Sei sulla pagina 1di 6

JOB CARD MPD-TASK:

CEB - A318/A319/A320/A321 AMM TASK : 33-21-11-960-001-A


33-21-11 PB 401

TITLE:
A/C Reg.:
33-21-11-960-001-A - Replacement of the
RP-C3267
Fluorescent Tube in the Ceiling Panel
CARD: ZONE: INTERVAL:
SKILL: ACCESS:

MECH. INSP.

** ON A/C 101-200

TASK 33-21-11-960-001-A
Replacement of the Fluorescent Tube in the Ceiling Panel

1. Reason for the Job


Self explanatory
2 Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment

REFERENCE QTYDESIGNATION
No specific 1 GLOVES - COTTON, LINT-FREE, CLEAN
No specific AR SAFETY CLIP - CIRCUIT BREAKER
No specific 1 STEPLADDER 1.0 M (3.3 FT)

B. Referenced Information

REFERENCE DESIGNATION
(Ref. 23-73-00-861-001-A). Energize the Cabin Intercommunication Data System
(CIDS)
(Ref. 24-41-00-861-002-A). Energize the Aircraft Electrical Circuits from the External
Power
(Ref. 24-41-00-861-002-A- Energize the Aircraft Electrical Circuits from the APU
01).
(Ref. 24-41-00-861-002-A- Energize the Aircraft Electrical Circuits from Engine 1(2)
02).
(Ref. 24-41-00-862-002-A). De-energize the Aircraft Electrical Circuits Supplied from
the External Power
(Ref. 24-41-00-862-002-A- De-energize the Aircraft Electrical Circuits Supplied from
01). the APU
(Ref. 24-41-00-862-002-A- De-energize the Aircraft Electrical Circuits Supplied from
02). the Engine 1(2)
(Ref. 25-23-42-000-001-A). Removal of the Ceiling Panels - Forward Utility Area
(Ref. 25-23-42-000-002-A). Removal of the Ceiling Panels - Aft Utility Area
(Ref. 25-23-42-400-001-A). Installation of the Ceiling Panels - Forward Utility Area
(Ref. 25-23-42-400-002-A). Installation of the Ceiling Panels - Aft Utility Area
(Ref. 25-23-48-000-001-A). Removal of the Cove Light Panels
(Ref. 25-23-48-400-001-A). Installation of the Cove Light Panels
Replacement of the Fluorescent Tube in the Ceiling Panel SHEET 1

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 6
JCP Ref: reference DATABASE REV DATE: Nov 01/2017
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Dec 03/2017 23:57
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
CEB - A318/A319/A320/A321 AMM TASK : 33-21-11-960-001-A
33-21-11 PB 401

TITLE:
A/C Reg.:
33-21-11-960-001-A - Replacement of the
RP-C3267
Fluorescent Tube in the Ceiling Panel
MECH. INSP.

A
Z220 - Z260 FR69

A
A

2
A
3

FR15 1

2 5 01

4 01

A
EXAMPLE

NOTE:
01 ONLY FOR AISLE LIGHT STRIPS
N_MM_332111_4_AAB0_01_01

Figure 33-21-11-991-00300-00-A / SHEET 1/1 -


Replacement of the Fluorescent Tube in the Ceiling Panel
** ON A/C 101-200

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 6
JCP Ref: reference DATABASE REV DATE: Nov 01/2017
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Dec 03/2017 23:57
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
CEB - A318/A319/A320/A321 AMM TASK : 33-21-11-960-001-A
33-21-11 PB 401

TITLE:
A/C Reg.:
33-21-11-960-001-A - Replacement of the
RP-C3267
Fluorescent Tube in the Ceiling Panel
MECH. INSP.

3. Job Set-up
Subtask 33-21-11-861-052-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002) .

NOTE: The table that follows shows you all circuit breakers for the ballast units. If
you open all the circuit breakers, the cabin becomes dark.

