Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
EXCAVATION
FILLING
Hardcore as specified
CONCRETE WORK
IN-SITU CONCRETE
1 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
In pile caps
In ground beams
2 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
In pile caps
In ground beams
3 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
ELECTRICAL INSTALLATIONS
BUILDERS WORK
Cable trench/pit
F Supply and install 3 nos. 150mm diameter fibre glass wool 1.00 NO
pipe in 6000mm length each including all necessary
excavation; etc and all as per drawing no.
JKR(CB)32(SP)900/02/DB(1)/14
4 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
5 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
B03/1
B03/2
B03/3
B03/4
B03/5
6 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
FILLING
Hardcore as specified
CONCRETE WORK
IN-SITU CONCRETE
In apron slab
In ramp
In apron slab
7 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:DRAINAGE (Contd)
DRAINAGE
DRAINS
A 230mm Diameter half round drain; not exceeding 2.0m deep, 147.00 M
average 0.25m deep
8 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
B03/7
B03/8
9 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
FRAME
CONCRETE WORK
IN-SITU CONCRETE
A In columns 62.00 M3
In columns
In floor beams
In roof beams
In columns
In floor beams
In roof beams
10 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:FRAME (Contd)
B Horizontal 936.00 M2
C Horizontal 378.00 M2
11 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
:FRAME
B03/10
B03/11
12 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
UPPER FLOOR
CONCRETE WORK
IN-SITU CONCRETE
In floor slab
In suspended hood
In floor slab
In suspended hood
G Horizontal 874.00 M2
H Horizontal 249.00 M2
13 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
ELECTRICAL INSTALLATIONS
BUILDERS WORK
Fan hook
A 12mm Diameter mild steel rod cast into floor as fan hook 12.00 NO
550mm long bent at centre into U-shape including all
necessary paint work to exposed hook
14 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
:UPPER FLOOR
B03/13
B03/14
15 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
ROOF
CONCRETE WORK
IN-SITU CONCRETE
In roof slab
In roof slab
D Horizontal 46.00 M2
SUNDRIES
Gable Ends
16 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:ROOF (Contd)
:ROOFING (Contd)
ROOFING
Coverings
Underlay
17 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:ROOF (Contd)
:ROOFING (Contd)
A 500mm Girth; one ends wedging into grooves; other ends 31.00 M
dressing along corrugations of concret tiling
WOODWORK
STRUCTURAL STEELWORK
FABRICATED
Notes: 1.00 xx
18 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:ROOF (Contd)
The Contractor shall also allow in his rates/prices for any 1.00 xx
additional structures, rafters, chord, bearers, tie, strut, wall
plate, truss connectors, straps, bolts and nuts, or other
associated members which are required solely to
accommodate or support his proposed roof trusses and which
are not provided for in the tender drawings
19 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:ROOF (Contd)
B 100mm Diameter stainless steel floor trap with the `elephant 16.00 NO
receiver' cast into concrete including all necessary boxing and
mortar as specified
NEW WORK
Woodwork
20 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
:ROOF
B03/16
B03/17
B03/18
B03/19
B03/20
21 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
CONCRETE WORK
IN-SITU CONCRETE
A In copings 1.00 M3
In coping
Walls
Balustrade walls
Sundries
22 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
On horizontal surfaces
METALWORK
BALUSTRADES STAIRCASES
23 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
B03/22
B03/23
24 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
METALWORK
DOORS
WINDOWS
25 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:METALWORK (Contd)
Timber flush door with 3 nos fixed glass panel on top; 2 nos.
fixed glass panel one side; coupling mullion; assembling and
fixing by bolting and screw complete with mild steel
decorative grille
Pair timber flush door with top hung casement on top; 1 nos.
fixed glass panel both sides; coupling mullion; assembling and
fixing by bolting and screw complete with mild steel
decorative grille
26 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:METALWORK (Contd)
27 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
B03/25
B03/26
B03/27
28 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
INTERNAL WALL
CONCRETE WORK
IN-SITU CONCRETE
A In stiffeners 1.00 M3
In stiffeners
In stiffeners
Walls
On horizontal surfaces
29 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:METALWORK (Contd)
METALWORK
PARTITION
30 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
:INTERNAL WALL
B03/29
B03/30
31 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
INTERNAL DOORS
CONCRETE WORK
IN-SITU CONCRETE
In heel stone
METALWORK
DOORS
PVC Door
Pair timber flush door with top hung casement on top; 1 nos.
