Sei sulla pagina 1di 9
Wy KOLONGLOBAL CORPORATIO No.0, Chien Rend, Wary aot, el 94 0)37-225008. Fa: 094 (OTE 297004 ” Ref, No: DeturNWS&DB- 22°) at” Pebeuary, 2018, Projet Director, Dedur Oya Water Supply Prost Wijesingha Mawatha, Meats, Wariyapot, Dear Madar, PLANT & DESIGN ~ BUILD CONTRACT FOR CIVIL AND M&E WORKS OF DEDURU OVA. WATER SUPPLY PROJECT CONTRACT NO- P&DjDOWSPIEDCRW/DH201401 SUBJECT: Submission of Pre-Condition Survey Report fo Thammitagoma ra (BS- B62 Regarding the above subject, we are submitting herewith the Pre-Condlon Survey Report fo the Site inspection waich was held on 08” February, 2018, “Therefore, we are requesting you to obiain the permission to lay pipes PS roads, spill way of Gal ‘Ambagaswewa tank under the Department of Agrarian Services and PRDD road crossing with coordination ofall relevant authorities, Your kind consideration and expedite action in this regards wil be highly appreciate. Yours’ faith, RECEIVED KICHUL, YOON 21 FER Project Manager Kolon Global Corporation ows (Ce: Consultant ~Samande KECC JV Enclosure 1). Pre- Condition Survey Reports ~ Thammitazama Road (85-162) Paget oft Wy KOLONGLOBAL CORPORATION o Ref, No: Deduru-NWS&DB- 29° af” February, 2018 Project Ditetor, Deduru Oya Water Supply Project, Wijesngha Mawatha, Melwatt, Wariyapola, Dear Madam, PLANT & DESIGN ~ BUILD CONTRACT FOR CIVIL AND M&E WORKS OF DEDURU OYA WATER SUPPLY PROJECT CONTRACT NO- P&DDOWSPIEDCEMW/DB201401 SUBJECT: Submission ofP ia Regarding the above subject, we are submitng herewith the Pe-Condtion Survey Report forthe Site Inspection which was hed on 08" February, 2018 Therefore, we are requesting you 10 obtain the permission wo ly pipes in PS roads, spill way of Gal Ambagaswewa tank under the Department of Agrarian Services and PRD road srossing with coordination ofall elevant authorities Your kind consideration and expedite tion in this regards willbe highly appreciated Yours’ filly, Ce: Consultant ~ Samand KECC IV Enclose: 1) Pre-Conditon Survey Reports ~ Tanita Rond(B5-62) RECEIVED ; 21 FER 208 Deduruoya es Water Gunny Brant. W KOLONGLOBAL CORPORATION ry Ref, No: Deduru-NWSADB- 2.9 at” February, 2018 Projet Director, Desura Oya Water Supply Project, Wijesingha Mawatha, Metwara, Wariyapota, Dear Madam, PLANT & DESIGN - BUILD CONTRACT FOR CIVIL AND M&E WORKS OF DEDURU OYA, WATER SUPPLY PROJECT CONTRACT NO- P&DDOWSPEDCEMW/DB201401 ‘SUBJECT: Submission of Pre-Condiion Ss nae (SBD Regarding the above subject, we are submitng herewith the Pre-Condiion Survey Report for the Si Inspection which was held on 08" February, 2018 Therefore, we are requesting you to obtain the permission to lay pipes in PS roads, sil way of Gal Ambagaswewa tank under the Department of Agrarian Services and PRDD road crossing with ‘coordination ofall elevane authorities ‘Your kind eonsidration and expedite aston inthis regards will be highly appreciate. ‘Yours fathilly, KICHUL, Yon Project Manager Kolon Global Corporation Ce: Consultant ~ Saman& KECCJV Enclosure: 1). Pre- Condition Survey Reports ~ Thammitagama Road (BS-B62) Page tort

Potrebbero piacerti anche