Sei sulla pagina 1di 18

PRESUPUESTO TOTAL

MANO DE OBRA

UNIDAD CANTIDAD PRECIO SUB TOTAL


BASE Y SOBREBASE Ml 151.65 S/90.00 S/13,648.50
COLUMNAS Unid. 49 S/300.00 S/14,700.00
ASENTADO DE LADRILLO Millar 11.37 S/500.00 S/5,685.00

MATERIALES
UNIDAD CANTIDAD PRECIO SUB TOTAL
CEMENTO Bolsas 524.60 S/. 25.00 S/13,114.91
ARENA GRUESA M3 25.60 S/. 38.00 S/972.66
PIEDRA 1/2" M3 21.47 S/. 48.00 S/1,030.66
HORMIGÓN M3 76.13 S/. 50.00 S/3,806.55
PIEDRA GRANDE 6" M3 32.46 S/. 65.00 S/2,110.10
PIEDRA GRANDE 3" M3 49.80 S/. 65.00 S/3,237.00
LADRILLO Unid. 11369.71 S/. 0.38 S/4,320.49
ACERO CORRUGADO DE 1/2" Varilla 120.76 S/. 28.50 S/3,441.79
ACERO CORRUGADO DE 3/8" Varilla 173.68 S/. 16.00 S/2,778.84

PRESUPUESTO TOTAL

Nota: El presupuesto al ser referencial puede sufrir modificaciones durante la ejecución del proyecto.
S/. 34,033.50

S/34,813.00

S/. 68,846.50
CÁLCULO DE MATERIAL POR PARTID
PARTIDA DESCRIPCIÓN

3.00 CONCRETO ARMADO F´C= 175 KG/CM2 PARA ZAPATAS


CEMENTO
ARENA GRUESA
PIEDRA 1/2"

4.00 CONCRETO 1:10 DE CIMIENTO CORRIDO


CEMENTO
HORMIGÓN
PIEDRA GRANDE 30% MAX 6"

5.00 CONCRETO SIMPLE 1:8 PARA SOBRECIMIENTO


CEMENTO
HORMIGÓN
PIEDRA MEDIANA 30% MAX 3"

6.00 CONCRETO ARMADO F´C= 175 KG/CM2 PARA COLUMNAS


CEMENTO
ARENA GRUESA
PIEDRA 1/2"

7.00 MURO DE SOGA LADRILLO KING KONG


LADRILLO
CEMENTO
ARENA GRUESA

8.00 ACERO PARA ZAPATAS 1/2"

9.00 ACERO PARA COLUMNAS 1/2"

10.00 ACERO PARA ESTRIBOS 3/8"


ATERIAL POR PARTIDA
PRECIO
UNIDAD CANTIDAD PRECIO TOTAL
UNITARIO

BOLSAS 107.52 25.00 S/. 2,688.00


M3 7.68 38.00 S/. 291.84
M3 12.29 48.00 S/. 589.82

BOLSAS 216.42 25.00 S/. 5,410.50


M3 64.93 50.00 S/. 3,246.30
M3 32.46 65.00 S/. 2,110.10

BOLSAS 47.31 25.00 S/. 1,182.75


M3 11.21 50.00 S/. 560.25
M3 49.80 65.00 S/. 3,237.00

BOLSAS 80.36 25.00 S/. 2,009.00


M3 5.74 38.00 S/. 218.12
M3 9.18 48.00 S/. 440.83

UNID. 11369.71 0.38 S/. 4,320.49 0.38


BOLSAS 72.99 25.00 S/. 1,824.66
M3 12.18 38.00 S/. 462.70

UND 22.76 28.50 S/. 648.79

UND 98.00 28.50 S/. 2,793.00

UND 173.68 16.00 S/. 2,778.84

S/34,813.00
PLANILLA DE METRADOS
PARTIDA DESCRIPCIÓN

1.00 EXCAVACIÓN DE CIMIENTO CORRIDO


2.00 EXCAVACIÓN DE ZAPATA
3.00 CONCRETO ARMADO F´C= 175 KG/CM2 PARA ZAPATAS
4.00 CONCRETO 1:10 DE CIMIENTO CORRIDO
5.00 CONCRETO SIMPLE 1:8 PARA SOBRECIMIENTO
6.00 CONCRETO ARMADO F´C= 175 KG/CM2 PARA COLUMNAS
7.00 MURO DE SOGA LADRILLO KING KONG
8.00 ACERO PARA ZAPATAS 1/2"
9.00 ACERO PARA COLUMNAS 1/2"
10.00 ACERO PARA ESTRIBOS 3/8"
ADOS
UND TOTAL

