Sei sulla pagina 1di 6

AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT

Jakarta, t: +62 21 385-6636 e: jakarta@grahaelektrotama.com | Surabaya, t: +62 31 534-8071 e: surabaya@grahaelektrotama.com


PT. Graha Elektro Tama

NO. EQUIPMENT NAME MODEL (1) Being practicable to measure temperature at each of compressor inlet
Standard Refrigeration Experimental and outlet, condenser inlet and outlet, expansion valve inlet and outlet,
KTE-1000BA evaporator outlet, inside chamber, and outside using thermo couples
Equipment
of T-type
(2) Measure of pressure: Being practicable to measure within the range of
I. IMAGE
-1bar ~ 35bar at each of compressor inlet and outlet, condenser outlet,
expansion valve outlet, and evaporator inlet by pressure sensors which
are installed.
(3) Experiment factors: Being practicable to calculate each factor of like as
refrigeration effect, compressor work, condensing effect, evaporating
latent heat, amount of flash gas at expansion valve outlet, dry rate
and humidity at expansion valve outlet, and coefficient of performance
in the abstract with temperature and pressure data which are measure.
(4) Saving: Being saved on every minute until 1440min as excel file after
click the icon ‘SAVE’.

III. SPECIFICATION

1. Mechanic device
(1) Compressor: 1/2HP, for R-22, single 220V, Include Control Box
(2) Condenser and Fan motor: 1/2HP, Air cooling, single 220V, 60Hz, 9W
(3) Evaporator and Blower fan
1) Evaporator Chamber: Transparent acrylic (size: 250×250×400mm)
2) Evaporator: Air cooling of pin-tube type, Surface 1.5 ㎡, pin pitch
2.5mm, tube(3/8″× 7step × 3row × 165EL)
 Appearance and specifications may be changed by the upgrade. 3) Blower: Power(220 ~ 240V), AC50/60Hz(0.25/0.26A), Size
(φ222mm × 60mm), Airflow(680 ~ 765 ㎥/hr) 220CFM,
II. FEATURE
Weight(1270g), Noise(61 ~66dB) Impeller(PBT UL94V-0 Reinforced
Plastic), Frame(aluminum Alloy)
1. Cycle composition: Compressor - Condenser - Filter Dryer - Sight Glass –
4) Damper: Thickness(8mm acrylic), rack and pinion
Expansion Value- Evaporator- Compressor.
- Ratio of Opening and Shutting:(0~100%), (250×25×50mm,
2. Being practicable to operate on manual, thermal control or pump down with
1EA)
connecting by sequence or PLC control system (Include a textbook), and

KTE-1000BA
KTENG
(4) Nipple: 1EA at each of high and low pressure
function for Specification of Refrigerator Performance Automatic Measuring and
(5) Expansion valve: Manual type, Range(1/2~3/2 tons),
Data Acquisition and System Monitoring Program.
Temperature0℉(-10℃)
(6) Solenoid valve: ⅜″ Welding type 1EA

KTENG CORPORATION | 2013

1
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
Jakarta, t: +62 21 385-6636 e: jakarta@grahaelektrotama.com | Surabaya, t: +62 31 534-8071 e: surabaya@grahaelektrotama.com
PT. Graha Elektro Tama

