Sei sulla pagina 1di 206

HERVE

BARON The execution of a Complex


Project… a guided tour

© 2015 – Hervé Baron


HERVE
BARON
The actors The suppliers
The
COMPANY
The EPC
“Client”
Contractor
Impossible d’afficher l’image.

© 2015 – Hervé Baron


The sub-contractors
HERVE
BARON The phases

Sanction Sanction

© 2015 – Hervé Baron


Conceptual evaluation
Basic Engineering Project Execution
+ Pre-Project
By ENGINEERING by EPC CONTRACTOR
By COMPANY
HERVE
BARON

Design Procurement Manufacturing Shipping

Construction &
Installation Inspection & tests Hand-over
erection

© 2015 – Hervé Baron


HERVE
BARON The multiple sides of a Project

Project Control
PROJECT

Human Resources Management

© 2015 – Hervé Baron


HERVE
BARON
The multiple sites of a Project
Engineering Sub-Contractor
Home office (Paris) (India)
•Project management
•Detail Engineering (part) Detail Engineering (part)
•Procurement

Shipyard (Korea)
Hull Engineering & Fabrication

Satellite office
Detail Engineering (part)

Fabrication yard (Nigeria):


Fabrication (part)

Offshore (Nigeria):

© 2015 – Hervé Baron


Installation, commissioning, start-up
Shipyards (Singapore &
Malaysia)
Topsides Fabrication & Integration
HERVE
BARON

Project

Engineering Procurement Construction

© 2015 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

© 2015 – Hervé Baron


HERVE The facilities design basis
BARON
Infrastructure:
Process facilities: 50
Administrative and technical

Pressure (bar)
Feedstock and products flow 45 buildings
Feedstock composition 40
Control room
35
Battery limit conditions Access road
30
Equipment Spare 25 Site fencing, gates, check point
20

Performance: 15
Design criteria:
10
Products specifications % of over design
5
Energy efficiency, emissions
0
-85 -80 -75 -70 -65 -60 -55
Environment data:
Utilities: Min/max temperature
Electric power supply Rain/snow fall
Other utilities Wind
Geological conditions

© 2015 – Hervé Baron


Systems:
Process control Applicable codes and standards:
Fire/gas alarm International standards
Public address, LAN, PABX Local rules
HERVE Engineering
BARON
in the Project

Design basis: Documents for Construction:

- Functional Construction drawings &


requirements specifications
Engineering
- Client Documents for Purchase:
specifications
bill of quantity & specification
- Design codes

© 2015 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


HERVE
BARON
Process simulations

© 2015 – Hervé Baron


HERVE
BARON
Thermodynamic Heat & Material
calculations balance

© 2015 – Hervé Baron


Process Flow
Diagram (PFD)
HERVE
BARON Equipment list

© 2015 – Hervé Baron


HERVE
BARON

Equipment
duty

© 2015 – Hervé Baron


HERVE
BARON

Process data sheet

© 2015 – Hervé Baron


HERVE
BARON Process Flow Diagram (PFD)

© 2015 – Hervé Baron


HERVE
BARON
Piping & Instrumentation Diagram (P&ID)

© 2015 – Hervé Baron


HERVE
BARON

Piping &

© 2015 – Hervé Baron


Instrumentation
Diagram (P&ID)
HERVE
BARON
Process control

© 2015 – Hervé Baron


HERVE
BARON Emergency shut down

© 2015 – Hervé Baron


HERVE
BARON Emergency relief

© 2015 – Hervé Baron


HERVE
BARON Operating manual

© 2015 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


HERVE
BARON

Rotating machinery

© 2015 – Hervé Baron


HERVE
BARON Pressure vessels

© 2015 – Hervé Baron


HERVE
BARON
Heat exchangers

© 2015 – Hervé Baron


HERVE
BARON
Packages,
Fired Equipment

© 2015 – Hervé Baron


HERVE
BARON

Process data
sheet

Mechanical
data sheet

© 2015 – Hervé Baron


HERVE
BARON Material Requisition

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE Fire fighting
BARON

© 2015 – Hervé Baron


HERVE
BARON Passive fire protection

© 2015 – Hervé Baron


HERVE
BARON
Fire & Gas detection layout

© 2015 – Hervé Baron


HERVE Environmental Impact Assessment
BARON

© 2015 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
© 2015 – Hervé Baron
BARON
HERVE
© 2015 – Hervé Baron
BARON
HERVE
© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON

© 2015 – Hervé Baron


Equipment supporting
structures
HERVE
BARON

© 2015 – Hervé Baron


Piping supporting
structures (pipe-racks)
HERVE
BARON Structural design

© 2015 – Hervé Baron


HERVE
BARON
Structural design

© 2015 – Hervé Baron


HERVE
BARON

Structural

© 2015 – Hervé Baron


drawings
© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON

Architectural drawings

© 2015 – Hervé Baron


Equipment layout
drawing
© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON

Layout/
principles

© 2015 – Hervé Baron


HERVE
BARON
Layout/consideration for all networks

© 2015 – Hervé Baron


HERVE
BARON General Plot Plan

© 2015 – Hervé Baron


HERVE
BARON

Piping Layout
drawing

© 2015 – Hervé Baron


HERVE
BARON 3D modelling

© 2015 – Hervé Baron


HERVE
BARON

3D model clash check

3D model review

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON
Piping Design

Design code for Process plants: ASME B31.3

P*D
t=
(2SWE + PY)

P design pressure
D (outside) diameter
S stress value for material as per table in ASME B31.3
W weld joint reduction factor – for long term strength of weld at elevated temperature
E quality factor, from table in ASME B31.3 (1 for seamless, 0.85 for ER welded pipe, etc.)
Y coefficient from table in ASME B31.3 (from 0.4 to 0.7 depending on material and
temperature)

© 2015 – Hervé Baron


To the above calculated thickness shall be added:
- The corrosion allowance, e.g., 3 mm
- The manufacturing tolerance: 12.5%
HERVE
BARON Thickness (mm) Number of passes

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
© 2015 – Hervé Baron
BARON
HERVE
© 2015 – Hervé Baron
BARON
HERVE
© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON
Isometric drawing

© 2015 – Hervé Baron


HERVE
BARON
Piping Pre-fabrication

© 2015 – Hervé Baron


HERVE
BARON

Piping General
Arrangement drawing

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON Standard Pipe Support
drawings

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON
Material Selection

© 2015 – Hervé Baron


HERVE
BARON Material Specification

© 2015 – Hervé Baron


HERVE
BARON Material Specification

© 2015 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE Instrument data sheet
BARON

© 2015 – Hervé Baron


HERVE
BARON

© 2015 – Hervé Baron


Process Control System
HERVE System architecture
BARON
drawing

© 2015 – Hervé Baron


HERVE Mechanical Equipment Control
BARON

© 2015 – Hervé Baron


HERVE The instrumentation hardware
BARON Instrument room Control room

Marshalling Controller
cabinet cabinet

VDU

PT JB

Process
line CPU

LAN
Secondary cable

Multi cable

© 2015 – Hervé Baron


HERVE
BARON

© 2015 – Hervé Baron


Building detail drawing/Telecom and PAGA layout
HERVE Cable routing drawings
BARON

© 2015 – Hervé Baron


Cable list
HERVE
BARON

© 2015 – Hervé Baron


Cable routing inside technical rooms
HERVE
BARON

Project

Engineering Procurement Construction

Instruments& Layout
Process Electrical Equipment Civil Safety
Control & Piping

© 2015 – Hervé Baron


HERVE
BARON

© 2015 – Hervé Baron


Electrical consumers list
HERVE
BARON Electrical Load Summary

© 2015 – Hervé Baron


HERVE
BARON
Electrical distribution

© 2015 – Hervé Baron


HERVE
BARON

General One
Line Diagram

© 2015 – Hervé Baron


HERVE
BARON
Generators

Equipment
specification

Switchgear

Transformer

© 2015 – Hervé Baron


HERVE
BARON Electrical equipment layout

© 2015 – Hervé Baron


HERVE
BARON

Electrical
Control System

© 2015 – Hervé Baron


HERVE
BARON

Process design

PFDs
H&M balance

© 2015 – Hervé Baron


HERVE
BARON

Process design

PFDs
H&M balance

Equipment specification
Process
data sheet
Rotating
Pressure vessels
Fired equipment

