Sei sulla pagina 1di 18

Power Solutions for

telecom applications TEL-IN-DO-US-21

Energy Solutions Provider


An energy solution
SDMO is renowned as one of the top manufacturers of generating
sets worldwide. SDMO's single-industry strategy enables it to offer the largest
range on the market, a reliable and long-lasting source of energy, conforming
to the most stringent standards. Its ranges and services undergo continuous
improvement, allowing them to meet even the most exacting energy requirements.
This strategy of constant innovation allows SDMO to meet the dual challenge of
naturally controlled energy, both from an economic and an environmental point
of view. By relying on the proximity of its distribution network, the largest possible
number can have access to electricity.
In addition to its role as an industrial manufacturer of generating
sets, SDMO is now positioning itself as a serious energy supplier.
Energy Solutions Provider

whatever
the energy required
Whether you require emergency power to be able to cope with potential power cuts
(e.g. hospitals, shopping centres) or continuous power when conventional electrical grids
are faulty (power plants), SDMO will be able to offer you a large range of performance
products which meet all the requirements of the market.
This range comprises 3 main categories:

•Standard products
(Portable Power, Residential Power, Power Products and Rental Power)
•Expertise and Services
(Power Solutions, Training, Spare Parts, Technical Assistance)
•Related products
(Nexys, Telys, Kerys command/control units)

2
National coverage, In order for SDMO to continue to grow and expand into
new markets, it relies on:
• a distribution network present in over 150 countries,
international • 8 overseas subsidiaries,
• 5 offices,
presence, "think • 7 sales offices and 3 regional divisions in France.

globally, act locally" The responsiveness of the company is based on its


development of 5 storage platforms which, in co-operation
with the subsidiaries, constitute an efficient commercial
network.
The links forged with the Kohler group have strengthened
SDMO's standing amongst its customers through a strategy
of synergistic installations.

SDMO Head Office


SDMO locations
Agents/Distributors
SDMO Stock

Market logic The production plants in Brest are organised according to


product lines relating to the product range offer:
• a production site for Portable Power generating sets and
for greater for Power Products with lower power.
• a production site for Power Products, Rental Power and
responsiveness Power Solutions ranges.
A dedicated laboratory, 69 test platforms (from 40 to 4000 kVA)
and a training academy complement the available equipment with
perfect consistency.

SDMO strengthens its position as a reliable and responsive


partner through an overall synergy between the industrial
teams and sales and marketing departments: prescription,
responsiveness, and presence in key markets.

3
POWER SOLUTIONS
Made-to-measure power

Proactive engineering
for specific applications
From the simplest of installations to the most complex, with the Power Solutions
range, the engineering department at SDMO will strive to accommodate all requests,
regardless of energy requirements. The department's international experience
coupled with its involvement in some of the most groundbreaking projects seen on
the planet are proof of this.

Engineering: a global process


- understanding
- analysing the exact requirements
- offering real solutions
- integrating innovative solutions
- designing complete programs
- carrying out the installation
- following up with technical inspections

Additional teams
SDMO's expert technicians and engineers are trained to master the latest design and analysis
tools. They have access to advanced 3D modelling software incorporating a very precise
structural calculation module.
SDMO's test engineers also use a state-of-the-art technique for analysing sound emissions -
sound intensity measurement - which, used in conjunction with modal analysis for determining
vibrational frequencies, enables them to carry out particularly delicate work in this sensitive
field.

4
POWER SOLUTIONS
Made-to-measure power

customer
info
Energies in synergy
The Engineering Department is made up of close to 100 engineers and
technicians and assists you in the development of your project, both from a
Factory/
technical and sales point of view. Installation Deal
Each project follows a proven process, from the preliminary review, through to supervisor
maintenance of the installation. A succession of pre-established steps, managed Dedicated contact
by all our teams, offers all the guarantees for flawless efficiency. person for the client,
from allocation of the
1. Preliminary review file until operational
Consultation, analysis and feasibility... handover of the power
plant/generating set(s).
The definition of the customer's needs is ensured by the complementary
areas of expertise that the SDMO teams possess, combined with a range of In cases where the
engineering tools such as the Sizing Program. installation is carried
If necessary, a project plan as well as an initial study and calculation notes out by the client
can be implemented and added to the specifications. directly, SDMO offers
supervision and
advice, checks and
commissioning startup.
2-Order
Costing, proposal and validation ...

