SUPPORT FUNCTIONS
Assistance to CIS
1. Technical Assistance to CIS All water permit applications and other
services for CIP / CIS development in
the Province of Benguet are provided
with necessary technical assistance / March 1, 2018 - June
service until end of June, 2018. 30, 2018
(Coordinates, Sketch Layout, NAMRIA
and others.)
SUPPORT FUNCTIONS
Assistance to CIS
1. Technical Assistance to CIS All water permit applications and other
services for CIP / CIS development in
the Province of Benguet are provided
with necessary technical assistance / March 1, 2018 - June
service until end of June, 2018. 30, 2018
(Coordinates, Sketch Layout, NAMRIA
and others.)
I. PCR Preparation for the past CY Prepared the three PCR/s of CY 2018
2016 project submitted by the end of July 2, 2018 -
December, 2018. December 31, 2018
SUPPORT FUNCTIONS
Assistance to CIS
1. Technical Assistance to CIS Assisted (Accomodation and
Preparation) on other services
instructed by the superior for the
development in the Province of
Benguet and be provided with July 2, 2018 -
necessary technical assistance / December 31, 2018
service from time to time until end of
December, 2018.
PREPARED BY:
RONALD A. BISQUERA
PROVINCIAL COORDINATOR, BENGUET
NATIONAL IRRIGATION ADMINISTRATION
CORDILLERA ADMINISTRATIVE REGION
Strategic Performance Management System (SPMS)
Individual Performance Commitment and Review (IPCR)
I, ADRIAN KYLE L. BAKISAN, Engineering Assistant A, Engineering and Operations Division, National Irrigation Administration-CAR, commit to deliver and agree
to be rated on the attainment of the following targets in accordance with the indicated measures for the period January to June, 2018.
SUPPORT FUNCTIONS
SF2. Assistance to CIS
SF2M1. Technical Assistance to CIS All water permit applications and other
services for CIP / CIS development in the
Province of Benguet are provided with
necessary technical assistance / service
until end of June, 2018. (Coordinates,
Sketch Layout, NAMRIA and others.)
SF2M4. Monitoring / Review and All required reports on CIS are submitted
Preparation / Consolidation of Reports on schedule, 100 % accurate and
(for CIS). complete until end of June, 2018.
Average Rating
Total Overall Rating
Final Average Rating
Adjectival Rating
Prepared by: Date: Assessed by: Date: Final Rating by: Date:
LEGEND :
Q1 - Quality 5 - Outstanding (O) - Target exceeded by 30 %
E2 - Efficiency 4 - Very Satisfactory (VS) - Target exceeded by 15 % - 20 %
T3 - Timeliness 3 - Satisfactory (S) - Met target by 90 % - 114 %
A4 - Average 2 - Unsatisfactory (U) - Only met target by 51 % - 89 %
1 - Poor (P) - Failed to deliver most target by 50 % and below
TOTAL QUANTITY
PIPELINE STRUCTURES / FACILITIES (unit/s)
DIVERSION DAM/ INTAKE
NAME OF PROJECT SYSTEM
(unit/s) (kms.) INTAKE RESERVOIR TOWER & ANCHOR WASTEWAY PRESSURE RELIEF BOX TURNOUT PUMP HOUSE TOTAL
NEW AREA GENERATION
1 SHELPI SIP 1 10.524 11 14 1 2 28
2 SABDANG SIP 3 3.8 7 4 2 13
3 SAN PASCUAL CIS 1 5.7 1 3 6 1 11
TOTAL 5 20.024 52
REHABILITATION/RESTORATION OF AREA
4 TADIANGAN CIS 4 11.46 7 6 13
TOTAL 4 11.46 13
Prepared by: Date: Assessed by: Date: Final Ranking by: Date:
LEGEND :
Q1 - Quality 5 - Outstanding (O) - Target exceeded by 30 %
E2 - Efficiency 4 - Very Satisfactory (VS) - Target exceeded by 15 % - 20 %
T3 - Timeliness 3 - Satisfactory (S) - Met target by 90 % - 114 %
A4 - Average 2 - Unsatisfactory (U) - Only met target by 51 % - 89 %
1 - Poor (P) - Failed to deliver most target by 50 % and below
NATIONAL IRRIGATION ADMINISTRATION
CORDILLERA ADMINISTRATIVE REGION
Strategic Performance Management System (SPMS)
Individual Performance Commitment and Review (IPCR)
I, ADRIAN KYLE L. BAKISAN, Engineering Assistant A, Engineering and Operations Division, National Irrigation Administration-CAR, commit to deliver and
agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January to June, 2018.
CF3.
CF3M10. Programmed capacity of Not applicable.
reservoir (wherever applicable)
CF3M11. Pump Operations Not applicable.
(wherever applicable)
CF3M12. Watershed Management 500 seedlings planted in at least 5
(wherever applicable) has. area identified within the
sources of CIS's in the Province of
Benguet.
CF3M13. Monitoring / Review and All required reports on O & M of CIS
Preparation / Consolidation of are submitted on schedule, 100 %
Reports accurate and complete until end of
December, 2015.
CF4. Institutional Development
Average Rating
Total Overall Rating
Final Average Rating
Adjectival Rating
REMARKS
(5)
3340
REMARKS
(5)
REMARKS
(5)
REMARKS
(5)
REMARKS
(5)
REMARKS
(5)
REMARKS
(5)
REMARKS
(5)
Date:
UNDO B. APIL
, Engineering and
ations Division