fixed glass panel both sides; coupling mullion; assembling and
fixing by bolting and screw complete with mild steel
decorative grille
32 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
FLOOR
In situ Finishings
A 20mm Thick to floor; level, falls and crossfalls and to slope 425.00 M2
not exceeding 15 degrees from horizontal
33 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
FLOOR
In situ Finishings
B 20mm Thick to floor; level, falls and crossfalls and to slope 409.00 M2
not exceeding 15 degrees from horizontal
C 20mm Thick to floor; level, falls and crossfalls and to slope 12.00 M2
not exceeding 15 degrees from horizontal
D Floor, level, falls and crossfalls and to slope not exceeding 15 258.00 M2
degrees from horizontal
F Floor, level, falls and crossfalls and to slope not exceeding 15 459.00 M2
degrees from horizontal
34 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
WOODWORK
FRAMEWORK
CEILING
Plastering
B 20mm Thick; level, falls, falls and crossfalls and to slope not 182.00 M2
exceeding 15 degrees from horizontal
C 20mm Thick; level, falls, falls and crossfalls and to slope not 303.00 M2
exceeding 15 degrees from horizontal
Ceiling Board
35 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
NEW WORK
Ceiling Finishes
36 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
B03/35
B03/36
37 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
WOODWORK
FRAMEWORK
CEILING
Plastering
B 20mm Thick; level, falls, falls and crossfalls and to slope not 732.00 M2
exceeding 15 degrees from horizontal
Ceiling Board
NEW WORK
Ceiling Finishes
38 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
WALL
Plastering
NEW WORK
Wall Finishes
F On plastered wall, column and beam; over 300mm girth for 64.00 M2
dormer wall
Metalwork
Red iron oxide metal primer and high gloss enamel paint as
specified
39 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
WALL
Plastering
Tile work
NEW WORK
Wall Finishes
40 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
SANITARY FITTINGS
Basin
Water Closet
D Padestal Water Closet (disable user) talbot pan 510mm high, 2.00 NO
bakasan open front, no cover Flush valve suites; without
pump, push button, vacum breaker, elbow flush connection,
adjustable tailpiece, dual filtered, one flush depress and hold
feature, exposed parts hard chrome plated, pan with S or P
trap conversion bend, setting pan in tiled concrete floor
41 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
Cistern
A Salona cistern and civer (disable user) 6/3 litres capacity for 2.00 NO
side supply and overflow, reversible lever, freeflow plastic
syphon fittings with 13mm microvalve HP/LP ballvalve, side
supply, 20mm side overflow, simplainlet connector and
supports and plastic flushpipe
Shower
Soap Holder
Mirror
Cloth Hook
42 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
B Approved 13mm diameter chrome plated inclined bib tap with 32.00 NO
flexible hose and stainless steel clips, ball lever handle and
quarter turn ceramic disc head parts
C 13mm Diameter chrome plated lever action spray mixer tap 2.00 NO
Floor Trap
43 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
:SANITARY FITTINGS
B03/41
B03/42
B03/43
44 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
PLUMBING INSTALLATION
A Supply pipes and fittings, from and including first stopcock Item
from incoming mains to water storage tanks to sanitary
appliances and scour and overflow pipes from water storage
tanks, including all necessary excavation, connections with
requisite connectors to water storage tank and sanitary
appliances, requisite pipe fittings, stopcock and requisite
openings and holes in roof, floors and all other necessary
works as per drawing no. PBA B/60/2-10 and PBA H/437/3-4
C Waste water, soil and vent pipes with and including all Item
requisite fittings from sanitary appliances and from floor traps
and outlet grating to connecting manholes or water channel
drains including all necessary excavation, concrete casing
around pipework, connections with requisite connectors to
sanitary appliances, requisite openings, requisite to chase, in
roof, floors, beams and wall, and other all necessary work as
per drawing no. PBA.B/60/12 - 15
45 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
TESTING
46 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
:PLUMBING INSTALLATION
B03/45
B03/46
47 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
BUILDER'S WORK
Stool
C Floor; level, falls and crossfalls and to slope not exceeding 15 24.00 M2
degrees from horizontal
Basin Worktop
Concrete Bench
48 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
Timber Bench
49 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Collection
B03/48
B03/49
50 0.00
BLOCK B - ADMINISTRATION AND ACADEMIC BLOCK
:Summary
:FRAME
:UPPER FLOOR
:ROOF
:INTERNAL WALL
:INTERNAL DOORS
:SANITARY FITTINGS
:PLUMBING INSTALLATION
51 0.00