Projects Funded Under NLCPR

DAM UNDER GSWSS FUNDED UNDER NLCPR

Public Health Engineering Department, 
8/22/2017
Meghalaya
TURA PHASE‐III
TURA PHASE III WSS(NLCPR)
WSS(NLCPR)
• The
The scheme will cater to the needs of newly 
scheme will cater to the needs of newly
grown up localities of Tura town.
• Estimated Cost Rs. 2160.24 Lakhs.
Estimated Cost Rs. 2160.24 Lakhs.
• Expenditure up to 31.3.07 = Rs. 1889.81 Lakhs 
against release of Rs.1978.58 Lakhs.
against release of Rs.1978.58 Lakhs.
• Physical Progress 77%.
• Likely Date of Completion:‐
Likely Date of Completion:‐ 31.3.08.
31 3 08

Public Health Engineering Department, 
8/22/2017
Meghalaya
COMPLETED RCC WEIR
UNDER TURA PHASE-III
WSS

Public Health Engineering Department, 
8/22/2017
Meghalaya
Public Health Engineering Department, 
8/22/2017
Meghalaya
Public Health Engineering Department, 
8/22/2017
Meghalaya
Public Health Engineering Department, 
8/22/2017
Meghalaya
Nongpoh WSS(NLCPR)
Nongpoh WSS(NLCPR)
• This
This will cater to the needs of Nongpoh
will cater to the needs of Nongpoh town 
town
& adjoining villages.
• ESTIMATED COST 
ESTIMATED COST = Rs. 1746.72 Lakhs.
Rs. 1746.72 Lakhs.
• Sanction Accorded in 2006‐07.

Public Health Engineering Department, 
8/22/2017
Meghalaya
Nongpoh Urban WSS
Urban WSS
Nongpoh Urban WSS
Urban WSS
Nongpoh Urban WSS
Urban WSS
MAIRANG WSS(NLCPR)
MAIRANG WSS(NLCPR)
• This will cater to the needs of Mairang
s ca e o e eeds o a a g town & adjoining 
o adjo g
villages.
• ESTIMATED COST = Rs. 806.61 Lakhs.
• Sanction Accorded in 2005‐06.

Public Health Engineering Department, 
8/22/2017
Meghalaya
Public Health Engineering Department, 
8/22/2017
Meghalaya
Mairang WSS
Mairang WSS
Mairang WSS
Name of Scheme Greater Selsella WSS
Programme NLCPR

NO. 
NO
PHE/335/2008/84  
Sanctioned  NO and date dated 28‐03‐2013
Sanctioned amount 1204 lakhs

Funding Pattern 90:10  (Central:State)
Type of Scheme
Type of Scheme Gravity
Rate of supply 40 LPCD
8/22/2017
Name of Scheme Greater Selsella WSS

Name of Source River Galwang
Type of Intake RCC weir

Simplified Treatment 
Si lifi d T t t
Type of treatment plant  plant 

Treatment Plant Capacity 1.02 MLD

8/22/2017
Greater Selsella
G t S l ll
Name of Scheme WSS

Total Villages /hamlets/ institutions 
to be covered
to be covered 86

Total population tobe covered        ( 
P
Prospective)
ti ) 22185

Total water Demand 11.81 liers/sec

Type of pipes for Feeder and  GI pipes
distribution system
distribution system

8/22/2017
Greater Selsella
G t S l ll
Name of Scheme WSS

Original date of completion 3/31/2015

Revised date of Completion


Revised date of Completion 3/31/2017

Mild steel pipe, 200 
mm diameter, 5500 
di 5500
Type , Length and size of pipe for  Rm
Gravity main

8/22/2017
Intake & Treatment Plant of Selsella
WSS

8/22/2017
ZONAL RESERVOIR NO. I  WITH 1,20,000 LITRES CAPACITY AT 
MAKBILKOLGRE UNDER GREATER SELSELLA W.S.S .

