ANNEXURE-I

WHEELING TARIFF SCHEDULE FOR FY 2014-15 TO FY 2018-19

In view of the provisions contained in the earlier order of erstwhile APERC


Wheeling charges for 3rd control period which is kept on the website of the
Commission [APERC] on 09-05-2014, this Commission [TSERC] has re-looked and
modified the wheeling charges of entire control period because of A.P.
Reorganisation Act, 2014, and which will be effective from 01-04-2015. However,
the wheeling charges pertaining to FY 2014-15 shall not be levied now directly
from the consumers, but the same will be adjusted during the true up of 3rd
control period.

TSSPDCL

A. WHEELING RATES

Voltage 2014-15 2015-16 2016-17 2017-18 2018-19


33 kV ( Rs/kVA/month) 12.67 15.71 16.63 18.34 19.95
11 kV( Rs/kVA/month) 155.91 173.97 191.53 211.62 231.52
LT( Rs/kVA/month) 344.17 373.12 406.84 446.15 485.45

B. WHEELING LOSSES

2014-15 Supply point 2015-16 Supply point


Drawn at 33kV 11kV Drawn at 33kV 11kV
33kV 3.99% 8.79% 33kV 3.99% 8.79%
11kV 8.79% 8.79% 11kV 8.79% 8.79%
2016-17 2017-18
Drawn at 33kV 11kV Drawn at 33kV 11kV
33kV 3.99% 8.31% 33kV 3.99% 8.21%
11kV 8.31% 8.31% 11kV 8.21% 8.21%
2018-19
Drawn at 33kV 11kV
33kV 3.99% 8.07%
11kV 8.07% 8.07%

Note:
1. The users of distribution system shall pay the rates and also bear
the losses approved by the Commission.
2. The licensee shall deliver the quantum of energy and capacity
given to it reduced by distribution losses in kind specified above.
3. The wheeling tariff/charges are to be levied as per the terms and
conditions approved by the Commission from time to time.
TSNPDCL

A. WHEELING RATES

Voltage 2014-15 2015-16 2016-17 2017-18 2018-19


33 kV ( Rs/kVA/month) 10.69 13.74 13.20 14.28 15.62
11 kV( Rs/kVA/month) 218.45 259.09 321.20 332.70 346.34
LT( Rs/kVA/month) 484.50 576.16 691.33 714.49 743.42

B. WHEELING LOSSES

2014-15 Supply point 2015-16 Supply point


Drawn at 33kV 11kV Drawn at 33kV 11kV
33kV 4.00% 8.08% 33kV 4.00% 8.08%
11kV 8.08% 8.08% 11kV 8.08% 8.08%
2016-17 2017-18
Drawn at 33kV 11kV Drawn at 33kV 11kV
33kV 4.00% 8.06% 33kV 4.00% 8.03%
11kV 8.06% 8.06% 11kV 8.03% 8.03%
2018-19
Drawn at 33kV 11kV
33kV 4.00% 7.98%
11kV 7.98% 7.98%

Note:
1. The users of distribution system shall pay the rates and also bear
the losses approved by the Commission.
2. The licensee shall deliver the quantum of energy and capacity
given to it reduced by distribution losses in kind specified above.
3. The wheeling tariff/charges are to be levied as per the terms and
conditions approved by the Commission from time to time.