© 2015 – Hervé Baron


Heat exchangers
Packages etc.
HERVE
BARON

Process design

PFDs P&IDs

H&M balance

© 2015 – Hervé Baron


HERVE
BARON

Process design

PFDs P&IDs

H&M balance
Piping
Instrumentation

Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Fired equipment Civil

© 2015 – Hervé Baron


Heat exchangers
Electrical
Packages etc.
HERVE Engineering work sequence
BARON

© 2015 – Hervé Baron


Extract from the book: ”The Oil & Gas Engineering
Guide”, Hervé Baron, Editions Technip, 2015, page 209
HERVE Typical 3 year EPC Project Engineering schedule
BARON

PR = Process,
EQ = Equipment,
PL = Plant Layout,
PI = Piping,
I&C = Instrumentation
& Control,
EL = ELectrcial,
HSE = Safety &
Environment,
CIV = Civil

© 2015 – Hervé Baron


Extract from the book: ”The Oil & Gas
Engineering Guide”, Hervé Baron,
Editions Technip, 2015, page 211
HERVE
BARON

Process design

PFDs P&IDs

H&M balance
Piping
Instrumentation

Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Fired equipment Civil

© 2015 – Hervé Baron


Heat exchangers
Electrical
Packages etc.
HERVE
BARON

Electrical

Layout Instrumentation &


Vendor Control
Piping
Process

Civil

© 2015 – Hervé Baron


HERVE Engineering / Vendor interfaces
BARON

Electrical Process

Power consumption Utility consumption


Battery limit conditions

General
Arrangement P&ID
Layout Functional analysis Instrumentation
Vendor & Control
C&E
Piping
Terminals dwgs
Purchaser Mechanical
connection list and
dwg

© 2015 – Hervé Baron


Foundation drawing and loads,
including auxiliaries!

Civil
HERVE Interested and wanting to know more on Engineering?
BARON

A unique synthesis for


the busy Project
professional

 270 pages
 300 illustrations

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide
BARON
2nd edition

Order direct from the publisher:

http://www.editionstechnip.com/en/catal
ogue-detail/1111/oil-gas-engineering-
guide-the.html

© 2015 – Hervé Baron


HERVE
BARON

Project

Engineering Procurement Construction

© 2015 – Hervé Baron


HERVE
BARON Procurement

© 2015 – Hervé Baron


HERVE
BARON Procurement / Steps

Inquiry (Call for Tender)


Short listing
Bid analysis
Clarifications
Negotiations
Purchase Order
Expediting
Inspection

© 2015 – Hervé Baron


Delivery
Warranty Period
HERVE
BARON Procurement / Supplier selection criteria

Technical Compliance
Price
Qualification of supplier
Schedule
Load of workshop
References
References with final Client
Financial situation

© 2015 – Hervé Baron


Annual turn-over
Internal feed-back
HERVE
BARON Procurement

© 2015 – Hervé Baron


HERVE
BARON Expediting

© 2015 – Hervé Baron


HERVE
BARON Expediting

© 2015 – Hervé Baron


HERVE
BARON Inspection

© 2015 – Hervé Baron


HERVE
BARON Inspection

© 2015 – Hervé Baron


© 2015 – Hervé Baron
Shipping
BARON
HERVE
© 2015 – Hervé Baron
Shipping
BARON
HERVE
© 2015 – Hervé Baron
Shipping
BARON
HERVE
HERVE
BARON

Project

Engineering Procurement Construction

© 2015 – Hervé Baron


HERVE
BARON Earthworks

© 2015 – Hervé Baron


© 2015 – Hervé Baron
Pipeline
BARON
HERVE
© 2015 – Hervé Baron
Pipeline
BARON
HERVE
© 2015 – Hervé Baron
Roads
BARON
HERVE
© 2015 – Hervé Baron
Buildings
BARON
HERVE
HERVE
BARON Civil Works

