487 480 Request for Marble strips 75mm dia for parking area found satisfactory Discarded due to
date issue by DHA
5/14/2018
488 481 Request to check the cast iron pipe fixing shoes and bend. 6/11/2018 found satisfactory not approved present Test Fail
489 482 Request to check the Master tiles in CHB toilet and its Accessories for washroom. 6/11/2018 found satisfactory not approved present Test Fail
490 483 Request for check the platform and T iron in CHB 6/11/2018 checked and found Approved present Test pass
491 484 Request to check the Cat welding,lying conductor,joints earthing rod Emplacement and Riser. 6/11/2018 checked and found not approved present Test Fail
492 485 Request to check the Earthing Rod Quantity:68 Emplacement 6/11/2018 checked and found not approved present Test Fail
493 486 Request to check the erection of Outgoing,incoming,CP,RP,Bus Couplor,AC/DC panel and Battery Charger 6/11/2018 checked and found Approved Present Test pass
494 487 Request to check the Aluminium work of CHB 6/11/2018 silicon replace the plastic of not approved present Test Fail
495 488 Request to check the Master tiles in CHB toilet and its Accessories for washroom. 6/11/2018 as per BOQ OK Approved Present Test pass
496 489 Request to check the roof treatment and khuras. 6/11/2018 found satisfactory Approved present Test pass
497 490 Request to start the Castiron pipe fixing for rain water. 6/8/2018 found satisfactory Approved present Test pass
498 491 Request to check the brick work and plaster work for fence wall gate pillor 6/11/2018 Discarded
499 492 Request to check the cast iron pipe fixing shoes and bend. 6/11/2018 found satisfactory Approved present Test pass
500 493 Request for lying the Power Cables for Power Transformer,PMT and Capacitor Bank and sand bed for laid the cable 6/21/2018 Discarded
501 494 Request for lying the Power Cables for Power Transformer,PMT and Capacitor Bank as per Drawing. 6/21/2018 you can proceed Approved Present Test pass
502 495 Request to check the sample of socket board. 6/21/2018 ok in pad
503 496 Request to check the Brick work of switchyard gate pillor. 6/11/2018 found satisfactory Approved present Test pass
504 497 Request to check the sample of tube light manufacture by phillips. 6/25/2018 checked and found need approval in D/O
505 498 Request to check the laid of Power cables 1000MCM total length 10*90 and 5*88=1340 m for power T/F. 6/25/2018 checked and found Discarded
506 499 Request to check the the ACC 600 mm Total Length 20m for Connecting the jumpers DS to CB. 6/25/2018 checked and found Approved present Test pass
507 500 Request for Checked and Verified the Electrification Cables for CHB. 6/26/2018 checked and found Approved Present Test pass
508 501 Request to Check the Excavation of Power Cables lying for Power Transformer. 6/18/2018 checked and found Not Approved Present Test Fail
509 502 Request to check the laid of Power cables 1000MCM total length 15*89.5= 1342.5 m for power T/F 02. 6/25/2018 checked and found Not Approved Present Test Fail
510 503 Request to check the laid of Power cables 1000MCM total length 15*75=1125 m for power T/F 02 6/27/2018 Discarded
511 504 Request to check the excavation for septic tank. 6/2/2018 checked and found Not Approved Present Test Fail
512 505 Request to check the steel fixing and shattering for Septic tank. 6/5/2018 checked and found Not Approved Present Test Fail
513 506 Request to Check the Vinyle sample for Battery room in CHB. 6/29/2018 Discarded
514 507 Requst to check the AAC 600mm 6 Lengths of 46m 6*46=276m for 132kv bus bar. 6/30/2018 Discarded
515 508 Request to check the sample of Vinyl tile for battery room in CHB. 6/29/2018 found satisfactory Approved present Test pass
