Sei sulla pagina 1di 31

HOJA DE PRESUPUESTO

TERMINAL MOLLENDO

ITEM DESCRIPCION UND

3.11.1 Excavación en basamento rocoso m3 ###

3.11.2 Excavación en roca fracturada m3

3.11.3 Carga y transporte a vertedero m3

3.11.4 Relleno cimentaciones procedente excavación m3

3.13.1 Excavación en basamento rocoso m3

3.13.2 Excavación en roca fracturada m3

3.13.3 Relleno estructural m3

3.13.4 Carga y transporte a vertedero m3

3.13.5 Excavación zanja m3

3.13.6 Relleno zanja con arena m3

3.13.11 Relleno arena limpia tanques m3


3.14.8 Relleno grava e=10cm m3

3.14.11 Relleno estructural m3

8.46.5 Relleno zanjas terreno procedente excavación m3

8.55.5 Relleno zanjas terreno procedente excavación m3

3.21.5 Relleno zanja con arena m3

7.5.2 Relleno grava muros m3

8.76.4 Relleno general procedente excavación m3

8.76.1 Relleno estructural pavimentos m3

4.6.14 Relleno estructural m3

7.5.3 Relleno estructural m3

3.21.2 Relleno estructural m3

Relleno estructural m3

3.19.4 Relleno estructural m3


3.16.1 Excavación en basamento rocoso m3

3.16.2 Excavación en roca fracturada m3

3.16.3 Carga y transporte a vertedero m3

3.16.4 Relleno cimentaciones procedente excavación m3

8.46.6 Relleno estructural m3

8.55.6 Relleno estructural m3

Relleno cimentaciones procedente excavación m3

Relleno cimentaciones procedente excavación m3

4.1.4 Relleno cimentaciones procedente excavación m3

4.2.4 Relleno cimentaciones procedente excavación m3

4.3.4 Relleno cimentaciones procedente excavación m3

4.4.4 Relleno cimentaciones procedente excavación m3

4.6.4 Relleno cimentaciones procedente excavación m3


6.2.4 Relleno cimentaciones procedente excavación m3

Relleno cimentaciones procedente excavación m3

6.2.4 Relleno cimentaciones procedente excavación m3

6.2.4 Relleno cimentaciones procedente excavación m3

7.67.4 Relleno cimentaciones procedente excavación m3

3.18.1 Excavación en basamento rocoso m3

3.18.2 Excavación en roca fracturada m3

3.18.3 Relleno estructural m3

3.18.4 Carga y transporte a vertedero m3

3.18.5 Excavación zanja m3

3.18.6 Relleno zanja con arena m3

3.19.1 Relleno grava e=10cm m3

3.19.4 Relleno estructural m3


8.46.3 Relleno cimentaciones procedente excavación m3

8.55.3 Relleno cimentaciones procedente excavación m3

3.21.10 Relleno arena limpia tanques m3

4.5.1 Excavación en roca fracturada m3

4.5.2 Carga y transporte a vertedero m3

4.5.3 Relleno cimentaciones procedente excavación m3

4.5.14 Excavación en roca fracturada m3

4.5.15 Relleno estructural m3

4.5.16 Carga y transporte a vertedero m3

4.5.17 Relleno cimentaciones procedente excavación m3

4.5.18 Excavación zanja m3

4.5.19 Relleno zanja con arena m3

4.5.24 Relleno arena limpia tanques m3


4.5.32 Excavación terreno suelto m3

4.5.33 Carga y transporte a vertedero m3

4.5.34 Relleno estructural m3

3.21.4 Excavación zanja m3

8.55.2 Excavación zanja m3

8.76.1 Excavación tierra vegetal m3

4.6.12 Excavación terreno suelto m3

8.46.1 Excavación roca fracturada m3

8.55.1 Excavación roca fracturada m3

8.76.2 Excavación roca fracturada m3

8.46.2 Excavación en zanja m3

6.2.2 Excavación en terreno suelto m3

Excavación en roca fracturada m3


Excavación en roca fracturada m3

4.1.2 Excavación en roca fracturada m3

4.2.2 Excavación en roca fracturada m3

