPIO


Zapatas
Z-1 4
Z-1 (ESQUINAS) 2
Z-2 7
Z-2(ESQUINAS) 2
CIMIENTOS CORRIDOS
EJE 2 ENTRE EJE F-A 1
EJE A" ENTRE F-A 1
EJE A" ENTRE F-A 1
EJE 1 ENTRE F-A 1
EJE F ENTRE 1-2 1
EJE E" ENTRE 1-2 1
EJE E" ENTRE 1-2 1
EJE C ENTRE 1-2 1
EJE B ENTRE 1-2 1
EJE A ENTRE 1-2 1
EJE A ENTRE 1-2 1
01.04.00.00 CONCRETO SIMPLE
01.04.01.00 CIMIENTOS CORRIDOS
01.04.01.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
EJE 2 ENTRE EJE F-A 1
EJE A" ENTRE F-A 1
EJE A" ENTRE F-A 1
EJE 1 ENTRE F-A 1
EJE F ENTRE 1-2 1
EJE E" ENTRE 1-2 1
EJE C ENTRE 1-2 1
EJE B ENTRE 1-2 1
EJE A ENTRE 1-2 1
EJE A ENTRE 1-2 1

01.04.02 SOLADOS
01.04.02.01 CONCRETO MEZCLA C:H 1:12, EN SOLADOS
Zapatas
Z-1 6
Z-2 9

01.04.03 SOBRECIMIENTO
01.04.03.01 ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO
EJE 2 ENTRE EJE F-A (interior) 1
EJE 2 ENTRE EJE F-A (exterior) 1
EJE A" ENTRE F-A 2
EJE 1 ENTRE F-A (interior) 1
EJE 1 ENTRE F-A (exterior) 1
EJE F ENTRE 1-2 2
EJE E" ENTRE 1-2 2
EJE C ENTRE 1-2 2
EJE B ENTRE 1-2 2
EJE A ENTRE 1-2 2

01.04.04.02 CONCRETO EN SOBRECIMIENTO MEZCLA 1:8 CEMENTO-HORMIGON


EJE 2 ENTRE EJE F-A (interior) 1
EJE A" ENTRE F-A 1
EJE 1 ENTRE F-A (interior) 1
EJE F ENTRE 1-2 1
EJE E" ENTRE 1-2 1
EJE C ENTRE 1-2 2
EJE B ENTRE 1-2 2
EJE A ENTRE 1-2 2
FECHA: 12+04/18

Medidas
Parcial Total Und.
Largo Ancho Altura

61.42 61.42 61.42 M

156.09 M2
AREA 156.09 156.09

156.09 M2
AREA 156.09 156.09

57.88 M3

1.00 1.00 1.60 9.60


1.30 1.00 1.60 18.72

14.85 0.60 0.90 8.02


18.55 0.60 0.60 6.68
0.53 0.60 0.60 0.19
14.85 0.60 0.90 8.02
3.83 0.60 0.9 2.07
6.06 0.60 0.6 2.18
2.80 0.60 0.6 1.01
0.72 0.60 0.6 0.26
3.15 0.60 0.6 1.13

1.25 45.03 56.29 M3

12.84 M3

VOLUMEN 0.36 1.44


VOLUMEN 0.25 0.50
VOLUMEN 0.73 5.11
VOLUMEN 0.36 0.72
14.85 0.35 0.20 1.04
16.55 0.45 0.20 1.49
0.53 0.60 0.20 0.06
14.86 0.35 0.20 1.04
3.83 0.35 0.20 0.27
4.61 0.45 0.20 0.41
1.45 0.60 0.20 0.17
2.80 0.45 0.20 0.25
1.07 0.45 0.20 0.10
0.89 0.45 0.20 0.08
1.26 0.60 0.20 0.15

26.53 M3
18.60 0.60 0.70 7.81
18.65 0.60 0.40 4.48
0.90 0.60 0.40 0.22
18.60 0.60 0.70 7.81
5.63 0.60 0.70 2.36
6.06 0.60 0.40 1.45
3.68 0.60 0.40 0.88
1.07 0.60 0.40 0.26
1.27 0.60 0.70 0.53
3.01 0.60 0.40 0.72

17.70 M2

1.00 1.00 6.00


1.30 1.00 11.70

58.80 M2
18.60 0.50 9.30
18.60 0.30 5.58
19.55 0.50 19.55
18.60 0.50 9.30
18.60 0.30 5.58
5.63 0.30 3.38
4.61 0.30 2.77
3.23 0.30 1.94
1.07 0.30 0.64
1.27 0.30 0.76

5.80 M3
18.60 0.25 0.50 2.33
19.55 0.15 0.50 1.47
18.60 0.25 0.50 2.33
5.63 0.25 0.50 0.70
4.61 0.15 0.50 0.35
3.23 0.15 0.50 0.48
1.07 0.15 0.50 0.16
1.27 0.25 0.50 0.32

Potrebbero piacerti anche