Sand

Aggregate

Cement

Admixtures

© 2015 – Hervé Baron


HERVE
BARON Civil Works

© 2015 – Hervé Baron


HERVE
BARON Civil Works

© 2015 – Hervé Baron


HERVE
BARON Civil Works

© 2015 – Hervé Baron


HERVE
BARON Civil Works

© 2015 – Hervé Baron


HERVE
BARON Civil Works

© 2015 – Hervé Baron


HERVE
BARON Pre-fabrication

© 2015 – Hervé Baron


© 2015 – Hervé Baron
Erection
BARON
HERVE
HERVE
BARON Underground networks

© 2015 – Hervé Baron


HERVE
BARON Plant erection

© 2015 – Hervé Baron


HERVE
BARON Steel structure erection

© 2015 – Hervé Baron


HERVE
BARON Equipment installation

© 2015 – Hervé Baron


HERVE
BARON Equipment installation

© 2015 – Hervé Baron


HERVE
BARON Piping Pre-fabrication

© 2015 – Hervé Baron


HERVE
BARON Piping erection

© 2015 – Hervé Baron


HERVE
BARON Piping erection

© 2015 – Hervé Baron


HERVE
BARON Field Instrumentation Installation

© 2015 – Hervé Baron


HERVE
BARON Electrical equipment connection

© 2015 – Hervé Baron


HERVE
BARON Cable pulling

© 2015 – Hervé Baron


HERVE
BARON Arrangement of Technical rooms

© 2015 – Hervé Baron


HERVE
BARON Cable connections

© 2015 – Hervé Baron


HERVE
BARON Other Systems Field Equipment Installation

© 2015 – Hervé Baron


HERVE
BARON Control room consoles installation

© 2015 – Hervé Baron


© 2015 – Hervé Baron
Testing
BARON
HERVE
HERVE
BARON Commissioning
Handover System

Sub-System

Document Folder

Circuit Elect Equip Mech Equip

Instrument
Loop

Junction Instrument Instrument


Box Cable Tag

© 2015 – Hervé Baron


HERVE
BARON The multiple sides of a Project

Project Control
PROJECT

Human Resources Management

© 2015 – Hervé Baron


HERVE
BARON Project Organisation

Project
Manager

Engineering Procurement Project Control


Site Manager
Manager Manager Manager

Project Discipline Construction Contract Scheduling


Purchasers Expediters Inspectors Cost Control
Engineers Engineers Manager Manager Manager

Construction
Process
Superintendent

Construction
Civil
supervisor

Construction
Instrumentation
superintendent

Construction
Electrical
supervisor

© 2015 – Hervé Baron


Equipment
HERVE
BARON Project procedures

© 2015 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2015 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2015 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2015 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2015 – Hervé Baron


HERVE
BARON Project temporary facilities

© 2015 – Hervé Baron


HERVE
BARON Construction Procedures

© 2015 – Hervé Baron


© 2015 – Hervé Baron
BARON
HERVE
HERVE
BARON Quality Control

© 2015 – Hervé Baron


HERVE
BARON Quality Control

Temperature
Sampling
Slump

© 2015 – Hervé Baron


HERVE
BARON Quality Control

© 2015 – Hervé Baron


HERVE
BARON Cost Control

© 2015 – Hervé Baron


© 2015 – Hervé Baron
Insurance
BARON
HERVE
HERVE
BARON Contracts

P.O.
P.O.

Purchase
Orders P.O.

EPC

Sub-Contracts
Main Contract Sub

© 2015 – Hervé Baron


Sub
HERVE
BARON Contracts

Terms and
Conditions
Price
Schedule
Performance
guarantees
EPC
Technical
Main Contract
basis
Specifications,
codes & stds

© 2015 – Hervé Baron


HERVE
BARON Contracts

E P C

© 2015 – Hervé Baron


HERVE
BARON Contracts

© 2015 – Hervé Baron


∑ + x%
HERVE
BARON Construction contracts

Civil

© 2015 – Hervé Baron


HERVE
BARON Construction contracts

Mechanical

© 2015 – Hervé Baron


HERVE
BARON Construction contracts

E&I

© 2015 – Hervé Baron


HERVE
BARON Construction contracts

General
Contractor

© 2015 – Hervé Baron


HERVE Contracts
BARON
Terms and Conditions

EPC

Main Contract

Obligations of the 2 parties


Limit of liability

© 2015 – Hervé Baron


Penalties in case of bad performance
Conflict resolution
HERVE
BARON Quality Assurance (QA)

© 2015 – Hervé Baron


HERVE
BARON Quality Assurance (QA)

© 2015 – Hervé Baron


HERVE
BARON Quality Assurance (QA)

© 2015 – Hervé Baron


HERVE
BARON Quality Assurance (QA)

© 2015 – Hervé Baron


HERVE
BARON Document Control
Document code
1 Installation drawings
2 Detail drawings
3 Diagrams
4 Lists – Bill of Quantities
5 Isometrics
6 Calculation notes
7 Specifications
8 Data sheets
9 Requisitions

Discipline code
A Instrumentation & Control
C Civil engineering
E Electrical
G Project general documents
J Mechanical
K Safety