Subtask 33-21-11-865-058-A
B. Open, safety and tag this(these) circuit breaker(s):

PANEL DESIGNATION FIN LOCATION


2000VU CAB LIGHT PWR-CEILING-AFT 307LG H08
2000VU CAB LIGHT PWR-CEILING-AFT 304LG H07
2000VU CAB LIGHT PWR-CEILING-FWD 306LG H06
2000VU CAB LIGHT PWR-CEILING-FWD 305LG H05
2000VU CABIN LIGHT POWER-WINDOW 302LG H04
AFT
2000VU CAB LIGHT PWR-WINDOW-AFT 301LG H03
2000VU CAB LIGHT PWR-WINDOW- 303LG H02
FWD
2000VU CAB LIGHT PWR-WINDOW- 300LG H01
FWD
Subtask 33-21-11-010-052-A
C. Get Access
(1) For the aisle light unit:
(Ref. Fig. Replacement of the Fluorescent Tube in the Ceiling Panel SHEET 1)
(a) Put the STEPLADDER 1.0 M (3.3 FT) below the related ceiling panel.
(b) Release the quick-release fasteners (4) and remove the light cover (5).
(2) For the window light unit:
(a) Remove the related cove light panel (Ref. AMM TASK 25-23-48-000-001) .
(3) For the entrance light unit:
(a) Put the STEPLADDER 1.0 M (3.3 FT) below the related ceiling panel.
(b) Remove the related ceiling panel (Ref. AMM TASK 25-23-42-000-001)
(Ref. AMM TASK 25-23-42-000-002) .
4. Procedure
(Ref. Fig. Replacement of the Fluorescent Tube in the Ceiling Panel SHEET 1)
Subtask 33-21-11-960-050-A
A. Replacement of the Fluorescent Tube

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 6
JCP Ref: reference DATABASE REV DATE: Nov 01/2017
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Dec 03/2017 23:57
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
CEB - A318/A319/A320/A321 AMM TASK : 33-21-11-960-001-A
33-21-11 PB 401

TITLE:
A/C Reg.:
33-21-11-960-001-A - Replacement of the
RP-C3267
Fluorescent Tube in the Ceiling Panel
MECH. INSP.

NOTE: The procedure is the same for all fluorescent tubes in the aisle light strips,
window light strips and entrance lights (if installed).

(1) Use GLOVES - COTTON, LINT-FREE, CLEAN for the replacement of the
fluorescent tube (1).

CAUTION: DO NOT TOUCH THE LAMP GLASS WITH YOUR FINGERS.


THE OILS FROM YOUR SKIN WILL QUICKLY CAUSE
DETERIORATION OF THE LAMP.
IF YOU ACCIDENTALLY TOUCH THE LAMP GLASS, CLEAN IT WITH A
LINT-FREE CLOTH.

(2) Hold the fluorescent tube (1) and push the button (2) at the end of the lampholder
(3) to remove the fluorescent tube (1).
(3) Remove and discard the fluorescent tube (1).
(4) Install the new fluorescent tube (1) into the lampholder (3). Make sure that you
hear a click from each holder when you push the fluorescent tube (1) into the
lampholder (3).
Subtask 33-21-11-865-059-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):

PANEL DESIGNATION FIN LOCATION


2000VU CAB LIGHT PWR-CEILING-AFT 307LG H08
2000VU CAB LIGHT PWR-CEILING-AFT 304LG H07
2000VU CAB LIGHT PWR-CEILING-FWD 306LG H06
2000VU CAB LIGHT PWR-CEILING-FWD 305LG H05
2000VU CABIN LIGHT POWER-WINDOW 302LG H04
AFT
2000VU CAB LIGHT PWR-WINDOW-AFT 301LG H03
2000VU CAB LIGHT PWR-WINDOW- 303LG H02
FWD
2000VU CAB LIGHT PWR-WINDOW- 300LG H01
FWD
Subtask 33-21-11-860-053-A
C. Aircraft Maintenance Configuration
(1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001) .
Subtask 33-21-11-710-052-A
D. Operational Test
(1) Do this test of the entrance-Lights, window-lights and ceiling-lights:

ACTION RESULT
1.For the entrance lighting:

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 6
JCP Ref: reference DATABASE REV DATE: Nov 01/2017
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Dec 03/2017 23:57
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
CEB - A318/A319/A320/A321 AMM TASK : 33-21-11-960-001-A
33-21-11 PB 401

TITLE:
A/C Reg.:
33-21-11-960-001-A - Replacement of the
RP-C3267
Fluorescent Tube in the Ceiling Panel
MECH. INSP.

