HALF-DAY SEMINAR ON PAM CONTRACT 2018
R
– Changes and Implications on QSs O 8.30am Registration
G 9.00am Lecture (Part 1)
After 12 years being the prime standard form of contract in the Malaysian construction industry, R 10.30am Morning Break
PAM has now completed the PAM Contract 2018. The PAM Contract 2018 takes into A 10.45am Walk Through Nippon Paint Forward Coating Expo
consideration compliance with the latest legislation, feedback from PAM members and the M 11.45am Lecture (Part 2)
introduction of ‘Expert Determination’. The PAM Contract 2018 was officially launched on 11 M 1.15pm Q&A Session
April 2018. There are a number of changes and new provisions in the new form, several of which
E 1.30pm Lunch; End
affect QSs.
The relevant changes and new provisions introduced in the PAM Contract 2018, amongst which SPEAKER’S PROFILE
are:
Expanding the Variation definition (Cl. 11.1);
Emphasizing on the Valuation of Variations (Cl. 11.5); Sr. ONG HOCK TEK (“HT”)
Clarification of payable amount to the Contractor upon determination (Cl. 25.4); Arbitrator/Adjudicator/Mediator/Reg.QS
Cert.Constr.PM/VM Practitioner/Master Trainer
Rationalization of Final Account time frame upon the Contractor’s determination (Cl.
BSc(Hons) MSc MBA DipM DipICArb MMIM MIVMM MIVMA
25.6); FCIOB FRICS FCInstCES FCIArb FSIArb FMIArb FMSAdj FRISM
Clarification on Set-off (Cl. 30.4); ICECA
Changes on Retention Fund mechanism (Cl. 30.5); and Managing Director, BK Entrusty
Revision on Performance Bond provision (Cl. 39.0).