516 509 Request to check the sample of Bar bid wire . 7/2/2018 found satisfactory Approved Present Test pass
517 510 Request for start the lying of control cables 2.5mm, 6mm, 4 core, 8 core, 16 core. 6/28/2018 you can proceed Approved Present Test pass
518 511 Request to Check the AAC 600mm 6 Lengths of 7.33m 6*7.33=44m for Dropper 132kv line to DS (bay1&2) 7/1/2018 checked and found Approved Present Test pass
519 512 Request to check the 4*2.5mm Control cables Length 584m. 6/28/2018 Discarded
520 513 Request to check the laid of Power cables 1000MCM total length 15*75.6=1134 m for power T/F 01. 6/27/2018 checked and found Not Approved Present Test Fail
521 514 Request to check the 8*2.5 mm control cables length 560m. 6/29/2018 Approved Present Test pass
522 515 Request to check the 8*2.5 mm control cables length 461m. 6/30/2018 Approved Present Test pass
523 516 Request to check the 16*2.5mm control cables Length 439m. 7/1/2018 Discarded
524 517 Request for start the Shield wire in sy Gentry,Earthmast,and SPG pole. 7/2/2018 you can proceed Approved Present Test pass
525 518 Request to check the 4*2.5mm Control cables Length 354m. 7/2/2018 Discarded
526 519 Request to check the shield wire 4 Length Total Quantity 175m. 7/2/2018 Discarded
527 520 Request to start the Erection of CT And VT. 7/4/2018 you can start Approved Present Test pass
528 521 Request to check the shield wire 4 Length Total Quantity 171m. 7/2/2018 checked and found Discarded
529 522 Request to check the Cat welding,lying conductor,joints earthing rod Emplacement and Riser. 6/11/2018 Discarded
530 523 Request to check the Bar bid wire in sy. 7/7/2018 checked and found Not Approved Present Test Fail
531 524 Request to check the GI Earth strip fixing fence wall pilor. 7/7/2018 checked and found Approved Present Test Pass
532 525 Request to check the erection of ceiling fan (6 nos) 7/7/2018 checked and found Approved Present Test Pass
533 526 Request to check the erection of Exhaust fan and Butterfly Shutter. 7/7/2018 checked and found Approved Present Test Pass
534 527 Request for check the fixing of Flourescent tube Light 40 watt as per BOQ Specification. 7/7/2018 checked and found Approved Present Test Pass
535 528 Request for start the Erection of 132kv Bus Bar. Discarded due to
7/7/2018 date issue by DHA
536 529 Request to check the ACSR Rail Conductor 400mm Length 6*50=300m for SPG pole to Gentry. 6/5/2018 checked and found Approved present Test pass
537 530 Request for check the Excavation of Boundary wall. 7/11/2018 Discarded
538 531 Request for Dismantle the boundry wall length. 7/11/2018 Not Approved present Test Fail
539 532 Request for check the sand bed and bricks bed on power cables. Discarded due to
7/11/2018 date issue by DHA
540 533 Request for check the Sag of 132 KV Bus bar. Discarded due to
7/11/2018 date issue by DHA
541 534 Intimation to Start the installation of vinyl floor tile, MF20010 in battery room. 7/12/2018 Not Approved Present Test Fail
542 535 Request to check the power cables 1000MCM 6No's length = 606m for capacitor bank (1 & 2). 7/12/2018 Not Approved Present Test Fail
Request to check the control cables 4x6 sqmm length = 402m and control cables 4x2.5 sqmm
543 536 length 621m - NET length = 1023m. 7/6/2018 Approved Present Test pass
544 537 Request to check the control cables 4x6 sqmm length 279m.
545 538 Request to check the control cables 4x6 sqmm length 701m.
546 539 Request to check the control cables 4x2.5 sqmm length 388m.
547 540 Request to check the control cables 16x2.5 sqmm length 426m.
548 541 Request to check the control cables 4x2.5 sqmm length 272m.
549 542 Request to check the ACC 600 sqmm (Hawthorn) 6 No's length 6x43 =258m for 132 Kv bus bar.