4.3.2 Excavación en roca fracturada m3

4.4.2 Excavación en roca fracturada m3

4.6.2 Excavación en roca fracturada m3

6.2.2 Excavación en roca fracturada m3

7.5.1 Excavación en roca fracturada m3

3.21.1 Excavación en roca fracturada m3

Excavación en roca fracturada m3

Excavación en roca fracturada m3

6.2.2 Excavación en roca fracturada m3

6.2.2 Excavación en roca fracturada m3


7.67.2 Excavación en roca fracturada m3

7.69.2 Excavación en roca fracturada m3

4.1.1 Excavación en basamento rocoso m3

4.2.1 Excavación en basamento rocoso m3

4.3.1 Excavación en basamento rocoso m3

4.4.1 Excavación en basamento rocoso m3

4.6.1 Excavación en basamento rocoso m3

6.2.1 Excavación en basamento rocoso m3

Excavación en basamento rocoso m3

7.67.1 Excavación en basamento rocoso m3

7.69.1 Excavación en basamento rocoso m3

8.76.3 Excavación basamento rocoso m3

Carga y transporte a vertedero m3


Carga y transporte a vertedero m3

4.1.3 Carga y transporte a vertedero m3

4.2.3 Carga y transporte a vertedero m3

4.3.3 Carga y transporte a vertedero m3

4.4.3 Carga y transporte a vertedero m3

4.6.3 Carga y transporte a vertedero m3

4.6.13 Carga y transporte a vertedero m3

6.2.3 Carga y transporte a vertedero m3

3.21.3 Carga y transporte a vertedero m3

Carga y transporte a vertedero m3

Carga y transporte a vertedero m3

6.2.3 Carga y transporte a vertedero m3

6.2.3 Carga y transporte a vertedero m3


6.2.3 Carga y transporte a vertedero m3

7.67.3 Carga y transporte a vertedero m3

7.69.3 Carga y transporte a vertedero m3

8.46.4 Carga y transporte a vertedero m3

8.55.4 Carga y transporte a vertedero m3

8.2.1 Excavación tierra vegetal m3

8.2.2 Excavación en roca fracturada m3

8.2.3 Excavación en basamento rocoso m3

8.2.4 Relleno general procedente excavación m3

8.2.5 Carga y transporte a vertedero m3

8.2.6 Excavación apertura de zanjas m3

8.2.7 Relleno zanja con arena m3

8.2.8 Relleno zanjas terreno procedente excavación m3


8.2.9 Carga y transporte a vertedero m3

8.3.4 Relleno estructural pavimentos m3

8.3.5 Relleno estructural m3

8.3.5 Relleno estructural pavimentos m3

8.6.10 Relleno estructural pavimentos m3

8.6.11 Excavación en basamento rocoso m3

8.6.12 Relleno general procedente excavación m3

8.6.13 Carga y transporte a vertedero m3

8.76.7 Excavación tierra vegetal m3

8.76.8 Relleno estructural pavimentos m3

Excavación tierra vegetal m3

Relleno estructural pavimentos m3

8.59.15 Acero embebido m


COSTO DIDRECTO

GG.GG 10%
UTILIDAD 5%
SUB TOTAL

IGV 18%

PRESUPUESTO
E PRESUPUESTO
AL MOLLENDO

METRADO PRECIO PARCIAL

158.13 $138.13 $21,842.50

520.00 $14.19 $7,378.80

284.00 $15.69 $4,455.96

410.00 $23.81 $9,762.10

73.25 $138.13 $10,118.02

220.65 $14.19 $3,131.05

920.00 $5.06 $4,655.20

293.90 $15.69 $4,611.29

10.03 $13.56 $136.01

9.72 $7.06 $68.62

157.60 $12.25 $1,930.60


237.00 $26.24 $6,218.88

835.00 $5.06 $4,225.10

133.01 $6.05 $804.71

18.78 $6.05 $113.62

2.27 $7.06 $16.03

2.27 $26.24 $59.56

133.00 $23.81 $3,166.73

42.75 $19.28 $824.22

300.00 $5.06 $1,518.00

6.39 $5.06 $32.33

145.00 $5.06 $733.70

18.00 $5.06 $91.08

5.18 $5.06 $26.21


355.00 $138.13 $49,036.15

1,065.00 $14.19 $15,112.35

800.00 $15.69 $12,552.00

620.00 $23.81 $14,762.20

75.00 $5.06 $379.50

63.18 $5.06 $319.69