ACTION RESULT
On Flight Attendant Panel (FAP) On FAP 120RH:
120RH:
· Set the 'LIGHT' page. · All possible cabin lighting zones are
shown.
· Push the ENTRY/BRT button. · The ENTRY/BRT indication on the
related button comes on.
In the cabin:
· The related entrance light comes on.
On FAP 120RH:
· Push the ENTRY/DIM1 button. · The ENTRY/DIM1 indication on the
related button comes on.
In the cabin:
· The related entrance light intensity
decreases.
On FAP 120RH:
· Push the ENTRY/DIM2 button. · The ENTRY/DIM2 indication on the
related button comes on.
In the cabin:
· The related entrance light intensity
decreases again.
On FAP 120RH:
· Push the ENTRY/DIM2 button again. · The ENTRY/DIM2 indication on the
related button goes off.
In the cabin:
· The related entrance light goes off.
2.For the window or ceiling lighting:
On FAP 120RH: On FAP 120RH:
· Push the BRT button. · The BRT indication on the related
button comes on.
In the cabin:
· The related window or ceiling light
comes on.
On FAP 120RH:
· Push the DIM1 button. · The DIM1 indication on the related
button comes on.
In the cabin:
· The related window or ceiling light
intensity decreases.
On FAP 120RH:
· Push the DIM2 button. · The DIM2 indication on the related
button comes on.
In the cabin:
· The related window or ceiling light
intensity decreases again.
On FAP 120RH:
· Push the DIM2 button again. · The DIM2 indication on the related
button goes off.
JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 5 of 6
JCP Ref: reference DATABASE REV DATE: Nov 01/2017
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Dec 03/2017 23:57
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE
JOB CARD MPD-TASK:
CEB - A318/A319/A320/A321 AMM TASK : 33-21-11-960-001-A
33-21-11 PB 401

TITLE:
A/C Reg.:
33-21-11-960-001-A - Replacement of the
RP-C3267
Fluorescent Tube in the Ceiling Panel
MECH. INSP.

ACTION RESULT
In the cabin:
· The related window or ceiling light
goes off.

5. Close-up
Subtask 33-21-11-410-053-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the related panel:
(a) For the aisle light unit:
(Ref. Fig. Replacement of the Fluorescent Tube in the Ceiling
Panel SHEET 1)
1 Put the STEPLADDER 1.0 M (3.3 FT) under related ceiling panel.
2 Install the light cover (5) with the quick-release fasteners (4).
(b) For the window light unit:
1 Install the related cove light panel (Ref. AMM TASK 25-23-48-400-001) .
(c) For the entrance light unit:
1 Put the STEPLADDER 1.0 M (3.3 FT) below the related ceiling panel.
2 Install the related ceiling panel (Ref. AMM TASK 25-23-42-400-001)
(Ref. AMM TASK 25-23-42-400-002) .
(3) Remove the STEPLADDER 1.0 M (3.3 FT).
Subtask 33-21-11-862-052-A
B. Put the aircraft back to its initial configuration.
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) .
*** END OF CARD ***

JCP Title: temporary job card package CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 6 of 6
JCP Ref: reference DATABASE REV DATE: Nov 01/2017
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN COMPLETED TO THE REQUIRED PRINT DATE: Dec 03/2017 23:57
STANDARD AND SUPPORTS THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF RELEASE
TO SERVICE

Potrebbero piacerti anche