Drawdown Hoppers & Flow Control

Stockpile
Reclaim Systems

A DIVISION OF HALLEY & MELLOWES GROUP OF COMPANIES


Drawdown Hoppers
Material Handling Solutions

Drawdown Hopper

The Carman Drawdown Hopper is designed for all types of outdoor storage piles. The discharger’s Projection
Ring transmits vibrations throughout the pile, encouraging “slough-in”. Wet and frozen materials such as coal,
potash, salt and aggregate come to life and flow from outside storage reclaim piles.

Greater Efficiency from Vibration

Estimated Reclaim = 640 Tons with Drawdown The Vibratory Drawdown Hopper is
= 150 Tons without Drawdown
located at ground level below the
stockpile, and its function is to provide
the initial flow stimulation. Once product
Static movement is established the flow rate
Reclaim Angle
is regulated by the Flow Control Gate.
Overall control is achieved by linking a
38Ft.

downstream belt weigher to the Flow


Dynamic 85° 37° Control Gate operation.
Reclaim
Angle

45° This system can provide 80% more


8Ft. Diameter
live reclaim compared to a static hole,
and is a very effective and cost efficient
method of stockpile reclaim.
Stockpile Discharge Problems

Minimal Active Reclaim Bridging Coring


By utilising a static hopper and Bridging is the archlike formation Coring occurs when the material
feeder, active reclaim is limited of material over either the static in the core of the pile discharges,
to within approximately 40° of hopper inlet or outlet. It results while material on the periphery
the stored material’s natural from improperly designed hoppers resists movement.
angle of repose. or when the outlet is too small.

How the Drawdown Hopper eliminates these problems

Maximise Active Reclaim Bridging Solution Coring Solution


Carman Drawdown Hoppers Carman Drawdown Hoppers have The projection ring of the
consistently increase active command of the material equal Carman Drawdown Hopper,
reclaim to within 5 to 10 degrees to the Drawdown diameter. This which is always exposed to the
of a material’s natural angle of results in an initial flow column equal pile, transmits vibration and
repose. A Carman Drawdown in diameter to the overall diameter energy directly into the pile. This
Hopper can provide 4 to 5 times of the Drawdown Hopper. A highly eliminates coring and maximises
the reclaim of an equally sized visible flow steam also improves active reclaim.
static hopper with a feeder. on-pile equipment operator safety.
Drawdown Hoppers
Material Handling Solutions

Flow Control Methods

Vibrating feeder “Swing hopper” Low Headroom NEW


Flow Control Gate Flow Control Gate
The Drawdown Hopper and With the requirement for larger The latest development to regulate
vibrating feeder has been used reclaim rates other systems were material flow is the Low Headroom
for many years and has proven a developed. The Halley & Mellowes Flow Control Gate. This gate is a
reliable method to reclaim material “Swing Hopper” Flow Control heavy-duty bi-parting slide gate
from a stockpile. The vibrating Gate was designed to enable large designed by Picor (US), and it
feeder is well suited to handle flow rates up to 6,000 tonnes per incorporates a range of unique
small to moderate flow rates. hour (coal) to be controlled. With design features. It was introduced in
only one moving component, this Australia a few years ago by Halley
system will allow variable discharge & Mellowes in response to a call for
rates by position adjustment of lower headroom in reclaim tunnels.
a pivoted swing hopper against This new Low Headroom Flow
a stationary curved floor. When Control Gate has been installed in a
adjusting the swing hopper away number of recent Australian projects
from curved floor, an open area and is performing reliably as it has
is created to allow material flow. done overseas for many years.
The volume of material discharged
varies depending on gate position. The benefits of this gate:
This system has been installed - Reduced reclaim chamber head
in a large number of locations in height (by over 2 metres). This
Australia and overseas, and has reduces excavation and concrete
been operating reliably for more structure costs.
than 20 years. - Reduced capital cost by 50%
- Non-stop infinite modulating
control. Hydraulic power source
allows instant flow rate change in
response to weigh scale signals.
- Easy low maintenance (no rollers).
This gate uses low friction HD
polymer blocks with long lifespan.
- Fail-safe close. Hydraulic
accumulator immediately closes the
Flow Control Gate in the event of
power failure, ready for restart.
Projection Ring: Complete Range of Construction Drive Motor:
Carman’s unique Projection Ring is Materials and Liners: Carman’s Drawdowm Hopper has
always in contact with the storage Carman provides a complete range separate electrical and mechanical
pile. Better flow stimulation and high of construction materials and liner drive components for reliability and
reclaim percentages result from the choices, including various grades ease of maintenance. A standard
controlled transmission of vibratory of stainless steel, abrasion resistant 1800 rpm, TEFC foot-mounted motor
energy. steel, epoxy and urethane. Whether transmits power though a belt drive
your application is coal, wood, to the centrifugal force exciter.
fertiliser, salt, iron ore, tailings or
something else Carman can supply
the proper construction materials.

Patented Rubber Isolators:


Carman’s patented isolators system
was developed to support the Centifugal Force Exciter:
enormous loads encountered under The low frequency, long stroke
a storage pile. Specifically designed action of the force exciter generates
for use with Drawdown Hoppers, the high energy required for
molded rubber isolators are totally maximum reclaim. Carman’s
non-restraining to allow more motion centrifugal force exciter consists
more flow stimulation, less power of adjustable eccentric weight
consumption and maximum reclaim. mounted on a single shaft and
The chamfered top of each isolator supported by bearings. Grease
allows improved isolation under all lubricated double roll spherical
conditions from full to no-load. bearings assure long life. The
exciter is easily accessible for
maintenance and serviceability.
Drawdown Hoppers
Material Handling Solutions

Applications

Problem:
An ore mine was experiencing periodic shutdowns due to
an inadequate method of handling mine tailings. Constant
attention and excessive manpower was required to
permanently dispose of refuse.