3.50 $23.81 $83.34

3.50 $23.81 $83.34

20.00 $23.81 $476.20

4.97 $23.81 $118.34

40.00 $23.81 $952.40

25.00 $23.81 $595.25

50.00 $23.81 $1,190.50


46.41 $23.81 $1,105.02

45.00 $23.81 $1,071.45

11.88 $23.81 $282.86

30.00 $23.81 $714.30

340.00 $23.81 $8,095.40

111.00 $138.13 $15,332.43

333.00 $14.19 $4,725.27

2,122.00 $5.06 $10,737.32

444.00 $15.69 $6,966.36

22.00 $13.56 $298.32

22.00 $7.06 $155.32

583.50 $26.24 $15,311.04

2,450.00 $5.06 $12,397.00


15.00 $23.81 $357.15

34.02 $23.81 $810.02

70.00 $12.25 $857.50

30.00 $14.19 $425.70

15.00 $15.69 $235.35

15.00 $23.81 $357.15

82.70 $14.19 $1,173.51

6.30 $5.06 $31.88

75.60 $15.69 $1,186.16

7.02 $23.81 $167.15

1.87 $13.56 $25.36

1.64 $7.06 $11.58

2.60 $12.25 $31.85


0.00 $32.82 $0.00

0.00 $15.69 $0.00

129.00 $5.06 $652.74

2.70 $13.56 $36.61

23.48 $13.56 $318.39

58.00 $22.75 $1,319.50

213.84 $32.82 $7,018.23

40.00 $14.19 $567.60

84.97 $14.19 $1,205.72

15.25 $14.19 $216.40

20.41 $13.56 $276.76

60.00 $32.82 $1,969.20

9.00 $14.19 $127.71


9.00 $14.19 $127.71

40.00 $14.19 $567.60

8.92 $14.19 $126.57

80.00 $14.19 $1,135.20

60.00 $14.19 $851.40

90.00 $14.19 $1,277.10

106.60 $14.19 $1,512.65

150.00 $14.19 $2,128.50

200.00 $14.19 $2,838.00

35.00 $14.19 $496.65

75.00 $14.19 $1,064.25

12.96 $14.19 $183.90

32.40 $14.19 $459.76


585.00 $14.19 $8,301.15

152.28 $14.19 $2,160.85

0.00 $64.66 $0.00

2.16 $64.66 $139.67

7.20 $64.66 $465.55

5.80 $64.66 $375.03

6.30 $64.66 $407.36

26.78 $64.66 $1,731.59

25.00 $64.66 $1,616.50

70.00 $64.66 $4,526.20

50.76 $64.66 $3,282.14

4.40 $138.13 $607.77

5.50 $15.69 $86.30


5.50 $15.69 $86.30

20.00 $15.69 $313.80

6.11 $15.69 $95.87

40.00 $15.69 $627.60

35.00 $15.69 $549.15

40.00 $15.69 $627.60

213.84 $15.69 $3,355.15

86.97 $15.69 $1,364.56

55.00 $15.69 $862.95

35.00 $15.69 $549.15

55.00 $15.69 $862.95

12.96 $15.69 $203.34

20.52 $15.69 $321.96


30.00 $15.69 $470.70

315.00 $15.69 $4,942.35

203.04 $15.69 $3,185.70

25.00 $15.69 $392.25

50.87 $15.69 $798.15

25.00 $22.75 $568.75

4.60 $14.19 $65.27

11.60 $64.66 $750.06

22,000.00 $5.12 $112,640.00

4,212.00 $15.69 $66,086.28

3,500.00 $13.56 $47,460.00

1,500.00 $7.06 $10,590.00

2,000.00 $6.05 $12,100.00


1,500.00 $15.69 $23,535.00

1,123.20 $19.28 $21,655.30

600.00 $5.06 $3,036.00

2,830.00 $19.28 $54,562.40

221.40 $19.28 $4,268.59

999.00 $64.66 $64,595.34

329.40 $6.05 $1,992.87

669.60 $15.69 $10,506.02

120.00 $22.75 $2,730.00

90.00 $19.28 $1,735.20

28.00 $22.75 $637.00

30.00 $19.28 $578.40

19.15 $40.00 $766.00


COSTO DIDRECTO $775,090.29

GG.GG 10% $77,509.03


UTILIDAD 5% $38,754.51
SUB TOTAL $891,353.83

IGV 18% $139,516.25


PRESUPUESTO $1,030,870.09
Premisas de rellenos en el preciario BASE:
1.- El material de relleno para los rellenos masivos se considera obtenido de la excavación masiva
realizada por Monte Azul y el cual se encuentra apilado en el interior del predio. Al material
excavado se le deberá realizar un chancado primario y los cribados necesarios para cumplir con la
Norma E_050 y obtener un material seleccionado apto para su uso como relleno masivo en caso de
ser necesario. El material debe de cumplir con lo indicado en el "Estudio de Suelos Complementario"
ES-1713 en lo referente a material de relleno.

