Sei sulla pagina 1di 6

JMG CHUA

CEBU CORDOVA LINK EXPRESSWAY


T1-P14 T1-P14 T1-P14 T1-P14 T1-P14 T1-P14
Dia= Dia= Dia= Dia= Dia= Dia=
Design Strength= Design Strength= Design Strength= Design Strength= Design Strength= Design Strength=
Tube Number=1-4 (F3,3)
Tube Number=1-2 2
3
Tube Number=1-2 2
3
Tube Number=1-3 2
3
Tube Number=1-3 2
3
Tube Number=1-4 3

L=62.80,62.70 m
2
3

L=62.80,62.83 m L=62.80,62.83 m L=62.80,62.79 m L=62.80,62.79 m L=62.80,62.70 m


2

1 4 1 4 1 4 1 4
Spacing=1.77 m 1 4
1 4

Spacing=0.77 m 5
Spacing=0.77 m 5
Spacing=1.54 m 5
Spacing=1.54 m 5 Gain=7849
6
5
Spacing=1.77 m 5

Gain=7849 Gain=7849 (x6) Gain=7849 Gain=7849 (x6) Gain=7849 (x6)


6 6 6 6 6

2/8/2019 15:30
2/8/2019 15:20 2/8/2019 15:20 2/8/2019 15:25 2/8/2019 15:25 2/8/2019 21:06 2/8/2019 15:30
2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06

Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms)
0 .1.2 .3.4.5 .1 .2 .3 .4 .5 0 .1.2 .3.4.5 .3 .4 .5 .6 .7 0 .1.2 .3.4.5 .35 .45 .55 .65 .75
0

0
10

10

10

10

10

10
20

20

20

20

20

20
Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)
30

30

30

30

30

30
40

40

40

40

40

40
50

50

50

50

50

50
60.11 60.25 60.23
60

60

60

60

60

60
high low high low high low
Energy (dB) Energy (dB) Energy (dB)

Pile Dynamics, Inc. 1/6


Cross-Hole Analyzer
JMG CHUA
CEBU CORDOVA LINK EXPRESSWAY
T1-P14 T1-P14 T1-P14 T1-P14 T1-P14 T1-P14
Dia= Dia= Dia= Dia= Dia= Dia=
Design Strength= Design Strength= Design Strength= Design Strength= Design Strength= Design Strength=
Tube Number=1-5 (F3,0) Tube Number=1-6 (F3,3)
Tube Number=1-5 3
Tube Number=1-6 3
Tube Number=2-3 3
Tube Number=2-3 3

L=62.80,62.76 m
2
L=62.80,62.87 m
2 2 2
3 3

L=62.80,62.76 m L=62.80,62.87 m L=62.83,62.79 m L=62.83,62.79 m


2 2

Spacing=1.56 m 1 4
1 4
Spacing=1.07 m 1 4
1 4 1 4 1 4

Gain=7849
6
5
Spacing=1.56 m 5 Gain=7849
6
5
Spacing=1.07 m 5
Spacing=0.96 m 5
Spacing=0.96 m 5

Gain=7849 (x6) Gain=7849 (x6) Gain=7849 Gain=7849 (x6)


6 6 6 6

2/8/2019 15:33 2/8/2019 15:38


2/8/2019 21:06 2/8/2019 15:33 2/8/2019 21:06 2/8/2019 15:38 2/8/2019 15:49 2/8/2019 15:49
2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06

Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms)
0 .2 .4 .6 .3 .4 .5 .6 .7 0 .1 .2 .3 .4 .2 .3 .4 .5 .6 0 .1 .2 .3 .4 .15 .25 .35 .45 .55
0

0
10

10

10

10

10

10
20

20

20

20

20

20
Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)
30

30

30

30

30

30
40

40

40

40

40

40
50

50

50

50

50

50
60.24 60.20 60.24
60

60

60

60

60

60
high low high low high low
Energy (dB) Energy (dB) Energy (dB)

Pile Dynamics, Inc. 2/6


Cross-Hole Analyzer
JMG CHUA
CEBU CORDOVA LINK EXPRESSWAY
T1-P14 T1-P14 T1-P14 T1-P14 T1-P14 T1-P14
Dia= Dia= Dia= Dia= Dia= Dia=
Design Strength= Design Strength= Design Strength= Design Strength= Design Strength= Design Strength=
Tube Number=2-4 2
3
Tube Number=2-4 2
3
Tube Number=2-5 2
3
Tube Number=2-5 2
3
Tube Number=2-6 2
3
Tube Number=2-6 2
3

L=62.83,62.70 m 1 4
L=62.83,62.70 m 1 4
L=62.83,62.76 m 1 4
L=62.83,62.76 m 1 4
L=62.83,62.87 m 1 4
L=62.83,62.87 m 1 4

Spacing=1.56 m 5
Spacing=1.56 m 5
Spacing=1.62 m 5
Spacing=1.62 m 5
Spacing=1.38 m 5
Spacing=1.38 m 5

Gain=7849 Gain=7849 (x6) Gain=7849 Gain=7849 (x6) Gain=7849 Gain=7849 (x6)


6 6 6 6 6 6

2/8/2019 15:52 2/8/2019 15:52 2/8/2019 15:56 2/8/2019 15:56 2/8/2019 15:42 2/8/2019 15:42
2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06

Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms)
0 .2 .4 .6 .3 .4 .5 .6 .7 0 .1.2 .3.4.5 .3 .4 .5 .6 .7 0 .2 .4 .6 .25 .35 .45 .55 .65
0

0
10

10

10

10

10

10
20

20

20

20

20

20
Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)
30

30

30

30

30

30
40

40

40

40

40

40
50

50

50

50

50

50
60.22 60.23 60.20
60

60

60

60

60

60
high low high low high low
Energy (dB) Energy (dB) Energy (dB)

Pile Dynamics, Inc. 3/6


Cross-Hole Analyzer
JMG CHUA
CEBU CORDOVA LINK EXPRESSWAY
T1-P14 T1-P14 T1-P14 T1-P14 T1-P14 T1-P14
Dia= Dia= Dia= Dia= Dia= Dia=
Design Strength= Design Strength= Design Strength= Design Strength= Design Strength= Design Strength=
Tube Number=3-5 (F3,3) Tube Number=3-6 (F3,3)
Tube Number=3-4 2
3
Tube Number=3-4 2
3
Tube Number=3-5 3
Tube Number=3-6 3

L=62.79,62.76 m
2
L=62.79,62.87 m
2
3 3

L=62.79,62.70 m L=62.79,62.70 m L=62.79,62.76 m L=62.79,62.87 m


2 2

1 4 1 4
Spacing=1.30 m 1 4
1 4
Spacing=1.47 m 1 4
1 4

Spacing=0.92 m 5
Spacing=0.92 m 5 Gain=7849
6
5
Spacing=1.30 m 5 Gain=7849
6
5
Spacing=1.47 m 5

Gain=7849 Gain=7849 (x6) Gain=7849 (x6) Gain=7849 (x6)


6 6 6 6

2/8/2019 16:01 2/8/2019 16:05


2/8/2019 16:09 2/8/2019 16:09 2/8/2019 21:06 2/8/2019 16:01 2/8/2019 21:06 2/8/2019 16:05
2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06

Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms)
0 .1.2 .3.4.5 .15 .25 .35 .45 .55 0 .1.2 .3.4.5 .25 .35 .45 .55 .65 0 .1.2 .3.4.5 .3 .4 .5 .6 .7
0

0
10

10

10

10

10

10
20

20

20

20

20

20
Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)
30

30

30

30

30

30
40

40

40

40

40

40
50

50

50

50

50

50
60.36 60.37 60.34
60

60

60

60

60

60
high low high low high low
Energy (dB) Energy (dB) Energy (dB)

Pile Dynamics, Inc. 4/6


Cross-Hole Analyzer
JMG CHUA
CEBU CORDOVA LINK EXPRESSWAY
T1-P14 T1-P14 T1-P14 T1-P14 T1-P14 T1-P14
Dia= Dia= Dia= Dia= Dia= Dia=
Design Strength= Design Strength= Design Strength= Design Strength= Design Strength= Design Strength=
Tube Number=4-6 (F3,3) Tube Number=5-4 (F3,3) Tube Number=5-6 (F3,3)
Tube Number=4-6 3
Tube Number=5-4 3
Tube Number=5-6 3

L=62.70,62.87 m
2
L=62.76,62.70 m
2
L=62.76,62.87 m
2
3 3 3

L=62.70,62.87 m L=62.76,62.70 m L=62.76,62.87 m


2 2 2

Spacing=1.07 m 1 4
1 4
Spacing=0.57 m 1 4
1 4
Spacing=0.61 m 1 4
1 4

Gain=7849
6
5
Spacing=1.07 m 5 Gain=7849
6
5
Spacing=0.57 m 5 Gain=7849
6
5
Spacing=0.61 m 5

Gain=7849 (x6) Gain=7849 (x6) Gain=7849 (x6)


6 6 6

2/8/2019 16:23 2/8/2019 16:14 2/8/2019 16:19


2/8/2019 21:06 2/8/2019 16:23 2/8/2019 21:06 2/8/2019 16:14 2/8/2019 21:06 2/8/2019 16:19
2/8/2019 21:06 2/8/2019 21:06 2/8/2019 21:06

Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms) Arrival (ms)
0 .1.2 .3.4.5 .2 .3 .4 .5 .6 0 .1.2 .3.4.5 .05 .15 .25 .35 .45 0 .1.2 .3.4.5 .05 .15 .25 .35 .45
0

0
10

10

10

10

10

10
20

20

20

20

20

20
Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)

Depth (m)
30

30

30

30

30

30
40

40

40

40

40

40
50

50

50

50

50

50
60.32 60.35 60.32
60

60

60

60

60

60
high low high low high low
Energy (dB) Energy (dB) Energy (dB)

Pile Dynamics, Inc. 5/6


Cross-Hole Analyzer
JMG CHUA
CEBU CORDOVA LINK EXPRESSWAY
Pile Profile Start To Peak Energy FAT
meters meters meters Decrease Delay
T1-P14 2-5 5.78 6.06 6.02 31%
T1-P14 1-6 60.04 60.20 60.20 40%
T1-P14 4-6 59.97 60.29 60.29 25%
T1-P14 5-6 60.11 60.31 60.31 35%

Pile Dynamics, Inc. 6/6


Cross-Hole Analyzer

Potrebbero piacerti anche