8/22/2017
LAYING OF FEEDER MAIN  PIPELINE  OF GREATER SELSELLA    

8/22/2017
Laying of Distribution Pipe Line
Laying of Distribution Pipe Line

8/22/2017
Greater Sohryngkham Water Supply Scheme‐Meghalaya‐East 
Khasi Hills
Hills‐Mawryngkneng
Mawryngkneng Block
Block‐Funded
Funded under NLCPR
under NLCPR

• Programme funded : NLCPR


• Type of scheme : Gravity
• Sanction Year : 2009‐10
• Sanctioned amount
Sanctioned amount : Rs 6 70 24 000/
Rs. 6,70,24,000/‐
• Habitation covered : Mawlyndep, Sohryngkhan Neng, 
Dong Pyngrope, Dong Kharpran, 
Lulong, Maw‐u‐tieng, Mawshru,
• Mawdieja & Wah Sohryngkham.
• Name of source : “Umngot” stream
• Ultimate population : : 16,340
• No. of platform
f l f : 60 (sixty)
(i )

8/22/2017
Greater Sohryngkham WSS
Greater Sohryngkham WSS‐contd..
contd..
• Components of the scheme :
• ( ) Construction of RCC Weir Including Footpath
(a) C t ti f RCC W i I l di F t th
• (b) Laying of Gravity Main – 250mm dia DI Pipe
• (c) Construction of RCC 0.76 MLD Treatment Plant
• (d) Construction of Clear Water Reservoir of 2 x 3,83,800 liters capacity and Sub‐
MainReservoir of 1,44,000 liters capacity
of 1 44 000 liters capacity
• (e) Laying of Distribution Main – 80mm, 65mm, 50mm & 40mm dia GI Pipe
• (f) Construction of RCC Zonal Reservoir – 8 (eight) nos. of 2,33,400 liters each
• (g) Laying of Distribution System – 65mm, 50mm, 40mm, 25mm, 20mm, & 15mm dia
GI Pipe
p
• (h) Construction of Protection Wall with fencing, painting for Treatment Plant and
• Clear Water Reservoir
• (i) Construction of Staff Quarter
• All the components  completed. 
p p

8/22/2017
4. Treatment Plant of Greater Sohryngkham W/S/S

5. Intake Chamber of Treatment Plant & Fencing of Greater Sohryngkham W/S/S

6. 2 Nos. of Clear Water & Overhead Sub‐Main Reservoirs of Greater Sohryngkham W/S/S
Platforms‐ Greater Sohryngkham
Platforms Greater Sohryngkham WSS

8/22/2017
Name of Project                                  :  Upper Shillong Water Supply Project

District
District                                                 :   East Khasi Hills
: East Khasi Hills

Project Source of Fund                      :  NLCPR

Funding Agency                                 :  MoDONER

Approved Cost (` in Lakh)               :   ` 3302.26 Lakh

Date of approval of Project/Scheme (GOI)           : 23.12.2010

Date of Administrative Approval by State Govt   : 23.03.2011

Funding Pattern  :                             Central Share : State Share
` 2972.12 Lakhs : ` 330.24 Lakhs

Fund Released    :                              Central Share :  State Share
` 2377.68 Lakh  :  ` 237.77 Lakh

Physical & Financial Progress:                Financial :  Physical
Physical & Financial Progress: Financial : Physical
` 2615.45 Lakh : 70 %
Progress of main component of works  viz. Water Treatment 
Plant, Clear Water Reservoir, Pump House, Laying of Gravity  Main 
upto 11th Mile are well in progress.
After permission sought from PWD for Laying of Pipe Lines
was accorded on 3rd February 2017, Pipe Lines works are now in
progress, viz:
i
ƒ Mylliem Marbaniang about 150Rm is completed.
ƒ Mylliem mawnianglah about 200Rm is completed.
completed
ƒ 6th Mile trenching of works are in progress.
ƒ Earthwork Excavation & Construction of Main Reservoir at
6½ Mile is completed.
Construction of Supporting Pillars for Laying of Gravity Main of 400mm dia  are in 
progress
Construction of Supporting Pillars for Laying of Gravity Main of 400mm dia  are in 
progress.
Upper Shillong Wss : Earthwork in excavation for Construction of Main Reservoir at 
Upper Shillong Wss : Earthwork in excavation for Construction of Main Reservoir at
6th Mile is in progress.
Upper Shillong Wss : Laying and fitting of gravity main of 400mm dia. from
Marbaniang to 7th Mile are in progress
Greater Umsning WSS‐Meghalaya‐Ri Bhoi District‐Umsning Block under NLCPR