2.- El material de relleno denominado relleno estructural se considera que es un material de cantera
que cumple con lo establecido en el artículo 3.4 de la norma CE.010 para gradación tipo C.

3.- El material de relleno denominado relleno estructural de pavimentos se considera que es un


material de cantera que cumple con lo establecido en el artículo 3.4 de la norma "Manual para el
diseño de caminos no pavimentados de bajo volumen de transito" para afirmado tipo 1.

4.- El material de relleno denominado relleno de arena limpia para tanques, se considera que es un
material de cantera que cumplirá la granulometría para arena de sello según ASTM C144 de acuerdo
con la norma CE.010 y los requisitos indicados en API651 artículo 5.3.2.

5.- El material de relleno denominado relleno de arena en zanjas, se considera que es un material de
cantera compuesto por arena fina y limpia.

6.- El material de relleno procedente de la excavación para relleno de zapatas, muros, etc. Se considera
que es proveniente de la excavación y se le realiza los procesos necesarios para cumplir con la
norma E_050.

Partidas Opcionales:

Suministro y relleno con material procedente


de cantera, en tongadas de 25cm de espesor,
compactadas al 98% pp, transporte, vertido,
etc. El material de cantera cumplirá con lo
establecido en la Norma E_050 como material
8.2.0 EDI Movimiento Masivo Tierras CIVIL seleccionado. Se incluyen los ensayos de
calidad y de laboratorio necesarios. El material
debe de cumplir con lo indicado en el "Estudio
de Suelos Complementario" ES-1713 en lo
referente a material de relleno.
Relleno estructural procedente de la
excavación en el cual se relizarán los procesos
8.2.0 EDI Movimiento Masivo Tierras CIVIL de chancada, cribado, etc. Para cumplir con lo
establecido en el artículo 3.4 de norma CE.010
para gradación tipo C.
PRECIO
UNIDAD UNITARIO CANTIDAD COSTE

Relleno general procedente de cantera m3 17,797.60 $0.00


Relleno estructural procedente de la excavación m3 5,000.00 $0.00
Partidas Opcionales:

8.2.0 EDI Movimiento Masivo Tierras CIVIL

8.2.0 EDI Movimiento Masivo Tierras CIVIL

8.2.0 EDI Movimiento Masivo Tierras CIVIL

8.2.0 EDI Movimiento Masivo Tierras CIVIL


UNIDAD

Excavación en apertura de zanjas, por cualquier


sistema de excavación, tipo de maquinaria y mano
de obra utilizada;incluso carga y transporte a
vertedero autorizado, a acopios intermedios para su
posterior utilización, retirada final a vertedero de los
materiales de acopio no utilizados, drenajes,
Excavación apertura de zanjas m3
agotamientos, entibaciones, formación de taludes
estables, nivelación y compactación de fondo de
excavación , perfilado y rasanteo; incl. p.p. de medios
auxiliares.

Relleno de zanjas con arena limpia, hasta por


encima de la generatriz de los tubos s/ Planos de
Proyecto, extendida en tongadas, humectada y
compactada hasta obtener el grado requerido con
Relleno zanja con arena m3
cualquier medio, incl. p.p. de medios auxiliares,
sumistro a pie de obra.

Relleno de zanjas con terreno procedente de


excavación, extendida en capas de 30 cm de
espesor máximo y compactada al 98% de ensayo
Proctor Modificado (incl. humectación o desecación
necesarias para alcanzar el grado de humedad
Relleno zanjas terreno procedente excavación m3
óptimo para la compactación según los resultados
del citado ensayo); incl. suministro de los materiales
a pie de obra, y p.p. de medios auxiliares. .

Carga y transporte a vertedero autorizado, de toda


clase de materiales inertes sobrantes de la
excavación, incl.p.p. de medios auxiliares, vertido,
Carga y transporte a vertedero m3
clasificación, extendido y cánon. .
PRECIO
UNITARIO CANTIDAD COSTE

3,300.00 $0.00

950.00 $0.00

2,000.00 $0.00

350.00 $0.00