AlpTransit Gotthard is creating a flat rail link for future travel through the Alps. At the heart of the new transalpine rail route
is Gotthard Base Tunnel. With a length of 57 km, the world’s longest tunnel should become operational at the end of 2016.
Sika is involved in this project since more than 15 years. Already during Sika Solutions
the design phase Sika’s engineers could provide valuable consultancy Sika® ViscoCrete® Superplasticiser
services for the concrete and sprayed concrete systems as well as for Sigunit® Shotcrete Accelerator
the complete waterproofing concept. Through an extremely complex SikaTard® Long Time Retarder
pre qualification procedure, Sika qualified for the supply of material Sika®-PM Shotcrete Spraying System
to the Gotthard project. Sika system solutions have been used since Aliva® TBM-Robotor
1994 during the construction of the sounding tunnel and since the end SikaPlan® Waterproofing Membrane
of 2002, Sika concrete admixtures, Sika-PM shotcrete systems, Aliva- Sikacrete® Fire Protection Mortar
TBM robots and SikaPlan waterproofing concepts are being supplied to
numerous construction lots.
The high requirements from project and AlpTransit Gotthard Prequalification System
contractors have again and again lead 60
Flow table spread cm
to new innovative solutions, especially
Superplasticiser (HRWR)
Minimales Ausbreitmass
in the field of Sika ® ViscoCrete ® Guaranteed workabilityzur
forPumpbarkeit über (w/c
actual mix design
Durchmesser 100 mm
100 mratio)
30 Frühester Abbindebeginn
Stabilizer (ST)
für sicheres Pumpen nach Retarders (Ret)
6 Stunden Guaranteed Workability (pumpability) Guaranteed workability time (6 to 8 hours)
20
hours
10
0h
6h
12 h
18 h
24 h
1
10
14
16
20
22
Section 360 Sedrun
Characteristics and main Dimensions:
Two single-track tunnels at 40m centre distance
Diameter up to 13m
Length 2 x 7.5km
Emergency stop station Sedrun
Logistic shaft 800m deep
Tunnelling method:
Drill and Blast
Tunnelling method:
2 rock TBM’s type Herrenknecht
Picture: AlpTransit Gotthard AG
Engineering Contractor:
EWE Electrowatt Engineering AG, Zürich Switzerland Engineering Contractor:
Lombardi SA Ingegneri Consulenzi, Minusio Switzerland EWE Electrowatt Engineering AG, Zürich Switzerland
Amberg Ingenieurbüro AG, Switzerland Lombardi SA Ingegneri Consulenzi, Minusio Switzerland
Amberg Ingenieurbüro AG, Switzerland
Client:
AlpTransit Gotthard AG, Luzern Switzerland Client:
AlpTransit Gotthard AG, Luzern Switzerland
Sika Services AG
Corporate Business Unit Concrete
Tüffenwies 16
CH-8048 Zürich
Switzerland
Phone +41 58 436 40 40
Fax +41 58 436 47 29
www.sika.com