550 543 Two vinyl tiles are not available, so we want to use on vinyl tile MF20010 for battery room.
551 544 Intimation to start the main hole.
552 545 Request for main hole brick work and plaster work.
553 546 intimation to start the erection of 11kv bus bar from T/F (1 & 2).
554 547 Intimation to start the erection of surge arrester.
Request for check the sample of 3 - way cables hangers (Measurment, Galvanization, tensile strength %
555 548 alongation total 130 quantity.
556 549 Request for check the shield wire 9 sqmm length no's = 197m.
557 550 Request for check the barbid wire in switchyard 4 rows (241).
558 551 Request to check the Grounding set for ZM-30 Tower.
559 552 Intimation to start the outdoor termination of power cables for transformer 01.
560 553 Request to check the erection of 11 kv Bus Bar for Transformer (1 & 2).
561 554 Request for check the termination of power cables for transformer (1&2) Ref # 552 Cr.
562 555 intimation to start the erection of capacitor bank.
563 556 Intimation to start the installation of batteries in battery room
564 557 Request to check the control cables 4x6 sqmm length = 517m.
565 558 Request to check the control cables 4x6 sqmm length =701m.
566 559 Request to check the control cables 16x2.5 sqmm length 661m.
567 560 Request to check the control cables 4x2.5 sqmm length = 774m.
568 561 Request to check the control cables 4x2.5 sqmm length = 283m.
569 562 Request to check the erection of current transformer and voltage transformer.
570 563 Request to check the Erection of Power Transformer.
571 564 Request to check the Erection of Disconnector switch.
572 565 Request for check the pipes of CHB washroom under floor pipe (100mm), water supply (20mm).
573 566 Request for check the AAC 600 sqmm total length = 115.3m for 132kv Busbar to DS Dropper.
Request for check the AAC (Hawthorn) 600 sqmm total length 40.8m for line bay jumpers DS to VT,
574 567
CB to CT, CT to DS
Request for check the AAC (Hawthorn) 600 sqmm conductor total length 33.6m for T/F Bay jumpers
575 568 Ds to CT, CT to CB.
576 569 Request to check the earthing rod = 68 qty emplacement.
577 570 Intimation to start the termination of LT and power Cables for PMT.
578 571 Request to check the copper conductor 95 sqmm for riser total length = 87.2m
579 572 Request to check the copper conductor 95 sqmm for riser total length = 118.2m
580 573 Request to check the copper conductor 95 sqmm for riser total length =67m.
581 574 Request to check the copper conductor 95 sqmm for riser total length =67m.
582 575 Request to check the copper conductor 95 sqmm for riser total length =67.3m.
583 576 Request to check the copper conductor 95 sqmm for riser total length =70.1m.
584 577 Request to check the IR power Cables Test with 5 KV MEEGER for transformer 01.
585 578 Request to check the IR power Cables Test with 5 KV MEEGER for transformer 02.
586 579 Request to check the erection of surge arrester
Request to check the earthing material ( earthing platform, cartridges, moulds with holding clamps,
587 580 grounding connecter) for 132 KV SY and CHB.
588 581 Request to check the 3 core 4/0 AWG Aluminium conductor total length = 89m for PMT.
589 582 Request to check the Termination of control cables for power transformer (1&2).
590 583 Request for check the termination of control cables in CP30, CP50, RTCC, RP-3, RP-4.
591 584 Request to check the termination of control cables for T/F bay, DS and CB.
592 585 Request to check the excavation of power cables for capacitor bank.
593 586 Request to check the excavation for Saptic tank.
594 587 Request to check the steel fixing and shattering for Septic tank.
595 588 Request to check the 3 core 4/0 AWG Aluminium conductor total length = 89m for PMT.
596 589 Intimation to start the termination of power cables for capacitor bank.
intimation to start the terminationof power cables for incoming panels capacitor control panels in
597 590 11kv Switchgear room.
598 591 Request to check the terminatiobn of control cables for line bay DS and CB.
