$ 161,285.00 $ 169,703.00 $ (8,418.00)
Total
Highland
$ 86,400.00 $ 393,050.00 $(306,650.00)
Elementary Total
5-Year Current
Year Bldg. Location Item Solution Difference
Explanation
Plan Proposed
Exterior exit stoop does not Provide and install a
1953 Wing Exterior SE
2018 Highland Primary have proper egress fully complaint ramp $ 4,800 $ 4,800 $ - HLS Funds
Entrance
capability for egress
Project list Highland Primary Annex Lockers pealing and dull Paint Lockers $ - $ 4,000 $ (4,000.00) New Request
Insufficient building access
Add two more
Project list Highland Primary Annex for students during bad $ - $ 5,275 $ (5,275.00) New Request
badge access doors
weather
Reconfigure break room to
2019 Highland Primary Between Main & Gym $ 9,000 $ 9,000 $ -
have a hallway and a door
Strip, paint and
replace metal
Project list Highland Primary Classrooms Metal shelves un attractive $ - $ 3,500 $ (3,500.00) New Request
counters / shelves in
all classrooms
Replace with
Project list Highland Primary Classrooms Replace Chalk Boards magnetic $ - $ 2,700 $ (2,700.00) New Request
whiteboards
Build a covered walkway
2019 Highland Primary Exterior $ 21,000 $ 21,000 $ -
between HP & MPB
Add tricycle area to existing Asphalt, fencing Grant will Pay
Project list Highland Primary Grounds $ - $ 19,000 $ (19,000.00)
Pre-K Play ground and Storage area for this
2019 Highland Primary Gym Bleachers are beyond repair Replace Bleachers $ 37,500 $ 31,250 $ 6,250.00 HLS Funds
Paint Entire Gym
Paint faded and
Project list Highland Primary Gym Block walls and $ - $ 2,200 $ (2,200.00) New Request
deteriorated
ceiling too
Paint faded and
Project list Highland Primary MPB Paint exterior $ 750 $ (750.00) New Request
deteriorated
Second time out
Work Order Highland Primary MPB Install another Time out room $ - $ 3,000 $ (3,000.00) New Request
room requested
Remodel/upgrade MPB Expanded
2019 Highland Primary Multi Purpose Building $ 15,000 $ 35,000 $ (20,000.00)
bathrooms Original Scope
Remove all carpet from MPB
2019 Highland Primary Multi Purpose Building $ 12,500 $ 12,500 $ -
replace with tile or linoleum
Mud Jacking by
Mud Jacking by door to stop
Project list Highland Primary Pre-K entrance door to stop $ - $ 1,725 $ (1,725.00) New Request
puddling
puddling
Highland Primary
$ 99,800.00 $ 155,700.00 $ (55,900.00)
Total
5-Year Current
Year Bldg. Location Item Solution Difference
Explanation
Plan Proposed
Lindenthal
2018 Four Diamonds Gravel $ 1,000 $ 1,000 $ -
Campus
allow for bulk
Lindenthal
Project list Grounds Salt & Mulch Containment purchasing of salt & $ - $ 2,500 $ (2,500.00) New Request
Campus
Mulch
Lindenthal
2019 HE BUFFER ELECTRIC Replace $ 1,874 $ 1,874 $ -
Campus
Lindenthal
2019 HP BUFFER ELECTRIC Replace $ 1,827 $ 1,827 $ -
Campus
Lindenthal
2019 HP BUFFER ELECTRIC Replace $ 1,827 $ 1,827 $ -
Campus
Lindenthal
2019 HP East Lot Chip and Seal Chip and Seal $ 16,000 $ 16,000 $ -
Campus
Lindenthal
2018 MAINT SHED WEED EATER - GAS Replace $ 330 $ 330 $ -
Campus
Lindenthal
2019 MAINT SHED BROADCAST SPREADER Replace $ 113 $ 113 $ -
Campus
Lindenthal
2019 MAINT SHED EDGER Replace $ 821 $ 821 $ -
Campus
Lindenthal
2019 MAINT SHED FIELD MARKER Replace $ 2,239.37 $ 2,239.37 $ -
Campus
Lindenthal
2019 MAINT SHED TRACTOR Replace $ 34,359 $ 34,359 $ -
Campus
Lindenthal
2020 MAINT SHED MOWER BATWING Replace $ 21,282.68 $ 21,282.68 $ - Move up a Year
Campus
Lindenthal
2019 UE alley Chip and Seal Chip and Seal $ 6,500 $ 6,500 $ -
Campus
Lindenthal
2019 UE Lower Lot Chip and Seal Chip and Seal $ 14,000 $ 14,000 $ -
Campus
Lindenthal
2019 UE North Circle Chip and Seal Chip and Seal $ 5,200 $ 5,200 $ -
Campus
Lindenthal
2019 UE Upper Lot Chip and Seal Chip and Seal $ 14,000 $ 14,000 $ -
Campus
Lindenthal
2019 UE West Circle Chip and Seal Chip and Seal $ 5,200 $ 5,200 $ -
Campus
New instead of
Lindenthal
2020 WEST WING UE- Area K New Roof $ 83,000 $ 285,000 $ (202,000.00) Recoat can
Campus
change to HLS
Lindenthal
$ 209,572.32 $ 414,072.32 $(204,500.00)
Campus Total
5-Year Current
Year Bldg. Location Item Solution Difference
Explanation
Plan Proposed
Install sound
Room is not conducive for
Project list Middle School Band room dampening $ - $ 20,000 $ (20,000.00) New Request
the level of sound
measures
2019 Middle School Exterior Paint Exterior of Building $ 25,000.00 $ 25,000.00 $ - May be Low
Crack Fill - Seal & Original
2019 Middle School Main Student Lot Asphalt $ 7,800 $ 14,500 $ (6,700.00)
Stripe Estimate is low
Replace carpet
Project list Middle School Office Carpet Deteriorated $ - $ 21,000 $ (21,000.00) New Request
squares
Middle School
$ 32,800.00 $ 80,500.00 $ (47,700.00)