Once the best solution has been determined based on energy


needs, technical constraints and the financial resources available,
the project is transferred to the relevant SDMO departments.
This handover is carried out using a complete dossier containing all the
technical and contractual data.

3-Study
Planning, calculation and projection...

The client's dedicated SDMO contact person sets up the project.


Plans, diagrams, calculations, scheduling, technical documentation...
everything is validated in complete transparency.

5
POWER SOLUTIONS
Made-to-measure power

4-Implementation
Manufacturing, testing and delivery...

The manufacturing of generating sets, containers, and


command and control panels is carried out in line with the order.
Equipment testing on test benches guarantees its reliability.
Various additional services can be included by SDMO's Power Solutions teams
for the client's peace of mind: packaging for delivery to the site, construction
of stone or metal buildings, equipment installation, soundproofing, etc.

5. Commissioning
Startup, initial testing and adjustments...

During commissioning, an initial test is carried out in terms of the equipment


unit's operation (mechanical and electrical) before on-load tests can
guarantee completely safe operation.
SDMO is able to offer its services throughout the world thanks to its solid
network of skilled and responsive teams: technicians and technical inspectors
work to support its sister company BES, along with distributors and partners
who can perform these services in SDMO's name.

6-Maintenance
Assistance, training and monitoring...

Backed by an extensive network of approved agents, SDMO is able to ensure


all its customers receive quick and efficient technical assistance.
Command/control system, electrotechnical and mechanical innova-
tions, every year the SDMO training unit shares its expertise on the subject
of generating sets.
Guaranteeing the longevity of its installations throughout the world, the
Spare Parts department responds to requests as quickly as possible, offering
over 40,000 numbered parts, including GenParts (SDMO brand).

6
TELECOMS
Solutions for everyone

Telecoms solutions flowchart


SDMO can provide solutions tailored to every situation, environment and budget.

network isolated sites


backup
Solution 1 Solution 2 Solution 3 Solution 4

ATS ATS

1 Generating set
1 Generating set 1 Generating set
2 Generating sets + batteries
+ network + batteries + solar panels
power ratings from 0.5 power ratings from 0.5 to
Application all power ratings all power ratings to 5 kW 3 kW

a low CAPEX(2) a low CAPEX(2) a low OPEX(3) a very low OPEX(3)


a long battery service life
a reduction in the genera-
a long equipment ting set's consumption and a maximum reduction in the
PROS service life running time (approximately generating set's consumption
5 hours/day) and running time
Advantages (approximately 3 hours/day)
a very quick return on a quick return on
a easy to transport a easy to transport
investment (around 1 year) investment (around 2 year)
a very long maintenance
a 1 maintenance
interval (no more than 1 or 2
intervention per year
interventions per year)

a high OPEX(3)(1) a high OPEX(3) a high CAPEX(2) a high CAPEX(2)


a use of the
a use of the generating a batteries require a batteries require
generating set at low
Constraints efficiency
set at low efficiency replacement replacement
a high maintenance
CONS frequency

(1) based on network quality


(2) CAPEX = capital expense (start-up investment)
(3) OPEX = operational expense (operational costs)

7
telecoms
Solutions for everyone

solution 1

solution 2

solution 1

Generating set
+ network
ATS

In this configuration, the installations are supplied directly by the


electrical network.
The generating set is therefore present as a safety measure.
It takes over the electrical power supply in the event that the
main network is cut off, using a normal/emergency switch (ATS).

solution 2

2 Generating sets
(without network)
ATS

When there is no electrical network, the configuration represented


by 2 generating sets coupled together provides a 24/7 power
supply.
The BTS (Base Transceiver Station) is supplied alternately by each of
the generating sets using a supply changeover switch date and
time system (ATS). Each set backs up the other during phases when
it is not running.