599 592 Request to check the 5kv MEGGAR test of power cables for capacitor control panel.
600 593 Reuest for check the Erection of 132 KV bus bar.
601 594 Request for check the aluminium work of C.H.B
602 595 Request to check the excavation of power cables for power T/F.
603 596 Request for check the pipe of C.H.B.
604 597 Request for check the erection of power transformer (1&2)
605 598 Request for main hole brick work and plaster work of C.H.B.
606 599 Request to check the power cables 1000MCM 6No's length = 606m for capacitor bank (1 & 2).
607 600 Request to check the laid of power cables 1000MCM total lengths 15x75.6 = 1134m for power T/F 01.
608 601 Request to check the laid of power cables 1000 MCM total lengths 15x89.5 = 1342.5m for power T/F 02.
609 602 Request to check the paint work of C.H.B.
610 603 Request for check the termination of power cables for transformer (1&2).
611 604 Request to check the IR power cables test with 5kv MEGGER for power transformer 02.
612 605 Request to check the IR power cables test with 5kv MEGGER for power transformer 01.
613 606 intimation to start the termination of power cables for incoming panels, capacitor control panels in 11kv room.
614 607 Request for check the sand bed and bricks bed on power cables.
615 608 Request to check the excavation for septic tank.
616 609 Request to check the steel fixing or shattering for septic tank.
617 610 Request for check the termination of control cables in CP30, CP50, RTCC, RP-3, RP-4 and incoming panel.
618 611 Request to check the excavation of power cables for power transformer.
619 612 Request to check the Termination of control cables for power transformer (1&2).
620 613 Request to check the 5kv MEGGAR test of power cables for capacitor control panel.
621 614 Request for start the erection of 132 KV Bus Bar.
622 615 Request for layout and excavation of main Gate (intimation)
623 616 Request for check the 3 core 4 / AWG Aluminium cable total length = 89m of PMT.
624 617 Request to check the laid power cables 1000 MCM total length 15x75.6 = 1134 m for power transformer 01.
625 618 Request to check the laid power cables 1000 MCM total length 15x75.6 = 1142.5m for power transformer 02.
626 619 Request to check the erection of 132KV busbar.
627 620 Request for check the paints work of C.H.B.
628 621 Request for Marble strips 75mm dia for parking area.
629 622 Intimation to start the excavation for outdoor power cable at the back side of C.H.B.
630 623 Request for check the transmission of power cables for transformer (1&2) (outdoor termination)
631 624 Request to check the termination of power cables for incoming panels and capaciter control panels in 11kv switchgear.
632 625 Request to check the outdoor termination of 3 core 4/0 AWG cables for PMT.
633 626 Request to check the indoor termination of 3 core 4/0 AWG cables for bus coupler panel.
634 627 Request for check the wiring light or fan point with 1/1.3 (3/0.029) and wiring of 3/5 pin 5 amp wall socket point
with 1/1.3 (3/0.029) isulator copper wire.
635 628 Request for check the flush type 3 pin 15 amp S/Phase plus Socket switch.
Request for check the distribution board 14 SWG, S sheet powder coated 100Amp 400V with 01 No I/C CB 100Amps
636 629 and O/G CB- 6-30 Amps.
637 630 Request for check the B.C babelites button lamp holder with 200mm white glass globe and gallery etc.
638 631 Request for check the emergency fitting (D.C) light 1x100 watts.
639 632 Request for check the 3 - phase 4 pin water proof socket imported 415 volts Amp.
640 633 Request for check the aluminium work of C.H.B
641 634 Request for check the installation of batteries in battery room.
642 635 Request to check the eathing materials (earthing platform, cartridges, moulds with holding clamps, grounding
connectors for 132 KV SY and CHB.
643 636 Request for check the cable trays, racks, supports, cable conduits etc.
644 637 Request for check the paints work of C.H.B.
645 638 Request for check the D-1 Door S.E paint in 11kv switchgear room.