(7) Filter dryer: ⅜″Welding type 1EA 3) Push Button Switch (1a1b)
(8) Pressure gages: 1EA each of high and low pressure, oil type 4) AC Volt Meter
(9) Sight glass : Welding type 1EA 5) AC Am Meter
(10) Receiver: Cylinder type, Include a Service valve 6) C.F.M S/S
1) 1/2 Hp, 22kgf/cm2G, Pressure test(33kgf/cm2G) 7) E.F.M Controller
2) Leak pressure (22kgf/cm2G), Down to 75℃, 90φ, 190mm, 265mm, 3. Performance Automatic Measuring Equipment
140mm (1) Refrigerator Performance Automatic Measuring Equipment (KTE-
(11) Table size: L1100× W690× H620mm 100DA)
1) Cover: Aluminum profile (30×30,30×60,30×90,40×40,40×40L ) (2) Data Acquisition and System Monitoring Program (KTE-100SMP)
2) Drawer 2ea, Cabinet 1) Function : Monitoring the measured data of temperature and
3) Rollers: 4EA (Include fixing device) pressure in real time, and enthalpy on a diagram of the
(Whole size: L1100×W770×H1390mm)
refrigeration system in real time, and factors like as refrigeration
effect, compressor work, condensing heat in condenser,
2. Automatic control device
(1) POWER, LAMP, PRESSURE MODULE evaporating latent heat, amount of flash gas at expansion V/V
1) S.M.P.S (24V) outlet, dry ratio at expansion V/V outlet, humidity at expansion
2) N.F.B (15A, single) V/V outlet, coefficient of performance in the abstract with
3) Buzzer (DC24V) temperature and pressure data which are measure in real time,
4) AC Lamp (220V) and being saved data all of temperature, pressure and enthalpy on
5) DC Lamp (24V)
every minute as excel
6) Lamp (DC24V)
7) Toggle Switch 2) Composition: Main Page, Sector for display of temperature data,
8) Fuse & Holder graph chart of temperature, display of pressure data, graph chart
9) Pressure S/W (HPS, LPS) of pressure, flowing diagram of the refrigeration system, display
10) DA-100 Port the P-H chart of the refrigeration system on real time, setting
11) SQ, PLC Port interval for saving data, and Run/Stop operation
12) Differential Pressure S/W (D.P.S)
(2) M/C, RELAY TERMINAL MODULE IV. ACCESSORIES, GUARANTEE AND DELIVERY
1) Magnet Contact (DC24V), 9A, 5a, 2b
2) Relay Base (DC24V, 8Pin)
3) Relay (DC24V, 8Pin) 1. Power Cable: 1EA
4) 24 Hour timer 2. Connection Cable: 2EA
5) RELAY (DC24V, 11Pin) 3. Banana jack: Red 20EA, Black 20EA

KTE-1000BA
KTENG
6) RELAY Base (DC24V, 11PIN) 4. Manual book 1EA
(3) S.W, TEMP MODULE 5. Delivery: 3Month
1) Electronic Digital Temperature module (-30~100℃) 6. Guarantee: For 1 year
2) Toggle switch

KTENG CORPORATION | 2013

1
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
Jakarta, t: +62 21 385-6636 e: jakarta@grahaelektrotama.com | Surabaya, t: +62 31 534-8071 e: surabaya@grahaelektrotama.com
PT. Graha Elektro Tama

NO. EQUIPMENT NAME MODEL 3. Should be available to study on software program about basic refrigeration
Refrigeration PLC Control Training Kit KTE-4000PL system, defrosting system, heat pump system, binary refrigeration system,
and brine refrigeration system.
I. IMAGE III. SPECIFICATION

4. Automatic Control Device


(1) GLOFA G7M-DR30A
1) Operation process speed: 0.1(0.5) ㎲/Step
2) Maximum control point: 80 point
3) Program capacity: 68Kbyte
4) Function: PID, HSC, Position settlement, Cnet etc.
(2) N.F.B (30A, single, 220V)
(3) S.M.P.S (Output 24V)
(4) AC Lamp: Red
(5) Buzzer (DC24V)
(6) Lamp: Red, Green, Yellow
(7) Toggle Switch
(8) Push Button (1a)
(9) Select Switch

IV. ACCESSORIES, GUARANTEE AND DELIVERY

1. Lead Wire: 1set to 5EA & 1,500mm Wire 1set


2. PLC Serial Cable: 1EA
3. Manual book 1EA
 Appearance and specifications may be changed by the upgrade. 4. Delivery: 3Month
5. Guarantee: For 1 year
II. FEATURE

1. Should possible PLC experimentation & training begin to progress at the


refrigeration & air-conditioning industry.
2. Should be cording into a computer for experiment on programming about

KTE-1000BA
KTENG
air conditioning and refrigeration using in industrial field.