8
telecoms
Solutions for everyone
solution 1
solution 2

K16 J30U covered version

Three phase
Specifications 50 Hz - 230 V Specifications 60 Hz - 240 V General specifications
kVA kWe
Engine Alternator Covered version (5)
GENERATING Cos Φ 0.8 Cons GENERATING ISO 8528* Cons
SETS ¾ SETS ¾ Weight
PRP ESP PRP ESP CC Enclo- Dimensions Tank
(1) L/h (2) L/h Engine type CC Type (Kg)
(3) (4) (3) (4) (L) sure lxwxh (m) (L)
50/60 Hz
K9 8 9 2.0 K9U 8 9 2.5 KDW1003 3L 1.0 ECP3-2S M125 1.48x0.76x1.03 400 50
ADRIATIC

K12 11 12 2.5 K12U 11 12 3.4 KDW1404 4L 1.4 ECP3-1L M126 1.75x0.78x1.23 510 50
K16 15 16 3.7 K16U 15 16 4.5 KDW1603 3L 1.7 ECP3-3L M126 1.75x0.78x1.23 580 50
K21 19 21 4.6 K20U 18 19 5.2 KDW2204 4L 2.2 ECP28-1L M126 1.75x0.78x1.23 650 50
J22 20 22 5.0 J20U 18 20 6.5 3029DF120 3L 2.9 ECO28-1L M127 2.08x0.96x1.42 980/930 100
J33 30 33 5.0 J30U 26 28 6.5 3029DF120 3L 2.9 ECP28-VL M127 2.08x0.96x1.42 980 100
J44K 40 44 7.5 J40U 36 40 8.7 3029TF120 3L 2.9 ECO32-3S M127 2.08x0.96x1.42 1040 100
MONTANA

J66K 60 66 12.0 J60U 55 60 14.5 4045TF120 4L 4.5 432M45 M128 2.30x1.06x1.68 1410 180
J77K 70 77 12.0 J70U 64 70 14.5 4045TF120 4L 4.5 432L8 M128 2.30x1.06x1.68 1530 180
J88K 80 88 14.0 J80U 73 80 16.0 4045TF220 4L 4.5 432L8 M128 2.30x1.06x1.68 1530 180
J110K 100 110 16.5 J100U 91 100 19.0 4045HF120 4L 4.5 442VS45 M129 2.55x1.15x1.68 1640 190
J130K 118 130 18.5 J120U 106 117 24.0 6068TF220 6L 6.7 442S7 M226 3.51x1.20x1.83 2160 340
LR8 7 8 1.5 LR8U 7 8 1.8 LPW2 2L 0.9 ECP3-2S M127 2.08x0.96x1.42 620 -
RUNNING

LR12 11 12 2.2 LR12U 11 12 2.7 LPW3 3L 1.4 ECP3-1L M127 2.08x0.96x1.42 680 -
LONG

LR16 15 17 2.9 LR16U 15 16 3.6 LPW4 4L 1.9 ECP3-3L M127 2.08x0.96x1.42 790 -
LR22 20 22 3.7 LR22U 20 22 4.6 LPW4T 4L 1.9 ECP28-1L M127 2.08x0.96x1.42 830 -

Single phase
Specifications 50 Hz - 230 V Specifications 60 Hz - 240 V General specifications
kVA kWe
GENERATING Cons GENERATING ISO 8528* Cons Engine Alternator Covered version (5)
Cos Φ 0.8
SETS ¾ SETS ¾
PRP ESP PRP ESP CC Enclo- Dimensions Weight Tank
(1) L/h (2) L/h Engine type CC Type
(3) (4) (3) (4) (L) sure lxwxh (m) (kg) (L)
- - - - K9UM 8 9 2.5 KDW1003 3L 1.0 ECP3-1L M126 1.75x0.78x1.23 290 50
RUNNING MONTANA ADRIATIC