646 639 Request for check the main hole bricks work and plaster work.
647 640 Request for check the layout and excavation of main Gate and Boundry wall.
648 641 Request for check the pipes of CHB washroom under floor pipe (100mm), water supply (20mm).
649 642 Request for check the Bitumen coating of septic tank.
650 643 Request for check the erection of Surge arrester.
651 644 Request for concrete pouring of ratio (1:4:8) for Boundry wall and main gate piller and main hole.
652 645 Request for check the S.E paint D-1 Door of CHB
653 646 Intimation to start the bricks work for main gate pillor, Boundary wall.
654 647 Request for check the steel fixing of main gate piller.
655 648 Request to check the control cables 4x6 sqmm total length =323m.
656 649 Request to check one Vinyl tile MF20010 for Battery Room.
657 650 Request to check the paint work of C.H.B.
658 651 Intimation to start the Pre- commissioning and testing of all equipment (GS).
659 652 Request for check water sprinkling at site and unmetalled road.
660 653 Request for disposal of swerage and soil waste during enite project.
661 654 Request for Safetly material i-e First Aid Box, Safety gloves, helmets, eye shield etc and placement of sign board.
662 655 Request for storage of lubricants, fuels and other hydrocarbons.
663 656 Request for Analysis/ monitoring of air quality.
664 657 Request for check arranged workshop/ training sessions.
665 658 Intimation to start the dehydration of power transformer (1 and 2).
666 659 intimation to start the pre comissioning and testing of all equipment (GS)
667 660 Request for check the flush type 3 pin 15 amp S/Phase plus Socket switch.
668 661 Request to check the dehyderation of t/f (1 & 2)
669 662 Request to check Brick work and plaster of boundry wall.
670 663 Request for check the testing results of line bay 1
671 664 request for check the testing results of line bay 2
672 665 Request for check the testing results of PMT
673 666 Request for check the sample of gravel as per BOQ specifications
674 667 Request for check the testing results of transformer bay 1
675 668 request for check the testing results of transformer bay 2
676 669 request for check the testing results of earthing of S.Y equipment control room and 11kV Switchgear room
677 670 Request for check the testing results of PT Bay in S.Y.
678 671 Request for check the testing result of 11kV incoming, out going bus coupler
679 672 Request for check the erection of transmission line pole (SPG) (1No) with ASCR rail stringing with allied accessories.
680 673 Request for check the cable trays, racks, supports, cable conduits etc.
681 674 Request for check the fire protection as drawing / site requirments (1no)
682 675 request for check the erection of capacitor bank (T1 and T2)
683 676 Request for check the fire fighting systems as per BOQ
684 677 Request for check control cables lengths (4x6 sqmm =245m, 4x6sqmm =140m) (4x2.5sqmm =57m, 4x2.5 sqmm =112m)
(16x2.5sqmm =138)
685 678 Request for check the AAC 600 sqmm length = 54m, ACSR rail 400 sqmm length=150m, Riser 95 sqmm length 187m.
686 679 Request for check the erection of 12kV Surge Arrester of transformer T1 and T2
687 680 Request for check the erection of ZM-30 (1No), SPG Pole (1No) with stringing, hardware and allied accessories.
688 681 Request for check the testing results of capacitor bank (T1 and T2)
689 682 Please collect Brick sample of Mark B-2 Quantity 20,000/-
690 683 Request to check the length of 8x2.5 sqmm control cable (length =103m)
691 684 Request to check the excavation of outgoing feeder cables and also check the length of outgoing feeder cables
692 685 request to check the installation of Acs in CHB 1.5 ton x 1, 2 ton x 2.