M3 72.14
M3 12.29
M3 15.36
M3 72.14
M3 12.45
M3 11.48
M2 304.41
ML 204.88
ML 882.00
ML 1563.10
PLANILLA DE METRADOS
PARTIDA DESCRIPCIÓN UND

1.00 EXCAVACIÓN DE CIMIENTO CORRIDO M3


Eje A-B
Eje C-D
Eje D-E
Eje E-F
Eje G-H
Eje H-I
Eje I-J
Eje K-L
Eje L-M
Eje M-N
Eje O-P
Eje P-Q
Eje Q-R
Eje S-T
Eje T-U
Eje U-V
Eje 1-2
Eje 2-3
Eje 4-5
Eje 5-6
Eje 1-7
Eje 7-8
Menos área de columna

2.00 EXCAVACIÓN DE ZAPATA M3


Z-1 (ANCHO)
Z-1 (PROFUNDIDAD)
Z-2 (ANCHO)
Z-2 (PROFUNDIDAD)
Z-3 (ANCHO)
Z-3 (PROFUNDIDAD)
Z-4 (ANCHO)
Z-4 (PROFUNDIDAD)

3.00 CONCRETO ARMADO F´C= 175 KG/CM2 PARA ZAPATAS M3


Z-1
Z-2
Z-3
Z-4

4.00 CONCRETO 1:10 DE CIMIENTO CORRIDO M3


Eje A-B
Eje C-D
Eje D-E
Eje E-F
Eje G-H
Eje H-I
Eje I-J
Eje K-L
Eje L-M
Eje M-N
Eje O-P
Eje P-Q
Eje Q-R
Eje S-T
Eje T-U
Eje U-V
Eje 1-2
Eje 2-3
Eje 4-5
Eje 5-6
Eje 1-7
Eje 7-8
Menos área de columna

5.00 CONCRETO SIMPLE 1:8 PARA SOBRECIMIENTO M3


Eje A-B
Eje C-D
Eje D-E
Eje E-F
Eje G-H
Eje H-I
Eje I-J
Eje K-L
Eje L-M
Eje M-N
Eje O-P
Eje P-Q
Eje Q-R
Eje S-T
Eje T-U
Eje U-V
Eje 1-2
Eje 2-3
Eje 4-5
Eje 5-6
Eje 1-7
Eje 7-8

6.00 CONCRETO ARMADO F´C= 175 KG/CM2 PARA COLUMNAS M3


C-1

7.00 MURO DE SOGA LADRILLO KING KONG M2


Eje A-B
Eje C-D
Eje D-E
Eje E-F
Eje G-H
Eje H-I
Eje I-J
Eje K-L
Eje L-M
Eje M-N
Eje O-P
Eje P-Q
Eje Q-R
Eje S-T
Eje T-U
Eje U-V
Eje 1-2
Eje 2-3
Eje 4-5
Eje 5-6
Eje 1-7
Eje 7-8
A DE METRADOS
N° VECES LARGO (m) ALTO (m) ANCHO (m) PARCIAL(m) TOTAL

72.14
2 4.25 0.80 0.60 4.08
2 4.15 0.80 0.60 3.98
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
1 4.13 0.80 0.60 1.98
1 3.35 0.80 0.60 1.61
1 3.83 0.80 0.60 1.84
1 4.10 0.80 0.60 1.97
1 3.95 0.80 0.60 1.90
1 4.27 0.80 0.60 2.05
1 4.65 0.80 0.60 2.23
-49 0.25 0.80 0.05 -0.49

12.29
22 1.00 0.80 0.20 3.52
22 1.00 0.20 0.80 3.52
11 1.20 0.80 0.20 2.11
11 1.20 0.20 0.80 2.11
2 0.80 0.80 0.20 0.26
2 0.80 0.20 0.80 0.26
2 0.80 0.80 0.20 0.26
2 0.80 0.20 0.80 0.26

15.36
22 1.00 0.50 0.80 8.80
11 1.20 0.50 0.80 5.28
2 0.80 0.50 0.80 0.64
2 0.80 0.50 0.80 0.64