Sub Zonal Reservoir at point ‘N’ of Greater 
Water Treatment Plant
Umsning Water Supply Scheme (Recently 
Water Supply Scheme (Recently
completed in December‐January 2017)
8/22/2017
Greater Umsning WSS
Greater Umsning WSS‐Photographs
Photographs

Chemical Tank
Laying of Gravity Main Line

8/22/2017
Renovation of Jowai WSS
Renovation of Jowai WSS‐under
under NLCPR
NLCPR

Sl Name of Schemes Year of  Sanction Stater  DONER  Release upto  Progress 


Sanction ed 
ed Share Share 31.3.16 upto 
upto
Amount  Sept 2016
((Rs. In 
Lakhs) Stater  DONER 
Share Share
1 Jowai WSS 2003‐04 1541.13 154.11 1387.02 150.00 1327.56 92%

8/22/2017
Renovation of Jowai WSS
Renovation of Jowai WSS‐under
under NLCPR
NLCPR

8/22/2017
Renovation of Jowai WSS

Raw Water Gravity Main crossing Myntdu
Raw Water Gravity Main crossing Myntdu river near Jowai
river near Jowai
2nd Stage Pump House
8/22/2017
GREATER RALIANG WSS‐Meghalaya‐
Janitia Hills‐Khliehriat
ll hl h under NLCPR
d

Sl Name of Schemes Year of  Sanction Stater  DONER  Release upto  Progress 


Sanction ed  Share Share 31.3.16 upto 
Amount  Sept 2016
(Rs. In 
Lakhs)) Stater  DONER 
Share Share
5 Greater Raliang  2009‐10 2156.20 215.62 1940.58 155.65 1552.46 60%
WSS

8/22/2017
Raliang WSS‐ Construction of 
Treatment Plant ‐under NLCPR
l d

8/22/2017
Raliang WSS under NLCPR
WSS under NLCPR

Zonal Reservoir at Laskein Zonal Reservoir at Mukhap
Zonal Reservoir at Mukhap

8/22/2017
Ialong WSS under NLCPR
WSS under NLCPR

Sl Name of Schemes Year of  Sanction Stater  DONER  Release upto  Progress 


Sanction ed  Share Share 31.3.16 upto 
p
Amount  Sept 2016
(Rs. In 
Lakhs) Stater  DONER 
Share Share
6 Ialong Combined  2010‐11 459.84 45.98 413.86 35.87 405.74 80%
WSS

8/22/2017
Ialong WSS under NRDWP
WSS under NRDWP
• Check Dam
Check Dam • Zonal Reservoir
Zonal Reservoir

8/22/2017
Ialong WSS

8/22/2017
Umroi WSS
WSS‐Intake
Intake
Zonal Reservoir‐Umroi
Zonal Reservoir Umroi WSS
Sub Zonal Reservoir‐Umroi
Sub Zonal Reservoir Umroi WSS
Stand Post‐Umroi
Stand Post Umroi WSS
Mawsynram WSS
WSS‐Intake
Intake
Laying of Pipe Line‐Mawsynram
Laying of Pipe Line Mawsynram WSS
Treatment Plant No‐2‐Mawsynram 
WSS
RCC SUMP‐Mawsynram
RCC SUMP Mawsynram WSS
PUMP HOUSE‐Mawsynram
PUMP HOUSE Mawsynram WSS
Delivery Point‐Mawsynram
Delivery Point Mawsynram WSS