SD 110G

Tire Assembly Procedure


SD110G
Tire Assembly Procedure

• This module explains the proper assembly procedure for fitting the
tube-less tire assembly on to the rim and to correctly ballast the
assembled tire:

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
2 2011-06-03
SD110G Tools

Pressure gauge Special Tool


Water Pump Tire Lever Air Compressor

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
3 2011-06-03
SD110G
Tire Assembly Procedure

• Clean the rim thoroughly


• Ensure that the rim is placed with the three-sided groove on the top
with the plug assembled

Plug
Volvo Construction Equipment Tire Assembly Procedure SD110G
Global CST - Training
4 2011-06-03
SD110G
• Lift and place the tire assembly on the top of the rim so that it just sits
on the outer edge of the rim assembly – TIRE NUMBER SHOULD
FACE DOWN !

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
5 2011-06-03
SD110G
• The first inner edge of the tire is now to be pushed onto the rim.
• This is normally done by using a hammer since the inner edges of the
tire are reinforced with metal ply to give strength to the tire and prevent
collapsing
• Take care while using the hammer so as not to damage the inner edge
of the tire as this will cause air/water leak and CANNOT be repaired,
leading to replacement of the tire itself–USE 4/8 LBS HAMMER

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
6 2011-06-03
SD110G
• Use 4/8 Lbs. hammer to push the inner edge of tire on to the rim
assembly. DO IT SLOWLY !

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
7 2011-06-03
SD110G
• Turn the tire/rim assembly on to it’s other side
• We are now ready to push the second inner edge of the tire into the rim
assembly

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
8 2011-06-03
SD110G
• Use a long tire lever with a flat
end and force a part of the edge
of the tire into the rim.
• Use a second tire lever and
repeat the above step about 6” to
8” away from the first lever.
• Remove the first tire lever and
repeat the above in steps until
the tire edge is fully seated inside
the rim edge.

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
9 2011-06-03
SD110G
• STEP: The tire is now being
seated inside the rim edge
• The procedure is repeated a
number of times to fully set
the tire inside the rim
• Usually two levers are
required to do this job

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
10 2011-06-03
SD110G
• After the tire is fully inside the rim, press the inner edge further inside to
ensure complete sealing
• This will also ensure that if any part of the tire is turned out, the same
will now be fully seated / set

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
11 2011-06-03
SD110G
• After the tire is assembled it is
made vertical and is then rolled for
a few feet
• This ensures proper seating of the
tire
• There should be an off-set
between the bottom portion and
the top portion of the rim

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
12 2011-06-03
SD110G
• To push the inner edge flush
with the groove in the rim, firstly
a long tire lever is used to hold
open one side of the tire as
shown in the snap.

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
13 2011-06-03
SD110G
• Once the inner edge is held, another short tire lever is now used the
tap the inner surface of the inner edge on the other side of the tire

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
14 2011-06-03
SD110G
• After the inner edge of the
tire is seated flush with the
outer groove on the rim,
check the tire assembly
again to see if the seating is
proper.
• If this is not done any air
gaps will lead to leak of both
water and air.

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
15 2011-06-03
SD110G
• The tire is now to be put on an incline – against a wall – this is to
ensure that the weight of the tire pushes on the rim groove, thereby
providing for good sealing prior to inflating the tire for proper seating

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
16 2011-06-03
SD110G
• The inflation valve is now to be removed from the rim to allow the high
pressure air line to be connected quickly to facilitate fast inflation

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
17 2011-06-03
SD110G
• The high pressure air hose is now connected to the valve unit as
shown.
• Turn on the air valve and high pressure air is filled in tire.

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
18 2011-06-03
SD110G
• Place the tire in standing position
and continue to fill the high
pressure air to 35 PSI
• We are using this procedure due
to availability of high pressure air.

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
19 2011-06-03
SD110G
• When the tire is inflated to 35 PSI, this ensures that the tire is seated
flush with the groove on the rim and is fully sealed
• The air non-return valve is now to be inserted

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
20 2011-06-03
SD110G
• Use the pressure gauge to set air pressure to 35 PSI.
DO NOT OVER INFLATE !!!

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
21 2011-06-03
SD110G
• The tire is now ready for ballasting
• The slide shows the special tool needed for this procedure
• This tool allows the technician to fill water into the tire
• The tool also allows for removal of the valve pin

Working end

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
22 2011-06-03
SD110G
• This tool consists of an adjustable plunger which facilitates opening of
the valve pin when the plunger is turned
• The water line is also connected to the tool as shown
• A bleed valve is provided to remove excess of water from the tire

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
23 2011-06-03
SD110G
• Locate the tool on to the inflation valve as show
• Ensure that the bleed valve is in closed position

Bleed
Valve
Closed

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
24 2011-06-03
SD110G
• Open the water line and allow water to flow into the tire
• Ensure that the inflation valve is kept at 12 O Clock

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
25 2011-06-03
SD110G
• Continue filling of water till the tire is fully filled – this is to be done in
steps – open/close to bleed air
• Stop the water line and open the bleed valve to check if water level is
above the nozzle

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
26 2011-06-03
SD110G
• When the bleed valve is opened water flow indicates that the tire is
filled fully
• Continue to keep the bleed valve open until no more water comes out,
THIS IS THE CORRECT LEVEL OF WATER IN TIRE

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
27 2011-06-03
SD110G
• Now keeping the water line closed turn the adjusting screw provided to
seat the valve pin
• This adjusting screw is to be turned clockwise fully to seat the inflation
valve pin to close fully

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
28 2011-06-03
SD110G
• The air inflation line can now be connected to facilitate air inflation into
the tire

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
29 2011-06-03
SD110G
• The air pressure gauge is used to check the pressure of the air in the
tire
• This air pressure is to be set to 16 PSI

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
30 2011-06-03
SD110G
• Now that the tire is fully Ballasted
and filled with air too, the machine is
to be removed from the jack-stands
and is now ready for trial and
testing.

• Check and re-tighten the wheel nuts


once again for both wheels before
moving the machine !

Volvo Construction Equipment Tire Assembly Procedure SD110G


Global CST - Training
31 2011-06-03
Volvo Construction Equipment Tire Assembly Procedure SD110G
Global CST - Training
32 2011-06-03