693 686 DISCARDED
694 687 intimation to start graveling in switchyard and also check and confirm the backfilling level and compaction of site
695 688 request to check the excavation of sewerage line and main hole
696 689 request to check excavation of boundry wall
697 690 intimation to start of CHB Plinth
698 691 Intimation to start the trench cover casting of SwitchYard as per drawing at site
699 692 intimation to start the RCC pipe (dia=225mm) for sewerage line and main hole
700 693 Request to check and confirm your compaction and give go-head for graveli spreading
701 694 Request is in lab
702 695 please collect crush and sand sample quantity crush =350cft and sand 280Cft
703 696 request to check the brick work of CHB Plinth Protection
704 697 Request to check the glass strip in CHb plinth protection
705 698 Request for gradation of ratio 1:2:4 please collect the sample from royal plant
706 699 Request for Concrete poring of CHB plinth
707 700 Please Collect sample of crush 3/4 mix mazalla (QTY=500Cft)
708 701 request to check plain stee,l trench cover (Dia =6mm) as per drawing
709 702 Please collect the sample of RCC Pipe 225mm dia Qty 100 Nos from Alpha pipe factory barki road Lahore
710 703 Request to check the Switch yard trench cover as per drawing casting
711 704 Concrete poring for Switch yard trench covers
712 705 Concrete poring for Switch yard covers
713 706 Concrete pouring of switch yard trench covers
714 707 Request to check the trench covers in control room
715 708 Request to check the CHB lightening protection System S.Y lighting
716 709 please collect the brick sample mark (B2) QTY=1500
717 710 please collect the brick sample mark (B2) QTY=1500
718 711 Request to check the Relay settings test, result of MV Switchgear room of all outgoing panel of T1
719 712 Request to check the relay setting test result of all outgoing panels of T2
720 713 Request to check the Relay setting test result of MV Switchgear room of incoming panels T1 and T2
721 714 Request to check the relay setting test result of MV Switchgear room for capacitor panel of T1 and T2
722 715 Request to check the relay setting test result of RP4 panel of T1 and T2 (Transformer differential relay test )
723 716 Request to check the relay test setting result of RP4 panel of T1 and T2 (overcurrent and earth fault relay)
724 717 Request to check the relay setting test results of RP3 of (L1 and L2) (Distance Protection relay)
725 718 Request to check the relay test setting result of RP3 of (L1 and L2) (overcurrent and earth fault relay)
726 719 Request to check the excavation of existing feeder cables
727 720 Request to check the Backfilling of existing feeder cables
728 721 Request to check the removal / pulling out of HT cables
729 722 Request to check the relaying of HT cable
730 723 Request to check the supply and laying of sand fine ravi in cable trenches
731 724 Request to check the laying of bricks 1500 PSI protection Cover with 3" thick
732 725 request to check the switch yard gravel leveling as per drawing
733 726 request to check the laying of RCC pipe in Sewerage line (length verified as per site )
734 727 Request to check the brick work of main hole
735 728 request to check the plaster work mainhole.
736 729 request to check the excavation of sewerage line and main hole
737 730 Request to check the Backfilling of sewerage line main hole.
738 731 Request to check the steel fixing of mainhole slabs
739 732 Request to check the steel fixing of draw pit
740 733 Request to check the Switchyard trench covers
741 734 Request to check the erection of PMT
742 735 Request to check the termination of LT 4-core 19/0.083 PVC/PVC/Cu cable length =100m and 3 core 4/0 AWG
aluminium conductor 120 sqmm length = 89m of PMT.
743 736 Request to check the length of 95 sqmm Copper conductor total length = 190m
744 737 Request to check 132kV line and tranfs CT junction boxes (outdoor type) QTY = 4/- ,132 kV VT junction Box
(outdoor type) QTY = 1/-
745 738
746 739
747 740
748 741 Request to check the excavation of boundry wall
749 742 Request to check the excavation of capacitor bank Power cables
750 743 Request to check the excavation for capacitor bank control
751 744 Request to check the excavation around CHB for earthing
752 745 Request to check the steel fixing of switchyard trench covers
753 746
754 747
755 748
756 749
757 750
758 751
759 752
760 753
761 754
762 755
763 756
764 757
765 758
766