Sei sulla pagina 1di 5

SUPPLIER PRE-INSTALLATION SITE-SURVEY FORM

COMPANY NAME:

Bill to ADDRESS:

CITY:

STATE/PROVINCE:

POSTAL CODE:

COUNTRY:

CONTACT PERSON:

BUSINESS TITLE:

PHONE:

FAX:

EMAIL ADDRESS:

BUYER/RETAILER:

Thank you for taking the time to fill out this important requirement of the installation.
The Avery Dennison InfoChain Express 3.0 solution configuration is installed using
3 fundamental components per installation.

1. SITE STATUS QUALITY – to ensure a stable install environment


2. PC REQUIREMENT - to ensure minimum needs for PRINT/SCAN&PACK
3. INTERNET REQUIREMENTS – to validate minimum bandwidth needs

This survey is the form in which factory environment information is captured.


The information captured is geared toward providing an improved understanding of
the technical installation environment and focused to assist in a successful on-site
installation of the ICE 3.0 system configuration needs.

It is important that extra care be used in filling out this form. It is more important to
note: HARDWARE CONFIGURATION installation can only commence when information provided is
verified. If, for any reasons, the conditions of the factory are different from the information provided
on this form and the factory conditions are found to be unfit for the installation to take place (e.g.
leakage of electricity, poorly configured internet connection), it cannot be successfully carried out.
Any re-visit to perform installation will be charged at the purchasers’ expense.

If at any time during the course of the interview or filling out the information required
below, there is difficulty with a response, please contact your Avery Dennison
technical support team immediately to review. When the form is completed, please
return it to your Avery Dennison technical support contact to schedule the ICE 3.0
installation.

AVERY DENNISON-Retail Information Services page 1 of 5


SITE STATUS EVALUATION – Part I
1 Supplied with dedicated 110 V AC/220
V AC Electrical Supply Output?
2 Is the AC power in the factory properly
grounded and how many outlets are
available for Avery’s equipment?
3 Supplied with Analog or digital
telephone line connection?
4 Is there a telephone line available that
is dedicated to internet on-line use?
5 Are frequent power outages
experienced?
6 Is an electrical generator back-up
system used?
7 Are Uninterrupted Power Supplies
currently used?
8 Is the working environment relatively
humid or dry?
9 Is the AC Voltage Adapter plug
configuration known? Please describe.
10 Is there an open workstation available
to install the DESKTOP SOFTWARE
required?
11 Are there technical personnel available
for training and operating the system?
12 Please provide any comments or
observations that you may foresee to
be an obstacle to this installation at
your factory.

PC REQUIREMENT – PART II
Item Requirement Answer Comments
1 PC Type Desktop, Tower or Laptop PC
2 Operating System Windows 2000, XP or Vista
(Windows XP with SP3
recommended)
3 What is the language For example: Korean PC’s may
of your PC Operating require special character set to
System? (English, be considered.
Chinese, Korean,
Spanish, Italian, etc.)
4 Memory RAM 1G
5 Free Hard Disk space 5GB
6 Processor: Pentium III – 500 MHz or Higher
7 COM1 PORT Serial 9 Pin Port - DEDICATED
8 Parallel Printer Port LPT1 Port - DEDICATED
9 Accessories Mouse Required
10

AVERY DENNISON-Retail Information Services page 2 of 5


AVERY DENNISON-Retail Information Services page 3 of 5
INTERNET REQUIREMENTS – PART III
1 Name & contact of local IT support
2 BROWSER
Mozilla Fire Fox v3.5.7 (Recommended)
MS Internet Explorer v7.0+
3 How do you presently access the
Internet? For example: TELCO modem
(56K), High Speed DSL (128K), High
Speed Cable (>256K), T1, ISDN or
private satellite, etc. (min=128kbps). Is
this a guaranteed bandwidth or the max.
bandwidth?
4 What is your peak operating hours of
internet access in your region?
5 What is the present upload and
download speed of you your Internet
connection? Can be checked by
technician on the ICE 3.0 platform.
6 Is there a FIREWALL installed on your
network? Port 2443; 2080:
ACTIVATED?
7 What is the name and the address of
your present ISP? (for example:
MSN.COM, AOL.COM, etc.)
8 What is the typical day to day
operational bandwidth from where ICE
3.0 will be operated? Consult IT if
needed.
9 Does the IT dept control access and
priority of the internal internet access
station that ICE 3.0 will be using?
10 Are there other factory associated
installations that have to be considered
for internet quality and minimum
bandwidth requirements?
11 Have the On-Line & Off Line capabilities
of the ICE 3.0 solution been reviewed?

AVERY DENNISON-Retail Information Services page 4 of 5


PLEASE ADD ANY ADDITIONAL INFORMATION BELOW:

I. SITE STATUS

II. PC CONFIGURATION

III. INTERNET REQUIREMENTS

AVERY DENNISON-Retail Information Services page 5 of 5

Potrebbero piacerti anche