KTENG CORPORATION | 2013

1
AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT
Jakarta, t: +62 21 385-6636 e: jakarta@grahaelektrotama.com | Surabaya, t: +62 31 534-8071 e: surabaya@grahaelektrotama.com
PT. Graha Elektro Tama

NO. EQUIPMENT NAME MODEL 3) Magnetic Switch (MC) with "a" "b" contact the circuit configuration
Refrigeration Sequence Control Training Kit KTE-4000SQ driving experiments and practices
4) Using a thermal overload relay, circuit configuration driving
I. IMAGE experiments and practices
5) circuit configuration driving experiments and practices for “c”
contact using a Relay(Ry)
6) circuit configuration driving experiments and practices for AND
7) circuit configuration driving experiments and practices for OR
8) circuit configuration driving experiments and practices for NOT
9) circuit configuration driving experiments and practices for NAND
10) circuit configuration driving experiments and practices for NOR
11) circuit configuration driving experiments and practices for rock up
circuit using a MC
12) circuit configuration driving experiments and practices for inter rock
13) circuit configuration driving experiments and practices for low
temperature control using a temperature switch
14) circuit configuration driving experiments and practices for high
temperature control using a temperature switch
15) circuit configuration driving experiments and practices for low
pressure control using a low pressure switch(LPS)
16) circuit configuration driving experiments and practices for high
 Appearance and specifications may be changed by the upgrade. pressure control using a high pressure switch(HPS)
17) circuit configuration driving experiments and practices for cutting out
high pressure control
II. FEATURE
(2) Craft skill program for Air conditioning and refrigeration
1) 1 Experimental practice of motor running or reversing using
1. Trainee must be able to practice the skill related with control of Temperature,
Interlock circuit
Pressure, Power, and defrost. Also every practice must be connected with a
2) 2 Experimental practice of motor running or reversing using
mechanical refrigeration system using PC cable using.
Interlock circuit
2. To adopt safe DC24V input power experiment and practice must be done.
3) Experimental practice motor operation using a Timer (instant
3. Connect each of the following issues in favor of frozen copyright registered
running)
in the system using the original materials that it must be done.
4) Experimental practice motor operation using a Timer (instant
(1) Qualification to perform a function
running) and a flicker relay
1) Practice for wiring work

KTE-1000BA
KTENG
5) Experimental practice AUTO or MANUAL operation using a select
2) Lab experiments with the primary circuit to drive the switch
switch
configuration
6) 1 Experimental practice motor ON or OFF operation using a ‘A’
contact push button

KTENG CORPORATION | 2013

1
Jakarta, t: +62 21 385-6636 e: jakarta@grahaelektrotama.com | Surabaya, t: +62 31 534-8071 e: surabaya@grahaelektrotama.com

AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT


PT. Graha Elektro Tama

7) 2 Experimental practice motor ON or OFF operation using a ‘A’ 1) Configuration manual control circuit for "Evaporation pressure
contact push button parallel control refrigeration system" and operation
8) 3 Experimental practice motor ON or OFF operation using a ‘A’ 2) Configuration automatic control circuit for "Evaporation pressure
contact push button parallel control refrigeration system" and operation
9) Experimental practice motor running or reversing operation using a 3) Configuration pump down control circuit for "Evaporation pressure
Timer (instant running) parallel control refrigeration system" and operation
(3) Skill competition problem for air conditioning and refrigeration 4) Configuration compulsory pump down control circuit for
1) 1Automatic control circuit of temperature for refrigerator "Evaporation pressure parallel control refrigeration system" and
2) 2Automatic control circuit of temperature for refrigerator operation
3) Hot gas defrosting system using a timer and a solenoid valve (7) Brine refrigeration system
4) Circuit configuration for hot gas defrosting system and manual pump 1) Configuration manual control circuit for "brine refrigeration system"
down and operation
5) Circuit configuration when power is Off 2) Configuration temperature automatic control circuit for "brine
refrigeration system" and operation
3) Configuration pump down control circuit for "brine refrigeration
(4) Temperature, pressure, and defrost control system system" and operation
1) Circuit configuration for low temperature control and adjusting of 4) Configuration compulsory pump down control circuit for "brine
Temperature switch refrigeration system" and operation
2) Circuit configuration for low pressure control and adjusting of (8) Heat pump refrigeration system
Pressure switch 1) Configuration circuit reversing refrigerant flow direction using
3) Circuit configuration for high pressure control and adjusting of manual V/V for "heat pump refrigeration system" and operation
refrigerator 2) Configuration manual control circuit (self-control) for "cooling and
4) Experimental practice configuration circuit for low temperature heating heat pump refrigeration system" and operation
control of refrigerator 3) Configuration temperature automatic control circuit for "cooling and
5) Configuration pump down circuit and operation in basic refrigeration heating heat pump refrigeration system" and operation
system 4) Configuration temperature and pressure automatic control circuit for
6) Configuration hot gas defrosting circuit and operation "cooling and heating heat pump refrigeration system" and operation
(5) Refrigerant parallel expansion refrigeration system (9) Binary refrigeration system
1) Configuration temperature automatic control circuit for "refrigerant 1) Configuration manual control circuit of binary refrigeration system
parallel expansion refrigeration system" and operation and operation
2) Configuration temperature manual control circuit for "refrigerant 2) Configuration temperature automatic control circuit at No.1 cycle
parallel expansion refrigeration system" and operation side (high pressure side) of binary refrigeration system, and manual
3) Configuration temperature pump down control circuit for "refrigerant control circuit at No.2 cycle side (low pressure side) of it
parallel expansion refrigeration system" and operation