The Solution:
A waste system was installed which included 10 Carman
Drawdown Hoppers with reclaim capability of 14,500 tons.
The Drawdown Hoppers feed a conveyor system leading to
a permanent refuse facility. Shutdowns have been replaced
by immediate, uninterrupted flow of refuse material.

Problem:
An lowa power company required a reliable active reclaim
system which would insure positive flow to fuel preparation
equipment.

The Solution:
Application data was analysed and four Drawdown Hoppers,
symmetrically placed around the stacking tower provide a
positive and continuous material source for feeders located
in the tunnel. The concrete pads provide a flush, bulldozer-
proof installation.

Problem:
A cogeneration facility in North Carolina required maximum
reclaim and equipment reliability in the reclamation of
coal for boilers.

The Solution:
Carman recommended two Drawdown Hoppers located
in each side of two stacking tubes. Field tests conducted
by the customer report the reclaim achieved is nearly
identical to that predicted.
60 Degree Cone Design: Installation Ease: Cycled Operation:
After testing many cone No other reclaim device Carman’s unique design
configurations, our 60 degree installs as easily as a Carman permits cycling of the
design has proven to be the Drawdown Hopper – we unit to achieve maximum
most effective for Drawdown guarantee it. Our units come reclaim. Cycling produces
Hopper performance. Its absolutely complete, ready uniform flow, longer exciter
60 degree cone promotes to install. All you supply is the life and reduced power
steady flow eliminates crane. Premounted isolators consumption.
dormant area associated and installation hardware
with other configurations. are provided.
VIC
Melbourne
11/97 Bayfield Road East, Bayswater VIC 3153
Tel: +61 (0)3 8720 6700
Fax: +61 (0)3 8720 6799
NSW Email: melbourne@hmagroup.com.au
Wyong - HMA Group Head Office Morwell
10 Hereford Street, Berkeley Vale NSW 2261 8 Jones Road, Morwell VIC 3840
PO Box 5010 Chittaway NSW 2261 Tel: + 61 (0)3 5136 8400
Tel: +61 (0)2 4389 6191 Fax: +61 (0)3 5136 8499
Fax:+ 61 (0)2 4389 6199 Email: morwell@hmagroup.com.au
Email: info@hmagroup.com.au

Sydney NT
13 Sirius Road, Lane Cove NSW 2066 Darwin
Tel: +61 (0)2 9428 7300 4/69 Aralia St, Nightcliff, NT 0810.
Fax: +61 (0)2 9428 7399 Tel: +61 (0)8 8948 5122
Email: sydney@hmagroup.com.au Mobile: +61 (0) 437 460 052
Fax: +61 (0)8 6254 9599
Singleton
Email: darwin@hmagroup.com.au
21 Magpie St, McDougall’s Hill, NSW 2330
Tel: +61 (0)2 6571 8200
Fax: +61 (0)2 6571 8299
NEW ZEALAND
Email: singleton@hmagroup.com.au Hamilton
Unit 9, 9 Karewa Place, Pukete, Hamilton NZ 3200
QLD PO Box 10102, Te Rapa Hamilton NZ 3241
Tel: +64 (0)7 850 2610
Brisbane
Fax: +64 (0)7 847 1883
Building 107, unit 3B, 2-6 Leonardo Drive,
Email: hamilton@hmagroup.co.nz
Hamilton Central, QLD 4007
PO Box 999, Hamilton Central, QLD 4007 Dunedin
Tel: +61 (0)7 3859 6800 Mobile: +64 (0) 275 116 694
Fax: +61 (0)7 3859 6869 Email: dunedin@hmagroup.co.nz
Email: brisbane@hmagroup.com.au

Mackay
INDONESIA
22-30 Southgate Drive, Jakarta
Southgate Industrial Park, Paget QLD 4740 Jl. Adhyaksa Raya Blok W No.11
PO Box 6221, Mackay Mail Centre QLD 4741 Kel. Lebak Bulus Kec. Cilandak
Tel: +61 (0)7 4998 6900 Jakarta Selatan 12440
Fax:+61 (0)7 4998 6999 Indonesia
Email: mackay@hmagroup.com.au Phone number: +62 21 29124898
Fax: +62 21 7512211
Gladstone Email: jakarta@hmagrp.com
9 Neil St, Gladstone QLD 4680
PO Box 1731, Gladstone QLD 4680 SOUTH AFRICA
Tel: +61 (0)7 4973 5500
Johannesburg
Fax: +61 (0)7 4973 5599
Quadrum Office Park Building 4
Email: gladstone@hmagroup.com.au
50 Constantia Boulevard, Constantia Kloof
Johannesburg 1709, South Africa
WA
Tel:+27 115 348 523
Perth Fax:+27 115 348 401
119 Dowd Street, Welshpool WA 6106 Email: johannesburg@hmagrp.com
Tel: +61 (0)8 6254 9500
Fax:+61 (0)8 6254 9599
Email: perth@hmagroup.com.au

Halley & Mellowes Australasia Group of Companies

Geotechnical
Systems Australia

08/14

Potrebbero piacerti anche