72.14
2 4.25 0.80 0.60 4.08
2 4.15 0.80 0.60 3.98
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
2 4.00 0.80 0.60 3.84
2 4.28 0.80 0.60 4.11
2 4.00 0.80 0.60 3.84
1 4.13 0.80 0.60 1.98
1 3.35 0.80 0.60 1.61
1 3.83 0.80 0.60 1.84
1 4.10 0.80 0.60 1.97
1 3.95 0.80 0.60 1.90
1 4.27 0.80 0.60 2.05
1 4.65 0.80 0.60 2.23
-49 0.25 0.80 0.05 -0.49

12.45
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
2 3.75 0.60 0.15 0.68
1 3.75 0.60 0.15 0.34
1 3.58 0.60 0.15 0.32
1 3.58 0.60 0.15 0.32
1 3.58 0.60 0.15 0.32
1 3.58 0.60 0.15 0.32
1 3.90 0.60 0.15 0.35
1 3.90 0.60 0.15 0.35

11.48
49 0.25 3.75 0.25 11.48

304.41
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
2 3.75 2.20 16.50
1 3.75 2.20 8.25
1 3.58 2.20 7.88
1 3.58 2.20 7.88
1 3.58 2.20 7.88
1 3.58 2.20 7.88
1 3.90 2.20 8.58
1 3.90 2.20 8.58
37.35

total 11369.86 11370


PLANILLA DE METRAD
08.00 ZAPATAS
08.10 ACERO PARA ZAPATAS

N° DE
ELEMENTO DESCRIPCION Ǿ VARILLAS O N° DE VECES
ESTRIBOS

ACERO LONGITUDINAL 1/2" 4 22


Z-1
ACERO TRANSVERSAL 1/2" 3 22
ACERO LONGITUDINAL 1/2" 4 11
Z-2
ACERO TRANSVERSAL 1/2" 3 11
ACERO LONGITUDINAL 1/2" 3 2
Z-3
ACERO TRANSVERSAL 1/2" 3 2
ACERO LONGITUDINAL 1/2" 3 2
Z-4
ACERO TRANSVERSAL 1/2" 3 2
TOTAL ML
TOTAL N° VARILLAS
TOTAL EN KG

09.00 COLUMNAS
09.10 ACERO PARA COLUMNAS
N° DE
ELEMENTO DESCRIPCION Ǿ VARILLAS O N° DE VECES
ESTRIBOS

ACERO LONGITUDINAL 1/2" 4 49


C-1
ESTRIBOS 3/8" 29 49
TOTAL ML
TOTAL N° VARILLAS
TOTAL EN KG
ILLA DE METRADOS DE ACERO
203.65

LONGITUD 3/8" 1/2" 5/8" 3/4" 1"


1/4"
DE TOTAL KG
ELEMENTO 0.25 0.56 0.994 1.55 2.24 3.98

0.90 71.28
113.71
0.70 43.12
1.10 53.24
74.35
0.70 21.56
0.70 3.92
7.79
0.70 3.92
0.70 3.92
7.79
0.70 3.92
0.00 0.00 204.88 0.00 0.00 0.00
0.00 0.00 23 0.00 0.00 0.00
0.00 0.00 203.65 0.00 0.00 0.00 203.65

1,752.04
LONGITUD 1/4" 3/8" 1/2" 5/8" 3/4" 1"
DE TOTAL KG
ELEMENTO 0.25 0.56 0.994 1.55 2.24 3.98

4.50 882.00
1752.04
1.10 1,563.10
0.00 1,563.10 882.00 0.00 0.00 0.00
0.00 174 98 0.00 0.00 0.00
0.00 875.34 876.71 0.00 0.00 0.00 1,752.04
VIGAS - COLUMNA VIGAS - COLUMNA
CALCULO DE ESTRIBOS CALCULO LONGITUD DE ESTR

Ancho Columna
Largo Columna

Recubrimiento

Longitud Estribo que Dobla


Longitud de Estructura 3.8 m
Longitud Estribo

1 @ 0.05
8 @ 0.1
@
R @ 0.2

2 @ 0.1
16 @ 1.6
0 @ 0

Longitud 1.7
Longitud Restante 2.1
Estribos Restantes 10.5

R @ 10.5
Estribos Zapata
Alto Zapata 0.4
Estribos cada 0.1
4
Menos 1 @ 3

TOTAL ESTRIBOS CON


15.5
ZAPATA

TOTAL ESTRIBOS SIN


ZAPATA 28.5
VIGAS - COLUMNA
CALCULO LONGITUD DE ESTRIBOS

cho Columna 0.25 m


rgo Columna 0.25 m

ecubrimiento 0.04 m

Longitud Estribo que Dobla 0.1 0.2

Longitud Estribo 1.04