K10M 9 10 2.5 K12UM 10 12 3.3 KDW1404 4L 1.4 ECP3-3L M126 1.75x0.78x1.23 350 50
K13M 12 13 3.7 K16UM 14 16 4.5 KDW1603 3L 1.6 ECP28-1L M126 1.75x0.78x1.23 420 50
K17M 15 16 4.6 K20UM 18 19 5.2 KDW2204 4L 2.2 ECP28-VL M127 2.08x0.96x1.42 520 100
- - - - J20UM 18 20 6.5 3029DF120 3L 2.9 ECP28-VL M127 2.08x0.96x1.42 980 100
- - - - J30UM 26 28 6.5 3029DF120 3L 2.9 ECO32-3S M127 2.08x0.96x1.42 1020 100
- - - - J40UM 36 40 8.7 3029TF120 3L 2.9 432M45 M127 2.08x0.96x1.42 1090 100
- - - - J70UM 61 67 14.5 4045TF120 4L 4.5 442VS45 M129 2.55x1.15x1.68 1630 190
LR6M 6 6 1.5 LR8UM 8 8 1.8 LPW2 2L 0.9 ECP3-1L M127 2.08x0.96x1.42 620 -
LR10M 9 10 2.2 LR12UM 11 12 2.7 LPW3 3L 1.4 ECP3-3L M127 2.08x0.96x1.42 680 -
LONG

LR14M 12 14 2.9 LR16UM 15 16 3.6 LPW4 4L 1.9 ECP28-1L M127 2.08x0.96x1.42 790 -
LR17M 16 17 3.7 LR21UM 19 21 4.6 LPW4T 4L 1.9 ECP28-VL M127 2.08x0.96x1.42 830 -
(1) Also available in the following voltages: 415/240 V - 380/220 V - 220/127 V - 200/115 V (5) PRP: main power available continuously with variable load for an unlimited time in accordance with ISO 8528-1.
(2) Also available in the following voltages: 440/254 V - 220/127 V - 208/120 V (6) ESP: Emergency Standby Power available for supplying emergency power in variable load applications in accordance with ISO 8528-1,
(3) ISO 8528: powers specified in compliance with the legislation in force no overload available for this service.
(4) The dimensions and weights apply to a generating set specified in the price list, without options (7) Dry weight - without fuel

9
POWER products
Long Running Details

"Long running"
operation
This system means a service only has to be carried out every
2000 hours (compared to 250 hours with a standard motor),
which gives an eightfold reduction in the maintenance
frequency, leading to a significant reduction in operating
costs (OPEX2).

"Long running" generating sets are particularly well- CAPEX1  


suited to isolated telecoms sites, and are equipped with
Lister Peter engines. Their low consumption guarantees
OPEX2  Conventional Long Running

generating generating
significant savings on fuel. This saving can exceed set set
20% compared to the main engine manufacturers on the
market. (1) CAPEX = capital expense (start-up investment)
(2) OPEX = operational expense (operational costs)

Theft protection for fuel tanks


To reduce the footprint and prevent any risk of fuel theft on-site, SDMO has developed three standard 600,
1000 and 2000 litre tanks, specially designed to be secured underneath SDMO generating sets, providing
much appreciated autonomy.
Siphoning protection

Dimensions
Excluding With With With
Enclosure tank 600 L 1000 L 2000 L
lxwxh (m) tank tank tank
M127 2.08x0.96x1.42 2.08x0.96x1.91 2.35x0.96x2.08 3.51x1.15x2.11

Drainage protection Filling protection


No access is possible, nor unscrewing The gauge is visible but access
for drop by drop. to filling is not possible.

Different safety systems restrict access to filling, making siphoning impossible.


This equipment, specially developed by SDMO for Telecoms applications, improves the profitability of investments,
giving a significant reduction in operating costs (OPEX).

10
POWER products
Control units

product
plus points
Source inverters - VERSO
From 35A to 160A, the VERSO is the SDMO changeover switch. Available in three phase and single
phase versions, it integrates power detection and allows automatic/manual start-up of the generating
set in the event of a mains power cut.

IP54 control unit


VERSO S Single phase VERSO S Three phase VERSO D
Ratings 63A 100A 125A 160A 35A 63A 80A 100A 125A 160A 35A 63A 80A 100A 125A 160A
Type Single phase Three phase Three phase
127 / 230 V / 50-60Hz 127 / 230 V / 50-60Hz
Nominal voltage/frequency 230V / 50-60Hz 230 / 400 V / 50-60Hz 230 / 400 V / 50-60Hz
Display and setting Potentiometer Potentiometer Via LCD display
Voltage drop tolerated 20% of the nominal voltage @230V 20% of the nominal voltage @400V 30% of the nominal voltage @400V
Protects against a change
X O a
in the phase rotation direction
Protection in "0" position X X Rapid automatic protection available for D versions
Lightning arrester X X O
Confirmation of mains return a a a
EJP (for France only) a a a
Protection index IP54 IP31 IP54
Dimensions (l x w x h) in mm 305x410x150 385x385x193 400x600x200

Depending on your needs and your technical constraints, SDMO can offer a range of different
source inverter models. To improve their robustness under extreme conditions, some options are also
available on some models.

