Sei sulla pagina 1di 4

BILL OF QUANTITIES

PROJECT: FOUR STOREY COMMERCIAL OFFICE BUILDING


LOCATION:
OWNER:

MATERIAL COST
ITEM SCOPE DESCRIPTION QTY UNIT
UNIT COST
A. Earth works
A.1 Excavation
B. Structural works
B.1 Concreting
B.2 Rebar works
B.3 Form works and Scaffolding
B.4 Steek works
C. Architectural works
C.1 Masonry works
C.1.1 CHB Laying
C.1.2 Plastering works
C.1.3 Concreting works
(Stiffener Beams and Sriffener Columns)
Zoccalo Concreting
Rebar and Form works Installation
C.2 Tiling works
C.2.1 Surface Preparation / Topping
C.2.2 60X60 Tile Installation
C.2.3 30X60 Tile Installation
C.2.4 30X30 Tile Installation
C2.5 Outdoor Bricks Installation
C.3 Painting works
C.3.1 Surface Preparation
C.3.2 Application of Paint Finish
C.3.2.1 Walls
C.3.2.2 Ceiling
C.3.2.3 Doors
C.4 Dry works / Carpentry works
C.4.1 Ceiling works
Installation of metal furrings
Installation of Gypsum Boards
C.4.2 Dry wall Partitions
C.4.3 Installation of wood stair planks
C.5 Doors, Windows and Accessories
C.5.1 Wood Doors (sizes)
C.5.2 Door Knobs
C.5.3 Glass Doors
C.5.4 Windows (sizes)
C.6 Water Proofing Application
C.6.1 Toilets
C.6.2 Roof Decks
C.6.3 Kitchen
D. Electrical works
D.1 Installations of Electrical wirings and fixtures
D.2 Aircon
D.3 Pinlights
D.4 Switches and Sockets
E. Installation of Fixtures
E.1 Water Closets
E.2 Faucets (Toilets)
E.3 Floor Drains
E.4 Shower / Shower Valves
E.5 Lavatories
E.6 Kitchen Sinks
E.7 Faucet (Kitchen and Outdoor)
F. Other Scope
F.1 Dismantling of Formworks
F.2 Clearing
MATERIAL COST LABOR COST
TOTAL COST
TOTAL MATERIAL COST UNIT COST TOTAL LABOR COST

Potrebbero piacerti anche