KTE-1000BA
KTENG
3) Configuration temperature automatic control circuit of binary
4) Configuration compulsory pump down control circuit and operation refrigeration system and operation
(6) Evaporation pressure parallel control refrigeration system 4) Configuration pump down automatic control circuit at No.1 cycle,
and temperature automatic control operation and operation

KTENG CORPORATION | 2013

1
Jakarta, t: +62 21 385-6636 e: jakarta@grahaelektrotama.com | Surabaya, t: +62 31 534-8071 e: surabaya@grahaelektrotama.com

AIR-CONDITIONING & REFRIGERATION EXPERIMENTAL EQIUPMENT


PT. Graha Elektro Tama

5) Configuration compulsory pump down operation and operation (18) Buzzer (DC24V)
(10) Air-conditioning system (19) Toggle Switch
1) Configuration circuit for mixture and heating between returned air (20) Push Button (1a)
(RA) and outside air (OA) of air-conditioning system and operation (21) Push Button (1a1b)
2) Configuration circuit for mixture and cooling between returned air (RA) (22) Lamp Push Button (1a1b)
and outside air(OA) of air-conditioning system and operation (23) Select Switch (3select)
3) Configuration circuit for mixture, getting wet and heating between (24) DC24V Motor
returned air(RA) and outside air(OA) of air-conditioning system and (25) Wire Assembly connector (36pin, 505mm)
operation
4) Configuration circuit for mixture and preheating, cleaning and IV. ACCESSORIES, GUARANTEE AND DELIVERY
reheating between RA and OA of the air-conditioning system and
operation
1. Power Cable: 1EA
5) Configuration circuit for precooling of OA, and mixture of the OA and
2. Connection Cable: 2EA
RA, and then cleaning and reheating operation
3. Banana jack: Red 20EA, Black 20EA
6) Configuration circuit for precooling of OA, and mixture of the OA and
4. Manual book 1EA
RA, and then cleaning and re-cooling operation
5. Delivery: 3Month
6. Guarantee: For 1 year
III. SPECIFICATION

1. Electric device
(1) N.F.B (30A, single)
(2) Magnet Contact (DC24V)
(3) Thermal Overload Relay
(4) Relay (DC24V, 8Pin)
(5) Relay Base (DC24V, 8Pin)
(6) Relay (DC24V, 11Pin)
(7) Relay Base (DC24V, 11Pin)
(8) IC Timer (DC24V, 60sec, 8Pin)
(9) IC Timer Base (DC24V, 8Pin)
(10) Flicker (DC24V, 60sec, 8Pin)
(11) Flicker Base (DC24V, 8Pin)
(12) Timer (DC24V, 24Hour)
(13) Terminal Base (20Pin)

KTE-1000BA
KTENG
(14) Terminal Base (15Pin)
(15) Terminal Base (10Pin)
(16) Terminal Base (3Pin)
(17) Lamp (DC24V)

KTENG CORPORATION | 2013

Potrebbero piacerti anche