Changeover cabinet
For sites equipped with two generating sets coupled together (solution 2), SDMO recommends a
changeover cabinet designed to easily manage the alternate operation of the generating sets. A

ATS timer system allows the running time to be split between the generating sets. So, in the event of a
fault with one set, the other will immediately take over operation to ensure a continuous supply of
power.

Remote management
SDMO offers a range of solutions for remotely monitoring and managing the generating set.
This allows you to monitor your bank of generating sets from your office.
These solutions enable you to set up reports, optimise your trips and thereby reduce your operational
costs.

11
TELECOMS
Solutions for everyone

1,0 > 1,9 2,0 > 2,9 3,0 > 3,9 4,0 > 4,9 5,0 > 5,9 6,0 > 6,9 7,0 > 7,9 kWh/m²/d.

Naturally controlled solutions


The depletion over the medium term of petroleum resources and the constant increase
in energy demands highlight an economic reality of which SDMO is fully aware.
By putting in place solutions which combine the various energy sources (generating set,
battery, photovoltaics, etc.), and which can be configured across its ranges of products,
SDMO gives you the opportunity to invest today in sustainable technology, at
manageable running costs and with a reduced impact on the environment.

An intelligent telecoms solution to


power your BTS directly (800 to 5000 W)
As a response to the development in telecoms in remote and inaccessible areas, SDMO is offering turnkey solutions which can be set up quickly
to provide a site with reliable power 24/7.
These solutions use local sources of energy, thus limiting maintenance interventions and reducing fuel consumption by up to 80% for a return
on investment in under 2 years. The SDMO hybrid solution is flexible, optimised for the individual conditions of each site and the capacity
required. Researched and industrialised by energy professionals, this meets the most rigourous demands on the market.

TURNKEY SYSTEMS FOR RAPID The whole cycle


DEPLOYMENT IN LARGE is fully managed:
- optimisation of the generating set's running time to optimally
NUMBERS limit fuel consumption
Each SDMO hybrid system is assembled, configured and tested in the
- optimal switching of batteries in order to extend their service life,
factory so it can be quickly connected to your telecoms equipment.
in particular using regular equalisation charges. This reduces the
It comes as a complete package:
CAPEX and OPEX as much as possible.
• SDMO generating set
• AC/DC rectifiers
• storage batteries
• fuel tank
• power source control cabinet

12
telecoms
solution 3

Generating set
+ batteries
These systems allow the energy produced by the
generating set to be stored. They reduce fuel consumption
and the number of hours the generating set has to run,
thereby reducing the number of maintenance operations
and fuel tank refills to one or two per year.

The OPEX (operational expenses) can be considerably


reduced. As a consequence, the return on investment
is very quick.

Depending on the sizing required and the constraints of the project,


the size of the container can be adapted.
(Example: 10 foot container).

Advantages:
• turnkey solution
• easy to install
• quick deployment
• reduction in the running time of the generating set
and consequently, the fuel consumption

13
telecoms
solution 4

Generating set
+ batteries
+ solar panels
These systems allows the generating set's power to be
saved and to have an additional intake of solar power.

This means the number of hours the generating set has to run
is reduced as much as possible and the battery life cycles are
extended. With an equivalent system and load, the battery unit
will therefore have a longer service life and consumption will
be lower for the generating set.

Depending on the sizing required and the constraints of the project,


the size of the container can be adapted.
(Example: 10 foot container).

Advantages:
• turnkey solution
• easy to install
• quick deployment
• optimum reduction in the running time of the generating set
and consequently, the fuel consumption
• extended battery service life

14
TELECOMS
Monitoring

Smart Energy Center (SEC)


In the form of a case or cabinet, the SMART ENERGY CENTER provides a complete turnkey solution for
managing energy resources for telecom operators.
It combines existing SDMO tools with new system which enable alternative energy sources to be
governed.