© 2015 – Hervé Baron


M Piping & Layout
P Processes
S Steel Structures
V Vessels – Heat exchangers
W Materials – Welding
HERVE
BARON Document Control

© 2015 – Hervé Baron


HERVE
BARON Document Control

Client

Documents Approval/
submitted
to client Comments

Engineering

Documents
Comments

© 2015 – Hervé Baron


submission

Vendors
HERVE
BARON Electronic Document Management System

Center 1 Sr.
Mgmt Center 2 Sr. Correspondence
Intranet / Mgmt
etc.
Internet

Electronic Document
Management System
Breakdown Projects
structures

Engineering
Reports
documents
Interfaces

© 2015 – Hervé Baron


Intranet /
Internet
Vendor
Satellite
documents
Engineering Construction
Center Site
HERVE
BARON Interface Management

© 2015 – Hervé Baron


HERVE
BARON Scheduling
MONTH
PROJECT SCHEDULE
PLANT START-UP
5
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

PIPING PRE-FABRICATION & INSTALLATION


PIPING MATERIAL & DRAWINGS AT SITE 4 X X X X X X X X X X

PIPING MATERIAL MANUFACTURING & SHIPPING X X X X X X


PURCHASE OF PIPING MATERIAL

2 3
TECHNICAL & COMMERCIAL CLARIFICATIONS X X
CALL FOR TENDER FOR PIPING MATERIAL
PREPARE PIPING MATERIAL TAKE-OFF X
PIPING ROUTING STUDIES 1 X X X
PIPING & INSTRUMENTATION DIAGRAMS (PIDs)

1 3 5

4 5
2

© 2015 – Hervé Baron


HERVE
BARON Critical path of an Oil & Gas Project

© 2015 – Hervé Baron


Extract from the book: ”The Oil & Gas Engineering Guide”, Hervé Baron, Editions Technip, 2015, page 225
HERVE
BARON Progress Monitoring

How would you measure


progress?

© 2015 – Hervé Baron


HERVE
BARON Progress Monitoring

© 2015 – Hervé Baron


HERVE
BARON Progress Monitoring

© 2015 – Hervé Baron


HERVE
BARON Progress Monitoring

© 2015 – Hervé Baron


HERVE
BARON IT

Today: 3D

Tomorrow:
15 years ago: 2D
3D & data

© 2015 – Hervé Baron


© 2015 – Hervé Baron
IT
BARON
HERVE
© 2015 – Hervé Baron
Safety
BARON
HERVE
HERVE
BARON
Safety

Guard Rail System with Toe Planking


Boards

Runner

Bearer

Cross Bracing Post

© 2015 – Hervé Baron


Sill Longitudinal Brace
© 2015 – Hervé Baron
Safety
BARON
HERVE
HERVE
BARON
Human resources / career path

Graduate Engineer, 25 years old

Process Engineer 3-5 yrs

Project Engineer 5 yrs

Engineering Manager/ 5-7 yrs


Deputy Project Manager

Project Manager
40-45 yrs old

© 2015 – Hervé Baron


Note: the career pattern shown here is a very fast track one to the PM
position... One would enjoy oneself just as well taking more time!
HERVE The Oil & Gas Engineering Guide
BARON
2nd edition
Do you want to know more... Much more?

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

Discipline
presentation:
activities and
deliverables

© 2015 – Hervé Baron


HERVE
BARON

The work of each


Engineering discipline is
described

© 2015 – Hervé Baron


HERVE
BARON

Design activities are


explained, e.g., Plant
Equipment layout

© 2015 – Hervé Baron


HERVE
BARON

Complex activities, such as


QRA, are explained
through a practical
example.

© 2015 – Hervé Baron


HERVE
BARON

A sample of all common


Engineering documents is
included

© 2015 – Hervé Baron


HERVE
BARON

Difference between
Engineering and Shop
drawings

© 2015 – Hervé Baron


HERVE
BARON

Understand the main


technical aspects, e.g.,
DCS vs ESD

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

The overall process

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

© 2015 – Hervé Baron


HERVE The Oil & Gas Engineering Guide
BARON
2nd edition

Order direct from the publisher:

http://www.editionstechnip.com/en/catal
ogue-detail/1111/oil-gas-engineering-
guide-the.html

© 2015 – Hervé Baron

Potrebbero piacerti anche