ETAP Page: 1
12.6.0H
Location: Date: 06-05-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: RASTROSAHE Config.: Normal
Bus8 13.80 0.446 -5.533 5.551 0.426 -5.862 5.877 4.792 0.387 4.808 4.593 3.502 5.776
All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA
* LLG fault current is the larger of the two faulted line currents
Project:
ETAP Page: 2
12.6.0H
Location: Date: 06-05-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: RASTROSAHE Config.: Normal
Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance
Bus8 13.800 0.11541 1.43060 1.43524 0.11541 1.43060 1.43524 0.06424 1.19487 1.19660
Project:
ETAP Page: 3
12.6.0H
Location: Date: 06-05-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SM
Filename: RASTROSAHE Config.: Normal
Symmetrical 3-Phase Fault between Bus8 and TR-00 Reduccion. Adjacent to Bus8.
853 IPT-SA01 (SG1) 0.0 Tripped by Relay IPT-SA01 (SG1) Phase - OC1 - 51
920 IPT-PP02 ( k1) 0.0 Tripped by Relay IPT-PP02 (K2) Phase - OC1 - 51
20814 IPT-SB01 (SG2) 0.0 Tripped by Relay IPT-SB01 (SG2) Phase - OC1 - 51