The standard SEC is fitted to our telecoms energy stations. It manages the supply cycle for energy from the various sources and ensures
continuity of operation 24/7. The main components of this modular cabinet are as follows:
- an external AC power supply: the generating set
- an external DC power supply: the solar panels (optional)
- a battery cycle control unit which communicates with the generating set control unit
- rectifiers for transforming alternating current to direct current
- the distribution equipment required for the various energy outputs

The SEC is preconfigured in the factory to guarantee


Fuel Tank
you the best results for your installation.
Generating set
Simplified description of the operation:
Batteries Energy
1. The batteries are used to cover the energy
requirements
2. The batteries reach a low charge level
Auxiliaries => The generating set starts up
3. The generating set supplies the charge while
recharging the batteries until the recommended
charging level is reached
4. Once the batteries are recharged,
Solar
the generating set stops
panels (2)
5. On a regular basis,
BTS(1) the system triggers equalisation charges
without network 6. As an option, solar panels (solution 4) supply the
connection charge and recharge the batteries
(1) BTS: Base Station Transceiver as soon as the solar energy produced is sufficient.
(2) Option
Air conditioning (2)

Communication OPTION
Communication is provided by an alarm report unit using dry contacts.
DETAILS
As standard, 7 alarm reports are available on terminals (generating set
faults, low fuel level, battery, customer charge, solar charge controller, Smartpack, rectifiers). Upgrade Version
For a more in-depth analysis of operation by recovering the data recorded by the battery of the Smart Energy Center
monitor, an Ethernet connection and a USB port are available on the front panel; it is also In addition to dry contacts, Modbus
possible to log in to the battery monitor website. communication is available on terminals inside
the Smart Energy Center.
Modbus communication is available as an option. The Upgrade version also allows connection to
the Smart Pack website and remote recovery of
data, sent by SMS.

15
TELECOMS
Example

Input data
Country Mali
City Bamako
Latitude °N 12.67
Geographical
Longitude °E -7.98
Average outdoor temperature (°C) 35
Altitude of the site (m) 396
Type of installation Indoor
Technical With solar panels Yes
input
data No. of operating hours (h/day) 24
General Service life of batteries (h) 35
description Maximum power to be supplied (W) 1500
of the required Average power to be supplied (W) 1200
hybrid system Energy output voltage (V) 48
Frequency of the generating set (Hz) 50
No. of generating set phases 3 (three phase)
Fuel tank volume (L) 1000
Additional Optimum angle of inclination (°) 15
Solar data
data Daily hours of sunlight within range of the panels (kWh/m²/j) 5.9

Results and analysis of the different hybrid solutions


Solution 2 SOLUTION 2 Solution 3 Solution 4
Long Running
conventional installation conventional installation HPG 22-1200 HPG 22-1200-3.52
Description of
the scenario

Type of installation 2 K16 generating sets at 2 LR16 (Long Running) with Long Running with Long Running
an isolated site generating sets at an isolated site generating set generating set
Scenario options - - - Solar
Space requirements 2 M126 enclosures 2 M126 enclosures 1 10 foot container 1 10 foot container
Cost of investment from the start of the proposed
CAPEX Base 100 115 271 364
solution
OPEX Annual operating cost for the proposed solution Base 100 67 22 13
Annual no. of operating hours (h/year) 4,383 4,383 1,695 996
Average no. of operating hours (h/day) 24 24 5 3
Generating set

No. of scheduled annual maintenance operations 18 3 1 1


Fuel consumption (L/year) 22,792 19,710 5,866 3,447
No. of fuel tank fills scheduled per year 23 20 6 3
Estimated service life of the generating set (years) 3 3 9 15
Technical

Time to arrive on site in the event of a fault with the


Batteries

- - 18 18
generating set (hours)
Estimated service life of the batteries (years) - - 4 6

Optimum angle of inclination (°) - - - 15


Photovoltaic
modules

Solar energy produced (kWh/year) - - - 5,689

Total cost over 5 years Base 100 75 53 49


Total cost over 10 years Base 100 73 45 37
Financial

Total cost over 20 years Base 100 72 37 28


Total energy consumed over 20 years (kWh) 210,384 210,384 210,384 210,384
Return on investment time (months) - - 17 24
Cost of energy Base 100 72 37 28

HPG 22-1200-3.52
Hybrid
Power kVA Ah kWc
Generator

16
telecoms
Example

Energy intake and operating rates


Solution 2 SOLUTION 2 Solution 3 Solution 4
Long Running

Energy intake
40%
% fossil fuel
% solar power 100% 100% 100% 60%

Operating rate
Generating set 19% 11%
Batteries 48%
81% 40%
Solar 100% 100%

advantages of HYBRID SOLUTIONS:


• 80% reduction in OPEX
• 90% reduction in generating set running time
• a single annual maintenance operation
• 3 tank refills per year
• return in investment in less than 2 years

Combined annual costs

2000

1500 )
sets
erating s)
gen g set
K16 eratin
2 (2 16 gen
ion g (2 LR
lut nin
So un
1000 Lon
gR
n2 set)
tio enerating
Sol
u
h Long Running g
00 wit
PG 22-12
ON 3 (H
SOLUTI
500
SOLUTION 4 (HPG 22-1200-3.52 with Long Running generating set)

years
100
0 1 2 3 4 5 6 7 8 9 10
start-up cost included in year 0
Base 100 = reference scenario

17
French Offices Subsidiaries

Non-contractual document - In accordance with our product quality improvement policy, SDMO Industries reserves the right to modify, without prior notice, any specifications published in this catalogue. Photo credit: SDMO - Guillaume Team
WEST ARGENTINA
SDMO BREST SDMO ARGENTINA S.A.
Tel. 02 98 41 13 48 - Fax 02 98 41 13 57 Tel. +54 11 48 36 35 11 - Fax +54 14 48 36 35 16

CENTRAL WEST BELGIUM


SDMO CHOLET SDMO NV/SA
Tel. 02 41 75 96 70 - Fax 02 41 75 96 71 Tel. +32 36 46 04 15 - Fax +32 36 46 06 25

PARIS/NORTHERN NORMANDY BRAZIL


SDMO Gennevilliers SDMO DO BRASIL
Tel. 01 41 88 38 00 - Fax 01 41 88 38 37 Tel. +55 (11)43 90 84 34 - Fax +55 (11)43 90 84 34

EAST SPAIN
SDMO Metz SDMO INDUSTRIES IBERICA
Tel. 03 87 37 88 50 - Fax 03 87 37 88 59 Tel.+34 (9)35 86 34 00 - Fax +34 (9) 35 80 31 36

SOUTH EAST US
SDMO Valence SDMO GENERATING SETS
Tel. 04 75 81 31 00 - Fax 04 75 81 31 10 Tel. +1 30 58 63 00 12 - Fax +1 30 58 63 97 81
SDMO Aix
Tel. 04 42 52 51 60 - Fax 04 42 52 51 61
UK
SDMO ENERGY Ltd
SOUTH WEST TEL. +44(0) 1606 838 120 - FAX +44(0) 1606 837 863
SDMO Toulouse
TEL-IN-DO-US-21 - English

Tel. 05 61 24 75 75 - Fax 05 61 24 75 79
NIGERIA
SDMO LAGOS
Tel. +234(0) 80 56 66 64 44 - Fax +33 (0)1 72 27 55 62

GERMANY
SDMO GmbH
Tel. +49(0)63 32 97 15 0 - Fax +49(0) 63 32 97 15 11

Offices

SDMO is a registered trademark of SDMO Industries.


SOUTH AFRICA
SDMO JOHANNESBURG
Tel. +27 (0) 8 32 33 55 61 - Fax +33 (0) 1 72 27 61 51

ALGERIA
SDMO ALGER
Tel. +213 (0) 21 68 12 12 - Fax +213 21 68 14 14

DUBAI
SDMO MIDDLE EAST
Tel. +971 50 51 496 83 - Fax +33 1 72 27 55 52

RUSSIA
SDMO MOSCOW
Tel.+7 495 665 16 98 - Fax +33 (0)1 72 27 55 48

SDMO Industries - 12 bis rue de la villeneuve


6230-02.12.L

CS 92 848 - 29 228 Brest Cedex 2 - France


Tel. +33 (0)2 98 41 41 41 - Fax +33 (0)2 98 41 63 07
www.sdmo.com

Potrebbero piacerti anche